Project Manual for Grange Phase 2A - Sections 11, 12 & Morton Rd Entry Landscape Improvements
This Project Manual contains technical specifications and construction documents for landscape improvements in Texas, specifically for the Grange Phase 2A development covering Sections 11, 12, and the Morton Road entry. The scope of work encompasses pedestrian hardscape and pavers, signage, planting and irrigation systems, lighting and electrical installations, landscape maintenance, grading and drainage work, site furniture, and wall construction. The document provides detailed specifications, construction standards, and technical requirements necessary for contractors to bid on and execute the landscape improvement work across the identified project areas.
The manual serves as the primary reference document for contractors preparing proposals, containing construction details, material specifications, quality standards, and installation procedures for all landscape components. It establishes the technical requirements and performance standards that successful bidders must meet throughout the project execution, ensuring consistency and quality across all landscape improvement elements within the Grange Phase 2A development.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grange Phase 2A – Sections 11,12 & Morton Rd Entry
Landscape Improvements
Waller County M.U.D. No. 55
Katy, Texas
September 11, 2026
CCA Project No. 125-085
Technical Specifications Provided By:
Clark Condon
10401 Stella Link Road Houston, Texas 77025
09.11.2026
Grange Phase 2A – Sections 11,12 & Morton Rd Entry
TABLE OF CONTENTS
I. INVITATION TO BIDDERS
II. INSTRUCTIONS TO BIDDERS
III. BID FORM
IV. CONTRACT
V. GENERAL CONDITIONS OF THE CONTRACT
- ATTACHMENT A TO THE GENERAL CONDITIONS OF THE CONTRACT
- ATTACHMENT B TO THE GENERAL CONDITIONS OF THE CONTRACT – MININUM WAGE
RATE SCALE
VI. SPECIAL CONDITIONS OF THE CONTRACT PART A
VII. SPECIAL CONDITIONS OF THE CONTRACT PART B
VIII. TEXAS SALES AND USE TAX EXEMPTION CERTIFICATION
IX. MEMORANDUM OF CONSTRUCTION CONTRACT
X. DUAL PERFORMANCE AND PAYMENT BOND
XI. DUAL OBLIGEE RIDER
XII. MAINTENANCE BOND
XIII. NOTICE TO PROCEED
XIV. FORM OF AFFIDAVIT OF BILLS PAID
XV. LIEN RELEASE FORM
XVI. CERTIFICATE OF SUBSTANTIAL COMPLETION
XVII. LETTER OF SUBSTANTIAL COMPLETION
XVIII. TECHNICAL SPECIFICATIONS
Waller County Municipal Utility District No. 55
Electronic Bids Only, Electronic Signatures
Option, and Remote Public Bid Opening Option Page 1 of 1 September 2026
Date: September 11, 2026
INVITATION TO BIDDERS
Sealed Electronic Bids addressed to Waller County M.U.D. No. 55, Attention Rick Hale , President, Board of Directors, will be electronically received, until 10:00 a.m. Local Time, October 1st 2026, and then publicly opened and read at Clark Condon Associates for “Grange Phase 2A – Sections 11, 12, & Morton
Rd Entry – Landscape Improvements, Waller County, Texas”. You may view the public opening of sealed Bids via Microsoft Teams at www.CivcastUSA.com: search Grange Phase 2A – Sections 11, 12, &
Morton Rd Entry – Landscape Improvements.
Scope of Work of the Contract Documents includes the following Pedestrian Hardscape, Grading &
Drainage, Lighting & Electrical, Seat Walls, Retaining Walls, Monument and Wayfinding Signage, Pavers, Site Furniture, Planting, Irrigation, Seeding, and Sodding.
Bids received after the closing time will not be considered. A MANDATORY pre-bid conference will be held remotely on September 23rd, 2026, at 11:00 a.m. Local Time, at www.CivcastUSA.com: search
Grange Phase 2A – Sections 11, 12, & Morton Rd Entry – Landscape Improvements. Attendance by each prospective bidder or its representative at the pre-bid conference is MANDATORY, and no Bid will be opened unless the bidder or representative was present at the pre-bid conference.
Each Bid must be accompanied by a Bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.
Copies of the bidding documents may be reviewed and obtained from www.CivcastUSA.com: search
Grange Phase 2A – Sections 11, 12, & Morton Rd Entry – Landscape Improvements. Bidders must register on this website in order to view and/or download specifications, plans, soils report, and environmental reports for this Project. There is NO charge to view or download documents.
Bidder must submit its Bid and Bid Securities in compliance with Owner’s Order Adopting Section 49.2731
Electronic Bidding Rules and all Bids and Bid Securities must be submitted through www.CivcastUSA.com. Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website.
By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature, as defined by and in accordance with Owner’s
Electronic Signature Rules for Construction Contracts.
The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter.
4907-8155-3542 v.1
Waller County M.U.D. No. 55 INSTRUCTIONS TO BIDDERS
1109700 Instructions to Bidders September 2023
INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided on CivCast, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form.
All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form. See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder; if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.
The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation shall be shown below the signature.
When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS.
State contractor license number, if any, must also be shown.
The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the Invitation to Bidders.
2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.
Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com website for such information to Engineer not less than seven (7) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.
Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Engineer in writing. It is http://www.civcastusa.com/ the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Engineer’s office and the office designated to receive the Bids, if any.
Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract Documents and to complete the Work for the consideration in its Bid.
3. PRE-BID CONFERENCE. A MANDATORY pre-bid conference among Owner, Engineer, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The MANDATORY pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda. Attendance by each prospective bidder or its representative at the pre-bid conference is MANDATORY, and no Bid will be opened unless the bidder or representative was present at the pre-bid conference. If an attendee fails to provide his/her name, firm represented, street address, and telephone number, Owner may treat such attendee as not having been present and as having failed to comply with the mandatory pre-bid conference requirement. No person can represent more than one bidder at the MANDATORY pre-bid conference. If a person claims to represent more than one bidder at the pre-bid conference, the Bid of each bidder so represented will be returned unopened.
4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents.
If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.
5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price. The Bonds must be in the form prescribed by the Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.
It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price.
Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.
If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner; Developer, if there is a Special Conditions of the Contract Part B; and Engineer and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.
6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.
7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an “equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.
Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.
8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value; however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.
9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.
10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under Section 1.01 of the General Conditions of the Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day; (iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time;
(vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any provision of the Contract Documents.
11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, within five (5) calendar days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Engineer. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided. Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.
12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its Bid and the Bid Security will be returned.
13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code Section 2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name is Waller County Municipal Utility District No. 55; the contract ID number is 123-185A; and the description of goods and services is Grange – Franz Road Extension Segment 1 – Landscape Improvements. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295. ALL BIDDERS MUST SUBMIT THEIR
TEC FORM 1295 WITH THEIR BID.
14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid.
Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.
In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.
Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.
Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.
BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL
INVESTIGATIONS INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR
EXPERIENCE, AND OTHER FACTORS PERTAINING TO BIDDER’S PERFORMANCE OF THE
WORK, AS OWNER DEEMS NECESSARY IN ITS SOLE DISCRETION, AND FOR THAT
PURPOSE, SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC AUTHORIZATION TO
PERSONS AND ENTITIES CONTACTED BY OWNER IN CONNECTION WITH SUCH
INVESTIGATIONS TO PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER
AND TO DISCUSS AND EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY
SUBMISSION OF A BID, BIDDER AGREES TO FULLY AND FOREVER WAIVE AND RELEASE
ANY CLAIM (KNOWN OR UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER,
ENGINEER, DEVELOPER AND THEIR RESPECTIVE ATTORNEYS, EMPLOYEES,
CONSULTANTS, REPRESENTATIVES, AND AGENTS (“THE EVALUATING PARTIES”)
ARISING OUT OF OR IN CONNECTION WITH THE: (1) ADMINISTRATION, EVALUATION, OR
RECOMMENDATION (OR LACK THEREOF) OF ANY BID; (2) WAIVER OF ANY
REQUIREMENTS UNDER THE BID DOCUMENTS OR THE CONTRACT DOCUMENTS; AND (3)
ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD OF THE CONTRACT.
Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items”, “Supplemental Items”, or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items”, “Supplemental Items”, or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.
Supplemental Items have been listed in the Bid Form and will be utilized on a as needed basis.
If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.
If the Contract is to be awarded, Owner will give the successful bidder a notice of award within sixty (60) days after the day of the Bid opening. All bidders must honor their Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.
Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Engineer the payment and performance bonds and all information or other items necessary to complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. See SAFETY under Section 5.20 of the General Conditions of the Contract. The successful bidder must return the fully executed Contract Documents to Engineer within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.
15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use Tax Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items.
Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.
16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents will be prepared in at least four (4) original sets for signature, one (1) for delivery to the successful bidder. Owner will furnish the successful bidder five (5) sets of Plans and Technical Specifications free of charge, and additional sets may be obtained from Engineer at Engineer’s reproduction rates.
17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER.
The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument.
Electronic Signatures, as defined by and in accordance with the Owner’s Order Adopting Electronic Signature Rules for Construction Contracts, will be deemed original signatures for purposes of the Contract Documents and all matters related thereto, with such Electronic Signatures having the same legal effect as physical, wet-ink signatures. Owner; Engineer;
Contractor; and Developer, if there is a Special Conditions of the Contract Part B, agree that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature. Any document accepted, executed, or agreed to in conformity with such Order is binding on Owner, Engineer, Contractor, and Developer, if applicable, the same as if it were physically executed, and https://www.lawinsider.com/clause/counterparts-and-electronic-signatures
Owner, Engineer, Contractor, and Developer, if applicable, each hereby consent to the use of any third-party electronic signature capture service provider that may be chosen by Owner or Engineer. Notwithstanding the foregoing, all Bonds must be provided to Owner either as a physical, wet-ink original, or in the form of a certified and complete copy of such Bond, which may be provided to Owner in electronic form, such as a .pdf file.
18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached..
19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.
Owner, Engineer, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others. Owner, Engineer, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.
20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.
(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.
The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.
(B) The minimum wage rates that apply to this Contract are specified in Attachment B to the General Conditions of the Contract. Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.
21. ECONOMIC DISINCENTIVES. The Contractor and the Owner agree that time is of the essence of this Contract. The Contractor and the Owner agree that a breach of this Contract by failure to complete the Work in the specified time will cause harm to the Owner. Therefore, the Contractor and the Owner agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the time limit(s) set in the Contract, or as extended under the provisions of these General Conditions (including, without limitation, due to a delay caused by Contractor’s failure to comply with the Contract Documents or due to Owner’s termination of Contractor for default under the Contract Documents), Contractor shall be liable to Owner for economic disincentives under Section 49.271(e) of Texas Water Code, in the amount of $1,000.00 per day liquidated damages for each such calendar day. The Owner shall have the option to deduct and withhold said amount from any monies that the Owner owes the Contractor or its sureties or to recover such amount from the Contractor or the sureties on the Contractor’s bond.
Waller County M.U.D. No. 55 CONTRACT
4 Contract - September 2023 (FINAL).docx Contract 1 of 2 September 2023
CONTRACT
STATE OF TEXAS }
COUNTY OF }
THIS CONTRACT (“Contract”) is made and entered into this _____________________ day of ___________, 2025 by and between Waller County Municipal Utility District No. 55 (the “Owner”) c/o Allen Boone Humphries Robinson LLP, 3200 Southwest Freeway, Suite 2600, Houston, of Harris County, Texas, and _______________, _____________, of the City of , County of ___, and State of _____________, hereinafter termed “Contractor.”
All capitalized terms used herein shall be given the meanings set forth in the General Conditions of the Contract. Clark Condon Associates, Inc. shall be referred to herein as the “Engineer.”
For and in consideration of the mutual covenants hereinafter set forth, and under the conditions expressed in the Bonds bearing even date herewith, the Contractor and Owner hereby agree as follows:
Contractor shall commence and complete the Work generally described as follows:
Grange –Section 1 Neighborhood Park Landscape Improvements for Waller County Municipal Utility District No. 55, Waller County, Texas, according to those Plans and Technical Specifications prepared by Engineer in the initial Contract Price of $______________ and all Extra Work in connection therewith, under the terms as stated in the Contract Documents, and, at Contractor’s own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all Contract Documents and is thoroughly familiar therewith.
The Contractor hereby agrees to begin work within ten (10) calendar days after the written Notice to Proceed has been given by the Engineer. Contractor hereby also agrees to achieve Substantial Completion of the Work within 150 calendar days after the date of the written Notice to Proceed and to achieve Final Completion of the Work within 180 calendar days after the date of the written Notice to Proceed.
Owner agrees to pay Contractor for completion of the Work in accordance with the Contract Documents for the initial Contract Price of ___________________ ($____________), plus or minus any increases or decreases to the initial Contract Price as provided by the Contract Documents. Contractor will be paid in current funds for the performance of the Contract in accordance with the Bid submitted therefor, subject to additions and deductions as allowed by the Contract Documents and, if applicable, approved by Change Order under the Contract Documents, and to make payments on account thereof as
Waller County M.U.D. No. 55 CONTRACT
4 Contract - September 2023 (FINAL).docx Contract 2 of 2 September 2023 provided therein. If included as Special Conditions of the Contract Part B, the Developer shall act as “Owner” for the purposes of all payments.
IN WITNESS WHEREOF, the parties to these presents have executed this Contract in the year and day first above written.
Waller County Municipal Utility District No. 55 Owner
ATTEST: By:
Name:
Title:
[CONTRACTOR]
Contractor
ATTEST: By:
Name:
Title:
(The following to be executed if Contractor is a corporation)
I, _________________________________, certify that I am the secretary of the corporation named as Contractor herein; that _________________________________________________, who signed this Contract on behalf of Contractor, was then _______________________________ __________________________ of said corporation; that said Contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
Signed:
Corporate Seal
ALL BIDDERS MUST SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE OWNER
WILL NOT AWARD THE CONTRACT WITHOUT THE COMPLETED TEC FORM 1295
NOTED IN THE INSTRUCTIONS TO BIDDERS.
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.
Clark Condon Grange Ph2A – Section 11, 12 & Morton Rd Entry September 2026 IFB
1/6
BID FORM
To: Waller County M.U.D. No. 55
Work: Name of Bid Package. Grange Phase 2A – Sections 11, 12, & Morton Rd Entry - Pedestrian Hardscape, Grading & Drainage, Lighting & Electrical, Seat Walls, Retaining Walls, Monument and Wayfinding Signage, Pavers, Site Furniture, Planting, Irrigation, Seeding, and Sodding.
Name of Bidder (Company Name):
Address:
Telephone:
Email:
The undersigned bidder has carefully examined the CONTRACT DOCUMENTS for the work described above and the site of the Work and will provide at its own cost and expense all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, maintenance, and other accessories and services necessary to complete the Work upon which it bids, as provided by the CONTRACT DOCUMENTS, and binds itself on acceptance of its bid to enter into the Contract on the terms proposed by Owner for performing and completing the Work within the Contract Time, for the following prices.
The Contract time for Landscape Improvements: Contractor shall be substantially complete with all work by:
150 calendar days from Notice to Proceed.
GRAND TOTAL LUMP SUM BID: $
(bid amount written)
September 2026
Grange Ph 2A - Section 11, 12 Morton Rd Entry
IFB
ITEM NO. ITEM UNIT QTY. UNIT COST EXTENSION
General
1. General Conditions & Permits LS 1 $0.00
2. Site Prep, Mobilization, & Maintenance LS 1 $0.00
3. Payment, Performance, and Maintenance Bonds LS 1 $0.00
Total General $0.00
SWPPP
4. SWPPP Maintain in Place & Remove LS 1 $0.00
Total SWPPP $0.00
Demolition
5. Lowering of Storm Manhole EA 7 $0.00
6. Lowering of Sanitary Manhole (As per jursidictional requirements)
EA 3 $0.00
Total Demolition $0.00
SECTION 11
Hardscape
7. 5' Concrete Walk SF 3,675 $0.00
8. 5' Concrete Walk 6" Thick with #4 Rebar SF 200 $0.00
9. Concrete Pad at Site Furnishings SF 12 $0.00
Total Hardscape $0.00
Grading and Drainage
10. Site Grading (Dirt Provided Onsite By Owner) LS 1 $0.00
Total Grading and Drainage $0.00
Softscape
11. Possumhaw - 30gal EA 3 $0.00
12. Eagleston Holly - 45gal EA 3 $0.00
13. Loblolly Pine - 30gal EA 1 $0.00
14. Loblolly Pine - 45gal EA 3 $0.00
15. Loblolly Pine - 65gal EA 1 $0.00
16. Southern Live Oak - 65gal EA 3 $0.00
17. Cedar Elm - 30gal EA 2 $0.00
18. Cedar Elm - 65gal EA 3 $0.00
19. Gregg's Mist Flower - 1gal EA 14 $0.00
20. Little Giant Coneflower - 3gal EA 10 $0.00
21. Prostrate Common Juniper - 3gal EA 18 $0.00
22. New Gold Trailing Lantana - 1gal EA 26 $0.00
23. Green Cloud Texas Shade - 3gl EA 10 $0.00
24. Fine Grade and Solid Sod (Common Bermuda) SF 4,604 $0.00
25. Fine Grade and Hydromulch (Common Bermuda) SF 68,767 $0.00
26. Irrigation System (Complete & Operational) LS 1 $0.00
All Bidders shall provide unit prices for all items included in the work. In the event a greater or lesser amount of work is done, the following unit prices will apply. Unit prices cover the cost of work and materials complete in place, including materials, equipment, labor, installation, delivery, taxes, overhead, profit, maintenance, and guarantee required to render complete.
1/4
Grange Ph 2A - Section 11, 12 Morton Rd Entry
IFB
ITEM NO. ITEM UNIT QTY. UNIT COST EXTENSION
27. 90 Day Landscape Maintenance LS 1 $0.00
Total Softscape $0.00
Mass Planting (Pit Planting)
28. Southern Live Oak - 65gal. EA 3 $0.00 29 Bur Oak - 45gal. EA 2 $0.00 30 Southern Red Oak - 45gal. EA 2 $0.00 31 Drummond Red Maple - 65gal. EA 3 $0.00 32 Cedar Elm - 30gal. EA 2 $0.00 33 Loblolly Pine - 30gal. EA 3 $0.00 34 Loblolly Pine - 15gal. EA 2 $0.00 35 Loblolly Pine - 5gal. EA 2 $0.00 36 Texas Redbud - 15gal. EA 2 $0.00 37 Yaupon Holly - 5gal. EA 3 $0.00 38 Southern Wax myrtle - 5gal. EA 2 $0.00 39 Dwarf Palmetto - 3gal. EA 2 $0.00 40 Turks Cap - 3gal. EA 3 $0.00 41 Viriginia Sweetspire - 3gal. EA 3 $0.00 42 2" Pine straw Mulch SF 2,490 $0.00
Total Mass Planting (Pit Planting) $0.00
Site Furnishings
43. Pet Waste Station (Complete and in Place) EA 1 $0.00
44. Trash Receptacle (Complete and in Place) EA 1 $0.00
Total Site Furnishings $0.00
TOTAL BASE BID SECTION 11 $0.00
SECTION 12
ITEM NO. ITEM UNIT QTY. UNIT COST EXTENSION
Hardscape
45. 5' Concrete Walk SF 4,421 $0.00
46. Concrete Pad at Site Furnishings SF 26 $0.00
47. Brick Retaining Wall LF 76 $0.00
48. Brick Seat Wall LF 25 $0.00
49. Steel Edging LF 10 $0.00
50. Decomposed Granite SF 146 $0.00
51. Brick Pavers LF 43 $0.00
52. Entry Monument Wall (complete in place including lighting) EA 1 $0.00
53. Secondary Monument Panel (complete in place including lighting)
EA 2 $0.00
Total Hardscape $0.00
Grading and Drainage
54. Site Grading (Dirt Provided Onsite By Owner) LS 1 $0.00
55. 6" Solid PVC Drain Pipe LF 129 $0.00
Total Grading and Drainage $0.00
2/4
Grange Ph 2A - Section 11, 12 Morton Rd Entry
IFB
ITEM NO. ITEM UNIT QTY. UNIT COST EXTENSION
Lighting and Electrical
56. Electrical Service (Complete and Operational Including
Enclosure, Meter, Panel, Grounding, Disconnect,etc.)
LS 1 $0.00
57. Pedestrian Wayfinding Sign Lighting LS 1 $0.00 Total Lighting and Electrical $0.00
Softscape
58. Yaupon Holly - 15 gal EA 20 $0.00
59. Yaupon Holly - 45 gal EA 18 $0.00
60. Eagleston Holly - 45gal EA 12 $0.00
61. Chaste Tree - 30gal EA 15 $0.00
62. Drummond Red Maple - 65gal EA 3 $0.00
63. Loblolly Pine - 30gal EA 4 $0.00
64. Loblolly Pine - 45gal EA 22 $0.00
65. Loblolly Pine - 65gal EA 9 $0.00
66. Southern Red Oak - 45gal EA 2 $0.00
67. Southern Red Oak - 65gal EA 7 $0.00
68. Southern Live Oak - 45gal EA 12 $0.00
69. Cedar Elm - 30gal EA 5 $0.00
70. Cedar Elm - 65gal EA 1 $0.00
71. Cherokee Sedge - 1gal EA 124 $0.00
72. Gregg's Mist Flower - 1gal EA 103 $0.00
73. Sandy Leaf Fig - 1gal EA 296 $0.00
74. Aztec Gold Daylily - 1gal EA 295 $0.00
75. Prostrate Common Juniper - 3gal EA 202 $0.00
76. Purple Trailing Lantana - 1gal EA 84 $0.00
77. White Trailing Lantana - 1gal EA 107 $0.00
78. New Gold Trailing Lantana - 1gal EA 60 $0.00
79. Green Cloud Texas Shade - 3gal EA 17 $0.00
80. Pink Muhly Grass - 3gal EA 125 $0.00
81. White Cloud Muhly Grass - 3gal EA 182 $0.00
82. Red Drift Groundcover Rose - 3gal EA 65 $0.00
83. Orange Zexemnia - 1gal EA 122 $0.00
84. Seasonal Color - 4" pot EA 141 $0.00
85. Fine Grade and Solid Sod (Common Bermuda) SF 17,568 $0.00
86. Fine Grade and Hydromulch (Common Bermuda) SF 125,327 $0.00
87. Irrigation System (Complete & Operational) LS 1 $0.00
88. 90 Day Landscape Maintenance LS 1 $0.00
89. Wildflower Mix SF 44,344 $0.00
Total Softscape $0.00
Mass Planting (Pit Planting)
90. Southern Live Oak - 65gal. EA 10 $0.00 91 Bur Oak - 45gal. EA 6 $0.00
92. Southern Red Oak - 45gal. EA 6 $0.00 93 Drummond Red Maple - 65gal. EA 10 $0.00
94. Cedar Elm - 30gal. EA 6 $0.00
3/4
Grange Ph 2A - Section 11, 12 Morton Rd Entry
IFB
ITEM NO. ITEM UNIT QTY. UNIT COST EXTENSION
95 Loblolly Pine - 30gal. EA 10 $0.00
96. Loblolly Pine - 15gal. EA 6 $0.00 97 Loblolly Pine - 5gal. EA 6 $0.00
98. Texas Redbud - 15gal. EA 6 $0.00 99 Yaupon Holly - 5gal. EA 12 $0.00
100. Southern Wax myrtle - 5gal. EA 8 $0.00 101 Dwarf Palmetto - 3gal. EA 8 $0.00
102. Turks Cap - 3gal. EA 12 $0.00 103 Viriginia Sweetspire - 3gal. EA 12 $0.00
104. 2" Pine straw Mulch EA 8,194 $0.00
Total Mass Planting (Pit Planting) $0.00
Site Furnishings
105. Pedestrian Wayfinding Sign (Complete and in Place) LS 1 $0.00
106. Pet Waste Station (Complete and in Place) EA 2 $0.00
107. Trash Receptacle (Complete and in Place) EA 2 $0.00
Total Site Furnishings $0.00
TOTAL BASE BID SECTION 12 $0.00
Supplemental Items 108 6" Bore and Sleeve LF 200 $0.00
109. Import of Soil CY 500 $0.00 110 Soils Spoils Shall be Hauled to Onsite Stockpile within 1/2 mile radius of project.
LS 1 $0.00
111 4" Perforated Drain Pipe (Complete and In Place, including solid PVC connectors)
LF 200 $0.00
112 6" Solid PVC Drain Pipe LF 100 $0.00 113 Dwarf Palmetto - 3gal. EA 15 $0.00 114 Giant Turk's Cap - 3gal. EA 15 $0.00 115 Viriginia Sweetspire - 3gal. EA 15 $0.00 116 Southern Live Oak - 100gal. EA 3 $0.00 117 Solid Sod (Common Bermuda) SF 5,000 $0.00 118 Fine Grade and Hydromulch (Common Bermuda) SF 10,000 $0.00
Total Supplemental Items $0.00
Total Base Bid & Supplemental Items 0.00
4/4
Clark Condon Grange Ph2A – Section 11, 12 & Morton Rd Entry September 2026 IFB
6/6
Bidder acknowledges receipt of the following addenda:
Addenda Number and Date:
Signature and Title of Bidder:
Name of Bidder Printed or Typed:
Date:
Surety Company:
State of Incorporation:
Local Agent:
Agent’s Telephone:
Insurance Carrier:
State of Incorporation:
Local Agent:
Agent’s Telephone:
Proposed Sub-Contractors:
Company Name and Type of Work:
Waller County M.U.D. No.55 GENERAL CONDITIONS OF THE CONTRACT
General Conditions of the Contract Page 1 of 41 April 2026
GENERAL CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS
ARTICLE I. DEFINITIONS
ARTICLE II. CONTRACT DOCUMENTS
ARTICLE III. PRELIMINARY MATTERS
ARTICLE IV. SITE ACCESS/ CONDITIONS/ REFERENCE POINTS
ARTICLE V. CONTRACTOR’S RESPONSIBILITIES/INDEMNITIES
ARTICLE VI. ENGINEER’S STATUS DURING CONSTRUCTION
ARTICLE VII. EXTRA WORK/ CHANGE ORDERS/ CLAIMS
ARTICLE VIII. TESTS AND INSPECTIONS/ DEFECTIVE WORK/ WARRANTY
ARTICLE IX. MINIMUM WAGE RATE SCALE/PRICE FOR WORK/ PAYMENTS TO
CONTRACTOR …………
ARTICLE X. SUBSTANTIAL COMPLETION, PARTIAL USE,
FINAL COMPLETION AND ACCEPTANCE…………………………
ARTICLE XI. SUSPENSION OF WORK/ TERMINATION/ DEFAULT
ARTICLE XII. MISCELLANEOUS
ATTACHMENT A – INSURANCE REQUIREMENTS
ATTACHMENT B – MINIMUM WAGE RATE SCALE
4900-6000-2182 v.1 4900-6000-2182 v.1
General Conditions of the Contract Page 2 of 41 September 2026
GENERAL CONDITIONS OF THE CONTRACT
ARTICLE I. DEFINITIONS
1.01. DEFINITIONS. The following terms shall be defined as described below unless such definition is expressly modified by the Contract Documents. Any capitalized terms used in the Contract
Documents not defined in this Section shall have the meaning assigned to such term under the
Contract Documents.
a. Bid. The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
b. Bond(s). Performance bonds, maintenance bonds and payment bonds, or any of them, as required by the Contract Documents.
c. Change Order. A document signed by Contractor, Engineer, and Owner and entered into in accordance with the Contract Documents that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time.
d. Claim. A “Claim” is a claim, demand, or assertion by the Contractor seeking for itself or on behalf of a subcontractor or supplier: adjustment or interpretation of any Contract term, including without limitation, adjustment of the Contract Price or Contract Time;
payment of money; relief from obligations; or other relief or recovery with respect to the terms of the Contract. The term “Claim” also includes other disputes and matters in question asserted by the Contractor (whether for itself or on behalf of a subcontractor or supplier) arising out of or relating to the Contract.
e. Contract. The entire and integrated written agreement between the Owner and Contractor concerning the Work, including the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.
f. Contract Documents. The Bid, Contract, Instructions to Bidders, General Conditions, Addendum to the General Conditions, Special and Supplemental Conditions, if any, Technical Specifications, Plans, Change Orders, any written amendment to the Contract signed by Contractor, Engineer, and Owner, Written Work Orders, addenda issued by
Engineer, and all other documents designated as incorporated by reference. Documents incorporated by reference are Contract Documents, whether attached or not. Approved
Shop Drawings and other Contractor’s submittals, inspections, and reports, such as testing of subsurface and physical or environmental conditions, are not Contract
Documents and are not part of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .