PWS-Elevator Maintenance Dated 27 Feb 2025.pdf

PDF 418 KB Posted

Attached to
Elevator Maintenance Federal contract opportunity
Solicitation number
FA489725QC014
Issued by
Department of the Air Force Air Combat Command

About this file

This is a Performance Work Statement (PWS) for vertical transportation equipment maintenance, repair, and inspection services at Mountain Home Air Force Base (MHAFB) in Idaho, dated February 27, 2025. The contractor must provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect various types of vertical transportation equipment including freight/passenger elevators, escalators, wheelchair/stair lifts, dock levelers, and dumbwaiters to ensure continuous and safe operation.

The PWS covers 9 specific pieces of equipment including hydraulic and traction elevators manufactured by Dover, ThyssenKrupp, and Schindler, installed between 1988-2012 with capacities ranging from 2,000-3,500 lbs. Key requirements include developing a Maintenance Control Program (MCP) within 30 days of award, performing routine maintenance per the MCP, responding to routine service calls within 3 hours and emergency calls within 2 hours, maintaining 95% equipment availability, and conducting required inspections per ASME standards. The contractor must employ Qualified Elevator Inspectors (QEI) and comply with Idaho state licensing requirements. The work includes full maintenance coverage except for alterations/modernizations, vandalism, acts of God, and certain cosmetic/ancillary components.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance, newest first.
File Type Posted
Amendment 1-Site Visit.pdf PDF
Wage Determination- 2015-5513 Rev 24 dated 23 Dec 2024.pdf PDF
Past-Present Performance Questionnaire (PPQ)- Elevator Maintenance.pdf PDF
RFQ-FA489725QC014- Elevator Mx.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK

STATEMENT

VERTICAL TRANSPORTATION

EQUIPMENT MAINTENANCE, REPAIR, &

INSPECTION SERVICES

27 February 2025

Mountain Home AFB, Idaho

TABLE OF CONTENTS

PARAGRAPH PAGE

1.0 Description of Services 3

2.0 Excluded Services 3

3.0 Definitions 4

4.0 Maintenance and Inspection Services 4

5.0 Repair Service Calls 6

6.0 Service Summary 7

7.0 Government Furnished Property and Services 7

8.0 General Information 8

9.0 Security Requirements 9

10.0 Environmental Controls 13

Appendices A. Vertical Transportation Equipment List 14 B. Local State Specific Requirements 15

1. DESCRIPTION OF SERVICES. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property vertical transportation equipment (VTE) at Mountain Home Air Force Base (MHAFB) in a manner that will ensure continuous and safe operation (full maintenance and repair apart from the exclusions listed in paragraph 2 below). The VTE and their locations are listed in Appendix A. NOTE: The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix B considered real property: freight and passenger elevators, escalators, and may include wheelchair/stair lifts, dock levelers, and dumbwaiters.

1.1. This full maintenance contract signifies a VTE service provider (Contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2 below, includes all inspections, maintenance, repairs, replacements, and routine and emergency service calls. The Contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the VTE operating safely and within the performance objectives of paragraph 6.

1.2. Work conducted on VTE will be in accordance with the American Society of Mechanical Engineers (ASME) A17.1-2016 (or applicable code for year VTE put in service) Safety Code for Elevators and Escalators (ASME A17.1); ANSI/ASME A17.2-2014, Guide for Inspection of Elevators, Escalators, and Moving Walks (applicable to equipment); A17.3-2015, Safety Code for Existing Elevators and Escalators (applicable to equipment); National Fire Protection Association Standards (NFPA); Unified Facilities Criteria (UFC) 3-600-01; Fire Protection Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards and the recommendations of the original equipment manufacturer (OEM).

1.3. SPECIAL QUALIFICATIONS. The Contractor will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to Contracting Officer (CO)/Contracting Officer’s Representative (COR) or representative upon request) in maintenance of VTE.

1.4. SCHEDULE COORDINATION. The Contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the Contracting Officer (CO)/Contracting Officer’s Representative (COR) or representative. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.

2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a., modernizations) are not covered in the full maintenance service arrangement. (See Paragraph 3.2)

2.2. Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power generator power spikes and low quality) are not included in this PWS.

2.3. Additional items excluded in the full maintenance coverage are cosmetic, construction, ancillary components of the VTE system including the finishing, repairing or replacement of the cab enclosure, ceiling frames, hoistway door panels, door frames, sills, car flooring, floor covering, main line power switches, main power breaker(s), hydraulic elevator jack outer housing, buried piping, smoke and fire sensors, fire service reports, main communication feeders to controller, security systems, batteries for emergency lighting and lowering that are not solely dedicated to the VTE, air conditioners, and heaters.

2.4. Routine cleaning and refinishing of the interior of cars and the exterior of the hoistway doors and frames is not included in the basic full maintenance service.

2.5. In the event that the Contractor encounters an item of work included in paragraph 2.1 through 2.4, the Contractor will report the situation to the designated government representative and/or COR. The report will include the work location, a detailed scope of the required work, justification for Contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product from a commercial source.

3. DEFINITIONS:

3.1. Maintenance, Repair and Replacement. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. See ASME A17.1 for requirements.

3.2. Alteration. Alteration/modernization will be covered on an over and above Contract Line Item (CLIN), or it may result in a modification to the contract. The typical alteration results in a betterment to the safe operation of the equipment. In the case of elevators, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with specific requirements of the current ASME A17.1 Code edition. See ASME A17.1 for requirements.

4. MAINTENANCE AND INSPECTION SERVICES:

4.1. The Contractor with the CO/COR (or designated representative) shall determine the working order and condition of all VTE listed in Appendix B within thirty (30) calendar days following contract award. The Government shall either replace missing items or repair all items not in working order or serviceable condition. The CO will give instructions for situations where a unit requires a level of repair potentially constituting alteration as described by paragraph 3.2 The Contractor and the CO shall certify their agreement as to the working order of the equipment.

All repair work shall be in accordance with standard commercial practices using only new parts of equal quality specified by the VTE manufacturer in effecting repairs (substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency).

4.2. The Contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each VTE within thirty (30) calendar days following contract award.

The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed. The MCP shall ensure compliance with all minimum code requirements.

4.3. The Contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the VTE in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, and repairs are required.

4.5. The Contractor shall perform all necessary inspections and tests as required under ASME A17.1 Appendix N, and AFMan 91-203 par. 2.5.6.1 using a Qualified Elevator Inspector (QEI) within the first quarter of the first year. A Certificate to Operate shall be issued upon successful completion of initial tests and inspections. The initial tests shall include the five-(5)-year test for all traction and hydraulic elevators regardless of due date. The three- (3) - year test shall be scheduled in conjunction with the annual test and inspection two years later from the first initial inspection and test. The government (owner) authorizes the contractor to act as its authorized agent having the authority within its jurisdiction to have inspections conducted and the responsibility to provide a certificate of operation following the initial inspections.

4.6. The Government may perform inspections of the VTE at no cost to the Contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the Contractor shall be notified in writing of any determination and may be responsible for the corrective actions.

4.7. The Contractor shall prepare and submit a written report within two (2) business days of work. The report shall be submitted to the designated government representative and identify each VTE, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the VTE.

4.8. The Contractor shall maintain a copy of all current VTE inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR. The index and copies of certificates shall be delivered to the CO/COR or representative upon request; however, no later than one (1) business day of such request.

5. REPAIR SERVICE CALLS. Contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge. All repair work shall be done in accordance with standard commercial practices. Contractor shall repair and replace components of the VTE at no additional cost to the Government. When a component in a labeled product is replaced, it must be replaced with an identical component manufactured under the original labeling service (certifying agency). Substitution of a different component is only permitted where it is equivalent to that which was tested, as determined by the certifying agency.

The parts used for replacement are required to comply with all the requirements that the old parts originally complied with. The Unified Facilities Guide Specifications (UFGS) and the UFC will be used to benchmark acceptable replacement components. See UFGS 14 21 00. 00 20 Electric Traction Elevators, UFGS 14 21 13 Electric Traction Freight Elevators, UFGS 14 21 23 Electric Traction Passenger Elevators, and UFGS 14 2 00 Hydraulic Elevators for guidance.

5.1. Routine Calls. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.2. The Contractor shall respond in-person to the VTE and begin work on routine service calls within 3 hours after receipt of the call during normal business hours.

5.1.3. The Contractor shall report to the work location, survey the repair, and provide the CO/COR or representative an estimate of time and cost of repairs not covered in the full maintenance service contract, but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two (2) business days after the repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

5.2. Emergency Calls. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel; threatens to damage properties; or threatens to disrupt activity, operations, and/or training missions.

5.2.1. The following personnel are authorized to contact the contractor in the event of an emergency as defined in paragraph 5.2. Mr. Guy Cumber and/or Mr. Ed Schafer.

5.2.2. The Contractor shall respond in person to the VTE and begin work on emergency service calls within 2 hours after receipt of the call.

5.2.3. The Contractor shall report to the work location, survey the repair, and provide base contracting an estimate of time to repair and cost of repairs not covered in the basic full maintenance service contract but necessary to bring the VTE back to operation. The Contractor shall commence repair work after notification from the CO/COR. The Contractor shall prepare and submit to the CO/COR a written report within two (2) business days after the emergency repair. The report shall include the date and time of the service call, the location of the VTE, the repairs performed, and the name of the technician performing the repairs.

6. SERVICES SUMMARY.

The Government will evaluate the Contractor performance in accordance with the following criteria. Performance evaluations will be rendered in one or more Government databases for that purpose.

Performance Objective PWS Para Performance Threshold

1. Written Maintenance Control Program (MCP) for each VTE for all equipment.

MCP identifies all maintenance intervals to include safety inspections.

4 MCP in accordance with ASME A17.1 delivered to CO within 30 calendar days following contract award.

2. VTE Service Availability 4 VTE availability is 95%.

Calculation = [(sum of all VTE * # days in service during the selected month for each VTE) / (# VTE * # days in the selected month)].

3. Repair Service Call Routine – Response Time.

Response to routine calls within time specified in paragraph 5.1.2.

5 Response to routine service calls are on-time 95% of the time on a monthly basis.

4. Repair Service Call Emergency – Response Time.

Response to emergency calls within time specified in paragraph 5.2.2.

5 Response to emergency service calls are on-time 95% of the time on a monthly basis.

5. Service Call Repairs – Repair Quality.

Repairs are of high quality resulting in reduced call backs.

5 Only two call backs (same instance) each month.

6. Inspection – MCP Adherence Inspection to MCP 95%

7. Preventative Maintenance - MCP Adherence

4.7, 5.1.3, 5.2.3.

Preventative maintenance performed to MCP 95% of time.

8. Reporting 2, 4, 5 Submit reports in a manner consistent with PWS 95% of the time.

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

7.1. Telephones. Government telephone facilities shall be made available for local calls to the contractor for official business use only.

7.2. Security Police and Fire Protection: The Government will provide general on-base security and fire protection services. Security Police telephone extension is 8-2256 (on-base) and 208-828- 2256 (from all other phones) for both emergency and routine calls. Fire protection emergency phone is 8-0911(from on-base phone) and 208- 828-0911(from all other phones).

7.3. Utilities: All reasonable quantities of electricity will be made available to the Contractor without charge.

7.4. Toilet facilities: Use of existing toilet facilities in the immediate work area will be permitted.

The Contractor will ensure facility cleanliness is maintained at all times to the extent of cleaning up after Contractor personnel only.

The Government does not anticipate providing any government furnished property (GFP).

8. GENERAL INFORMATION.

8.1 HOURS OF OPERATION.

Normal operating hours are 0730 to 1630 Monday through Friday, except for Federal holidays or when the installation is officially closed by the 366th FW Commander.

Recognized Federal Holidays. A minimum of ten paid holidays per year:

New Year's Day Martin Luther King Jr.'s Birthday Washington's Birthday Memorial Day Juneteenth Labor Day Independence Day Veterans' Day Columbus Day Christmas Day.

Thanksgiving Day

A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) The contractor is not required to provide service during 366 FW Family and/or Down Days:

8.2 Contract Manager and Alternate. Within ten (10) business days following contract award, the Contractor shall appoint a contract manager and alternate(s) in writing to the CO. Any changes to this letter of appointment shall be provided to the CO within three (3) business days. These individual(s) will be responsible for contract performance IAW the PWS. The contract manager or alternate will have full authority to act for the contractor on all contract matters. The name of this person, and an alternate or alternates, will act for the contractor when the primary Contract Manager is absent.

8.2.2 All contractor personnel must present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing contractor-furnished clothing bearing the company name and/or logo. Dress of office workers will be in good taste and conducive to working with the general public. The contractor will identify himself as a contractor in meetings, telephone conversations, and e-mails and in any correspondence with the Government.

All employees shall fluently read, write, speak, and understand the English language.

8.3. QUALITY CONTROL. Contractor shall develop and maintain a quality control program (QCP) to ensure maintenance and repair services are performed in accordance with ANSI/ASME A17 and other applicable standards and codes. The Contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in Paragraph 6, Service Summary. The QCP shall demonstrate how the Contractor ensures quality performance during the contract period of performance. The Contractor shall maintain the QCP throughout the period of performance of the contract. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, VTE MCP, and the location of all inspection records and key control logs which will always be available to the government upon request. The QCP will have the inspection forms and records which will be used for the service. The Contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.

8.4. QUALITY ASSURANCE. The Government will periodically evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

9.0 SECURITY REQUIREMENTS.

9.1 General. Contractor personnel employed under this contract shall meet the requirements of all security requirements addressed in this PWS. The 366th FW Information Protection (IP) office will provide oversight as the Servicing Security Activity (SSA). Sponsoring Air Force organization will ensure Integrated Visitor Groups complete all necessary security training, i.e. Information, Physical Security and Anti-Terrorism. The contractor shall ensure requirements for obtaining Contractor personnel security clearances/background checks, protecting Government property, safeguarding protected information/materials, and shielding Government AISs and non-automated information systems are met. The Contractor shall also perform in accordance with the Compliance with National Industrial Security Program Operating Manual (NISPOM).

NOTE: Not all security requirements will apply to every contract. Please reference contract agreement to determine appropriate requirements.

9.1.2 Notification of Government Security Activity. Upon performance on the military installation, the contractor will notify the SSA and/or host unit security assistant (USA) 30 days prior to contractor operations. In the event the contract starts within 30 days, the contractor will need to notify the SSA within 72 hours of contract start. The contractor shall furnish the SSA/host USA at the performance location all required information (identifying information for personnel working the contract, contract information, etc.).

9.1.2.2 Security Agreement. If deemed as a long-term contract the contractor and sub-contractors shall enter into a security agreement with host base SSA, by reviewing and signing the local security procedures documentation. This agreement shall outline how the contractor integrates security requirements for contract operations with the AF to ensure effective and economical operation on the installation.

9.2 Listing of Employees. The contractor shall maintain a listing of all employees performing work under this contract. The list shall be validated and signed by the Contracting Officer Representative (COR), and provided to the Contracting Officer (CO), SSA and host unit supervision. The contractor shall update the list when employees move positions, are replaced, or upon request. The Contract Manager (CM) will also provide visit notification identifying all integrated personnel regardless of clearance level. The list shall include the employees’ Names, Location of Performance, and Security Clearance.

9.2.1 Contractor Removal. The CO may direct the removal of a contractor employee from this contract for reasons of security or misconduct. All contractor personnel are subject to Security Forces jurisdiction and the authority of the installation commander while on USAF installations.

9.2.1.2 Contractor Integration. Contractor personnel will be integrated into individual host unit organizations as applicable to their respective functional position. The contractor will adhere to all wing and squadron level security policies and directives. Respective unit security assistants shall provide security administration, to include training and badging.

9.2.3 Security Support Provided by AF. Security support is provided by the AF to the contractor, including use of base destruction facilities, reproduction facilities, security badges, base visitor control, investigation of security incidents, base traffic regulations, the use of security forms and conducting inspections.

9.3. Off-Installation Security. In the event temporary work is required at locations other than Mountain Home Air Force Base (MHAFB), the contractor will ensure applicable security measures and processes are established with the governing SSA or government agency. Performance intended to exceed 90 days will require revision of the contract.

9.4. Pass and Identification Items. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees. Base identification badges will be furnished by the SSA and/or host USA for each contractor employee upon presentation of evidence of assignment. Other required badges will be furnished by the Government as necessary to complete task requirements.

9.5. Base Access. The Contractor shall provide a completed 366 SFS Form 30 for each employee requiring installation access to the Contracting Representative within five (5) business days following contract award.

After approval, the Contracting Representative shall notify the Contractor, who will notify their employees that they can obtain their installation access ID at the MHAFB Visitor’s Center.

9.5.1. The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Action (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting and safeguarding For Official Use Only (FOUO) material.

9.5.2. Contractor personnel shall report to an appropriate authority any information or circumstances which they are aware of and may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

9.5.3 The Contractor shall be responsible for safeguarding all Government property. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

9.6 Retrieving Identification Items. The Contractor shall retrieve all identification items from employees who depart for any reason before the contract expires, e.g. terminated for cause, retirement, etc.

9.7 Security Clearance/Background Check. When applicable all personnel performing on this PWS will have a security clearance/background check equivalent to the requirements listed in the contract. Personnel will complete the appropriate documentation (SF-85, Questionnaire for Non-Sensitive Positions or SF-86, Questionnaire for National Security Positions) through National Background Investigation Services (NBIS) website. Documentation of a completed/adjudicated application is required prior to issuance of a Common Access Card (CAC).

9.8 Controlled/Restricted Areas. The Contractor shall implement local base procedures for entry to Air Force controlled/restricted areas where contractor personnel will work. When applicable an AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued.

9.9 Controlled Unclassified Information. The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, for identification, protection, and training requirements of CUI. The contractor shall be responsible for training their personnel and accomplishment of the out-processing procedures identified in DoDI 5200.48_DAFI16-1403. The contractor shall comply with DoDM 5400.07_AFMAN33-302, Freedom of Information Act (FOIA) Program, requirements. Unclassified DoD information not approved for public release on non-DoD Information Systems will be protected IAW DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD Information.

9.10 Foreign Disclosure. Due to the nature of the MHAFB mission, foreign integration and sensitivity of information and materials, the contractor will ensure all personnel are aware of and comply with foreign disclosure procedures. Release of CUI and Classified Military Information must be approved by the 366 FW Foreign Disclosure Officer (FDO).

9.11 Operations Security (OPSEC). The contractor shall comply with 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security. Contractors shall receive unit specific OPSEC briefing prior to the start of work. Briefing documentation must be completed by the respective unit OPSEC coordinator. The unit OPSEC personnel will provide guidance on protecting critical information, training materials and other instructions as needed. The contractor will comply with the 366 FW OPSEC Policy that imposes a 100% shred requirement of all government related paper products using NSA approved devices only.

9.12 Antiterrorism (AT). IAW DFARS 252.204-7004, Antiterrorism Awareness Training for Contractors, and DoDI O-2000.16 Volume 1, DoD Antiterrorism Program Implementation: DoD Antiterrorism Standards, contractor personnel who require routine physical access to MHAFB shall complete Level I AT Awareness Training within 30 days of requiring access and annually thereafter. Routine physical access is defined as any contractor issued a Common Access Card (CAC), any contractor having installation access for a year or more, any contractor requiring a security clearance, or any contractor requiring access to specific secure areas (e.g., SAPF, SCIF, etc.).

9.12.1 Level I AT training shall be complete through a DoD-sponsored/certified computer or web-based distance learning instruction, or under the instruction of a Level I AT Instructor. Contractor personnel can complete DoD Level I AT Training at https://jko.jten.mil/. If the Contractor has personnel who can’t access the DoD Level I AT Training site, they notify the COR to arrange access to the training site or to coordinate other Level I AT Training. Certificates of Completion of initial and annual training will be maintained by the prime contractor and Unit Antiterrorism Representative (UATR) and will be readily available for review as needed.

9.12.2 All personnel, to include contractors, on MHAFB will comply with directed/implemented Force

Protection Condition (FPCON) and/or AT measures, unless specifically exempted by the 366 FW Commander (CC). Contractor personnel will submit requests for exceptions to FP/AT Measures through the COR, who will submit the request to 366 FW Antiterrorism Officer (ATO) for submittal to 366 FW/CC.

9.12.3 During periods of increased threat or raised FPCONs, contractor access to the installation, or specific parts of the installation, may be limited or denied. The COR will, when possible, notify contractor personnel before the limitations/restrictions are implemented. Contractor personnel will coordinate with the COR regarding possible affects limited/restricted access will have on contract completion. Contractor personnel will coordinate with the COR on assignment of Mission Critical Contractor status as needed.

9.12.4 During periods of increased threat or raised FPCONs, personnel, to include contractors, may be required to be escorted while on MHAFB. When being escorted, personnel will always remain with their escort. If personnel become separated from their escort, they will remain where they are and notify the 366 Security Forces Squadron (SFS) at 208-828- 2256/2257/2258.

9.12.5 The Contractor shall include the DFARS 252.204-7004, Antiterrorism Awareness Training for Contractors, clause as well as all other above identified AT items, in all subcontracts, including subcontracts for commercial items, when subcontractor performance requires routine physical access to MHAFB.

9.13 Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

9.14 Physical Security. The Contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

9.14.1 Key Control/Access Badge Control. The Contractor shall establish and implement methods of making sure all keys/badges issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.

9.15 Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.

9.16 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on DOD Installations.

9.17 Domestic Violence/Lautenberg Amendment. Contractor personnel who have duties in, have access to, or are otherwise involved in the storage, issue, disposition of, or transporting firearms or ammunition shall complete DD Form 2760, Qualification to Possess Firearms or Ammunition, annually.

The DD Forms 2760 shall be maintained by the CM and be made available to the KO and COR office upon request. Any person who has been convicted of a crime of domestic violence is not eligible to perform these duties. All personnel have an affirmative, continuing obligation to inform their supervisors if they have, or later obtain, a qualifying conviction. Candidates selected to fill these positions certify they have not been convicted of a crime of domestic violence, or who is subject to a protective order for domestic violence prior to assuming the duties of the position. These activities are covered by 18 U.S.C. §

922.

10.0 ENVIRONMENTAL CONTROLS.

10.1 Hazardous Material Inventory and Safety Data Sheets (SDS): SDS are required as specified in the latest version of Federal Standard No. 313 for all potentially hazardous materials. SDSs must be submitted by the Contractor upon contract award to the Hazardous Materials Program Manager (366 CES/CEIE) at 208-828-1684/6351 for a determination of whether or not a product is a hazardous material (HAZMAT) and what additional requirements may be applicable/necessary. Approval is required before bringing any HAZMAT onto the installation. The government (HAZMART personnel) will inventory all chemicals that the Contractor brings on to Mountain Home AFB or any property under the control of Mountain Home AFB. Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.

10.2 Material Storage and Use. The contractor shall follow manufacturer's guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes

HAZMAT.

10.3 Notification of Environmental Spills. If a spill occurs, the person discovering the spill will make every effort to stop the product flow (if possible), warn personnel, shut off ignition sources, contain the spill, make notifications, and begin cleanup. If the spill is considered an emergency and there is a potential life, health, fire, or other safety hazard, the MHAFB Fire Department will be notified IMMEDIATELY. Responsible units/activities will clean up small spills safely and within their capabilities to do so. Generally, a spill of only a few gallons will be recovered by the responsible unit/activity using absorbent materials or a spill kit located by the site. Recovered product and contaminated materials will be packaged and staged for disposal in accordance with the installations hazardous waste procedures. Contact the Environmental Office (208-828-6351) for guidance. All spills, regardless of size, must be immediately reported to the Environmental Office (208-828-6351) by the responsible party. The liability for the spill or release of such substances rests solely with the contractor and its agent.

10.4 Waste. Identify, label, handle, store, and dispose of hazardous waste or debris in accordance with federal, state, and local regulations. Ensure all waste has undergone the appropriate hazardous waste determination and documentation is retained for these determinations. Do NOT remove any soil from base until authorized by Environmental at 828-6351. If hazardous wastes are generated, the contractor will be required to setup and maintain a hazardous waste accumulation point. All hazardous waste generated must be disposed of at a RCRA permitted treatment storage or disposal facility. Do not dispose of hazardous waste on Government property. Do not discharge any waste to a sanitary sewer, storm drain, or to surface waters or conduct waste treatment or disposal on Government property without written approval of the Contracting Officer and Environmental. Consult with the Hazardous Waste Program Manager (366 CES/CEIE) at 208-828-1684/6351 prior to disposal of any waste.

10.5 ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j) (7) (iv). Asbestos may be located in facilities which contain Asbestos Containing Material (ACM) or Potential ACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.

10.6 Historic Preservation. MHAFB houses numerous historic properties (buildings, structures, objects, archaeological sites) managed in compliance with the National Historic Preservation Act (NHPA), and its implementing regulations at 36 CFR 800. In order to avoid inadvertent adverse effects to historic properties, coordination with 366 CES/CEIE Cultural Resources Manager (828-8003/6351) is required prior to implementation.

APPENDICES.

A. Vertical Transportation Equipment List (VTE)

B. Local/State Specific Requirements

Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair and Inspection Services

Appendix A

VTE Equipment Listing

Item

Type of VTE

Location of

VTE

Manufacturer

Capacity

(LBS)

Year Installed

1 Hydraulic Elevator

Bldg 512: 2 landings

Dover 3500lb

2 Hydraulic Elevator

Bldg 900: 2 landings

Dover 2000 lb

3 Traction Elevator

Bldg 3600: 6 landings

Dover 2000 lb

4 Hydraulic Elevator

Bldg 2428: 3 landings

Dover 2000 lb

5 Hydraulic Elevator

B-261: 2 landings

Thyssenkrupp 3500 lb

6 Hydraulic Elevator

Bldg 8395: 2 landings ea.

Thyssenkrupp 2000 lb

7 Hydraulic

Elevator Bldg 8395: 2 landings ea.

Thyssenkrupp 2000 lb

8 Hydraulic Elevator

Bldg 2610: 2 landings

Schindler 2000 lb

Hydraulic Elevator

Bldg 1132: 2 landings

ThyssenKrupp

3500 lb

Performance Work Statement for Vertical Transportation Equipment Maintenance, Repair and Inspection Services

Appendix B Local/State Specific Requirements

Idaho Statutes and Administrative Rules 39-86 Title 39. Health and Safety Chapter 86 Idaho Elevator Safety Code Act available via the internet.

TITLE 39

HEALTH AND SAFETY

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8601. Short title. This chapter shall be known and may be cited as the "Elevator Safety Code Act."

History:

[39-8601, added 2004, ch. 359, sec. 1, p. 1067.]

TITLE 39

HEALTH AND SAFETY

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8602. Legislative findings and intent. (1) The purpose of this chapter is to provide for safety of life and limb and to ensure that the safe design, mechanical and electrical operation, erection, installation, alteration, maintenance, inspection and repair of elevators, escalators, moving walks, platform lifts, material lifts, and dumbwaiters, and all such operation, erection, installation, alteration, maintenance, inspection and repair subject to the provisions of this chapter shall be reasonably safe to persons and property and in conformity with the provisions of this chapter.

The use of unsafe and defective lifting devices imposes a substantial probability of serious and preventable injury to employees and the public exposed to unsafe conditions. The prevention of these injuries and the protection of employees and the public from unsafe conditions is in the best interest of the people of this state. Personnel performing work covered by this chapter must, by documented training or experience or both, be familiar with the operation and safety functions of the components and equipment and be licensed in accordance with this chapter.

Training and experience shall include, but are not limited to, recognizing the safety hazards and performing the procedures to which they are assigned in conformance with the requirements of this chapter. This chapter establishes the minimum acceptable standards for personnel performing all inspections required in this chapter.

(2) This chapter is not intended to prevent the use of systems, methods or devices of equivalent or superior quality, strength, fire resistance, code effectiveness, durability and safety to those required by this chapter, provided that there is technical documentation to demonstrate the equivalency of the system, method or device, as prescribed in this chapter and the rules adopted under this chapter.

[39-8602, added 2004, ch. 359, sec. 1, p. 1067.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8603. Definitions. As used in this chapter, the terms defined in this section shall have the following meanings unless the context clearly indicates another meaning:

(1) "Administrator" means the administrator of the division of building safety for the state of Idaho.

(2) "ANSI" means the American national standards institute.

(3) "ASME" means the American society of mechanical engineers.

(4) "Conveyance" includes elevators, escalators, moving walks, platform lifts, material lifts, and dumbwaiters.

(5) "Division" means the Idaho division of building safety.

(6) "Dumbwaiter" means a hoisting and lowering mechanism equipped with a car of limited size that is used exclusively for carrying materials and that moves in guide rails and serves two (2) or more landings.

(7) "Elevator" means a hoisting or lowering machine equipped with a car or platform that moves in guides and services two (2) or more floors or landings of a building or structure.

(8) "Escalator" means a power-driven, inclined, continuous stairway used for raising and lowering passengers.

(9) "Installation" means a complete conveyance including any hoistway, hoistway enclosures and related construction, and all machinery and equipment for its operation.

(a) "Existing installation" means an installation that has been completed or upon which construction was commenced prior to July 1, 2004.

(b) "New installation" means any installation not classified as an existing installation by definition, or an existing conveyance moved to a new location subsequent to July 1, 2004.

(10) "Maintenance" means a process of routine examination, lubrication, cleaning, adjustment, and replacement of parts for the performance in accordance with applicable code requirements.

(11) "Major alteration" means any change to equipment or other maintenance, repair or replacement where work is defined by any applicable code requirement.

(12) "Material lift" means a hoisting and lowering mechanism normally classified as an elevator, equipped with a car that moves within a guide system installed at an angle of greater than seventy degrees (70°) from the horizontal, serving two (2) or more landings, for the purpose of transporting materials which are manually or automatically loaded or unloaded.

(13) "Modernization" means the replacing or upgrading of any major operating component(s) of a conveyance.

(14) "Moving walks" means a type of passenger-carrying device on which passengers stand or walk and in which the passenger-carrying surface remains parallel to its direction of motion and is uninterrupted.

(15) "Owner" includes the designated agent or representative of the owner.

(16) "Platform lift" means a hoisting and lowering mechanism that moves within a guide system and serves two (2) or more landings, and may include vertical or inclined platform lifts used by persons who are mobility impaired.

(17) "Private residence" means a separate dwelling or a separate apartment in a multiple dwelling occupied only by the members of a single family unit.

(18) "Qualified elevator inspector" or "QEI" means a person who is currently certified by the National Association of Elevator Safety Authorities International (NAESA International) accredited certifying organization as meeting the requirements of the NAESA International QEI- 1 standard, and who is employed by or under contract to the division of building safety.

(19) "Repair" means the process of rehabilitation, upgrading or replacement of parts that are basically the same as the originals for the purpose of ensuring performance in accordance with the applicable code requirements.

(20) "Replacement" means the substitution of a device or component in its entirety with a new unit that is basically the same as the original for the purpose of ensuring performance in accordance with the applicable code requirements.

[39-8603, added 2004, ch. 359, sec. 1, p. 1068.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8604. Enforcement. The administrator shall enforce the provisions of this chapter. Local governments shall not adopt codes or institute enforcement programs with regard to conveyances.

[39-8604, added 2004, ch. 359, sec. 1, p. 1069.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8605. Administrator's rulemaking authority. The administrator may adopt rules and codes governing the operation, installation, alteration, maintenance, inspection and repair of conveyances and shall adopt minimum standards governing existing installations. The administrator may adopt such rules and fees as are reasonably necessary to establish and administer the provisions of this chapter.

[39-8605, added 2004, ch. 359, sec. 1, p. 1069.]

TITLE 39

HEALTH AND SAFETY

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8606. Scope -- Exemptions. (a) The provisions of this chapter shall apply to all conveyances within the state of Idaho except the following or as provided in subsection (b) of this section:

(1) Conveyances located in private residences;

(2) Conveyances in federally owned facilities;

(3) Conveyances permanently removed from service or made effectively inoperative; and

(4) Conveyances erected temporarily for use only during construction work that are of such a design that they must be operated by a workman stationed at the hoisting machine.

(b) Conveyances erected before July 1, 2004, pursuant to section 39-8614(3), Idaho Code, are subject only to the requirements of the safety code for existing elevators and escalators (ASME A17.3). Such conveyances, however, shall also be exempted from any requirements of that ASME A17.3 requiring conveyances to be modified with upgrades or replacements that would fall within the definition of "modernization" as defined in section 39-8603, Idaho Code, or to be modified with additional safety features falling within the definition of "alteration" unless:

(1) The total cost of the modification is less than five thousand dollars ($5,000); or

(2) The conveyance is not situated in a privately owned business facility; or

(3) The facility in which the conveyance is located is being altered, as defined within the provisions and guidelines applicable to the Americans with disabilities act of 1990 and amendments thereto, provided that said alterations are significant in that they affect the accessibility of the majority of floor space on at least one (1) floor of the building.

[39-8606, added 2004, ch. 359, sec. 1, p. 1069; am. 2012, ch. 42, sec. 1, p. 130.] http://www.legislature.idaho.gov/idstat/Title39/T39CH86SECT39-8614.htm http://www.legislature.idaho.gov/idstat/Title39/T39CH86SECT39-8603.htm

IDAHO ELEVATOR SAFETY CODE ACT

39-8607. Inspections. On and after July 1, 2004, all installations and periodic inspections required by this chapter shall be performed by a QEI as defined in this chapter.

[39-8607, added 2004, ch. 359, sec. 1, p. 1070.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8608. Installation permits required -- Application -- Posting -- Exceptions -- Other licenses, permits and inspections. (1) On and after July 1, 2004, it shall be unlawful for any person to do, or cause or permit to be done, whether acting as principal, agent or employee, any installation or major alteration of any conveyance in the state of Idaho without first procuring an installation permit from the division of building safety authorizing the work to be done.

(2) The owner of a conveyance shall submit an application for the permit in a form that the division may prescribe. A copy of the plans or specifications for the installation, erection, major alteration, or relocation shall be attached to the permit application.

(3) The permit issued by the division shall be kept posted conspicuously at the site of installation.

(4) No installation permit is required for repairs and replacement normally necessary for maintenance and made with parts of equivalent materials, strength and design, or for installations and major alterations that have been commenced prior to July 1, 2004, or for new installations let for bid prior to November 1, 2002.

(5) The installation permit and inspections required in this chapter are not exclusive.

Installations and major alterations of conveyances as herein defined may be subject to licensing, permitting and inspection requirements set forth in other provisions of law.

[39-8608, added 2004, ch. 359, sec. 1, p. 1070.]

IDAHO ELEVATOR SAFETY CODE ACT

39-8609. Responsibility for operation and maintenance of equipment and for periodic tests. (1) The person installing or altering a conveyance is responsible for its operation and maintenance until the division has issued an operating certificate for the conveyance. The owner is responsible for all tests of a new, relocated or altered conveyance until the division has issued an operating permit for the conveyance.

(2) The owner shall be responsible for the safe operation and proper maintenance of the conveyance after the division has issued the operating certificate and also during the period of effectiveness of any temporary operating permit. The owner shall be responsible for assuring that all required periodic tests are performed by a QEI as defined in this chapter.

[39-8609, added 2004, ch. 359, sec. 1, p. 1070.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8610. Temporary certificate to operate. A temporary certificate to operate may be issued by the administrator. No temporary certificate shall be issued when life-safety nonconformances are present. Before the expiration of the temporary certificate, the conveyance shall be reinspected and a five (5) year certificate to operate shall be issued or the conveyance shall be put out of service.

[39-8610, added 2004, ch. 359, sec. 1, p. 1070; am. 2011, ch. 24, sec. 1, p. 65.]

CHAPTER 86

IDAHO ELEVATOR SAFETY CODE ACT

39-8611. Certificate to operate. (1) Inspection and certificate. No conveyance shall be placed into operation until an inspection has been performed and a certificate to operate has been issued by the division.

(2) Inspection prior to issuance. A certificate to operate may be issued only if, after a thorough inspection, the QEI finds that the conveyance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .