PWS 22-2B8 FormFactor Maintenance and Calibration Services 2022-2023 Redacted.pdf

PDF 16 KB Posted

Attached to
FormFactor Maintenance and Calibration Svs
Solicitation number
HQ072722QRH02
Issued by

View the file

Other files

File Type Posted
Combined Synopsis and Solicitation 22-2B8_20220311.pdf PDF
FormFactor Pricing Worksheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW PWS Template 20161116.doc

PERFORMANCE WORK STATEMENT (PWS)

DMEA 22-2B8

26 January 2022

Project Engineer:

1.0 SCOPE:

1.1 TITLE: FormFactor Maintenance and Calibration Services 2022-2023

1.2 APPLICABILITY: The FormFactor probe stations are used to support Defense Microelectronics Activity

(DMEA) foundry and external customer testing requirements. This announcement is not a request for competitive quotations. Sole source award will be made to FormFactor Cascade, Livermore, CA 94551, based on FAR

13.106(b)(1), Soliciting from a single source.

1.3 BACKGROUND: The FormFactor equipment is owned by DMEA and is used to test wafers that are produced by DMEA and received from external customers. There are three (3) FormFactor Cascade Summit 12000 wafer probe systems with corresponding chuck thermal system, and one (1) FormFactor High Voltage Tesla wafer probe system with corresponding chuck thermal system. The equipment is used to provide wafer level semiconductor device characterization and reliability data. The equipment requires trained operators and must be vendor calibrated and maintained.

1.4 PURPOSE: The purpose is to acquire maintenance and calibration services for DMEA owned FormFactor

Cascade Summit 12000 wafer probe systems, and FormFactor High Voltage Tesla wafer probe system.

2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES:

2.5 GOVERNMENT FURNISHED FACILITIES/ACCESS:

Facility/Access Date

Lab 1 (Building 1, Room 134) ARO

Building 1, Room 120 ARO

3.0 REQUIREMENTS:

3.1 GENERAL REQUIREMENTS:

3.1.1 RESERVED

3.2 PROGRAM MANAGEMENT: NONE.

3.3 TASK REQUIREMENTS:

3.3.1 REQUIREMENT: The contractor shall provide maintenance service as follows

Manufacturer Series/Model Serial Number Service Level

FormFactor Cascade Summit 12000 1171030809 Single preventative

Maintenance visit

FormFactor Cascade Summit 12000 2041091408 Single preventative

Maintenance visit

FormFactor Cascade Summit 12000 GT6021071204 Single preventative

Maintenance visit

FormFactor Tesla 2009701406 Silver

SOW PWS Template 20161116.doc

[Note: Silver service level is defined by service response time where priority service for issue resolution is addressed within 1-2 business days and major issues/parts resolution within 10-15 business days.]

3.3.2 CALIBRATION REQUIREMENT: The contractor shall provide a National Institute of Standards and

Technology (NIST) traceable calibration with one (1) calibration sticker and one (1) calibration certificate for each

Cascade Summit 12000 wafer probe system, and Tesla wafer probe system.

3.3.3 LOCATION REQUIREMENT: The contractor shall deliver the service/materials to DMEA at the location listed in paragraph 2.2. The period of performance is twelve (12) months for the Cascade Summit 12000 wafer probe systems and Tesla wafer probe system.

3.3.4 INTERVAL REQUIREMENT: The contractor shall provide services at the following intervals:

Calibration Annual

Preventative Maintenance Annual

Repair Maintenance As Required for silver service level equipment

3.4 SECURITY REQUIREMENT: The contractor shall provide advance notification prior to conducting any onsite inspection, installation, maintenance, or calibration. A forty-eight (48) hours minimum notice during normal business hours shall be given. All contractor work at DMEA shall be performed by United States citizens unless an exception is granted, in writing, by DMEA. Prior to being allowed entry, contractor personnel shall provide proof of citizenship in accordance with the DMEA visitor approval process in effect at the time the visit is requested. During periods of exceptionally heightened security, additional advance notice background investigations of contractor personnel may be required prior to gaining entry into DMEA.

3.5 PROGRAM SUMMARY: NONE.

4.0 POINTS OF CONTACT:

DMEA/MEBD PROJECT ENGINEER:

File details come from the government source that posted it. Updated .