Summary of Project Statement 26360
This Project Statement from the Michigan Department of Technology, Management and Budget (DTMB) on behalf of the Michigan Department of Corrections (MDOC) requests professional architectural and engineering services for Phases 300, 400, 500, 600, and 700 to design a facility equipment storage building at Green Oaks Training Center in Whitmore Lake, Michigan. The proposed structure will house heavy equipment including front-end loaders, zero-turn mowers, Bobcats, and salt-spreader trucks, requiring 4 to 6 overhead doors with 12-foot ceilings and 10-foot high doors, heated concrete entrance slabs, and a separate non-heated salt storage bay with hardened walls. Proposals are due Thursday, September 3, 2026, at 2:00 p.m. Eastern. A mandatory pre-proposal walk-through inspection and meeting will be held on Wednesday, August 12, 2026, at 9:00 a.m. at the Green Oaks Training Center. All contractor representatives must submit a Vendor/Contractor LEIN Request five business days prior to the meeting. The design contract is expected to be awarded in September 2026, with completed design and construction documents ready for bidding by February 2027, construction contract award in March 2027, and construction commencement in April 2027.
The Professional Services Contract (PSC) proposal must include a complete cost estimate covering all phases, with reimbursable expenses itemized separately for sub-consultants, printing, postage, travel over 100 miles, LARA plan review, testing, and permitting. Required deliverables include schematic plans through contract documents with design submittals at 50 and 90 percent milestones, cost estimates with each submittal, four full-size sealed hardcopy sets of contract documents, a proposed design schedule, bi-weekly progress summaries, and a graphic bar chart schedule in weeks based on a proposed contract start date of September 24, 2026. The PSC must participate in a minimum of four in-person face-to-face meetings, assume fourteen calendar days for owner review periods, and maintain a complete project file throughout design and construction administration. Proposals must be uploaded to SIGMA VSS; attachments cannot exceed 25 megabytes. Questions must be submitted by August 20, 2026, at 2:00 p.m. Eastern to the Project Director.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| LEIN Request 26360.pdf | ||
| RFP Billable Rate 26360.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 04/26)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
472/26360.KMM
PROPOSAL DUE DATE
Thursday, September 3, 2026, at 2:00 pm EASTERN
CLIENT AGENCY
Department of Corrections
PROJECT NAME AND LOCATION
Green Oaks Training Center (GTC) Facility Equipment Storage Building
PROJECT ADDRESS (if applicable) Green Oaks Training Center, 8701 M-36, Whitmore Lake, MI
CLIENT AGENCY CONTACT
Corey Daly Tim Schubring
TELEPHONE NUMBER
517-927-3326 734-449-6755
DTMB - DCD PROJECT DIRECTOR
Kurt Maiberger
TELEPHONE NUMBER
517-899-2693
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
A MANDATORY PRE-PROPOSAL MEETING will be conducted by the Issuing Office for this Request for Proposal at Green Oaks Training Center (GTC), 8701 M-36 located in Whitmore Lake, Michigan, at 9:00 a.m. on Wednesday, August 12, 2026.
MANDATORY (Check box if Mandatory)
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
PROJECT DESCRIPTION/SERVICES REQUESTED:
The Department of Technology, Management and Budget (DTMB) on behalf of Michigan Department of Corrections (MDOC), is requesting professional architectural and engineering services to perform Phase 300, 400, 500, 600, 700 Professional Services at the Green Oaks Training Center (GTC), Whitmore Lake, Michigan. The intent of this selection process is to contract with a qualified firm to provide ad-hoc professional services to design a project to add a facility equipment storage building. The building to house front end loader, two zero turn mowers, Bobcat, truck with salt spreader, other materials, etc. Minimum of 4 to 6 overhead doors, 12’ ceilings with 10’ high doors, concrete entrance slab, heated. Separated salt storage bay with hardened walls, non-heated, high ceiling and door. This design should include but not limited to site survey, building location analysis, soil borings/geotechnical analysis, electrical circuit capacity review, LARA review, etc.
Phase 600 and 700 construction administration by the PSC will be required, and the PSC will participate in the contractor bidding and selection process.
mailto:SmithD76@michigan.gov mailto:FrostS1@michigan.gov
Provide a complete PSC proposal for all required Professional Architectural and Engineering Services in compliance with the State of Michigan, Department of Technology, Management and Budget (DTMB) Project Statement (DTMB-0427), DTMB Billable Rate Professional Services Contract and the DTMB Request for Proposal Billable Rate Form (DTMB-0430) and the DTMB, State Facilities Administration, Design and Construction (DCD) policies and procedures for complete Phase 300, 400, 500, 600, and 700 design services to produce the deliverables detailed in the Scope of Work.
Professional services shall also include, but are not limited to the following:
• Gathering and verifying all base information required for the proper design of the project.
• Phase 300, 400, 500 design services as required to produce schematic plans through contract document development.
• Design submittals for review at 50% and 90% milestones. Cost estimates are required with each submittal.
• Phase 600 & 700 construction administration services.
• Gathering or preparing all data and design development information that shall ultimately be necessary for plans, submittals, and permit application considerations where required. Include as reimbursable expenses.
• Provide a proposed design schedule. Schedule shall be kept up to date through the project design.
• Provide up to four (4) full-size sealed hardcopy sets of contract documents, including addenda, for
DTMB and MDOC use during construction.
• Michigan Licensing and Regulatory Affairs (LARA) plan review submittal.
• All testing throughout construction.
• Sub-consultants, printing/reproduction, postage, and project travel (over 100 miles) are to be included as a reimbursable expense.
The PSC proposal shall also include, but are not limited to the following:
• The proposal must include meetings as required to fulfill the intent of the contract. While some project team meetings may be considered in the form of computer-based meetings (e.g., Teams, Zoom, etc.), key review meetings shall be in person. For all document review meetings, required review information shall be submitted within sufficient time to allow for complete Owner review, in electronic and in hard copy formats. At a minimum, four (4) face to face meetings will be required, including but not limited to: the predesign meeting, pre bid meeting and pre-construction meetings.
• Provide a bi-weekly progress summary email to the project team, briefly documenting the prior two week’s progress by the PSC and display the initial project schedule and current schedule status.
• All testing required to verify the site conditions for the proper design are to be identified in the PSC Technical proposal, and the associated costs of testing are to be itemized in the PSC Cost proposal as reimbursements. The PSC shall indicate in their proposal any testing requirements.
• A graphic bar chart schedule (in weeks) indicating the PSC’s proposed timeline for services based on a proposed PSC contract start date of September 24, 2026. For scheduling purposes, assume fourteen (14) calendar days each for Owner review for the documentation and recommendation.
• Budget for the construction portion of the project.
The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, base information, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders, and communications.
Reimbursable Items: Itemize all reimbursable expenses and allowances in the PSC Proposal as individual line items.
• List and include all field services, travel expenses, permitting, and testing required for the proper design and construction oversight of this project.
• LARA Plan Review.
• PSC shall detail any additional reimbursables not specifically listed they deem needed to successfully complete this project.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS.
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
• Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 25mb.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
90607, 90638, 92517, 92533, 92586
DESIRED SCHEDULE OF WORK
Award of design contract in September 2026. Complete design and have a set of construction documents ready to bid in February 2027. Award construction contract March 2027. Construction to start in April 2027.
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to Kurt Maiberger at maibergerk@michigan.gov address no later than 2:00 p.m., Eastern on August 20, 2026.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4 mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:maibergerk@michigan.gov