This is a Project Manual and Work Order Agreement for the City of Houston Public Works Department for the FY2026 Sidewalk Program Work Order Package #1 (WBS No. N-320610-0154-4). The project involves construction of new sidewalks, rehabilitation of existing sidewalks, reconstruction of driveways as necessary, median modifications, new pavement markings, signage, wheelchair ramps, walkways, curbs, curb and gutter, pedestrian crossings, and miscellaneous work as needed to complete each work order location on a citywide basis throughout Houston, Texas. The contract is structured as a work order agreement under which the City may issue one or more work orders concurrently within 730 calendar days after the Notice to Proceed. Individual work order contract times vary based on estimated work order price: 30 days for work orders from $0 to $50,000; 60 days for $50,001 to $100,000; 90 days for $100,001 to $250,000; and 90+ days for work orders exceeding $250,001. The contract documents include general conditions, supplementary conditions, performance and payment bonds, maintenance bonds, wage rate requirements, and detailed specifications for divisions 01 through 16 covering construction requirements and materials.
The total contract price shall not exceed $5,500,000.00, which includes all allowances and accepted alternates. The City will issue progress payment certificates monthly on the basis of contractor applications for payment, with final payment constituting the entire unpaid balance of the contract price. The contractor must comply with the City's Minority, Women, and Small Business Enterprise (MWSBE) and Persons with Disabilities Business Enterprise (PDBE) programs as set forth in the supplementary conditions and Chapter 15, Article V of the City of Houston Code of Ordinances. The contractor is required to submit a Bidder's Revised MWSBE Participation Plan (Document 00570), a Post-Bid Good Faith Efforts form (Document 00571), and a Post-Award Plan Deviation Request (Document 00572) demonstrating compliance with stated business enterprise goals. Prevailing wage rates for engineering construction apply per Document 00820. The contract is subject to renewal for one additional year upon expiration if the Director makes a written renewal request at least 30 days before expiration and sufficient funds are allocated. Liquidated damages for delay are specified in the Supplementary Conditions (Document 00803) and apply for each day beyond the contract time.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF HOUSTON
HOUSTON PUBLIC WORKS
CONSTRUCTION
PROJECT MANUAL
FY2026 Sidewalk Program Work Order Package #1
WBS No. N-320610-0154-4
VOLUME 1 of 1
Divisions 00 through 16
June 2026
In-House 611 Walker Street Houston, Texas 77002
(832) 395-2957
6/5/2026
WBS No. N-320610-0154-4 TABLE OF CONTENTS
00010-1
09-02-2026
Document 00010
TABLE OF CONTENTS
NOTE: Capitalized Specification Sections are included in https://www.houstonpermittingcenter.org/media/6386/download, and are incorporated in Project Manuals by reference as if copied verbatim. Documents listed "for filing" are to be provided by Bidder and are not included in this Project Manual unless indicated for example only. The Document numbers and titles hold places for actual documents to be submitted by Contractor during Bid, post-bid, or construction phase of the Project. Specification Sections marked with an asterisk (*) are amended by a supplemental specification, printed on blue paper and placed in front of the Specification it amends. Documents in the 00200, 00300 and 00400 series of Division 00, except for Document 00410B, “Bid Form, Part B,” are not part of the Contract.
Doc. No. Document Title Doc. Date
INTRODUCTORY INFORMATION
00010 Table of Contents ...................................................................... 09-02-2026
CONTRACTING REQUIREMENTS
AGREEMENT
00520WO Work Order Agreement .............................................................. 05-27-2026 00570 Contractor’s Revised MWSBE Participation Plan ...................... 09-02-2026 00571 Record of Post-Award Good Faith Efforts .................................. 09-02-2026 00572 Contractor’s Request for Plan Deviation .................................... 09-02-2026
BONDS AND CERTIFICATES
00600 List of Proposed Subcontractors and Suppliers ......................... 07-01-2013 00610 Performance Bond ..................................................................... 07-30-2020 00611 Statutory Payment Bond ............................................................ 07-30-2020 00612 One-year Maintenance Bond ..................................................... 05-17-2005 00613 One-year Surface Correction Bond ............................................ 05-17-2005
GENERAL CONDITIONS
00700 General Conditions .................................................................... 07-10-2026
SUPPLEMENTARY CONDITIONS
00803 Work Order Supplementary Conditions ..................................... 09-02-2026
00808 Requirements for the City of Houston Program for Minority, Women, and
Small Business Enterprises (MWSBE), and Persons with Disabilities Business Enterprises (PDBE) .................................................... 03-16-2026
00820 Wage Scale and Payroll Requirements for Engineering Construction ............................................................................... 02-01-2026 https://www.houstonpermittingcenter.org/media/6386/download
00010-2
ADDENDA AND MODIFICATIONS
00943 Monthly Subcontractor Payment Reporting Form (previously, Document 00642)
................................................................................................... 04-07-2026 00946 Payment Notification – Explanation of Withholding (previously, Document 00646)
................................................................................................... 02-27-2026
SPECIFICATIONS
Division 01 through 16 Specifications reference the latest editions of the Standard Specifications that are in effect as of the date of receipt of bids, unless otherwise noted. Supplemental Specifications include Doc Date for reference.
DIVISION 1 - GENERAL REQUIREMENTS
01110 Summary of Work 01145 Use of Premises 01255 Change Order Procedures 01270 Measurement and Payment 01292 Schedule of Values 01312 Coordination and Meetings 01321 Construction Photographs 01325 Construction Schedule 01326 Construction Schedule (Bar Chart) 01330 Submittal Procedures 01340 Shop Drawings, Product Data, and Samples 01351 Environmental Safety and Worker Protection 01410 TPDES Requirements (with Attachments) 01422 Reference Standards 01450 Contractor's Quality Control 01452 Inspection Services 01454 Testing Laboratory Services 01502 Mobilization 01504 Temporary Facilities and Controls 01506 Diversion Pumping 01520 Temporary Field Office 01554 Traffic Control and Street Signs 01555 Traffic Control and Regulation 01562 Tree and Plant Protection 01570 Storm Water Pollution Prevention Control 01575 Stabilized Construction Access 01576 Waste Material Disposal 01578 Control of Ground and Surface Water 01580 Project Identification Signs 01581 Excavation in Public Way Permit Signs 01582 Build Houston Forward Project Identification Signs
00010-3
01610 Basic Product Requirements 01630 Product Substitution Procedures 01725 Field Surveying 01731 Cutting and Patching 01732 Procedure for Water Valve Assistance (with Attachments) 01740S Site Restoration………………………………………………………01-17-2013 *01740 Site Restoration 01755 Starting Systems 01770 Closeout Procedures 01782 Operations and Maintenance Data 01785 Project Record Documents
DIVISION 2 - SITE WORK
02081 CAST-IN-PLACE CONCRETE MANHOLES
02082 PRECAST CONCRETE MANHOLES
02083 FIBERGLASS MANHOLES
02085 VALVE BOXES, METER BOXES, AND METER VAULTS
02086 ADJUSTING MANHOLES, INLETS, AND VALVE BOXES TO GRADE
02088 PRECAST POLYMER CONCRETE MANHOLES
02090 FRAMES, GRATES, RINGS, AND COVERS
02091 NON METALLIC FRAMES, GRATES, RINGS, AND COVERS
02136 WASTE MATERIAL HANDLING, TESTING AND DISPOSAL
02201 SITE PREPARATION, GRADING, RESTORATION AND CLEAN UP FOR WATER
STORAGE TANKS
02221 REMOVING EXISTING PAVEMENTS, STRUCTURES, WOOD, AND DEMOLITION
DEBRIS
02222 ABANDONMENT OF SEWERS
02233 CLEARING AND GRUBBING
02260 TRENCH SAFETY SYSTEM
02315S Roadway Excavation…………………………………………………06-17-2016
*02315 ROADWAY EXCAVATION
02316 EXCAVATION AND BACKFILL FOR STRUCTURES
02317 EXCAVATION AND BACKFILL FOR UTILITIES
02318S Extra Unit Price Work for Excavation and Backfill………………..08-26-2013
*02318 EXTRA UNIT PRICE WORK FOR EXCAVATION AND BACKFILL
02319 BORROW
02320 UTILITY BACKFILL MATERIALS
02321S Cement Stabilized Sand…………………………………………….08-26-2013
*02321 CEMENT STABILIZED SAND
02322 FLOWABLE FILL
02330 EMBANKMENT
02336 LIME STABILIZED SUBGRADE
02337 LIME/FLY ASH STABILIZED SUBGRADE
02338 PORTLAND CEMENT STABILIZED SUBGRADE
00010-4
02340 COMPACTED SANDFILL UNDER TANK FLOOR PLATE
02400 TUNNEL SHAFTS
02401 COMMON TUNNEL SHAFTS
02425 TUNNEL EXCAVATION AND PRIMARY LINER
02426 SEWER LINE IN TUNNELS
02427 PLASTIC LINER FOR LARGE-DIAMETER CONCRETE SEWERS AND
STRUCTURES
02431 TUNNEL GROUT
02441 MICROTUNNELING
02445 JACK AND BORE/JACK AND MINE/PILOT TUBE GUIDED BORING TUNNELS
02447 INSTALLATION OF WATER LINES BY SLURRY BORE
02448 PIPE AND CASING AUGERING FOR SEWERS
02465 DRILLED SHAFT FOUNDATIONS
02476 CAISSON FOR LIFT STATION
02501 DUCTILE IRON PIPE AND FITTINGS
02502 STEEL PIPE AND FITTINGS
02503 COPPER TUBING
02504 FIBERGLASS REINFORCED PIPE
02505 HIGH DENSITY POLYETHYLENE (HDPE) SOLID AND PROFILE WALL PIPE
02506 POLYVINYL CHLORIDE PIPE
02507 PRESTRESSED CONCRETE CYLINDER PIPE
02508 EXTRA STRENGTH CLAY PIPE
02509 FIBERGLASS REINFORCED PIPE FOR PRESSURE MAINS
02510 POLYPROPYLENE (PP) CORRUGATED WALL PIPE
02511 WATER LINES
02512 WATER TAP AND SERVICE LINE INSTALLATION
02513 WET CONNECTIONS
02514 DISINFECTION OF WATER LINES
02515 HYDROSTATIC TESTING OF PIPELINES
02516 CUT, PLUG, AND ABANDONMENT OF WATER LINES
02517 WATER LINE IN TUNNELS
02518 STEEL PIPE AND FITTINGS FOR LARGE DIAMETER WATER LINES
02520 FIRE HYDRANTS
02521 GATE VALVES
02522 BUTTERFLY VALVES
02523 PRESSURE REDUCING VALVES
02524 AIR RELEASE AND VACUUM RELIEF VALVES
02525 TAPPING SLEEVES AND VALVES
02526 WATER METERS
02527 POLYURETHANE COATINGS ON STEEL OR DUCTILE IRON PIPE
02528 POLYETHYLENE ENCASEMENT/WRAP
02529 TAPE COATINGS ON STEEL PIPE
02531 GRAVITY SANITARY SEWERS
02532 SANITARY SEWER FORCE MAINS
00010-5
02533 ACCEPTANCE TESTING FOR SANITARY SEWERS
02534 SANITARY SEWER SERVICE STUBS OR RECONNECTIONS
02550 SLIPLINING SANITARY SEWERS
02551 SANITARY SEWER RENEWAL BY SPIN CAST PIPE LINING METHOD
02553 POINT REPAIRS AND OBSTRUCTION REMOVALS
02555 MANHOLE REHABILITATION
02556 CURED-IN-PLACE PIPE
02557 FOLDED AND FORMED PIPE
02558 CLEANING AND TELEVISION INSPECTION
02571 PIPE BURSTING/CRUSHING SANITARY SEWERS
02581 STREET LIGHTING CONDUIT
02582 TRAFFIC POLE ASSEMBLIES – STEEL
02590 STREETLIGHT LUMINAIRES
02611 REINFORCED CONCRETE PIPE
02612 PRECAST REINFORCED CONCRETE BOX SEWERS
02613 BAR WRAPPED STEEL CYLINDER PIPE
02614 LARGE DIAMETER LINE STOP
02615 INSERTION VALVES AND LINE STOPS
02621 GEOTEXTILE
02631 STORM SEWERS
02632 CAST-IN-PLACE INLETS, HEADWALLS, AND WINGWALLS
02633 PRECAST CONCRETE INLETS, HEADWALLS, AND WINGWALLS
02642 CORRUGATED METAL PIPE
02643 PLATE CULVERT STRUCTURES
02662 PIPING, VALVES, FITTINGS, AND ACCESSORIES FOR WATER STORAGE
TANKS
02711 HOT MIX ASPHALT BASE COURSE
02712 CEMENT STABILIZED BASE COURSE
02713 RECYCLED CRUSHED CONCRETE BASE COURSE
02714 FLEXIBLE BASE COURSE FOR TEMPORARY DRIVEWAYS
02741 ASPHALTIC CONCRETE PAVEMENT
02742 PRIME COAT
02743 TACK COAT
02751 CONCRETE PAVING
02752S Concrete Pavement Joints…………………………………………….12-29-2009
*02752 CONCRETE PAVEMENT JOINTS
02753 CONCRETE PAVEMENT CURING
02754 CONCRETE DRIVEWAYS
02761 COLORED CONCRETE FOR MEDIANS AND SIDEWALKS
02762 BLAST CLEANING OF PAVEMENT
02764 RAISED PAVEMENT MARKERS
02765 PREFORMED PAVEMENT MARKINGS
02767 THERMOPLASTIC PAVEMENT MARKINGS
02768 EPOXY PAVEMENT MARKINGS
00010-6
02771 CURB, CURB AND GUTTER, AND HEADERS
02772 CONCRETE MEDIANS AND DIRECTIONAL ISLANDS
02775 CONCRETE SIDEWALKS
02811 LANDSCAPE IRRIGATION
02871 BIKE RACKS
02890 PEDESTRIAN CROSSWALK SYSTEM RECTANGULAR RAPID FLASHING
BEACON (RRFB)
02893 TRAFFIC SIGNAL CONSTRUCTION
02911 TOPSOIL
02912 TREE, PLANT, AND HARDSCAPE PROTECTION
02915 TREE PLANTING
02921 HYDRO MULCH SEEDING
02922 SODDING
02951 PAVEMENT REPAIR AND RESTORATION
02960 MILLING PAVEMENT
02983 REMOVAL AND RESTORATION OF BRICK PAVED STREETS
DIVISION 3 - CONCRETE
03315 CONCRETE FOR UTILITY CONSTRUCTION
DIVISION 4 - MORTAR
04061 MORTAR
04210 BRICK MASONRY FOR UTILITY CONSTRUCTION
DIVISION 5 - METALS
05501 METAL FABRICATIONS
DIVISION 6 - WOOD AND PLASTICS
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
DIVISION 8 - DOORS AND WINDOWS
DIVISION 9 - FINISHES
09901 PROTECTIVE COATINGS
09971 PAINTING AND PROTECTIVE COATINGS FOR POTABLE WATER STORAGE
TANKS
DIVISION 10 - SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 - FURNISHINGS
00010-7
DIVISION 13 - SPECIAL CONSTRUCTION
13111 CATHODIC PROTECTION FOR WATER TANK INTERIORS (SACRIFICIAL
ANODE)
13112 CATHODIC PROTECTION FOR WATER TANK INTERIORS (ICCP)
13113 CATHODIC PROTECTION FOR NEW TANK BOTTOMS
13201 WELDED STEEL WATER STORAGE TANKS
13202 REHABILITATION OF WELDED STEEL WATER STORAGE TANKS
13203 TANK CLEAN-UP AND DISINFECTION
13501 SPEED CUSHIONS
DIVISION 14 - CONVEYING SYSTEMS
DIVISION 15 – MECHANICAL
15640 JOINT BONDING AND ELECTRICAL ISOLATION
15641 CORROSION CONTROL TEST STATIONS
DIVISION 16 – ELECTRICAL
16010 BASIC ELECTRICAL REQUIREMENTS
16124 CONDUCTIVE TRACE WIRE FOR NON-METALLIC WATER LINE PIPES
16130 ADVANCED TRANSPORTATION CONTROLLER (ATC) CABINET ASSEMBLY
16640 CATHODIC PROTECTION FOR PIPELINES
16641 CATHODIC PROTECTION FOR EXISTING TANK BOTTOMS
16642 CATHODIC PROTECTION FOR PLANT PIPING
16644 CATHODIC PROTECTION FOR CLARIFIERS
16645 CATHODIC PROTECTION FOR WET WELLS
16709 COMMUNICATIONS CONDUIT
16710 PULL BOXES
16711 TRAFFIC SIGNAL CONDUIT
16712 SOLAR POWERED SCHOOL ZONE FIELD EQUIPMENT
16713 PRE-FORMED LOOPS
16715 VEHICLE SIGNAL HEADS (POLYCARBONATE) (ADJUSTABLE, EXPANDABLE
TYPE)
16716 PEDESTRIAN SIGNAL HEADS
16718 VEHICLE TRAFFIC CONTROL SIGNAL HEADS – LIGHT EMITTING DIODE (LED)
CIRCULAR SIGNAL SUPPLEMENT
16719 COUNTDOWN PEDESTRIAN SIGNAL MODULE
16720 TRAFFIC SIGNAL CABLE
16724 EMERGENCY VEHICLE PREEMPTION (EVP)
16725 DYNAMIC MESSAGE SIGN(DMS)
16727 TRAFFIC SIGNAL SAW-CUT LOOP DETECTOR
16730 INTELLIGENT TRANSPORTATION SYSTEM (ITS) CONTROLLER CABINET
ASSEMBLY
16731 MODEL 2070 CONTROLLER UNIT
00010-8
16732 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM FOR TRAFFIC SIGNAL
CABINETS
16733 FIELD HARDENED ETHERNET SWITCH
16735 FIBER OPTIC SPLICE ENCLOSURE
16736 FIBER DISTRIBUTION UNIT
16737 COMMUNICATION SERVICE BOX
16739 BLUETOOTH SPECIFICATION (ANONYMOUS WIRELESS ADDRESS MATCHING
DEVICE)
16740 SINGLE MODE FIBER OPTIC CABLE SYSTEM
16741 VIDEO COLOR QUAD UNIT
16742 VIDEO DETECTION SYSTEM
16746 VIDEO MANAGEMENT SOFTWARE
16747 PERMANENT COUNT STATION RADAR VEHICLE SENSING DEVICE (RVSD)
16748 SYSTEM INTEGRATION
16750 ACCESSIBLE PEDESTRIAN PUSH BUTTON STATION
16780 CCTV FIELD EQUIPMENT
16785 GPS SERIAL COMMUNICATIONS
END OF DOCUMENT
FY2026 Sidewalk Program Work Order Package #1 WORK ORDER WBS No. N-320610-0154-4 AGREEMENT
00520WO-1
05-27-2026
Document 00520WO
WORK ORDER AGREEMENT
Project: FY2026 Sidewalk Program Work Order Package #1
Project Location: Citywide. The project location and limits will be determined and defined by each work authorization (Key Map No. Citywide)
Project No: WBS No. N-320610-0154-4
The City:
THE CITY OF HOUSTON, 900 Bagby Street, Houston, Texas 77002 (the “City”) and
Contractor:
(Address for Written Notice)
Contact Name and Email address:
For HPW and GSD construction projects, with respect to the General Conditions, the City Engineer, is:
Oluwole McFoy, P.E. (or his successor)
P. O. Box 1562
Houston, Texas 77251-1562
For HAS construction projects, with respect to the General Conditions, the City Engineer is:
Eren Selcen, P.E. (or his successor)
111 Standifer Drive
Humble, Texas 77338
THE CITY AND CONTRACTOR AGREE AS FOLLOWS:
ARTICLE 1
THE WORK OF THE CONTRACT
1.1 Contractor shall perform the Work in accordance with the Contract.
1.2 One or more Work Orders may be issued concurrently at any given time under the Contract.
00520WO-2
ARTICLE 2
CONTRACT TIME
2.1 The City may issue Work Orders within 730 calendar days after Notice To Proceed for the Contract.
This Agreement is effective on the Notice To Proceed date until the final acceptance of the last Work Order issued by the City. If the Director, makes a written request for renewal to the Contractor at least 30 days before expiration of the then-current term, and if sufficient funds are allocated, then, upon expiration of the then-current term, this Agreement is renewed for one (1) year upon expiration upon the same terms and conditions.
2.2 Each Work Order will establish the Contract Time for that Work Order based on the Estimated Work
Order Price. Contract Time shall be as following:
30 days for Estimated Work Order Price from $0 to $50,000;
60 days for Estimated Work Order Price from $50,001 to $100,000;
90 days for Estimated Work Order Price from $100,001 to $250,000;
90 + days for Estimated Work Order Price from $250,001 and over.
Project Manager may adjust the actual duration and Completion Date based on availability of materials or to comply with infrastructure needs.
2.3 The Parties recognize that time is of the essence for this Agreement and that the City will suffer financial loss if the Work is not completed within the Contract Time. Parties also recognize delays, expense, and difficulties involved in proving in a legal or arbitration proceeding actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, the Parties agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay the City the amount stipulated in Document 00803, “Supplementary Conditions,” for each day beyond Contract Time.
2.4 Contractor shall achieve Date of Substantial Completion within the stipulated duration noted in each
Work Order, subject to adjustments of the Contract Time as provided in the Contract. Each Work Order will establish a date of Commencement and Completion Date specific to that Work Order.
ARTICLE 3
CONTRACT PRICE
3.1 Subject to terms of the Contract, the City will pay Contractor the Contract Price set out in each
Work Order in current funds for Contractor's performance of the Contract. The total Contract Price, as sum of Contract Prices of all Work Orders issued, shall not exceed_$5,500,000.00 , which includes Allowances, and Alternates, if any, accepted below.
3.2 The City accepts Alternates as follows:
Alternate No. 1 None Alternate No. 2 None Alternate No. 3 None Alternate No. 4 None
ARTICLE 4
PAYMENTS
4.1 The City will make progress payments to Contractor as provided below and in the General
Conditions of the Contract.
4.2 The Period covered by each progress payment is one calendar month ending on the last day of the month.
00520WO-3
4.3 The City will issue Certificates for Payment and will make progress payments on the basis of such
Certificates as provided in the General Conditions of the Contract.
4.4 Final payment, constituting entire unpaid balance of Contract Price, will be made by the City to
Contractor as provided in the General Conditions of the Contract.
ARTICLE 5
CONTRACTOR REPRESENTATIONS
5.1 Contractor represents:
5.1.1 Contractor has examined and carefully studied Contract documents and other related data identified in Request For Competitive Sealed Proposals or Competitive Sealed Bids.
5.1.2 Contractor has visited the site and become familiar with and is satisfied as to general, local, and site conditions that may affect cost, progress, and performance of the Work.
5.1.3 Contractor is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work.
5.1.4 Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in Contract documents and (2) reports and drawings of a hazardous environmental condition, if any, at the site which has been identified in Contract documents.
5.1.5 Contractor has obtained and carefully studied (or assumes responsibility for having done
so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including applying specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract to be employed by Contractor, and safety precautions and programs incident thereto
5.1.6 Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for performance of the Work at Contract Price, within Contract Time, and in accordance with the Contract.
5.1.7 Contractor is aware of general nature of work to be performed by the City and others at the site that relates to the Work as indicated in Contract documents.
5.1.8 Contractor has correlated information known to Contractor, information and observations obtained from visits to the site, reports and drawings identified in the Contract, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract.
5.1.9 Contractor has given City Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract, and written resolution thereof by City Engineer is acceptable to Contractor.
5.1.10 Contract documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
00520WO-4
ARTICLE 6
MISCELLANEOUS PROVISIONS
6.1 The Contract may be terminated by either Party as provided in the General Conditions of the
Contract.
6.2 The Work may be suspended by the City as provided in the General Conditions of the Contract.
ARTICLE 7
ENUMERATION OF CONTRACT DOCUMENTS
7.1 The following documents are incorporated into this Agreement:
[ X ] Bid Form/Proposal Form
Document No. Title [ X ] 00610 Performance Bond [ X ] 00611 Statutory Payment Bond [ X ] 00612 One-year Maintenance Bond [ X ] 00613 One-year Surface Correction Bond [ ] 00623 Contractor’s Act of Assurance (SRF Form ED-103) [ ] 00628 Affidavit of Compliance with Disadvantaged Business Enterprise
(DBE) Program for Project Funded By AIP Grant [ X ] 00700 General Conditions.
[ ] 00800 Supplementary Conditions for Project CIP or AIP Funded [ ] 00801 Supplementary Conditions for Project AIP Funded [ ] 00802 SRF Supplementary Conditions [ X ] 00803 Supplementary Conditions for Project CIP or AIP Funded [ ] 00807 Bidder/Contractor Requirements for DBE Program [ X ] 00808 Minority and Women-owned Business Enterprise (MWBE) &
Persons with Disabilities Business Enterprise (PDBE) Program [ ] 00810 Federal Wage Rate - Highway [ ] 00811 Federal Wage Rate - Building [ ] 00812 Federal Wage Rate - Heavy [ X ] 00820 Wage Rate for Engineering Construction [ ] 00821 Wage Rate for Building Construction [ ] 00830 Trench Safety Geotechnical Information [ ] 00912 Rider [ X ] 00943 Monthly Subcontractor Payment Reporting Form [ X ] 00946 Payment Notification – Explanation of Withholding
[ ] Addenda [and Riders] which apply to the Contract, are as follows:
Addendum No. 1, dated None
Addendum No. 2, dated None
Addendum No. 3, dated None
Rider No. [ ], dated None
[ X ] 00010 Table of Contents (sealed) [ X ] Division 01 - General Requirements.
[ X ] Divisions 02 through 50 of Specifications.
00520WO-5
ARTICLE 8
SIGNATURES
8.1 The Parties have executed this Agreement in multiple copies, each of which is an original. Each person signing this Agreement represents and warrants that he or she is duly authorized and has legal capacity to execute and deliver this Agreement. Each Party represents and warrants to the other that the execution and delivery of this Agreement and the performance of such Party’s obligations hereunder have been duly authorized and that the Agreement is a valid and legal agreement binding on such Party and enforceable in accordance with its terms. The Parties hereby agree that each Party may sign and deliver this Agreement electronically or by electronic means and that an electronic transmittal of a signature, including but not limited to, a scanned signature page, will be as good, binding, and effective as an original signature.
CONTRACTOR: (If Joint Venture)
By: By:
Name: Name:
Title: Title:
Title: Title:
Tax Identification Number: Tax Identification Number:
CITY OF HOUSTON, TEXAS
ATTEST/SEAL: SIGNED:
City Secretary Mayor
APPROVED: COUNTERSIGNED:
Director, Houston Public Works City Controller
By: Date Countersigned:
Chief Procurement Officer
8.2 This Contract and Ordinance have been reviewed as to form by the undersigned Assistant City
Attorney and have been found to meet established Legal Department criteria. Legal Department has not reviewed the content of these documents.
Assistant City Attorney Date
FY2026 Sidewalk Program Work Order Package #1 CONTRACTOR’S REVISED
WBS NO. N-320610-0154-4 WSBE PARTICIPATION PLAN
<<Contractor Name>> 00570-Pg 1 of 2 Edition Date: 09-02-2026
Document 00570
BIDDER’S REVISED WSBE PARTICIPATION PLAN
WSBE ADVERTISED GOALS
WBE SBE
The Bidder or Proposer shall submit this completed form with the bid to demonstrate the Bidder/Proposer’s plan to meet the W/SBE contract goal(s). If the Bidder/Proposer cannot meet the contract goal(s), the Bidder/Proposer has the burden to demonstrate “Good Faith Efforts,” which shall include correctly and accurately preparing and submitting this form, a Record of Post-Bid Good Faith Efforts (Document 00571), a Post Award Plan Deviation Request (Document 00572), and supporting documentation evidencing their “Good Faith Efforts,” as required by the City of Houston’s Good Faith Efforts Policy (Document 00808). The City will review the Participation Plan and Good Faith Efforts at the time of bid opening. Visit http://www.houstontx.gov/obo for more information.
• WBE and SBE Goals are all separate Contract Goals, to be met individually on all contracts.
• Any excess of one Goal cannot be applied to meet another Goal.
• Women-owned Firms are capped at 8% WBE in Goods.
• Any excess of SBE participation to meet other goal types must be explained via Good Faith Efforts (Documents 00571 & 00572).
• All other locally certified firms (PDBE, VOSB, DVOSB, LGBTQ) may be utilized for up to 4% in lieu of WBE.
• Up to 50% of the Bidder’s Participation plan may be met using Suppliers.
• Up to 50% of the advertised goal may be met at the Prime level if the Prime is a City of Houston-certified WBE firm. Prime-level credit must not exceed the individual WBE advertised goal. Prime-level credit does not apply to SBE-certified firms.
NAICS
Code
(6 digit)
Description of Work (Plan Sheet #, Unit
Price #, Scope of Work #, as applicable)
% of Total Bid Price
(2 decimal places; for example: 5.00%)
Services or
Supplier
Cert. Type for Goal: WBE, SBE or
OTHER LOCAL
CERTIFICATION
Certified Firm Name Firm Address Contact Name
Phone No. and E-Mail
WBE �
USE THIS LINE FOR
PRIME LEVEL CREDIT ONLY.
CREDIT MUST NOT EXCEED 50%
OF THE ADVERTISED GOAL.
WBE �
SBE �
OTHER �
PLEASE ELECTRONICALLY COMPLETE THIS FORM OR PRINT LEGIBLY
By submitting this form, your firm agrees to enter into formal subcontracting agreement(s) with the MWSBE subcontractors/subconsultants listed on this participation plan upon award of a contract from the City.
Authorized Signature:
Printed Name:
Company Name:
Date:
Phone: Email:
Bidder’s Participation
Plan Total
WBE SBE OTHER
(up to 4%) http://www.houstontx.gov/obo/index.html
FY2026 Sidewalk Program Work Order Package #1 CONTRACTOR’S REVISED
WBS NO. N-320610-0154-4 WSBE PARTICIPATION PLAN
<<Contractor Name>> 00570-Pg 2 of 2 Edition Date: 09-02-2026
DOCUMENT 00570
BIDDER’S REVISED WSBE PARTICIPATION PLAN
CONTINUATION PAGE
NAICS
Code
(6 digit)
Description of Work (Plan Sheet #, Unit
Price #, Scope of Work #, as applicable)
% of Total Bid Price
(2 decimal places; for example: 5.00%)
Services or
Supplier
Cert. Type for Goal: WBE, SBE or
OTHER LOCAL
CERTIFICATION
Certified Firm Name Firm Address Contact Name
Phone No. and E-Mail
WBE �
*I understand that supplying inaccurate information may violate Texas Penal Code Section 37.10 and lead to City sanctions.
FOR CITY USE ONLY
WSBE Plan Compliant? YES ☐ NO ☐
If no, date sent to OBO:
SPD Signature:
FY2026 Sidewalk Program Work Order Package #1 POST-BID
WBS NO. N-320610-0154-4 GOOD FAITH EFFORTS
00571-1 Edition date: 09-02-2026
Document 00571
POST-BID GOOD FAITH EFFORTS
Bidder Name: Project Name
A Bidder or Proposer that may be unable to complete or follow a Participation Plan (Document 00470) to meet the Contract Goal in the Supplemental Conditions (Document 00800), must submit this completed form along with Post Award Plan Deviation Request (Document 00572), providing supporting documentation evidencing their “Good Faith Efforts,” as required by the City of Houston’s Good Faith Efforts Policy (see Document 00808).
The Bidder or Prime Contractor has the burden to demonstrate “Good Faith Efforts” to meet the WSBE goal, which includes correctly and accurately preparing and submitting this form and other efforts described in the City’s Good Faith Efforts Policy (Document 00808). The Office of Business Opportunity will review Good Faith Efforts and Participation Plan after selection of an apparent low bidder.
UNLESS THE BIDDER’S/PROPOSER’S PARTICIPATION PLAN MEETS THE INDIVIDUAL CONTRACT GOALS, FAILURE TO SUBMIT THIS FORM MAY RESULT IN THE BID BEING FOUND NON-RESPONSIVE.
Plan Item No.
WSBE/
OTHER
Type for
Goal
Certified Firm Name Address, Phone No. and
Certified Firm
Contact Person
Methods of
Contact
Prime Contact Dates
Certified Firm
Response
Results of Contact
(why suitable or not suitable for work)
WBE �
SBE �
OTHER �
Phone � E-mail � Other �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
Authorized Signature: Date: Phone:
Print Name: Email Address:
Company Name:
FY2026 Sidewalk Program Work Order Package #1 POST-BID
WBS NO. N-320610-0154-4 GOOD FAITH EFFORTS
00571-2
CONTINUATION PAGE
Plan Item No.
WSBE/OTHER
Type for Goal
Certified Firm Name Address, Phone No.
and E-Mail
Certified Firm
Contact Person
Methods of
Contact
Prime Contact Dates
Certified Firm
Response
Results of
Contact (why suitable or not suitable for work)
WBE �
SBE �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
OTHER �
Phone �
PLEASE COMPLETE ELECTRONICALLY OR PRINT LEGIBLY!
Authorized Signature: Date: Phone:
Print Name: Email Address:
FY2026 Sidewalk Program Work Order Package #1 POST AWARD PLAN WBS No. N-320610-0154-4 DEVIATION REQUEST
00572-1
Document 00572
POST AWARD PLAN DEVIATION REQUEST
Project Name:
Department Approved
Contract Goals
WBE
SBE
Total
Bidder’s Proposed Participation Plan
WBE
SBE
OTHER
(PDBE, VOSBE,
DVOSBE,
LGBTBE)
(up to 4%)
Total
Justification: Please provide the reason the Bidder is unable to meet the Contract Goal in Document 00800.
Good Faith Efforts: Please list any efforts not listed in the Bidder’s Pre-Bid Good Faith Effort (Document 00571) and provide supporting documentation evidencing “Good Faith Efforts”, as required by the City of Houston’s Good Faith Efforts Policy (Document 00808).
Date: Company Name:
Email: Company Representative:
Phone Number: Title:
PLEASE ELECTRONICALLY COMPLETE OR PRINT LEGIBLY!
FOR OFFICIAL USE ONLY: Approved Not Approved
OBO Representative Date:
Title:
WBS No. N-320610-0154-4 LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS
Document 00600
00600-1 07-01-2013
LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS
PROJECT NAME: FY2026 Sidewalk Program Work Order Package #1
TOTAL DBE AWARD: $
ORIG. CONTRACT PRICE: $ TOTAL MWSBE AWARD: $
PROJECT NO.: WBS No. N-320610-0154-4 TOTAL HUB AWARD: $
DATE OF REPORT: TOTAL PDBE AWARD: $
(6 digits)
SUBCONTRACTOR OR
SUPPLIER (INCLUDE
“MWSBE”, “PDBE”, “DBE”, OR
“HUB” DESIGNATION)2
ADDRESS
SCOPE OF
WORK3
NOTES: 1. RETURN FOR ALL PROJECTS AS REQUIRED IN DOCUMENT 00803 – SUPPLEMENTARY CONDITIONS. RETURN
WITHIN THE SPECIFIED NUMBER OF DAYS AFTER RECEIPT OF NOTICE OF INTENT TO AWARD
2. DESIGNATE FIRMS CERTIFIED BY THE CITY OFFICE OF BUSINESS OPPORTUNITY ON THIS FORM.
3. DESCRIBE THE WORK TO BE PERFORMED, FOR WHICH THE FIRM IS CERTIFIED, SUCH AS “PAVING”, “ELECTRICAL”, ETC.
4. CONTRACTOR SHALL EXECUTE CONTRACTS WITH APPROVED SUBCONTRACTORS AND SUPPLIERS WITHIN
30 DAYS AFTER THE DATE OF THE NOTICE TO PROCEED. COPIES OF CONTRACTS WITH DESIGNNATED FIRMS
MUST BE SENT TO THE OFFICE OF BUSINESS OPPORTUNITY.
SIGNATURE: COMPANY NAME:
NAME: TITLE:
(Type or Print)
Document 00600
00600-2 07-01-2013
WBS No. N-320610-0154-4 LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS
PROJECT NAME:
Continuation Page
DATE OF REPORT:
PROJECT NO.: WBS No. N-320610-0154-4
(6 digits)
SUBCONTRACTOR OR
SUPPLIER (INCLUDE
“MWSBE”, “PDBE”, “DBE”, OR
“HUB” DESIGNATION)2
ADDRESS
SCOPE OF
WORK3
SIGNATURE: COMPANY NAME:
NAME: TITLE:
(Type or Print)
PERFORMANCE BOND
00610-1 07-30-2020
Document 00610
THAT WE, , as Principal, (the “Contractor”), and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound to the City of Houston (the “City”), a municipal corporation, in the penal sum of $ for the payment of which sum, well and truly to be made to the City, its successors and assigns, Contractor and Surety do bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the Contractor has on or about this day executed a Contract in writing with the City for FY2026 Sidewalk Program Work Order Package #1 WBS N- 320610-0154-4, all of such work to be done as set out in full in said Contract documents therein referred to and adopted by the City Council, all of which are made a part of this instrument as fully and completely as if set out in full herein.
NOW THEREFORE, if the said Contractor shall faithfully and strictly perform the Contract in all its terms, provisions, and stipulations in accordance with its true meaning and effect, and in accordance with the Contract documents referred to therein and shall comply strictly with each and every provision of the Contract and with this Bond, then this obligation shall become null and void and shall have no further force and effect;
otherwise the same is to remain in full force and effect. Should the Contractor fail to faithfully and strictly perform the Contract in all its terms, including but not limited to the indemnifications thereunder, the Surety shall be liable for all damages, losses, expenses and liabilities that the City may suffer in consequence thereof, as more fully set forth herein.
It is further understood and agreed that the Surety does hereby relieve the City or its representatives from the exercise of any diligence whatever in securing compliance on the part of the Contractor with the terms of the Contract, and the Surety agrees that it shall be bound to take notice of and shall be held to have knowledge of all acts or omissions of the Contractor in all matters pertaining to the Contract. The Surety understands and agrees that the provision in the Contract that the City will retain certain amounts due the Contractor until the expiration of 30 days from the acceptance of the Work is intended for the City's benefit, and the City will have the right to pay or withhold such retained amounts or any other amount owing under the Contract without changing or affecting the liability of the Surety hereon in any degree.
00610-2
It is further expressly agreed by Surety that the City or its representatives are at liberty at any time, without notice to the Surety, to make any change in the Contract documents and in the Work to be done thereunder, as provided in the Contract, and in the terms and conditions thereof, or to make any change in, addition to, or deduction from the Work to be done thereunder; and that such changes, if made, shall not in any way vitiate the obligation in this Bond and undertaking or release the Surety therefrom.
It is further expressly agreed and understood that the Contractor and Surety will fully indemnify and save harmless the City from any liability, loss, cost, expense, or damage arising out of Contractor’s performance of the Contract.
If the City gives Surety notice of Contractor’s default, Surety shall, within 45 days, take one of the following actions:
1. Arrange for Contractor, with consent of the City, to perform and complete the Contract; or
2. Take over and assume completion of the Contract itself, through its agents or through independent contractors, and become entitled to the payment of the balance of the Contract Price.
If the Surety fails to take either of the actions set out above, it shall be deemed to have waived its right to perform and complete the Contract and receive payment of the balance of the Contract Price and the City shall be entitled to enforce any remedies available at law, including but not limited to completing the Contract itself and recovering any cost in excess of the Original Contract Price from the Surety.
This Bond and all obligations created hereunder shall be performable in Harris County, Texas. This Bond is given in compliance with the provisions of Chapter 2253, Texas Government Code, as amended, which is incorporated herein by this reference.
Notices required or permitted hereunder shall be in writing and shall be deemed delivered when actually received or, if earlier, on the third day following deposit in a United States Postal Service post office or receptacle, with proper postage affixed (certified mail, return receipt requested), addressed to the respective other Party at the address prescribed in the Contract documents, or at such other address as the receiving party may hereafter prescribe by written notice to the sending party.
00610-3
IN WITNESS THEREOF, the said Contractor and Surety have signed and sealed this instrument on the respective dates written below their signatures and have attached current Power of Attorney.
ATTEST, SEAL: (if a corporation) WITNESS: (if not a corporation) Name of Contractor
Name: Name:
Title: Title:
Date:
ATTEST/SURETY WITNESS:
Full Name of Surety
(SEAL)
Address of Surety for Notice
Telephone Number of Surety
Name: Name:
Title: Title: Attorney-in-Fact Date: Date:
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department has not reviewed the content of these documents.
Legal Assistant Date
STATUTORY PAYMENT BOND
00611-1
Document 00611
THAT WE, , as Principal, hereinafter called Contractor and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound unto the City of Houston, a municipal corporation, in the sum of $ for the payment of which sum, well and truly to be made to the City of Houston, and its successors, the said Contractor and Surety do bind themselves, their heirs, executors, administrators, successors, jointly and severally.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the Contractor has on or about this day executed a contract in writing with the City of Houston for FY2026 Sidewalk Program Work Order Package #1 WBS N-320610-0154-4, all of such work to be done as set out in full in said Contract documents therein referred to and adopted by the City Council, all of which are made a part of this instrument as fully and completely as if set out in full herein;
NOW, THEREFORE, if the said Contractor shall pay all claimants supplying labor and materials to him or a Subcontractor in the prosecution of the Work provided for in the Contract, then, this obligation shall be void; otherwise the same is to remain in full force and effect;
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this Bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein.
00611-2
IN WITNESS THEREOF, the said Contractor and Surety have signed and sealed this instrument on the respective dates written below their signatures and have attached current Power of Attorney.
Title: Title:
Date:
ATTEST/SURETY WITNESS
Full Name of Surety
Name: Name:
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department has not reviewed the content of these documents.
WBS No. N-320610-0154-4 ONE-YEAR MAINTENANCE BOND
00612-1 05-17-2005
Document 00612
ONE-YEAR MAINTENANCE BOND
hereinafter called Contractor, and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound to the City of Houston, a municipal corporation, in the sum of $ , for the payment of which sum well and truly to be made to the City of Houston and its successors, the said Contractor and Surety do bind themselves, their heirs, executors, administrators, successors, jointly and severally.
WHEREAS, the Contractor has on or about this day executed a Contract in writing with the City of Houston for FY2026 Sidewalk Program Work Order Package #1 WBS N- 320610-0154-4, all of such work to be done as set out in full in said Contract documents therein referred to and adopted by the City Council, all of which are made a part of this instrument as fully and completely as if set out in full herein.
NOW THEREFORE, if the said Contractor shall comply with the provisions of Paragraph
11.5.1 of the General Conditions, and correct work not in accordance with the Contract documents discovered within the established one-year period, then this obligation shall become null and void, and shall be of no further force and effect; otherwise, the same is to remain in full force and effect.
delivered when actually received or, if earlier, on the third day following deposit in a United States Postal Service post office or receptacle, with proper postage affixed (certified mail, return receipt requested), addressed to the respective other party at the address prescribed in the Contract documents, or at such other address as the receiving party may hereafter prescribe by written notice to the sending party.
WBS No. N-320610-0154-4 ONE-YEAR MAINTENANCE BOND
00612-2 05-17-2005
IN WITNESS THEREOF, the said Contractor and Surety have signed and sealed this instrument on the respective dates written below their signatures and have attached current Power of Attorney.
ATTEST/SURETY WITNESS:
Full Name of Surety
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department
ONE-YEAR SURFACE CORRECTION BOND
00613-1 05-17-2005
Document 00613 hereinafter called Contractor, and the other subscriber hereto, , as Surety, do hereby acknowledge ourselves to be held and firmly bound to the City of Houston, a municipal corporation, in the sum of $ such sum being equal to four percent of the Original Contract Price, for the payment of which sum to be made to the City of Houston and its successors, Contractor and Surety do bind themselves, their successors, jointly and severally.
WHEREAS, the Contractor has entered into a Contract in writing with the City of Houston, Texas, dated of even date herewith, for FY2026 Sidewalk Program Work Order Package #1 WBS N-320610-0154-4, all of such work to be done in accordance with the Contract documents therein referred to, and adopted by the City Council of the City of Houston.
NOW THEREFORE, if the Contractor shall comply with the provisions of Paragraph
11.5.1 of the General Conditions, and repair, replace, restore, and correct surface work associated with backfill operations of subsurface work not in accordance with the Contract documents discovered within one year from the date that the One-year Maintenance Bond has expired, then this obligation shall become null and void, and shall be of no further force and effect; otherwise, the same is to remain in full force and effect.
delivered when actually received or, if earlier, on the third day following deposit in a United States Postal Service post office or receptacle, with proper postage affixed (certified mail, return receipt requested), addressed to the respective other party at the address prescribed in the Contract documents, or at such other address as the receiving party may hereafter prescribe by written notice to the sending party.
00613-2 05-17-2005
IN WITNESS THEREOF, the said Principal and Surety have signed and sealed this instrument on the respective dates written below their signatures.
By: By:
Name: Name:
ATTEST/SURETY WITNESS:
Full Name of Surety
This Ordinance or Contract has been reviewed as to form by the undersigned legal assistant and have been found to meet established Legal Department criteria. The Legal Department
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 1 of 54 DOCUMENT 00700 - GENERAL CONDITIONS 10 July 2026
Document 00700
GENERAL CONDITIONS
July 10, 2026 EDITION
TABLE OF ARTICLES
1. GENERAL PROVISIONS
2. THE CITY
3. CONTRACTOR
4. ADMINISTRATION OF THE CONTRACT
5. SUBCONTRACTORS AND SUPPLIERS
6. CONSTRUCTION BY THE CITY OR BY SEPARATE CONTRACTORS
7. CHANGES IN THE WORK
8. TIME
9. PAYMENTS AND COMPLETION
10. SAFETY PRECAUTIONS
11. INSURANCE AND BONDS
12. WARRANTIES AND CORRECTION OF THE WORK
13. MISCELLANEOUS PROVISIONS
14. TERMINATION OR SUSPENSION OF THE CONTRACT
Page 00700/2 of 54 CITY OF HOUSTON - CONDITIONS OF THE CONTRACT
DOCUMENT 00700 - GENERAL CONDITIONS
ARTICLE 1 – GENERAL PROVISIONS 5
1.1 DEFINITIONS
1.2 EXECUTION, CORRELATION AND INTENT
1.3 OWNERSHIP OF DOCUMENTS AND CONFIDENTIALITY
1.4 INTERPRETATION
ARTICLE 2 – THE CITY 11
2.1 LIMITATIONS OF THE CITY’S OFFICERS AND EMPLOYEES
2.2 DUTIES OF THE CITY
2.3 AVAILABILITY OF LAND AND USE OF SITE
2.4 THE CITY’S RIGHT TO STOP THE WORK
2.5 THE CITY’S RIGHT TO CARRY OUT WORK
ARTICLE 3 – CONTRACTOR 12
3.1 RESPONSIBILITIES
3.2 REVIEW OF CONTRACT AND FIELD CONDITIONS BY CONTRACTOR
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
3.4 SUPERINTENDENT
3.5 LABOR; MINORITY AND WOMEN BUSINESS ENTERPRISE COMPLIANCE
3.6 PREVAILING WAGE RATES
3.7 LABOR CONDITIONS
3.8 DRUG-FREE WORKPLACE COMPLIANCE
3.9 MATERIALS & EQUIPMENT
3.10 PRODUCT OPTIONS AND SUBSTITUTIONS
3.11 CASH ALLOWANCES
3.12 TITLE AND RISK OF LOSS
3.13 TAXES
3.14 PERMITS, FEES, AND NOTICES
3.15 CONSTRUCTION SCHEDULES
3.16 DOCUMENTS AND SAMPLES AT THE SITE
3.17 MANUFACTURER’S SPECIFICATIONS
3.18 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
3.19 CULTURAL RESOURCES AND ENDANGERED SPECIES
3.20 CUTTING AND PATCHING
3.21 CLEANING
3.22 SANITATION
3.23 ACCESS TO WORK AND TO INFORMATION
3.24 TRADE SECRETS
3.25 INDEMNIFICATION
3.26 RELEASE AND INDEMNIFICATION – PATENT, COPYRIGHT, TRADEMARK, AND TRADE SECRET INFRINGEMENT
3.27 INDEMNIFICATION PROCEDURES
3.28 CONTRACTOR DEBT
3.29 PRESERVATION OF CONTRACTING INFORMATION
3.30 COMPLIANCE WITH EQUAL OPPORTUNITY ORDINANCE
ARTICLE 4 – ADMINISTRATION OF THE CONTRACT 24
4.1 CONTRACT ADMINISTRATION
4.2 COMMUNICATIONS IN ADMINISTRATION OF THE CONTRACT
4.3 CONDITION PRECEDENT TO SUIT; WAIVER OF ATTORNEY FEES AND INTEREST
ARTICLE 5 – SUBCONTRACTORS AND SUPPLIERS 25
5.1 AWARD OF SUBCONTRACTS OTHER CONTRACTS FOR PORTIONS OF THE WORK
5.2 CONTRACTOR RESPONSIBILITY FOR SUBCONTRACTORS
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 3 of 54
ARTICLE 6 – CONSTRUCTION BY THE CITY OR BY SEPARATE CONTRACTORS 26
6.1 THE CITY’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS .. 26
6.2 COORDINATION
6.3 MUTUAL RESPONSIBILITY
6.4 THE CITY’S RIGHT TO CLEAN UP
ARTICLE 7 – CHANGES IN THE WORK 27
7.1 CHANGES
7.2 WORK CHANGE DIRECTIVES
7.3 ADJUSTMENTS IN CONTRACT PRICE
7.4 MINOR CHANGES IN THE WORK
7.5 CONCEALED OR UNKNOWN CONDITIONS
7.6 CONTRACTOR REQUESTED CHANGES
7.7 REVIEW AND DETERMINATION BY CITY ENGINEER
ARTICLE 8 – TIME 31
8.1 PROGRESS AND COMPLETION
8.2 DELAYS AND EXTENSIONS OF TIME
ARTICLE 9 – PAYMENTS AND COMPLETION 32
9.1 UNIT PRICE WORK
9.2 ESTIMATES FOR PAYMENT, UNIT PRICE WORK
9.3 STIPULATED PRICE WORK
9.4 APPLICATIONS FOR PAYMENT, STIPULATED PRICE WORK
9.5 CERTIFICATES FOR PAYMENT
9.6 COMPUTATIONS OF CERTIFICATES FOR PAYMENT
9.7 DECISIONS TO WITHHOLD CERTIFICATION
9.8 PROGRESS PAYMENTS
9.9 DATE OF SUBSTANTIAL COMPLETION
9.10 PARTIAL OCCUPANCY OR USE
9.11 FINAL COMPLETION AND FINAL PAYMENT
9.12 LIQUIDATED DAMAGES
ARTICLE 10 – SAFETY PRECAUTIONS 38
10.1 SAFETY PROGRAMS
10.2 POLLUTANTS AND POLLUTANT FACILITIES
10.3 SAFETY OF THE ENVIRONMENT, PERSONS, AND PROPERTY
10.4 EMERGENCIES
ARTICLE 11 – INSURANCE AND BONDS 39
11.1 GENERAL INSURANCE REQUIREMENTS
11.2 INSURANCE TO BE PROVIDED BY CONTRACTOR
11.3 PROOF OF INSURANCE
11.4 PERFORMANCE AND PAYMENT BONDS
11.5 MAINTENANCE BONDS
11.6 SURETY
11.7 DELIVERY OF BONDS
ARTICLE 12 -- WARRANTIES AND CORRECTION OF THE WORK 47
12.1 WARRANTIES
12.2 ACCEPTANCE OF NONCONFORMING WORK
ARTICLE 13 – MISCELLANEOUS PROVISIONS 49
13.1 GOVERNING LAW AND VENUE
13.2 SUCCESSORS
13.3 BUSINESS STRUCTURE AND ASSIGNMENTS
Page 00700/4 of 54 CITY OF HOUSTON - CONDITIONS OF THE CONTRACT
13.4 WRITTEN NOTICE
13.5 RIGHTS AND REMEDIES
13.6 TESTS AND INSPECTIONS
13.7 INTEREST
13.8 PARTIES IN INTEREST
13.9 ENTIRE CONTRACT
13.10 WRITTEN AMENDMENT
13.11 COMPLIANCE WITH LAWS
13.12 SEVERABILITY
13.13 COMPLIANCE WITH CERTAIN STATE LAW REQUIREMENTS
13.14 ZERO TOLERANCE POLICY FOR HUMAN TRAFFICKING & RELATED ACTIVITIES
ARTICLE 14 - TERMINATION OR SUSPENSION OF THE CONTRACT 51
14.1 TERMINATION BY THE CITY FOR CAUSE
14.2 TERMINATION BY THE CITY FOR CONVENIENCE
14.3 SUSPENSION BY THE CITY FOR CONVENIENCE
14.4 TERMINATION BY CONTRACTOR
CITY OF HOUSTON - CONDITIONS OF THE CONTRACT Page 5 of 54
ARTICLE 1
GENERAL PROVISIONS
1.1 DEFINITIONS.
1.1.1 Agreement: Document signed by the Parties and binding the Parties, containing the name of Contractor, title and location of the Project, Original Contract Time, Original Contract Price, enumeration of documents included in the Contract, and other provisions.
1.1.2 Applicable Law: All laws, treaties, ordinances, judgments, decrees, injunctions, writs, orders, codes, rules, regulations, permits, and interpretations of any Governmental Authority having jurisdiction over the Parties, the Project, the Work, the Contract, and each other document delivered hereunder or in connection herewith.
1.1.3 Bonds: Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument.
1.1.4 Business Enterprise: Any business entity registered in a program authorized by 49 C.F.R.
§ 26 (where applicable) or City Code of Ordinances, Chapter 15, Article II. The term “Business Enterprise” may include any Disadvantaged Business Enterprise (“DBE”), Minority Business Enterprise (“MBE”), Woman Business Enterprise (“WBE”), Small Business Enterprise (“SBE”), and any Person with Disability Enterprise (“PDBE”).
1.1.5 Business Enterprise Policy: Contract documents and applicable policies relating to
Business Enterprises and authorized under 49 C.F.R. § 26 or City Code of Ordinances, Chapter 15, Article V.
1.1.6 Cash Allowance: An estimated sum of money to be used only for a limited class of expenditures such as utility relocation costs, fees for special licenses or permits, or other “pass-through” costs that would be the same for any contractor. Cash Allowances may not be used to purchase goods or services that are not specified in the Contract. The unspecified items must be purchased according to the terms of Article 7.
1.1.7 Change Order: Written instrument prepared by the City and signed by Director or his designee and Contractor, specifying the following:
1.1.7.1 a change in the Work;
1.1.7.2 a change in Contract Price, if any; and
1.1.7.3 a change in Contract Time, if any.
The value of a Change Order is the net amount after offsetting all deductions against all additions effected by the Change Order.
1.1.8 City: The City of Houston, a home rule municipality located principally within Harris County, Texas, including its successors and its authorized representatives.
1.1.9 City Engineer: The City Engineer, or the City employee representing the City Engineer, designated in the Agreement and authorized to represent the City, or successors.
1.1.10 City Indemnified Parties: The City and its officials, officers, directors, representatives, agents, employees, consultants and separate…