MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS

PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).

2.0 Applicable Documents

2.1 General Specifications

American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:

ANSI/ASQ Z1.4
Sampling Procedures and Tables for Inspection by Attributes

Code of Federal Regulations (CFR):

22 CFR 121
The United States Munitions List
22 CFR 122
Registration of Manufacturers and Exporters

Contract Data Requirement Lists as in the attached Form 1423s:

DI-QCIC-81356
Certificate of Compliance
DI-MISC-80678
Certification / Data Report
DI-QCIC-81110
Inspection and Test Plan
DI-NDTI-80809
Test/Inspection Report

Department of Defense (DoD) Directives:

5230.25
Withholding of Unclassified Technical Data From Public Disclosure

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001
Quality Management Systems
ISO/IEC 17025
General Requirements for the Competence of Testing and Calibration Laboratories

2.2 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable order and drawings. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.2.1 First Article Testing

The Contractor shall submit an Inspection Test Plan (A004) to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 10EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.

Any production by the Contractor before formal acceptance of the First Article sample shall be at the Contractor’s cost risk.

3.2.2 Dimensional Inspection

The Contractor is responsible for performing in-house inspections to ensure each component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.

The Contractor shall submit a Final Dimensional Inspection Report (CDRL A001) as required by the order. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension

3.2.3 Product Certification

The Contractor shall submit a Certificate of Compliance (CDRL A002) and/or a Certificate of Analysis (CDRL A003) as identified in the order for each drawing.

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.

3.3.3 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination, as identified in the applicable order for each drawing. The Government shall complete sample testing within 30 days of receipt of all line item deliverables, unless otherwise stated in the applicable order. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 1. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.

ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:

Critical:
100%
Major:
Level II
Minor:
Level I

Table 1: ACSI Sampling Plan

3.3.4 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Export Control

The Contractor shall comply with either one, or both, of the export control options below.

3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.

3.4.2 Joint Certification Program (JCP) Registration

The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.

3.5 Preservation

The Contractor shall be responsible for packing and packaging of deliverables in accordance with applicable order for each drawing to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified in the order. If required by the order, the following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL
Spec
Section
Title
A001
DI-NDTI-80809
3.2.2
Final Dimensional Inspection Report
A002
DI-QCIC-81356
3.2.3
Certificate of Compliance
A003
DI-MISC-80678
3.2.3
Certificate of Analysis
A004
DI-QCIC-81110
3.2.1
Inspection Test Plan

4.1 Hardware Delivery

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units to the required destination. Delivery address provided below:

Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640