The document is a Bid Schedule for the Roadway Improvement Project - 2024, involving a municipality in Colorado, detailing a comprehensive roadway rehabilitation project. The project encompasses mill and overlay work on approximately 82,000 square yards of roadway, including multiple pavement treatment stages such as milling (taper, transition, and standard), full depth reclamation, cement-treated subgrade, and asphaltic concrete pavement placement in various lifts and gradings. The bid schedule includes detailed quantities for roadway work, pavement markings, and miscellaneous items like mobilization, traffic control, and construction surveying.

The bid schedule provides a comprehensive breakdown of project components with precise quantities and unit pricing, covering activities from roadway milling (41,232.7 SY of taper mill) to pavement marking (including items like double yellow lines, crosswalk bars, turn arrows, and specialized markings such as accessible parking symbols). Miscellaneous contract requirements include mobilization, potholing, bonds, insurance, traffic and pedestrian control, and construction surveying, all listed as lump sum items. The document includes space for bidder contact information, allowing potential contractors to submit their pricing and company details for this municipal infrastructure improvement project.

View the file

Other files for this state and local contract opportunity

Other files attached to Roadway Improvement Project - 2024, newest first.
File Type Posted
Bid Schedule - Roadway Improvement Project - 2024 Rev 4-3-24.pdf PDF
Project Manual - Roadway Improvement Project - 2024.pdf PDF
Plan Set - Roadway Improvement Project - 2024 Rev 4-3-24.pdf PDF
Plan Set - Roadway Improvement Project - 2024.pdf PDF
Q&A Document 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

ROADWAY IMPROVEMENT PROJECT - 2024

DescriptionQuantityUnitUnit PriceTotal
Roadway
2.1.D.1Mill - Taper Mill41,232.7SY
2.1.D.2Mill - Transition Mill5,984.3SY
2.1.D.3Mill - 2" Mill6,214.1SY
2.2Full Depth Reclamation12,700.9SY
2.3Cement Treated Subgrade12,700.9SY
2.4.E.1Placement of Asphaltic Concrete Pavement - 3" Bottom Lift (Grading S - PG 64-22)12,700.9SY
2.4.E.2Placement of Asphaltic Concrete Pavement - 2" Overlay (Grading S - PG 64-22)59,403.4SY
2.4.E.3Placement of Asphaltic Concrete Pavement - 2" Overlay (Grading S - PG 64-28)22,757.9SY
2.4.E.4Placement of Asphaltic Concrete Pavement - Leveling (Grading SX - PG 64-22)250.0TONS
2.5.D.1Concrete Collar - Manhole31.0EA
2.5.D.2Concrete Collar - Valve Box79.0EA
2.5.D.3Concrete Collars - Survey Monument3.0EA
Roadway Subtotal
Pavement Marking
2.6.D.1Pavement Marking and Striping - 4" Double Yellow Lines5,021.2LF
2.6.D.2Pavement Marking and Striping - 4" Single Yellow Line1,764.1LF
2.6.D.3Pavement Marking and Striping - 4" Single White Line9,181.0LF
2.6.D.4Pavement Marking and Striping - 8" Single White Line1,277.7LF
2.6.D.5Pavement Marking and Striping - 4" Single Dashed White Line (3' Line w/ 9' Gap)55.5LF
2.6.D.6Pavement Marking and Striping - 8" Single Dashed White Line (3' Line w/ 9' Gap)67.6LF
2.6.D.7Pavement Marking and Striping - 4" White Parking Line1,301.4EA
2.6.D.8Pavement Marking and Striping - 1' x 9' Crosswalk Bars82.0EA
2.6.D.9Pavement Marking and Striping - Left Turn Arrow46.0EA
2.6.D.10Pavement Marking and Striping - 1' Stop Bar167.6LF
2.6.D.11Pavement Marking and Striping - 2' Stop Bar79.6EA
2.6.D.12Pavement Marking and Striping - Helmeted Bicyclist13.0EA
2.6.D.13Pavement Marking and Striping - Accessible Parking Symbol4.0EA
2.6.D.14Pavement Marking and Striping - Shared Lane Marking2.0EA
2.6.D.15Pavement Marking and Striping - "ONLY"2.0EA
Pavement Marking Subtotal
ROADWAY IMPROVEMENT PROJECT - 2024
Miscellaneous
2.7Mobilization, Potholing, General Contract Requirements, Bonds, and Insurance1.0LS
2.8Traffic and Pedestrian Control1.0LS
2.9Construction Surveying1.0LS
Miscellaneous Subtotal
Grand Total

Written Grand Total: _______________________________________________________________________________________

Company: ___________________________________________________ Contact Person: ___________________________________________________

Phone Number: _____________________________________________________ County: ____________________________________

Business Address: __________________________________________________________________________________________

City: ____________________________, State: ____________________________ Zip Code: _______________________________

File details come from the government source that posted it. Updated .