STATEMENT OF WORK

ESB-4 Bergan TLI System Repair and Groom

Title: ESB-4 Bergan TLI System Repair and Groom

Contract Number:

1.0 SCOPE OF WORK:

1.1 The Contractor shall attend the vessel during the stated period of performance to groom the tank level indicator system for the ballast tanks and repair indicators which do not read properly. Contractor shall provide crew training on system operations and common troubleshooting techniques.

1.2 References:

1.2.1 Technical Manual S9437-CS-MMC-010, Tank Level Indicating System

1.2.2 NASSCO MLP-TLI System Drawing

2.0 SPECIFIC TASKS:

2.1 The Contractor shall:

2.1.1 Provide two service technicians to troubleshoot and perform system repairs, groom, and perform routine maintenance associated with the ballast tank level indicating system. All of the 3-month, 6-month, and annual maintenance described in Reference 1.2.1 shall be executed. For estimating purposes, assume two technicians onboard for six 10-hour work days.

2.1.2 Upon arrival, provide a detailed report to Port Engineer and Chief Engineer of conditions found with system and provide recommendations to repair resolve. Contact information is in section 8 below. Several TLI’s are known to not read properly and showing levels on both indicators typically at 100% and below 20%.

2.1.3 Provide four hours of system operational training and common fault/issue troubleshooting techniques to the vessel’s crew.

2.1.4 List of Tank Level Indicators to be serviced and groomed:

2.1.4.1 SW BALLAST TANK 3-126-0

2.1.4.2 SW BALLAST TANK 3-65-0

2.1.4.3 SW BALLAST TANK 3-73-0

2.1.4.4 SW BALLAST TANK 3-81-0

2.1.4.5 SW BALLAST TANK 3-89-0

2.1.4.6 SW BALLAST TANK 3-97-0

2.1.4.7 SW BALLAST TANK 4-108-0

2.1.4.8 SW BALLAST TANK 4-16-0

2.1.4.9 SW BALLAST TANK 4-57-3

2.1.4.10 SW BALLAST TANK 4-57-4

2.1.4.11 SW BALLAST TANK 5-65-0

2.1.4.12 SW BALLAST TANK 5-65-1

2.1.4.13 SW BALLAST TANK 5-65-2

2.1.4.14 SW BALLAST TANK 5-73-1

2.1.4.15 SW BALLAST TANK 5-73-2

2.1.4.16 SW BALLAST TANK 5-81-1

2.1.4.17 SW BALLAST TANK 5-81-2

2.1.4.18 SW BALLAST TANK 5-89-1

2.1.4.19 SW BALLAST TANK 5-89-2

2.1.4.20 SW BALLAST TANK 5-97-4

2.1.4.21 SW BALLAST TANK 5-97-5

2.1.4.22 SW BALLAST TANK 6-65-0

2.1.4.23 SW BALLAST TANK 6-65-1

2.1.4.24 SW BALLAST TANK 6-65-2

2.1.4.25 SW BALLAST TANK 6-73-0

2.1.4.26 SW BALLAST TANK 6-73-1

2.1.4.27 SW BALLAST TANK 6-73-2

2.1.4.28 SW BALLAST TANK 6-81-0

2.1.4.29 SW BALLAST TANK 6-81-1

2.1.4.30 SW BALLAST TANK 6-81-2

2.1.4.31 SW BALLAST TANK 6-89-0

2.1.4.32 SW BALLAST TANK 6-89-1

2.1.4.33 SW BALLAST TANK 6-89-2

2.1.4.34 SW BALLAST TANK 6-97-0

2.1.4.35 SW BALLAST TANK 6-97-1

2.1.4.36 SW BALLAST TANK 6-97-2

3.0 DELIVERABLES

3.1 The Contractor shall provide to MSC (electronically) a full trip report detailing conditions found, work performed while onboard, and any outstanding issues or recommendation upon departure.

4.0 DELIVERABLES SCHEDULE

Title
Due Date
Task Start
12 April 2021
Task End
17 April 2021
Final Report Due
30 April 2021

5.0 PERFORMANCE LOCATION:

TBD, Italy or Croatia

6.0 PERFORMANCE PERIOD: The Period of Performance is 12-17 April, 2021.

7.0 TECHNICAL POINT OF CONTACT AND PORT ENGINEER CONTACTS:

Ship/Title/Name/Desk Phone/Email

ESB Type Desk Joe Clark joseph.m.clark5@navy.mil 757-469-5676

ESB-4 Port Engineer Jared Barker jared.barker@eu.navy.mil +39-349-640-4377

ESB-4 Chief Engineer Bill Hanlon william.f.hanlon.civ@hershel-williams.navy.mil

8.0 ADITIONAL INFORMATION:

8.1 Contractor may submit invoices after all deliverables are received by the government.