PWS 22-2B8 FormFactor Maintenance and Calibration Services 2022-2023 Redacted.pdf
PDF 16 KB Posted
- Attached to
- FormFactor Maintenance and Calibration Svs
- Solicitation number
- HQ072722QRH02
- Issued by
-
Defense Microelectronics Activity
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis and Solicitation 22-2B8_20220311.pdf | ||
| FormFactor Pricing Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW PWS Template 20161116.doc
PERFORMANCE WORK STATEMENT (PWS)
DMEA 22-2B8
26 January 2022
Project Engineer:
1.0 SCOPE:
1.1 TITLE: FormFactor Maintenance and Calibration Services 2022-2023
1.2 APPLICABILITY: The FormFactor probe stations are used to support Defense Microelectronics Activity
(DMEA) foundry and external customer testing requirements. This announcement is not a request for competitive quotations. Sole source award will be made to FormFactor Cascade, Livermore, CA 94551, based on FAR
13.106(b)(1), Soliciting from a single source.
1.3 BACKGROUND: The FormFactor equipment is owned by DMEA and is used to test wafers that are produced by DMEA and received from external customers. There are three (3) FormFactor Cascade Summit 12000 wafer probe systems with corresponding chuck thermal system, and one (1) FormFactor High Voltage Tesla wafer probe system with corresponding chuck thermal system. The equipment is used to provide wafer level semiconductor device characterization and reliability data. The equipment requires trained operators and must be vendor calibrated and maintained.
1.4 PURPOSE: The purpose is to acquire maintenance and calibration services for DMEA owned FormFactor
Cascade Summit 12000 wafer probe systems, and FormFactor High Voltage Tesla wafer probe system.
2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES:
2.5 GOVERNMENT FURNISHED FACILITIES/ACCESS:
Facility/Access Date
Lab 1 (Building 1, Room 134) ARO
Building 1, Room 120 ARO
3.0 REQUIREMENTS:
3.1 GENERAL REQUIREMENTS:
3.1.1 RESERVED
3.2 PROGRAM MANAGEMENT: NONE.
3.3 TASK REQUIREMENTS:
3.3.1 REQUIREMENT: The contractor shall provide maintenance service as follows
Manufacturer Series/Model Serial Number Service Level
FormFactor Cascade Summit 12000 1171030809 Single preventative
Maintenance visit
FormFactor Cascade Summit 12000 2041091408 Single preventative
Maintenance visit
FormFactor Cascade Summit 12000 GT6021071204 Single preventative
Maintenance visit
FormFactor Tesla 2009701406 Silver
SOW PWS Template 20161116.doc
[Note: Silver service level is defined by service response time where priority service for issue resolution is addressed within 1-2 business days and major issues/parts resolution within 10-15 business days.]
3.3.2 CALIBRATION REQUIREMENT: The contractor shall provide a National Institute of Standards and
Technology (NIST) traceable calibration with one (1) calibration sticker and one (1) calibration certificate for each
Cascade Summit 12000 wafer probe system, and Tesla wafer probe system.
3.3.3 LOCATION REQUIREMENT: The contractor shall deliver the service/materials to DMEA at the location listed in paragraph 2.2. The period of performance is twelve (12) months for the Cascade Summit 12000 wafer probe systems and Tesla wafer probe system.
3.3.4 INTERVAL REQUIREMENT: The contractor shall provide services at the following intervals:
Calibration Annual
Preventative Maintenance Annual
Repair Maintenance As Required for silver service level equipment
3.4 SECURITY REQUIREMENT: The contractor shall provide advance notification prior to conducting any onsite inspection, installation, maintenance, or calibration. A forty-eight (48) hours minimum notice during normal business hours shall be given. All contractor work at DMEA shall be performed by United States citizens unless an exception is granted, in writing, by DMEA. Prior to being allowed entry, contractor personnel shall provide proof of citizenship in accordance with the DMEA visitor approval process in effect at the time the visit is requested. During periods of exceptionally heightened security, additional advance notice background investigations of contractor personnel may be required prior to gaining entry into DMEA.
3.5 PROGRAM SUMMARY: NONE.
4.0 POINTS OF CONTACT:
DMEA/MEBD PROJECT ENGINEER:
File details come from the government source that posted it. Updated .