This is a construction drawing document prepared by the City of Seattle Department of Parks and Recreation, Planning & Development Division, for the Central West Headquarters Re-Roof project located at 1403 W Howe Street, Seattle, WA 98119. The project involves the removal and disposal of existing built-up roof membranes down to the wood decking at the high roof and barrel vault, with removal to the plywood deck at the low roof. The scope includes removal of corrugated metal siding at gable ends, installation of tapered polyisocyanurate insulation and coverboard with mechanical fastening of the first layer and full adherence of subsequent layers, installation of new EPDM roof membrane at flat roofs, installation of standing seam metal roofing at the vaulted roof with underlayment, raising of parapet height to accommodate new insulation, installation of new sheet metal flashings and parapet coping, installation of safety rails and ladders, and structural upgrades including a 5/8-inch plywood roof diaphragm. The project manager is Ray Gontarz (206-584-7034), with the City of Seattle Department of Finance & Administrative Services serving as the owner.
The engineer's estimate for the base scope is $581,072.00, with Additive No. 1 for structural upgrades estimated at $137,616.00. The construction drawings establish general notes requiring contractor compliance with the 2026 or latest edition of the City of Seattle Standard Specifications and Plans, independent verification of all utility locations with a mandatory call to 811, contractor-maintained sedimentation control facilities, and coordination with the project engineer regarding site access, materials storage, staging areas, and utility interruptions. The architect will provide part-time on-site representation to observe construction compliance and address hidden conditions. All contractors must maintain clear egress paths, keep walkways clear of debris, repair any damaged paved surfaces and facilities, maintain dust barriers at interior work locations, and bear their own parking expenses on the street or in parking facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-028_Bid_Form.pdf | ||
| PW#2025-028_Central_West_Re-Roof_Project_Manual_-_signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
OP
ER
TY
LI
NE
6.0
0' P
RO
PE
RT
Y
LIN
E
275.96' PROPERTY LINE
PROPERTY LINE 429.25'
(E) STOR. SHEDS
6.0
0'
429.25'
4.6
0'
157.98'
WEST HOWE STREET
TH
A
VE
NU
E W
ES
T
CONTRACTOR'S LAY-DOWN,
STAGING AREA, AND ROOF
LOADING LOCATION.
COORDINATE WITH PROJECT
ENGINEER.
CONTRACTOR - MAINTAIN CLEAR
EGRESS PATH FROM BUILDING
DEVELOPMENT IMPACT AREA
IS LIMITED TO ROOF AREA,
LAY-DOWN, STORAGE AND
STAGING AREA
CENTRAL WEST
HEADQUARTERS
BARREL VAULT
+10'-0" ABOVE GRADE
+15'-3" ABOVE GRADE
+15'-3" ABOVE GRADE
SHEET INDEXGENERAL NOTESSITE PLAN
Central West Headquarters Re-Roof
Administering Department:
City of Seattle Department of Parks and Recreation, Planning & Development Division
300 Elliott Avenue West, Suite 100, Seattle, WA 98119 Project Manager: Ray Gontarz 206-584-7034
Owner:
City of Seattle Department of Finance & Administrative Services, Purchasing & Contracting
1. ALL WORK SHALL CONFORM TO THE 2026 OR THE LATEST EDITION OF THE CITY OF SEATTLE STANDARD SPECIFICATIONS AND PLANS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION AND
ALL APPLICABLE CODES AND REGULATIONS.
2. A COPY OF THE APPROVED CONTRACT DOCUMENTS SHALL BE ON SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
3. ALL UTILITIES SHOWN HAVE BEEN ESTABLISHED BY FIELD OBSERVATION OR AVAILABLE RECORDS AND SHOULD BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN ON THE PLAN WHICH MAY BE AFFECTED BY CONSTRUCTION.
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SEDIMENTATION CONTROL AND COLLECTION FACILITIES TO PREVENT ERODED SOILS FROM ENTERING THE PUBLIC DRAINAGE SYSTEM DURING
EXECUTION OF THE CONTRACT.
5. KEEP ALL WALKWAYS CLEAR AND FREE OF DEBRIS. PAVED SURFACES THAT ARE DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER.
6. STORAGE OF MATERIALS AND EQUIPMENT WILL BE ALLOWED ONLY IN AREAS DESIGNATED FOR
CONSTRUCTION OR STAGING. STAGING AND STORAGE AREAS TO BE VERIFIED WITH ENGINEER
PRIOR TO START OF WORK.
7. ALL FACILITIES SCHEDULED TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF EXECUTION
OF THE WORK SHALL BE REPLACED BY THE CONTRACTOR TO THE ENGINEERS SPECIFICATIONS.
THESE FACILITIES MAY INCLUDE ASPHALT AND CONCRETE PAVING, BENCHES, RAILINGS,
IRRIGATION, VEGETATION, FENCING, BUILDING AND VARIOUS UTILITIES.
8. ALL WORK TO BE PERFORMED IN COMPLIANCE WITH ALL APPLICABLE CODES, LAWS AND
REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR TO VERIFY ALL DIMENSIONS, PROPERTY LINES, MEASUREMENTS AND CONDITIONS
IN THE FIELD BEFORE BEGINNING WORK. ANY DISCREPANCIES, ERRORS OR OMISSIONS TO BE
BROUGHT TO THE ATTENTION OF THE ENGINEER AND THE ARCHITECT IMMEDIATELY.
10. THE ARCHITECT WILL HAVE A REPRESENTATIVE ON SITE, PART-TIME TO OBSERVE THE
CONSTRUCTION FOR COMPLIANCE WITH THE DESIGN INTENT AND TO ASSIST THE CONTRACTOR IN
RESOLVING VARIATIONS IN THE EXISTING CONSTRUCTION. THESE DOCUMENTS ADDRESS ALL
KNOWN CONDITIONS, BUT IT IS ANTICIPATED THAT HIDDEN CONDITIONS WILL BE ENCOUNTERED
DURING CONSTRUCTION. THE ARCHITECT WILL OBSERVE ALL SUCH HIDDEN CONDITIONS AND
THE ENGINEER WILL ISSUE CLARIFICATIONS OR MODIFICATIONS OF THE DESIGN TO ADDRESS
SUCH CONDITIONS AND WILL DOCUMENT ALL CHANGES.
11. UNLESS OTHERWISE NOTED, ALL ANGLES TO BE RIGHT ANGLES, ALL LINES WHICH APPEAR
PARALLEL ARE TO BE PARALLEL, AND ALL ITEMS WHICH APPEAR CENTERED ARE TO BE
CENTERED. CONTRACTOR TO BE RESPONSIBLE FOR MAINTAINING ALL LINES TRUE, LEVEL, PLUMB
AND SQUARE.
12. DETAILED AND/OR LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER GENERAL AND SMALLER
SCALE DRAWINGS. CONTRACTOR TO USE DIMENSIONS SHOWN AND NOT TO SCALE DRAWINGS.
13. ALL ATTACHMENTS, CONNECTIONS AND FASTENINGS OF ANY NATURE ARE TO BE PROPERLY AND
PERMANENTLY SECURED IN CONFORMANCE WITH THE BEST PRACTICES OF THE BUILDING
INDUSTRY. DRAWINGS SHOW ONLY SPECIAL REQUIREMENTS TO ASSIST THE CONTRACTOR AND
DO NOT SHOW EVERY DETAIL.
14. DETAILS SHOWN IN THESE DRAWINGS ARE TYPICAL AND WILL APPLY UNLESS OTHERWISE NOTED OR SHOWN. DETAILS OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE OF THE SAME NATURE AS
THOSE DRAWN FOR SIMILAR CONDITIONS.
15. CONTRACTOR TO COORDINATE ALL OPERATIONS WITH THE ENGINEER, INCLUDING: SITE ACCESS, MATERIALS STORAGE AND STAGING, INTERRUPTION OF ELECTRICAL, MECHANICAL, FIRE-ALARM, LOW-VOLTAGE SERVICES AND TIMING OF NOISY OR DISRUPTIVE OPERATIONS. CONTRACTOR TO
VERIFY SEQUENCE OF WORK WITH THE ENGINEER.
16. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING DUST BARRIERS AT ALL INTERIOR WORK
LOCATIONS AND DURING ALL PHASES OF THE WORK.
17. PATCH AND REPAIR ALL LOCATIONS; WALLS, CEILINGS, OR FLOORS WHERE EXISTING EQUIPMENT IS MOVED, RELOCATED, OR REMOVED AND REPLACED. TOUCH-UP PAINT SHALL MATCH EXISTING ADJACENT WALL IN SHEEN, COLOR, AND TEXTURE. WHERE MORE THAN ONE SQ. FT. OF WALL OR CEILING SPACE REQUIRES TOUCH-UP PAINTING, CONTRACTOR SHALL PAINT ENTIRE WALL FROM
CORNER TO CORNER, FLOOR TO CEILING, OR TOP OF WAINSCOT TO CEILING.
18. THE DRAWINGS HAVE BEEN COORDINATED TO THE EXTENT POSSIBLE WITH AS-BUILT
CONDITIONS. THE ENGINEER SHALL APPROVE ALL RELOCATIONS OF SURFACE MOUNTED
FIXTURES AND EQUIPMENT WHERE A CONFLICT IN THE FIELD IS NOT INDICATED ON THE
DRAWINGS.
19. PARKING ON THE STREET AND/OR PARKING GARAGE SHALL BE THE CONTRACTOR'S AND
WORKERS' OWN EXPENSE.
PROJECT TEAM
SITE INFORMATION
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
PROJECT DESCRIPTION
GENERAL
1. G0.1 COVER SHEET
2. G1.1 SITE PLAN
3. G2.1 PHOTO REFERENCE PLAN
4. G2.2 REFERENCE PHOTOS
5. G2.3 REFERENCE PHOTOS
ARCHITECTURAL
6. AD1.1 DEMOLITION ROOF PLAN
7. A1.1 FLOOR PLAN
8. A1.2 REFLECTED CEILING PLAN (BID ADDITIVE No. 1)
9. A1.3 ROOF PLAN
10. A2.1 EXTERIOR ELEVATIONS
11. A2.2 PARTIAL ELEVATIONS
12. A5.1 DETAILS
13. A5.2 DETAILS
STRUCTURAL (BID ADDITVE No. 1)
14. S1.01 GENERAL NOTES AND SPECIAL INSPECTIONS
15. S2.01 EXISTING FLOOR / FOUNDATION PLAN
16. S3.01 PS ROOF FRAMING PLAN
17. S3.02 WOOD DIAPHRAGM NAILING LAYOUT & SCHEDULE
18. S3.10 SECTIONS
19. S3.11 SECTIONS
ARCHITECT
OAI, PS
1001 SW KLICKITAT WAY #204
SEATTLE WA 98134
PRIMARY CONTACT:
JERRY OSBORN
(206) 920-6348 josborn@oaips.com
PROJECT ADDRESS: 1403 W HOWE STREET
OWNER: SEATTLE PARKS AND RECREATION
300 ELLIOTT AVENUE W
SEATTLE WA 98119
PARCEL NUMBER: 242503-9137
ZONING: NR1
LEGAL DESCRIPTION:
PAR B OF SEATTLE SHORT PLAT #9106178 PER REC
#9204140811 SD SP DAF - POR OF N 386 FT OF GL 2 LY BET
W LN OF HELSING ADD & E LN OF IS TH AVE W LESS ST
PLAT BLOCK:
PLAT LOT:
1. REMOVE AND DISPOSE OF THE EXISTING BUILT-UP ROOF
MEMBRANE DOWN TO THE EXISTING T&G WOOD DECKING AT HIGH
R0OF AND BARREL VAULT. REMOVE AND DISPOSE OF BUILT-UP
ROOF TO PLYWOOD DECK AT LOW ROOF.
2. REMOVE AND DISPOSE OF CORRUGATED METAL SIDING AT GABLE
ENDS OF VAULTED ROOF.
3. INSTALL TAPERED POLYISOCYANURATE INSULATION, AND
COVERBOARD. MECHANICALLY FASTEN THE FIRST LAYER OF
INSULATION AND FULLY ADHERE THE SUBSEQUENT LAYERS.
4. INSTALL NEW EPDM ROOF MEMBRANE AT FLAT ROOFS.
5. INSTALL STANDING SEAM METAL ROOF AT VAULTED ROOF AND
UNDERLAYMENT.
6. RAISE PARAPET HEIGHT TO ACCOMMODATE NEW TAPERED
INSULATION.
7. INSTALL NEW SHEET METAL FLASHINGS AND PARAPET COPING.
8. INSTALL SAFETY RAILS
9. INSTALL LADDERS.
10. BID ADDITIVE NO. 1: STRUCTURAL UPGRADES. INSTALL 5/8"
PLYWOOD ROOF DIAPHRAGM.
NOTE
THERE WILL BE A SEPARATE CONSTRUCTION CONTRACT CONCURRENT
WITH THE ROOFING PROJECT. STAGING FOR BOTH PROJECTS ARE
SHOWN ON SHEET G1.1. ELECTRICAL CONTRACTOR WILL DISCONNECT
THE MAST SHOWN ON 4/G2.2.
STRUCTURAL ENGINEER
PETERSON STREHLE MARTINSON, INC.
7614 195TH ST SW SUITE 201,
EDMONDS WA 98026
PRIMARY CONTACT:
DAVID STUBBS
(206) 239-7712 mdstubbs@psm-engineering.com
OWNER
SEATTLE PARKS AND RECREATION
300 ELLIOTT AVENUE WEST SUITE 100
SEATTLE WA 98119
PRIMARY CONTACT:
RAY GONTARZ
(206) 584-7034 ray.gontarz@seattle.gov
CURRENT CODES
2021 SEATTLE BUILDING CODE
2021 SEATTLE ENERGY CODE
2021 SEATTLE EXISTING BUILDING CODE
2023 SEATTLE ELECTRICAL CODE
2021 SEATTLE FIRE CODE
2021 SEATTLE PLUMBING CODE
BUILDING INFORMATION
BUILDING AREA: 14,324 SQ FT
CONSTRUCTION TYPE: TYPE III B (1992 UBC TYPE III-N HOUR)
OCCUPANCY GROUP: S-2 STORAGE (VEHICLE MAINTENANCE)
PW#2025-028 Project #PRK730300-279 Funding Source: Seattle Park District Fund
COVER SHEET
JO
CG
JO
NO SCALE
1 19
G0.1
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
CENTRAL WEST HEADQUARTERS
RE-ROOF
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
PROJECT ASSET LIST
ASSET ID ASSET DESCRIPTION CATEGORY DESCRIPTION INVOLVEMENT NOTES
TBD
TBD
ROOF-WCDHQ CENTRAL WEST DIST HQ ROOF UNSPECIFIED ROOF FULL RENOVATION/REFRESH
ARCHSYS-WCDHQ CENTRAL WEST DIST HQ ARCH SYS ARCHITECTURAL SYSTEM PARTIAL RENOVATION/REFRESH
BUILDING-WCDHQ CENTRAL WEST DIST HQ BUILDING OTHER BUILDING NOT INVOLVED
ELECSYS-WCDHQ CENTRAL WEST DIST HQ ELECTRICAL SYS BUILDING ELECTRICAL SYSTEM PARTIAL RENOVATION/REFRESH
NEW ASSETS
EXISTING ASSETS
ASSET ID ASSET DESCRIPTION ASSET CATEGORY DESCRIPTION INVOLVEMENT NOTES
SCALE: 1" = 50' NO SHT ID SHEET TITLE
TREE PROTECTION
TREE PROTECTION/DEVELOPMENT IMPACT AREA REQUIREMENTS:
1. RETENTION AND PROTECTION OF ALL TREES 6 INCHES OR GREATER IS REQUIRED.
2. NO TREE REMOVAL OR DAMAGE UNLESS AUTHORIZED.
3. EXCAVATION AND GROUND DISTURBANCE IS PROHIBITED OUTSIDE THE
DEVELOPMENT IMPACT AREA.
4. CONSTRUCTION-RELATED ACTIVITIES, SUCH AS SITE ACCESS, HEAVY EQUIPMENT
USE, STORAGE, OR STOCKPILING IS PROHIBITED OUTSIDE THE DEVELOPMENT
IMPACT AREA UNLESS LOCATED ON EXISTING HARD SURFACES.
07/27/2026
7/27/26 26 https://seattlegov.na1.adobesign.com/verifier?tx=CBJCHBCAABAAHbAa1NMBKAsF8htP_Xza5RHOqSLiVarB
4.6
0'
157.98'
PR
OP
ER
TY
LI
NE
CENTRAL WEST
HEADQUARTERS
6.0
0' P
RO
PE
RT
Y
LIN
E
275.96' PROPERTY LINE11
PROPERTY LINE 429.25'
(E) STOR. SHEDS
CONCRETE SIDEWALK
PEDESTRIAN PATH
ASPHALT
PAVEMENT
PRIMARY TENANT
ENTRANCE AND
DRIVEWAY
PA
RK
IN
G
WEST HOWE STREET
TH
A
VE
NU
E
W
ES
T
ASPHALT
PAVEMENT
5'- 0"
31'-9"
0'-
0"
322'-9"
'-0
RO
W
CONCRETE SIDEWALK
EXIT DRIVEWAY
TH
A
VE
NU
E
W
ES
T
TH
A
VE
NU
E
W
ES
T
WEST BLAINE STREET
TH
A
VE
NU
E
W
ES
T
TH
A
VE
NU
E
W
ES
T
ROOFING CONTRACTOR'S
LAY-DOWN, STAGING AREA. AND
ROOF LOADING LOCATION.
COORDINATE WITH PROJECT
ENGINEER.
CONTRACTOR -
MAINTAIN CLEAR
EGRESS PATH FROM
BUILDING
DEVELOPMENT IMPACT
AREA IS LIMITED TO
ROOF AREA, LAY-DOWN,
STORAGE AND STAGING
AREA
(E) FENCE LINE
ELECTRICAL CONTRACTOR'S STORAGE AND STAGING
AREA. COORDINATE WITH PROJECT ENGINEER.
SCALE:1 OVERALL SITE PLAN
1' = 30'
SITE INFORMATION
PROJECT ADDRESS: 1403 W HOWE STREET
OWNER: SEATTLE PARKS AND RECREATION
300 ELLIOTT AVE W #100
SEATTLE WA 98119
PARCEL NUMBER: 242503-9137
LEGAL DESCRIPTION:
PAR B OF SEATTLE SHORT PLAT #9106178 PER REC
#9204140811 SD SP DAF - POR OF N 386 FT OF GL 2 LY BET
W LN OF HELSING ADD & E LN OF IS TH AVE W LESS ST
PLat Block:
Plat Lot:
30 15 0 30 60
SCALE IN FEET
9/15/25
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
SITE PLAN
JO
CG
JO
AS NOTED
2 19
G1.1
LOW SLOPE ROOFS
LEGEND
BARREL VAULT ROOF
07/27/2026
1 2 3 4 5 6 7 8 9 10 11 12
E
D
C
B
A
(E) RD
(E) RD
(E) RD
(E) RD
(E) RV
(E) EF
(E) RD
(E) RD
(E) RD(E) RD
N
NN
(E) EF
(E) VTR
(E) VTR
(N) PERIMETER FALL
PROTECTION RAILING
(N) PERIMETER FALL PROTECTION RAILING
N
N
N N
N
SCALE:1 ROOF PLAN
1/8" = 1' - 0"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
0 8 16 24 32
PHOTO REFERENCE PLAN
CG
JO
NO SCALE
3 19
G2.1
SCALE :
9 (E) EXHAUST FAN
NO SCALE
SCALE :
5 LOW ROOF OVER OFFICES
NO SCALE
SCALE :
1 ROOF CORE
NO SCALE
SCALE :
6 LOW ROOF OVER OFFICES
NO SCALE
SCALE :
2 ROOF CORE
NO SCALE
SCALE :
7 ROOF DRAIN
NO SCALE
SCALE :
3 POWER MASTS
NO SCALE
SCALE :
8 ROOF DRAIN AT UPPER ROOF
NO SCALE
SCALE :
4 POWER MAST
NO SCALE
DEMO SHEET METAL
COPING
DEMO (E) CORRUGATED
METAL SIDING.
BUILT-UP ROOFING
ELECTRICAL MASTS TO BE
REMOVED UNDER SEPARATE
CONTRACT.
(E) ROOF DRAIN AND STRAINER.
DRILL AND TAP BOLT HOLES IN
RETAINING RING. PAINT BOWL.
RE-ATTACH STRAINER.
DEMO (E) BUILT-UP
ROOFING DOWN TO
PLYWOOD DECK
EXHAUST FAN. RAISE CURB
TO ACCOMMODATE (N)
TAPERED INSULATION.
EXTEND POWER.
WOOD ROOF DECK. 2x6 AT
UPPER ROOF AND BARREL
VAULT. PLYWOOD DECK AT
LOW ROOF.
DEMO (E) SHEET METAL
COPING.
ELECTRICAL MASTS TO BE
REMOVED/REPLACED UNDER
SEPARATE CONTRACT.
(E) ROOF DRAIN. DRILL AND
TAP BOLT HOLES IN RETAINING
RING. PAINT BOWL.RE-ATTACH
STRAINER.
DEMO (E) SHEET METAL
COPING.
RAISE EXHAUST FANS TO
ACCOMMODATE NEW
TAPERED INSULATION
(E) CMU WALL WITH
MARBLECRETE FINISH DEMO SHEET METAL
COPING
DEMO (E) BUILT-UP
ROOFING DOWN TO
PLYWOOD DECK
DEMO (E) SHEET METAL
COPING
(E) ROOF DRAIN. CLEAN AND
RE-THREAD BOLT HOLES IN
RETAINING RING. RE-ATTACH
STRAINER.
(E) ROOF DRAIN. CLEAN AND
RE-THREAD BOLT HOLES IN
RETAINING RING. RE-ATTACH
STRAINER.
DEMO (E) BUILT-UP
ROOFING DOWN TO 2x6 T&G
WOOD DECK
DEMO (E) BUILT-UP
ROOFING DOWN TO 2x6 T&G
WOOD DECK
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
REFERENCE PHOTOS
CG
JO
NO SCALE
4 19
G2.2
SCALE :
13 (E) ROOF DRAIN AT UPPER ROOF
NO SCALE
SCALE :
10 EXHAUST FAN CURB
NO SCALE
SCALE :
15 DETAIL (E) BARREL VAULT
NO SCALE
SCALE :
11 (E) EXHAUST FAN AND VENT
NO SCALE
SCALE :
16 (E) BASE DETAIL AT BARREL VAULT AND ROOF
NO SCALE
SCALE :
12 (E) ROOF DRAIN
NO SCALE
SCALE :
14 (E) BARREL VAULT
NO SCALE
(E) EXHAUST FAN HOUSING
DEMO (E) CORRUGATED
METAL SIDING.
DEMO (E) SHEET METAL
FLASHING
RAISE CURB TO
ACCOMMODATE (N)
TAPERED INSULATION.
(E) ROOF DRAIN AND STRAINER.
CLEAN AND RE-THREAD BOLT
HOLES IN RETAINING RING.
RE-ATTACH STRAINER.
DEMO (E) SHEET METAL
COPING.
DEMO (E) SHEET METAL
COPING.
DEMO (E) BUILT-UP
ROOFING DOWN TO 2x6 T&G
WOOD DECK
DEMO (E) BUILT-UP
ROOFING DOWN TO 2x6 T&G
WOOD DECK
DEMO (E) BUILT-UP
ROOFING DOWN TO 2x6 T&G
WOOD DECK
DEMO (E) SHEET METAL
COPING.
DEMO (E) CORRUGATED
SHEET METAL SIDING.
(E) FALL PROTECTION
ANCHOR AND HORIZONTAL
LIFELINE. DISCONNECT
LIFELINE, INSTALL FLASHING
BOOTS AT ANCHORS AND
REINSTALL LIFLINE.
EXHAUST FAN. RAISE CURB
TO ACCOMMODATE (N)
TAPERED INSULATION.
EXTEND POWER AS
REQUIRED. (E) ROOF DRAIN. DRILL AND
TAP BOLT HOLES IN RETAINING
RING. RE-ATTACH STRAINER.
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
REFERENCE PHOTOS
JO
CG
JO
NO SCALE
5 19
G2.3
D
C
B
A
BARREL VAULT
(E) RD
(E) RD
(E) RD
(E) RD
(E) RV
(E) EF
(E) RD
(E) RD
(E) RD(E) RD
(E) EF
(E) VTR
(E) VTR
SL
OP
E:
1/
8" / 1
2"
SL
OP
E
VA
RI
ES
SL
OP
E
VA
RI
ES
BARREL VAULT
LOW ROOF
SCALE:1 ROOF PLAN
1/8" = 1' - 0"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
DEMOLITION ROOF PLAN
CG
JO
1/8" = 1' - 0"
6 19
AD1.1
ROOF TO BE DEMOLISHED. REMOVE
AND DISPOSE OFF (E) BUILT-UP ROOF
MEMBRANE SYSTEM.
ROOF PLAN NOTES
LEGEND
(E) FALL PROTECTION (HORIZONTAL LIFELINE
AND ANCHORS TO REMAIN. DISCONNECT
LIFELINE, INSTALL FLASHING BOOTS AT
ANCHORS, AND RE-INSTALL LIFELINE
DEMO (E) CORRUGATED METAL SIDING
AT GABLE ENDS OF BARREL VAULT
(E) PARAPET COPING AND EDGE
FLASHING TO BE DEMOLISHED
SCALE:2 EXISTING ROOF ASSEMBLY - LOW SLOPE ROOF
NTS
2X6 T&G WOOD DECKING
(3/4" PLYWOOD DECKING AT
LOW ROOF)
3-PLY BUILT-UP ROOFING WITH
GRANULATED CAP SHEET AND
1/2" COVER BOARD. ENTIRE
SYSTEM APPLIED WITH HOT
ASPHALT.
(E) ROOF TOP EQUIPMENT
(E) ROOF TOP EQUIPMENT
TREE PROTECTION
TREE PROTECTION/DEVELOPMENT IMPACT AREA REQUIREMENTS:
1. RETENTION AND PROTECTION OF ALL TREES 6 INCHES OR
GREATER IS REQUIRED.
2. NO TREE REMOVAL OR DAMAGE UNLESS AUTHORIZED.
3. EXCAVATION AND GROUND DISTURBANCE IS PROHIBITED
OUTSIDE THE DEVELOPMENT IMPACT AREA.
4. CONSTRUCTION-RELATED ACTIVITIES, SUCH AS SITE ACCESS,
HEAVY EQUIPMENT USE, STORAGE, OR STOCKPILING IS
PROHIBITED OUTSIDE THE DEVELOPMENT IMPACT AREA
UNLESS LOCATED ON EXISTING HARD SURFACES.
50 25 0 50 100
SCALE IN FEET
SCALE:3 EXISTING ROOF ASSEMBLY - BARREL VAULT
NTS
2X6 T&G WOOD DECKING
3-PLY BUILT-UP ROOFING
WITH GRANULATED CAP
SHEET AND 1/2" COVER
BOARD. ENTIRE SYSTEM
APPLIED WITH WITH HOT
ASPHALT.
HAZARDOUS MATERIALS NOTES
1. THE BUILT-UP ROOF SYSTEM, PARAPET, AND
ROOFING MASTIC AT METAL FLASHING CONTAINS
ASBESTOS.
D
C
B
A
SHOP
SHOP
ELECTRICAL
JAN
MENS
TOILET
WOMENS
LOCKER
AREA
A118
CORRIDOR
A121
WOMENS
A119
MENS
A120CORRIDOR
A122
LUNCH
ROOM
A123
STORAGE
A124
STORAGE
A125
GOLD ROOM
A127
GOLD ROOM
A128
SUPPLY
HALLWAY
OFFICE
OFFICE
OFFICE
OFFICE
MUD ROOM
A117
CHEMICAL
MIXING ROOM
A114
HERBICIDE
STORAGE
A115
PESTICIDE
STORAGE
A116
SHOP
A126
CHAIN LINK FENCE STORAGE BINS
'-2
200'-2"
108'-2" 16'-8"75'-4"
'-2
ELECTRICAL CONTRACTOR'S
STORAGE AND STAGING AREA.
ROOFING CONTRACTOR'S STORAGE
AND STAGING AREA. COORDINATE
WITH PROJECT ENGINEER.
SCALE:1 FLOOR PLAN (FOR REFERENCE ONLY )
1/8" = 1' - 0"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
FLOOR PLAN
CG
JO
1/8" = 1' - 0"
7 19
A1.1
TREE PROTECTION
TREE PROTECTION/DEVELOPMENT IMPACT AREA REQUIREMENTS:
1. RETENTION AND PROTECTION OF ALL TREES 6 INCHES OR
GREATER IS REQUIRED.
2. NO TREE REMOVAL OR DAMAGE UNLESS AUTHORIZED.
3. EXCAVATION AND GROUND DISTURBANCE IS PROHIBITED
OUTSIDE THE DEVELOPMENT IMPACT AREA.
4. CONSTRUCTION-RELATED ACTIVITIES, SUCH AS SITE ACCESS,
HEAVY EQUIPMENT USE, STORAGE, OR STOCKPILING IS
PROHIBITED OUTSIDE THE DEVELOPMENT IMPACT AREA
UNLESS LOCATED ON EXISTING HARD SURFACES.
SCALE IN FEET
D
C
B
A
SHOP
SHOP
ELECTRICAL
JAN
MENS
TOILET
WOMENS
LOCKER
AREA
A118
CORRIDOR
A121
WOMENS
A119
MENS
A120CORRIDOR
A122
LUNCH
ROOM
A123
STORAGE
A124
STORAGE
A125
GOLD ROOM
A127
GOLD ROOM
A128
SUPPLY
HALLWAY
OFFICE
OFFICE
OFFICE
OFFICE
MUD ROOM
A117
CHEMICAL
MIXING ROOM
A114
HERBICIDE
STORAGE
A115
PESTICIDE
STORAGE
A116
SHOP
A126
CHAIN LINK FENCE STORAGE BINS
OPEN TO STRUCTURE
9'-0"
9'-0" 9'-0" 9'-0"10'-2"
10'-2"
8'-0"
(2 ) L
AY
ER
S 5/8
" G
YP
B D.
T
YP
E X
9'-0"
OPEN TO STRUCTURE
BARREL VAULT
LOW SLOPE ROOF
LOW SLOPE ROOF
SCALE:1 REFLECTED CEILING PLAN
1/8" = 1' - 0"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
REFLECTED CEILING PLAN
JO
CG
JO
1/8" = 1' - 0"
8 19
A1.2
SCALE IN FEET
BI
D
AD
DI
TI
VE
#1
NOTE: THIS DRAWING IS INCLUDED TO SHOW THE AREAS OF
THE EXISTING CEILING AND ROOF STRUCTURE THAT NEED
TO BE ACCESSED TO INSTALL THE STRUCTURAL
COMPONENTS OF THE SEISMIC UPGRADE. SEE THE
STRUCTURAL DRAWINGS.
(E) 2 X 4 ACOUSTIC CEILING WITH R-30
BATT INSULATION.
LEGEND
(E) GYPSUM BOARD CEILING
AREA OF (E) CEILING TO BE REMOVED AND
REINSTALLED FOR THE INSTALLATION OF
(N) STRUCTURAL COMPONENTS.
REFERENCE STRUCTURAL DRAWINGS.
(E) 2 X 4 LIGHT FIXTURE
(E) AIR REGISTER
8'-0" CEILING HEIGHT
AREA OPEN TO STRUCTURE FOR
INSTALLATION OF (N) STRUCTURAL
COMPONENTS. REFERENCE STRUCTURAL
DRAWINGS.
1. BATT INSULATION IS LOOSE LAID DIRECTLY ON THE
CEILING ASSEMBLIES. REMOVE INSULATION AND REPLACE
INSULATION AS REQUIRED.
2. INCLUDE ALL REFERENCED WORK ON THIS PLAN SHEET
UNDER BID ADDITIVE #1
NOTES
D
C
B
A
(E) RD
(E) RD
(E) RD
(E) RD
(E) RV
(E) EF
(E) RD
(E) RD
(E) RD(E) RD
N
NN
200'-2" V.I.F.
84'-7" V.I.F.
'-2
V.
I.F
108'-2" V.I.F.
'-1
3/ 4"
V.
I.F
16'-8" V.I.F.
7'- 0"
V.
I.F
101'-0" V.I.F.
14'-7" V.I.F.
'-2
V.
I.F
'-0
V.
I.F
(E) EF
(E) VTR
(E) VTR
SL
OP
E:
1/
4" / 1
2"
SL
OP
E:
1/
4" / 1
2"
CRICKET
SL
OP
E:
1/
4" / 1
2"
SL
OP
E:
1/
4" / 1
2"
SL
OP
E:
1/ 4"
/ 1 2"
CRICKET
SLOPE: 1/4" / 12"
CRICKET
CR
IC
KE
T
CR
IC
KE
T
CRICKET
CR
IC
KE
T
CR
IC
KE
TCRICKET
RIDGE
CRICKETCRICKET
(N) PERIMETER FALL
PROTECTION RAILING
(N) PERIMETER FALL PROTECTION RAILING
N
N
N N
N
CRICKET CRICKET
@ RAKE
@ TIE-IN
@ RAKE
SIM
4'-0" 4'-0"
4'-0"
3'-0"(N) LADDER
@ LOW
ROOF
SIM
(E) FALL PROTECTION LIFE LINE AND
ANCHORS (TYP). COORDINATE ROOF
LAYOUT SO THAT ROOF ANCHORS ARE
IN MIDDLE OF PANELS.
(E) FALL PROTECTION
LIFE LINE AND ANCHORS
(E) FALL PROTECTION
LIFE LINE AND ANCHORS
(E) FALL PROTECTION
LIFE LINE AND ANCHORS
@ TIE-IN
NEW EPDM ROOF ASSEMBLY
(N) EPDM ROOF
ASSEMBLY
(N) EPDM ROOF
ASSEMBLY
(N) LADDER WITH
SECURITY GATE
END OF VAULTED ROOFEND OF VAULTED ROOF
4444 4
RAILING EXTENDS 4'-0"
BEYOND WALK PADS10'-10 1/2"
TYP
CONCEALED PANEL CLIP
SCALE:3 NEW METAL ROOF ASSEMBLY @ BARRLE VAULT
3/4" = 1' - 0"
2" STANDING SEAM METAL ROOF
PANEL
SELF-ADHERED COLD APPLIED
HIGH TEMPERATURE RUBBERIZED
ASPHALT MEMBRANE
(E) 2X6 T&G WOOD DECK
(N) PLWD. SHEATHING (BID
ADDITIVE No. 1)
SCALE:2 NEW ROOF ASSEMBLY @LOW SLOPE ROOFS
NTS
60 MIL EPDM ROOF MEMBRANE,
FULLY ADHERED.
EPDM BONDING ADHESIVE
1/4" GYPSUM COVER BOARD SET
IN LOW RISE FOAM ADHESIVE
(4'X4' MAX SIZE)
TAPERED INSULATION SYSTEM.
MECHANICALLY FASTENED. 1/4"
PER 12" U.N.O.
VAPOR BARRIER
(E) 2X6 T&G WOOD OR PLYWOOD
DECKING
(N) PLWD SHEATHING (BID
ADDITIVE 1)
SCALE:1 ROOF PLAN
1/8" = 1' - 0"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
(N) STANDING SEAM METAL ROOF
ROOF PLAN NOTES
LEGEND
REINSTALL (E) LIFE-LINE TO (E) CB-12 ANCHORS.
INSTALL TO PRE-DISASSEMBLY CONDITION..
(E) WALL MOUNTED FALL PROTECTION
(E) ROOF TOP EQUIPMENT
(N) THRU-WALL OVERFLOW SCUPPER.
SEE DETAILS 9 & 10/A5.2
EXISTING ROOF DRAIN(E) RD
(N) WALKWAY PADS
N
TREE PROTECTION
TREE PROTECTION/DEVELOPMENT IMPACT AREA REQUIREMENTS:
1. RETENTION AND PROTECTION OF ALL TREES 6 INCHES OR
GREATER IS REQUIRED.
2. NO TREE REMOVAL OR DAMAGE UNLESS AUTHORIZED.
3. EXCAVATION AND GROUND DISTURBANCE IS PROHIBITED
OUTSIDE THE DEVELOPMENT IMPACT AREA.
4. CONSTRUCTION-RELATED ACTIVITIES, SUCH AS SITE ACCESS,
HEAVY EQUIPMENT USE, STORAGE, OR STOCKPILING IS
PROHIBITED OUTSIDE THE DEVELOPMENT IMPACT AREA
UNLESS LOCATED ON EXISTING HARD SURFACES.
SCALE IN FEET
ROOF PLAN
CG
JO
1/8" = 1' - 0"
9 19
A1.3
(E) ROOF DRAIN. NEW WORK AT ROOF DRAINS
INCLUDE 1) DRILLING AND TAPPING (E) BOLTS
AND 2) PAINT DRAIN BOWLS , CLAMP RING, AND
ATTACHMENT HARDWARE WITH RUST-INHIBITING
PAINT.
2 13456789101112
21 3 4 5 6 7 8 9 10 11 12
BA C D EB ACDE
BARREL VAULT BEYOND
(N) METAL PANEL FACIA
(E) BARREL VAULT
BEYOND
(N) METAL PANEL FACIA,
TYP
(N) METAL PANEL FACIA
BARREL VAULT ROOF W/
STANDING SEAM METAL ROOFING
(N) GUARDRAIL
(N) METAL PANEL FACIA,
TYP.
(N) THRU-WALL
OVERFLOW SCUPPER
BARREL VAULT ROOF W/
STANDING SEAM METAL ROOFING
(N) GUARDRAIL
(N) METAL PANEL FACIA,
TYP
(N) OVERFLOW
SCUPPER, TYP
'-0
"22 '-8
'-0
4'- 8"
'-8
'-0
4'- 8"
'-8
'-4
6'-
8"
(N) ELECTRIC METER AND CT CAN (BY
OTHERS)
(N) SERVICE DISCONNECT (BY OTHERS)
(N) LADDER WITH
SECURITY GATE
(N) THRU-WALL
OVERFLOW SCUPPER
TYP
(N) THRU-WALL
OVERFLOW SCUPPER
(N) ROOF ACCESS
LADDER
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
EXTERIOR ELEVATIONS
JO
CG
JO
1/4" = 1' - 0"
10 19
A2.1
SCALE:1 SOUTH ELEVATION
1/8" = 1' - 0"
SCALE:3 WEST ELEVATION
1/8" = 1' - 0"
SCALE:4 EAST ELEVATION
1/8" = 1' - 0"
SCALE:2 NORTH ELEVATION
1/4" = 1' - 0"
KEY PLAN
BA EE B A
R = 59'-6"
VERIFY
R = 59'-6"
VERIFY
(E) LOUVER
(N) METAL SIDING
PANELS
(N) ROOF ACCESS
LADDER - SEE DETAIL
13/A5.1
(N) METAL SIDING PANELS
(N) METAL PANEL FACIA,
TYP
'-4
2 13456
BARREL VAULT ROOF BEYOND
W/ STANDING SEAM METAL ROOFING
(N) GUARDRAIL
(N) ROOF ACCESS
LADDER
(N) FLASHING(N) METAL PANEL FACIA,
TYP.
(N) THRU-WALL
OVERFLOW SCUPPER,
TYP
(E) WALL MOUNTED
FALL PROTECTION
(E) PILASTER
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
PARTIAL ELEVATIONS
CG
JO
AS NOTED
11 19
A2.2
SCALE:1 SOUTH GABLE ELEVATION
1/8" = 1' - 0" SCALE:2 NORTH GABLE ELEVATION
1/8" = 1' - 0"
KEY PLAN
SCALE:3 PARTIAL EAST ELEVATION
1/4" = 1' - 0"
BASE TIE-IN. SEE
DETAIL.
SCALE:1 BASE TIE-IN @ GABLE END
3" = 1' - 0"
(E) 2 X 6 T&G SIDING
(E) TRUSS
(E) PLYWOOD SIDING
8" MI
N.
METAL SIDING
WEATHER BARRIER
DRIP FLASHING
PANEL CLOSURE
HAT CHANNEL
FURRING
TERMINATION BAR
EPDM ROOFING
MEMBRANE
EPDM
EXTEND (N) EPDM MEMBRANE
2" ABOVE METAL PLATE
(N) 3" SPLICE TAPE
(N) FASTENERS AND 2" METAL
PLATE @ 12" O.C. MAX.
(N) EPDM MEMBRANE FLASHING
(N) PRIMER
(N) ADHERED EPDM MEMBRANE
(N) COVER BOARD
(N) TAPERED INSULATION
(E) WOOD DECKING
SCALE:2 BASE TIE-IN DETAIL
3" = 1' - 0"
BONDING ADHESIVE
SCALE:3 CURB DETAIL
3" = 1' - 0"
SHEET METAL FLASHING
MIN. 3" WIDE TAPE IN
CONJUNCTION WITH EPDM
PRIMER
MAXIMUM 12" O.C. SPACING
1/8" TO 1" MAX.
EPDM MEMBRANE
FLASHING
FASTENER & SEAM FASTENING
PLATE, MAX. 12"
BONDING ADHESIVE
(N) 2X 8 FRAMING TO RAISE
CURB HEIGHT.
(E) WOOD ROOF DECK
8"
MI
NI
MU
M
(N) TAPERED INSULATION
(N) COVERBOARDS
(E) CURB
1'- 0"
MI
NI
MU
M
SPRING ACTION COUNTER
FLASHING
TERMINATION BAR (TYP.)
SCALE:4 FLASHING @ LOW ROOF
1 1/2" = 1' - 0"
(E) CMU WALL WITH
MARBLECRETE FINISH
MEMBRANE FLASHING
BASE TIE-IN. SEE DETAIL 2/A5.1
WATER CUT-OFF MASTIC
EPDM ROOF MEMBRANE
METAL PANEL FACIA
(E) 8" CMU WALL W /
MARBLECRETE FINISH
(N) PARAPET EXTENSION. SEE
DETAIL 6/A5.15'-
1"
SCALE:11 GUARDRAIL DETAIL
3/4" = 1' - 0"
2 1/2"SCHED. 40 PIPE
POST, GALVANIZED
STEEL PLATE. SEE
DETAIL 15/A5.1
1 1/2" I.D. PIPE RAIL, SCHED. 40,
GALVANIZED
ROOF ELEVATION VARIES
EQ. SPACES
8'-0" MAX
SLIP JOINTS IN RAIL FOR
EXPANSION / CONTRACTION
SCALE:12 GUARDRAIL ELEVATION
1/2" = 1' - 0"
A5.1
1 1/2" SCHED. PIPE
RAIL, GALVANIZED
STEEL PLATE. SEE
DETAIL 15/A5.1
1'- 1"
2 1/2" SCHED. PIPE
POST, GALVANIZED
METAL PANEL FACIA
ROOF LEVEL
VARIES
5'- 1"
VF
Y
2'-0"
LADDER WIDTH
1'- 0"
TY
P.
7"
GRAB BAR
ALUMINUM
PLATFORM
SCALE:13 ROOF PARAPET LADDER
3/4" = 1' - 0"
FRONT ELEVATION SIDE ELEVATION
3'- 6"
ALUMINUM RUNGS
ALUM LADDER BRACKET
W/ 1/2" Ø EPOXY
ANCHORS W/ SCREEN
TUBES. 2" MIN. EMBED.
ALUMINUM RAIL
7'- 7"
VF
Y
6"
(E) 8" CMU WALL WITH
MARBLECRETE FINISH
SIDE RAIL
2X BLOCKING
@ BRACKET
8"
SCALE:14 LOUVER DETAIL
3" = 1' - 0"
WEATHER BARRIER
HAT CHANNEL FURRING
METAL SIDING
SILL FLASHING W/ DRIP EDGE
(E) LOUVER
SELF ADHERING TAPE ALL EDGES
DRIP FLASHING
(E) WD. SIDING
JAMBHEAD
SILL
FLASHING W/
HEMMED EDGE
(E) WD. SIDING
2"
2"
(E) LOUVER
BASE TIE-IN. SEE DETAIL
SCALE:6 PARAPET DETAIL @ CMU WALL
1 1/2" = 1' - 0"
4"
2'- 0"
2X8'S @ 16" OC
PARAPET COPING
TAPERED SHIM
METAL PANEL FACIA
DRIP FLASHING
GASKETED FASTENER
STANDING SEAM
EPDM MEMBRANE FLASHING
1'-
0" 5/8" PLWD. EA. SIDE
WEATHER BARRIER
(E) CMU WALL W /
MARBLECRETE FINISH
BASE TIE-IN. SEE DETAIL
4"
2'- 0"
FROM 2 X 6'S @ 16" OC
PARAPET COPING
TAPERED SHIM
METAL PANEL FACIA
DRIP FLASHING
GASKETED FASTENER
STANDING SEAM
EPDM MEMBRANE FLASHING
1'-
0" 5/8" PLWD. EA. SIDE
WEATHER BARRIER
(E) WOOD FRAMED
PARAPET W/
MARBLECRETE FINISH
SCALE:5 PARAPET DETAIL @ FRAMED WALL
1 1/2" = 1' - 0"
CRICKET
METAL ROOFING PANELS
SCALE:8 DETAIL
3" = 1' - 0"
EPDM MEMBRANE. EXTEND
UNDER ROOF PANEL 18" MIN.
METAL ROOFING
UNDERLAYMENT
SPLICING TAPE
EXTRA LAYER OF EPDM
MEMBRANE
WATER CUT-OFF MASTIC
(E) 2 X 6 WOOD
DECKING
JOGGLE CLEAT
SCALE:7 DETAIL AT BARREL VAULT / PARAPET
3/4" = 1' - 0"
4'-11" ±
8" MI
N.
VA
RI
ES
(E) CMU WALL W/
MARBLECRETE
FINISH
PIPE GUARDRAIL.
SEE DTL. 11/A5.1
METAL ROOF PANELS
(E) BOWSTRING
TRUSS
BASE TIE-IN
VARIES
SEE DTL. 8/A5.1
(E) 2X6 T&G DECKING
CONT. CLEAT
SCALE:10 RAKE DETAIL @ GABLE END
3" = 1' - 0"
METAL ROOFING
UNDERLAYMENT
WEATHER BARRIER
HAT CHANNEL FURRING
RAKE TRIM
RECEIVER TRIM
SEALANT
POP RIVETS
METAL SIDING(E) 2X6 T&G SIDING
(E) PLYWOOD SIDING
4" 4"
PANCAKE HEAD
FASTENERS @ 12" OC
BUTYL TAPE
SCALE:15 GUARDRAIL DETAIL
1 1/2" = 1' - 0"
8" 2'-2"
1'-
0" (8) 1/2" Ø HILTY HY-270
ADHESIVE ANCHORS W/
HIT-IC INSERTS ( 2" EMBED).
1/2" X 2'-2" X 1'-0" STEEL PLATE
W/ 1/2" STIFFENER PLATES.
8"
8"
1"
1"
1" 1"
3/16
2 1/2" SCHED 40 PIPE.
3/16
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
DETAILS
CG
JO
AS NOTED
12 19
A5.1
SCALE:10 OVERFLOW SCUPPER @ CMU WALL
3" = 1' - 0"
BLOCKING AT ALL
SIDES OF SCUPPER
(E) CMU WALL W/
MARBLECRETE FINISH
6"
2 LAYERS OF
PRESSURE SENSITIVE
FLASHING
(N) S.S THRU-WALL
SCUPPER WITH DRIP
EDGE WATER CUTOFF
MASTIC
MTL. PANEL WITH
CLSOURE STRIP
2"
2"
DEMO (E) CMU AS
REQUIRED FOR
SCUPPER
DRIP FLASING
2"
BLOCKING AT ALL
SIDES OF SCUPPER
(E) FRAMED WALL W/
MARBLECRETE FINISH
6"
2 LAYERS OF
PRESSURE SENSITIVE
FLASHING
(N) S.S THRU-WALL
SCUPPER WITH DRIP
EDGE WATER CUTOFF
MASTIC
MTL. PANEL WITH
CLSOURE STRIP
2"
DRIP FLASING
SCALE:9 OVERFLOW SCUPPER @ FRAMED WALL
3" = 1' - 0"
SCALE:1 PIPE PENETRATION AT RIB
NO SCALE
ROOF JACK BOOT INSTALL PER
MFR. SPECIFICATIONS W/
STAINLESS STEEL HOSE CLAMP
COVER FLASHING w/ 1" CLEAR
CUTOUT FOR VENT PIPE
VENT PIPE
COVER
FLASHING
POP-RIVET @ 8" O.C. MAX
BUTYL TAPE (EXTEND TAPE
SEALANT OVER TOP OF PANEL)
SEAL ENDS OF ZEE
CLOSURES WITH
BUTYL TAPE
VENT PIPE
POP-RIVET @ 8" O.C.
ZEE CLOSURE ZEE CLOSURE
BUTYL TAPE
ROOF PANEL
ROOF
PANEL
BUTYL TAPE
CONTRACTOR: COORDINATE ROOF LAYOUT SO THAT PIPE PENETRATIONS ARE IN THE
MIDDLE OF ROOF PANELS. USE THIS DETAIL ONLY WHEN A PIPE PENETRATION IS UNABLE
TO BE CENTERED ON A PANEL WITH A MINIMUM OF 3” CLEARANCE ON EITHER SIDE.
SLOPE
1" INCH CLEAR CUT OUT
FOR VENT PIPE
SLOPE
QUICK APPLIED UNCURED EPDM
FLASHING IN CONJUNCTION WITH
EPDM PRIMER
LAP SEALANTPIPE PENETRATION
PROTECTIVE STRIP OF EPDM
STAINLESS STEEL CLAMPING
RING
LAP SEALANT
3"
SCALE:6 PIPE FLASHING @ EPDM ROOFING (FIELD FABRICATED)
3" = 1' - 0"
3"
NOTES:
1. EXTEND PLUMBING WASTE VENTS AND TERMINATE 6" MINIMUM ABOVE ADJACENT ROOF LEVELS.
2. REMOVE ALL LEAD AND OTHER FLASHING BEFORE INSTALLING FIELD-FABRICATED FLASHING.
3. PIPE FLASHING MAY BE USED WITH SQUARE OR RECTANGULAR STRUCTURAL TUBING WITH
ROUNDED CORNERS.
4. EPDM PRIMER MUST BE APPLIED TO THE MATING SURFACES PRIOR TO APPLYING QUICK APPLIED
UNCURED EPDM FLASHING.
QUICK APPLIED UNCURED EPDM
FLASHING IN CONJUNCTION WITH
EPDM PRIMER
LAP SEALANT
PIPE PENETRATION. LOCATE
IN CENTER OF ROOF PANEL
IF POSSIBLE.
PROTECTIVE STRIP OF EPDM
STAINLESS STEEL CLAMPING
RING
LAP SEALANT
3"
SCALE:4 PIPE FLASHING @ METAL ROOFING (FIELD FABRICATED)
3" = 1' - 0"
3"
NOTES:
1. EXTEND PLUMBING WASTE VENTS AND TERMINATE 6" MINIMUM ABOVE ADJACENT ROOF LEVELS.
2. REMOVE ALL LEAD AND OTHER FLASHING BEFORE INSTALLING FIELD-FABRICATED FLASHING.
3. PIPE FLASHING MAY BE USED WITH SQUARE OR RECTANGULAR STRUCTURAL TUBING WITH ROUNDED
CORNERS.
4. EPDM PRIMER MUST BE APPLIED TO THE MATING SURFACES PRIOR TO APPLYING QUICK APPLIED
UNCURED EPDM FLASHING.
CUT HOLE IN METAL PANEL 1"
LARGER THAN PIPE
STAINLESS STEEL
CLAMPING RING
PRE-MOLDED PRESSURE-
SENSITIVE PIPE SEAL
WATER CUT-OFF MASTIC
PRIMER
PIPE PENETRATION. 1/2" TO 6"
DIAMETER.
SCALE:3 PIPE FLASHING @ METAL ROOFING (PRE-MOLDED)
3" = 1' - 0"
PRE-MOLDED PIPE SEAL
NOTES:
1. EXTEND PLUMBING WASTE VENTS AND TERMINATE 6" MINIMUM ABOVE ADJACENT ROOF LEVELS.
2. REMOVE ALL LEAD AND OTHER FLASHING BEFORE INSTALLING FIELD FABRICATED PIPE SEAL.
3. APPLY EPDM PRIMER TO SPLICE AREA.
4. PRE-MOLDED PIPE FLASHING MUST HAVE INTACT RIB AT THE TOP EDGE REGARDLESS OF PIPE
DIAMETER.
CUT HOLE IN METAL
PANEL 1" LARGER
THAN PIPE
STAINLESS STEEL
CLAMPING RING
PRE-MOLDED PRESSURE-
SENSITIVE PIPE SEAL
WATER CUT-OFF MASTIC
PRIMER
PIPE PENETRATION. 1/2" TO
6" DIAMETER.
SCALE:5 PIPE FLASHING @ EPDM ROOF (PRE-MOLDED)
3" = 1' - 0"
PRE-MOLDED PIPE SEAL
NOTES:
1. EXTEND PLUMBING WASTE VENTS AND TERMINATE 6" MINIMUM ABOVE ADJACENT ROOF LEVELS.
2. REMOVE ALL LEAD AND OTHER FLASHING BEFORE INSTALLING FIELD FABRICATED PIPE SEAL.
3. APPLY EPDM PRIMER TO SPLICE AREA.
4. PRE-MOLDED PIPE FLASHING MUST HAVE INTACT RIB AT THE TOP EDGE REGARDLESS OF PIPE
DIAMETER.
SCALE:11 SCUPPER - ISOMETRIC VIEW
1 1/2" = 1' - 0"
1'-0"
4"
4"
6"
4"
WALL THK + 2"
DRIP EDGE
STAINLESS STEEL
SCALE:7 ROOF DRAIN SUMP
1 1/2" = 1' - 0"
(E) STRAINER AND
CLAMPING RING (N) WATER CUTOFF MASTIC. ALL
BOLTS OR CLAMPS MUST BE IN
PLACE TO PROVIDE CONSTANT
COMPRESSION ON MASTIC.
REMOVE (E) FLASHING MATERIAL &
ENSURE THE DRAIN RING IS COMPLETELY
CLEAN DOWN TO BARE METAL. DRILL AND
TAP (E) BOLT HOLES. PAINT DRAIN BOWL.
REINSTALL (E) STRAINER.
(N) EPDM MEMBRANE
(N) TAPERED INSULATION
(N) COVER BOARD
(N) SUMP
(E) ROOF DRAIN BOWL
(E) WOOD DECK
CUT A HOLE IN MEMBRANE
GREATER THAN DRAIN PIPE
DIAMETER, BUT SHALL BE NO
LESS THAN 1/2" FROM DRAIN
CLAMPING RING ATTACHMENT
POINTS.
SEATTLE PARKS AND RECREATION
CENTRAL WEST HEADQUARTERS
DATE OF SUBSTANTIAL COMPLETION
(DSC)
DATE OF INSTALL WARRANTY AND EXPIRATION
(DSC + 2 YEARS)
DATE OF ROOF MANUFACTURER WARRANTY EXPIRATION
(DSC + 20 YEARS)
ROOF MANUFACTURER AND WARRANTY REFERENCE NO.:
(ROOF MANUFACTURER: WARRANTY NUMBER)
ROOF INSTALLER AND INSTALLER WARRANTY REFERENCE NUMBER
(INSTALLER AND TELEPHONE NUMBER)
(INSTALLER'S PROJECT NUMBER)
DESCRIPTION OF ROOF ASSEMBLY
- PROVIDE DECRIPTION OF ROOF ASSEMBLY -
ENGRAVED ALUMINUM PLAQUE
5 1/2"
SCALE:13 ROOF PLAQUE
3" = 1' - 0"
8 1 /2"
COORDINATE INSTALLATION OF
PLAQUE WITH PROJECT
ENGINEER AND ARCHITECT.
PROVIDE ROOF PLAQUES FOR
EACH TYPE OF ROOF ASSEMBLY.
(2 TOTAL).
2'-0"
LADDER WIDTH
7"
SCALE:16 LADDER TO LOW ROOF
3/4" = 1' - 0"
FRONT ELEVATION SIDE ELEVATION
1'- 0"
TY
P.
GRAB BAR
ALUMINUM
PLATFORM
3'- 6"
ALUMINUM RUNGS
ALUM LADDER BRACKET.
ANCHOR TO WOOD
FRAMING
ALUMINUM RAIL
'-7
VF
Y
(E) FRAMED WALL
SIDE RAIL
2X BLOCKING
@ BRACKET
6"
HINGED SECURITY GATE
6"
Also, verify all underground utilities not located by the 811 service by using a commercial location service and call SPR Inspection Request Line (206) 684-7034.
>>>>CAUTION - CALL 811<<<<
UTILITY NOTIFICATION CENTER
BEFORE YOU DIG!
WWW.CALL811.COM
CENTRAL WEST HEADQUARTERS
1001 SW Klickitat Way, Suite 204 Seattle WA 98134 p: 206.631.8442 | www.oaips.com
RE-ROOF
REGISTERED
ARCHITECT
JERRY D. OSBORN
STATE OF WASHINGTON
DETAILS
JO
CG
AS NOTED
13 19
A5.2
TIMBER:
STRUCTURAL TIMBER AND LUMBER TO BE STRESS GRADE HEM-FIR OR DOUGLAS FIR AS FOLLOWS:
USE SPECIES GRADE FB
4 X BEAMS/POST DOUGLAS FIR NO. 2 900 PSI
6 X BEAMS/POST DOUGLAS FIR NO. 1 1350 PSI
EXTERIOR & BEARING WALL STUDS DOUGLAS FIR NO. 2 900 PSI
SHEAR WALL STUDS, PLATES AND BLOCKING DOUGLAS FIR NO. 2 900 PSI
ROOF JOISTS, FLOOR JOISTS DOUGLAS FIR NO. 2 900 PSI
BEARING WALLS DOUGLAS FIR NO. 2 900 PSI
WOOD AND WOOD BASED MATERIALS USED IN CONTACT WITH SOIL, CONCRETE OR MASONRY, INSTALLED WITHIN 1” OF CONCRETE OR MASONRY, OR EXPOSED TO MOISTURE EITHER INTERIOR OR EXTERIOR, SHALL BE TREATED WITH AN APPROVED PRESERVATIVE PER THE “PRESERVATIVE TREATMENT” SECTION BELOW.
SOLID BLOCKING OF NOT LESS THAN 2" NOMINAL THICKNESS SHALL BE PROVIDED AT ENDS AND AT ALL SUPPORTS OF JOISTS AND RAFTERS. BETWEEN SUPPORTS PROVIDE BLOCKING OR BRIDGING AT 8' - 0" O.C.
ALL SILL PLATES AT SHEAR WALLS TO BE 3X_ PRESERVATIVE TREATED DOUGLAS-FIR #2, U.N.O. ON THE PLANS. SILL PLATES SHALL HAVE A MOISTURE CONTENT OF NOT GREATER THAN 19% BEFORE BEING
COVERED WITH INSULATION, INTERIOR WALL FINISH, FLOOR COVERING OR OTHER MATERIAL.
ALL STUD WALL SILL AND TOP PLATE MEMBERS SHALL BE SURFACE-DRIED (S-DRY) LUMBER (MOISTURE CONTENT = 19% OR LESS DURING FRAMING). ALL STUDS AND POSTS MAY BE SURFACE-GREEN (S-GREEN) LUMBER (MOISTURE CONTENT = 19% TO 23% DURING FRAMING) OR S-DRY LUMBER. THE MOISTURE CONTENT OF THE FRAMING SHALL BE LESS THAN 12 % PRIOR TO INSTALLATION OF GYPSUM WALLBOARD
SHEATHING.
WOOD CONNECTORS:
SILL BOLTS TO BE 3/4" DIAMETER EMBEDDED 7" INTO THE CONCRETE. MAXIMUM SPACING OF SILL BOLTS SHALL BE 48” O.C. AT DESIGNATED SHEARWALLS SILL BOLT SPACING SHALL BE PER THE PLANS. USE GALVANIZED 3" X 3" X 1/4" PLATE WASHERS, WITH HOLES NO GREATER THAN 3/16” LARGER THAN THE BOLT DIAMETER AT ALL SHEARWALL SILL BOLTS. PROVIDE A MINIMUM OF TWO BOLTS EACH PIECE. PROVIDE ONE BOLT AT EACH END OF EACH PIECE, NOT LESS THAN 6” AND NOT MORE THAN 12” FROM THE END.
BOLT HEADS AND NUTS BEARING AGAINST WOOD TO BE PROVIDED WITH MALLEABLE IRON WASHERS EXCEPT ON STEEL BEAM NAILERS USE CUT WASHERS. NAILERS TO STEEL BEAMS SHALL BE ATTACHED WITH
5/8" BOLTS AT 3' - 0" O.C. STAGGERED.
NAILS SHALL CONFORM TO REQUIREMENTS OF ASTM F 1667 AND HAVE A MINIMUM BENDING STRENGTH OF 90 KSI FOR SHANK DIAMETERS BETWEEN .142” AND .177”. ALL WOOD-TO-WOOD NAILING SHALL BE PER IBC TABLE 2304.9.1. IF PLANS AND DETAILS SPECIFY 8D, 10D OR 16D NAILS, THEY SHALL HAVE THE FOLLOWING
PROPERTIES:
8D = 0.131” DIA X 2-1/2”
10D = 0.148” DIA X 3”
16D = 0.162” DIA X 3-1/2”
ALL SUBSTITUTIONS SHALL HAVE THE WRITTEN APPROVAL OF THE ENGINEER OF RECORD PRIOR TO USE.
LIGHT GAUGE METAL FRAMING CONNECTORS AND THEIR REQUIRED FASTENERS SHALL BE “STRONG-TIE” BY
SIMPSON COMPANY, OR APPROVED EQUAL.
ALL FASTENERS AND CONNECTORS IN CONTACT WITH PRESERVATIVE TREATED WOOD SHALL BE HOT- DIPPED GALVANIZED STEEL WITH A G185 SPECIFICATION OR TYPE 304 & 316 STAINLESS STEEL. TYPE 304 AND 316 STAINLESS STEEL SHOULD BE USED FOR ALL CONNECTORS AND FASTENERS IN CONTACT WITH AZCA TREATED WOOD AND SOME VARIATIONS OF ACQ TREATED WOODS. HOT-DIPPED GALVANIZED STEEL
SHOULD NEVER COME IN CONTACT WITH STAINLESS STEEL.
THE STRUCTURE SHOWN ON THESE DRAWINGS IS STRUCTURALLY SOUND ONLY IN ITS COMPLETED FORM.
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BRACING TO STABILIZE THE BUILDING DURING
CONSTRUCTION.
THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR, AND WILL NOT HAVE CONTROL OF, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE CONSTRUCTION WORK, NOR WILL HE BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
FIELD MEASUREMENTS AND THE VERIFICATION OF FIELD DIMENSIONS ARE NOT PART OF THE STRUCTURAL ENGINEER'S RESPONSIBILITY. THE CONTRACTOR MUST CHECK ALL (ASSUMED) EXISTING CONDITIONS
SHOWN ON THESE DRAWINGS FOR ACCURACY AND NOTIFY THE STRUCTURAL ENGINEER OF ANY
DISCREPANCIES.
OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OR THE INADVERTENT MISLABELING OF DETAILS OF
WORK WHICH ARE MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND
SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR INADVERTENT MISLABELED DETAILS OF THE WORK BUT THEY SHALL BE
PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATIONS.
SHOP DRAWINGS
SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION. SHOP DRAWING SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE PURPOSE OF SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO THE ENGINEER THAT THE CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT, BY INDICATING WHICH MATERIAL IS INTENDED TO BE FURNISHED AND INSTALLED, AND BY DETAILING THE INTENDED FABRICATION AND INSTALLATION METHODS. IF DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN SHOP DRAWING SUBMITTALS AND THE CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SHOP DRAWING SUBMITTALS ARE PROCESSED BY THE ENGINEER, THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL CONTROL AND SHALL BE FOLLOWED. SUBMITTAL REVIEW IS FOR
GENERAL CONFORMANCE ONLY; THIS REVIEW DOES NOT CHECK DIMENSIONS OR QUANTITIES.
THE FOLLOWING NOTES APPLY EXCEPT WHERE SHOWN OTHERWISE
CODE: INTERNATIONAL BUILDING CODE (IBC) (2021)
SEATTLE EXISTING BUILDING CODE (SEBC) (2021)
THIS IS A VOLUNTARY SEISMIC UPGRADE OF ELEMENTS AT ROOF ONLY
STRUCTURAL LOADS
ROOF SNOW LOADS: GROUND SNOW LOAD, Pg = 25PSF ROOF SNOW LOAD, Pf = 25PSF SNOW EXPOSURE FACTOR, Ce = 1.0 SNOW LOAD IMPORTANCE FACTOR, Is = 1.0 THERMAL FACTOR, Ct = 1.0
EARTHQUAKE LOADS: THIS IS VOLUNTARY SEISMIC UPGRADE
HAZARD LEVEL BSE-1E
SEISMIC IMPORTANCE FACTOR Ie = 1.00 MAPPED ACCELERATIONS, Ss = 0.506 S1 = 0.157
SITE CLASS = D
DESIGN ACCELERATIONS, Sxs = 0.706 Sx1 = 0.359
SEISMIC DESIGN CATEGORY = D
BASIC SEISMIC FORCE RESISTING SYSTEM: UNREINFORCED MASONARY
SHEARWALLS
SEISMIC RESPONSE COEFFICIENT, Sa = 0.706
SCOPE OF STRUCTURAL ENGINEERING SERVICES:
THE STRUCTURAL ENGINEER HAS PERFORMED THE STRUCTURAL DESIGN AND PREPARED THE STRUCTURAL
WORKING DRAWINGS FOR THIS PROJECT. THE CONSTRUCTION MUST BE PERFORMED IN STRICT
ACCORDANCE WITH THE STRUCTURAL DRAWINGS. ANY DEVIATION FROM THE DRAWINGS MUST BE
APPROVED IN WRITING BY THE STRUCTURAL ENGINEER. ERRORS AND/OR OMISSIONS FOUND ON THE STRUCTURAL DRAWINGS MUST BE BROUGHT TO THE STRUCTURAL ENGINEER'S ATTENTION IMMEDIATELY.
ARCHITECTURAL DRAWINGS ARE THE PRIME CONTRACT DRAWINGS. STRUCTURAL DRAWINGS SHALL BE
USED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS. PRIMARY STRUCTURAL ELEMENTS ARE
DIMENSIONED ON THE STRUCTURAL PLANS AND DETAILS. THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE DIMENSIONS AMONG ALL DRAWINGS. ANY DISCREPANCIES, CONTRADICTIONS, OR OMISSIONS SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH WORK OR
FABRICATION OF THE ITEM(S) IN QUESTION.
THE STRUCTURAL ENGINEER IS RESPONSIBLE FOR THE DESIGN OF THE PRIMARY STRUCTURAL SYSTEM, EXCEPT FOR ANY COMPONENTS NOTED ABOVE. RESPONSIBILITY FOR ANY SECONDARY STRUCTURAL AND NON-STRUCTURAL SYSTEMS NOT SHOWN ON THE STRUCTURAL PLANS RESTS WITH SOMEONE OTHER THAN
THE STRUCTURAL ENGINEER.
PRESERVATIVE TREATMENT:
ALL LUMBER, TIMBER, PLYWOOD, GLUE-LAMINATED AND OTHER COMPOSITE LUMBER THAT IS IN CONTACT
WITH CONCRETE OR MASONRY OR EXPOSED TO WEATHER SHALL BE PRESERVATIVE TREATED IN
ACCORDANCE WITH CURRENT AMERICAN WOOD-PRESERVERS’ ASSOCIATION (AWPA) PRESERVATIVE (P) STANDARDS. THESE MEMBERS SHALL BE TREATED WITH AN APPROVED PRESERVATIVE IN ACCORDANCE WITH CURRENT AWPA COMMODITY (C) STANDARDS AND THE AWPA USE CATEGORY SYSTEM (UCS).
WHEREVER POSSIBLE, PRECUT ALL MATERIAL BEFORE TREATMENT. HANDLE TREATED LUMBER IN
ACCORDANCE WITH AWPA M4 STANDARDS.
FIELD CUTS, HOLES (SUCH AS ANCHOR BOLT HOLES IN TREATED SILL PLATES) AND PENETRATION DAMAGE SHALL BE TREATED IN ACCORDANCE WITH THE CURRENT AWPA M4 STANDARDS. THE MOST COMMONLY AVAILABLE PRESERVATIVE MEETING THE REQUIREMENTS OF STANDARD M4 IS A COPPER NAPHTHENATE SOLUTION CONTAINING AT LEAST 2% COPPER. CERTAIN DAP, WM BARR, CUPRINOL, BEHR, GREEN'S, JASCO, HENRY AND FIELDS PRESERVATIVE PRODUCTS CONTAIN THIS METAL CONTENT.
ALL FASTENERS AND CONNECTORS IN CONTACT WITH PRESERVATIVE TREATED WOOD SHALL BE HOT-
DIPPED GALVANIZED OR TYPE STAINLESS STEEL. SEE THE “WOOD CONNECTORS” SECTION.
STRUCTURAL STEEL:
CHANNELS, ANGLES, AND PLATES TO BE ASTM A36, FY=36 KSI; UNO.
ALL STEEL EXCEPT STEEL EMBEDDED IN CONCRETE SHALL BE GIVEN ONE SHOP COAT OF APPROVED PAINT.
WELDS TO BE 3/16" MINIMUM CONTINUOUS FILLET, BY CERTIFIED WELDERS USING E70XX ELECTRODES.
ALL WELDING SHALL BE PERFORMED IN STRICT ADHERENCE TO A WRITTEN WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1. ALL WELDING PARAMETERS SHALL BE WITHIN THE ELECTRODE MANUFACTURER’S RECOMMENDATIONS. WELDING PROCEDURES SHALL BE SUBMITTED TO THE OWNER’S TESTING AGENCY FOR REVIEW BEFORE STARTING FABRICATION OR ERECTIONS. COPIES OF THE WPS SHALL BE
ON SITE AND AVAILABLE TO ALL WELDERS AND THE SPECIAL INSPECTOR.
STEEL TO STEEL BOLTED CONNECTIONS ARE SHOWN TO BE BEARING-TYPE CONNECTIONS USING A325 BOLTS WITH THREADS INCLUDED IN THE SHEAR PLANE. HOLE SIZE SHALL BE IN ACCORDANCE WITH AISC SPECIFICATION FOR BEARING CONNECTION AND BOLTS SHALL BE TIGHTENED TO SNUG-TIGHT CONDITION.
WHERE BOLTS ARE NOTED A325SC, CONNECTIONS SHALL BE FRICTION-TYPE CONNECTIONS WITH BOLTS TENSIONED AND USING APPROPRIATE HARDENED STEEL WASHERS AS REQUIRED BY AISC STANDARDS.
ANCHOR BOLTS EMBEDDED IN CONCRETE OR MASONRY ARE ASTM F1554 GRADE 36, UNLESS OTHERWISE NOTED. USE HEADED ANCHOR BOLTS, NOT “J” BOLTS. DO NOT ENLARGE HOLES IN BASE PLATE BY BURNING.
BENDING OF ANCHOR BOLTS IS PERMITTED ONLY WITH THE PRIOR APPROVAL FROM THE ENGINEER.
SUBMIT SHOP DRAWINGS PREPARED BY AN EXPERIENCED DETAILER FOR REVIEW PRIOR TO FABRICATION. SHOP DRAWINGS TO BE COMPLETE, SHOWING ALL WELDS AND MATERIAL GRADES. PROVIDE A PLAN LOCATION OR DETAIL REFERENCE FOR EACH SHOP DRAWING. FOR MINOR STEEL-TO-STEEL CONNECTIONS OF 12” AND SMALLER STEEL MEMBERS: IF AN EXPLICIT CONNECTION IS NOT SHOWN ON THE STRUCTURAL DRAWINGS, DETAILER IS TO PROPOSE A CONNECTION SIMILAR TO THE CONNECTIONS ON THE DRAWINGS OR PER AISC STANDARD CONNECTIONS. ON THE SHOP DRAWING, CLOUD THE CONNECTION AND STATE “VERIFY.” SHOP DRAWINGS NOT MEETING THESE CONDITIONS WILL BE REJECTED. REVIEW OF SHOP DRAWINGS BY THE ENGINEER IS FOR DESIGN INTENT ONLY, AND DOES NOT INCLUDE VERIFICATION OF DIMENSIONS AND QUANTITIES. VERIFICATION OF DIMENSIONS AND QUANTITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR.
STEEL FABRICATORS AND DETAILERS: BASE BID TO INCLUDE STEEL DETAILER AND FABRICATOR TIME AND COSTS FOR ROUTINE CONSTRUCTION QUESTIONS. ROUTINE CONSTRUCTION QUESTIONS INCLUDE DIMENSIONAL QUESTIONS AND MINOR FRAMING QUESTIONS. ROUTINE CONSTRUCTION QUESTIONS ARE PART OF THE NORMAL
CONSTRUCTION PROCESS, AND ARE TO BE INCLUDED IN THE BASE BID.
MASONRY GROUT
ELEMENTS EXPOSURE CATEGORY f'c
MASONRY POURED GROUT IN CELLS AND BOND BEAMS - - 2500
FOR HIGH STRENGTH BOLTS, NUTS, AND WASHERS:
VERIFY IDENTIFICATION MARKINGS TO CONFORM TO
ASTM STANDARDS SPECIFIED IN THE APPROVED
CONSTRUCTION DOCUMENTS
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STEEL CONSTRUCTION
TYPE CONTINUOUS PERIODIC REFERENCE STANDARD IBC REFERENCE
INSPECTION OF HIGH STRENGTH BOLTING:
PROVIDE INSPECTION OF HIGH STRENGTH BOLTING TO
CONFORM TO AISC 341-16 CHAPTER J. INSPECTION TASKS
INCLUDE:
1. SELECTION OF PROPER MATERIALS AND BOLTING
PROCEDURES PRIOR TO BOLTING.
2. OBSERVATION OF BOLTING DURING BOLTING TO
ASSURE PROPER ASSEMBLIES AND TECHNIQUES
ARE EMPLOYED.
3. DOCUMENTATION OF ACCEPTED AND REJECTED
BOLTING AFTER BOLTING IS COMPLETED.
4. SNUG-TIGHT JOINTS
5. PRE-TENSIONED AND SLIP CRITICAL JOINTS USING
TURN- OF-NUT WITH MATCHMARKING, TWIST-OFF
BOLT OR DIRECT TENSION INDICATOR METHODS OF
INSTALLATION.
6. PRE-TENSIONED AND SLIP CRITICAL JOINTS USING
TURN-OF-NUT WITHOUT MATCHMARKING OR
CALIBRATED WRENCH METHODS OF INSTALLATION.
MATERIAL VERIFICATION OF STRUCTURAL STEEL AND COLD
FORMED METAL DECK:
STRUCTURAL STEEL IDENTIFICATION MARKINGS TO
CONFORM TO AISC 360
MATERIAL VERIFICATION OF WELD FILLER MATERIALS:
IDENTIFICATION MARKINGS TO CONFORM TO AWS
SPECIFICATION IN THE APPROVED CONSTRUCTION
DOCUMENTS
INSPECTION OF STEEL FRAME JOINT DETAILS FOR
COMPLIANCE:
1. BRACING AND STIFFENING DETAILS
2. MEMBER LOCATIONS
3. APPLICATION OF JOINT DETAILS AT EACH
CONNECTION
SHOP FABRICATED STEEL:
STRUCTURAL STEEL ELEMENTS FABRICATED AT SHOP
WHICH IS FULLY AISC CERTIFIED, WITH DETAILED
FABRICATION AND QUALITY CONTROL PROCEDURES
FABRICATED AT SHOP OTHER THAN ABOVE:
SPECIAL INSPECTOR PROVIDES INSPECTIONS IN SHOP
INSPECTION OF WELDING:
1. COMPLETE AND PARTIAL JOINT PENETRATION
GROVE WELDS
2. MULTI-PASS FILLET WELDS
3. SINGLE-PASS FILLET WELDS > 5/16"
4. PLUG AND/OR SHOT WELDS
5. SINGLE-PASS FILLET WELDS ≤ 5/16"
6. FLOOR AND ROOF DECK WELDS
- X
AISC 360, SECTION
A3.3 AND
APPLICABLE ASTM
STANDARDS
- X
AISC 360,
SECTION M2.5
AISC 341-16
CHAPTER J,
TABLES J7-1,
J7-3, J7-2
- X
AISC 360, SECTION
N5.6
X -
AISC 360, SECTION
N5.6
- X
AISC 360, SECTION
A3.1
- X
AISC 360, SECTION
A3.5 AND
APPLICABLE AWS
A5 DOCUMENTS
1705.2.1 AND
1705.2.2
X 1704.3.2
NOT REQUIRED 1704.2.5NOT REQUIRED
ALL INSPECTIONS PER STEEL
SECTION
1704.2.5
- X
- X
X -
X -
X -
X -
AWS D1.3
AWS D1.1
AISC 360,
SECTION N5.4
1704.3.1
COMPLIANCE WITH REQUIRED INSPECTION PROVISIONS
OF THE CONSTRUCTION DOCUMENTS AND THE APPROVED
SUBMITTALS SHALL BE VERIFIED
REQUIRED INSPECTIONS AND VERIFICATIONS FOR MASONRY CONSTRUCTION
TYPE CONTINUOUS PERIODIC REFERENCE STANDARD IBC REFERENCE
VERIFICATION OF (f'm) PRIOR TO CONSTRUCTION
VERIFICATION OF SLUMP FLOW AND VSI AS DELIVERED
TO THE SITE FOR SELF-CONSOLIDATING GROUT
AS MASONRY CONSTRUCTION BEGINS, THE FOLLOWING
SHALL BE VERIFIED TO ENSURE COMPLIANCE:
1. PROPORTIONS OF SITE-PREPARED MORTAR
2. CONSTRUCTION OF MORTAR JOINTS
3. LOCATION OF REINFORCEMENT, CONNECTORS
AND ANCHORAGES
DURING CONSTRUCTION THE INSPECTION PROGRAM
SHALL VERIFY:
1. SIZE AND LOCATION OF STRUCTURAL ELEMENTS
2. TYPE, SIZE AND LOCATION OF ANCHORS, INCLUDING
OTHER DETAILS OF ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS, FRAME OR OTHER
CONSTRUCTION
3. SPECIFIED SIZE, GRADE AND TYPE OF
REINFORCEMENT, ANCHOR BOLTS AND
ANCHORAGES
4. PREPARATION, CONSTRUCTION AND PROTECTION
OF MASONRY DURING COLD WEATHER
(TEMPERATURES BELOW 40°F) OR HOT WEATHER
(TEMPERATURES ABOVE 90°F)
GROUT PLACEMENT SHALL BE VERIFIED TO ENSURE
COMPLIANCE
PREPARATION OF ANY REQUIRED GROUT SPECIMENS,
MORTAR SPECIMENS AND/OR PRISMS SHALL BE
OBSERVED
PRIOR TO GROUTING, THE FOLLOWING SHALL BE VERIFIED
TO ENSURE COMPLIANCE:
1. GROUT SPACE IS CLEAN
2. PLACEMENT OF REINFORCEMENT, CONNECTORS
AND ANCHORAGES
3. PROPORTIONS OF SIT-PREPARED GROUT
4. CONSTRUCTION OF MORTAR JOINTS
X TMS 602/ACI 530.1/ASCE 6a
Art. 1.5
X TMS 602/ACI 530.1/ASCE 6a
Art. 1.4B
TMS 602/ACI 530.1/ASCE 6a Art. 1.5B.1b.3
X
X TMS 602/ACI 530.1/ASCE 6a
Art. 2.6A, 3.3B, 3.4, 3.6A
X
TMS 602/ACI 530.1/ASCE 6a Art. 1.8C, 1.8D, 2.4, 3.3F, 3.4;
TMS 402/ACI 530/ASCE 5a Sec. 1.2.2(e), 1.15, 1.16.1;
IBC Sec. 2104.3, 2104.4
X
TMS 602/ACI 530.1/ASCE 6a Art. 2.6B, 3.2D, 3.3B, 3.4;
TMS…