This is a comprehensive Project Manual for the Berrien Springs Public Schools High School Misc Projects, involving four specific improvement projects at the high school facility in Berrien Springs, Michigan. The document was issued on February 27, 2025, and includes an invitation to bid for projects covering door and frame replacements, power upgrades in robotics and engineering rooms, greenhouse conversion to storage, and counseling center reconfiguration. The bid is scheduled to be received by the district on March 21, 2025, at 3:00 PM, with a mandatory pre-bid meeting on March 4, 2025, at 3:00 PM. The projects are to be completed by August 18, 2025, with construction commencing no later than July 9, 2025.

The project specifications indicate a total of 15 new doors and frames, 23 hardware set upgrades, additional power outlets, new metal stud framing, roofing, insulation, HVAC modifications, and flooring changes. Bidders are required to submit a 5% bid bond, provide prevailing wage rates for Berrien County, and comply with the Iran Economic Sanctions Act. The contract will be awarded to a single contractor responsible for all four project components, with a total bid to be submitted that covers the entire scope of work. Bidding documents are available electronically at no charge, and the Owner reserves the right to reject any or all bids while selecting the most advantageous proposal.

View the file

Other files for this state and local contract opportunity

Other files attached to HS SUMMER PROJECTS, newest first.
File Type Posted
Addendum #2.pdf PDF
Addendum #3.pdf PDF
Invitation to Bid.pdf PDF
Addendum #1.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

High School Misc. Projects

Project Manual

210 E. Main St. / Suite 200 /

P.O. Box 487 / Niles, MI 49120

Berrien Springs Public Schools

Berrien Springs, MI

Issue Date:

27 February, 2025

Berrien Springs Public Schools 1 Table of Contents

TABLE OF CONTENTS

Invitation to Bid Instructions to Bidders Bid Form Familial Disclosure Statement Iran Economic Sanctions Act Certification Owner-Contractor Agreement – AIA A101 2017 Edition General Conditions of the Contract for Construction – AIA A201 2017 Edition

Berrien County Prevailing Wage Rates

Division 1 – GENERAL REQUIREMENTS

011000 Summary 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 014000 Quality Requirements 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution Requirements 017700 Closeout Procedures

024119 Selective Demolition 042200 Concrete Unit Masonry 053100 Steel decking 054000 Cold formed Metal Framing 072413 Polymer-Based Exterior Insulation and Finish System (EIFS) 081213 Hollow Metal Frames 081416 Flush Wood Doors 087100 Door Hardware ( to be included in Addendum 1) 088000 Glazing

Berrien Springs Public Schools 1 Invitation to Bid

INVITATION TO BID

PROJECT NAME: High School Misc. Projects

PROJECT DESCRIPTION:

The four High School improvement projects within the Misc. Projects drawing set consist of the following:

A- High School Doors and Frames- 15 new doors and frames which will meet building code ratings and improve ADA requirements; 23 additional openings will receive new hardware sets which meet ADA grasp-ability requirements; paint touch-ups at disturbed areas of work.

B- Robotics and Engineering Room Power- these rooms receive additional power outlets at perimeter of room and hose reel power hung from ceiling.

C- Greenhouse to Storage- An un-used greenhouse space is repurposed to a storage room for the science rooms that are adjacent. Improvements include new metal stud framing for walls and roof, new roofing; new insulation; new HVAC thru-wall unit; new tile flooring.

D- High School counseling center is reconfigured to add an additional office for a third high school guidance counselor. Improvements include new mt stud framing, door and frame, new lighting, redistribution of HVAC diffusers: new cpt flooring.

BID DATE:

Bids will be received at the district’s Administrative Offices, located at the corner of Shawnee and Sylvester Ave., until 3:00 PM (local time) on Friday 21st, March 2025.

Bids will be publicly opened at the Administrative Offices and read aloud at this time. Bids received after this time will not be considered and will be returned to the bidder unopened.

Bids shall be properly and completely executed on the Bid Proposal Form included within the Project Manual and submitted in duplicate. Bids shall be clearly marked as “High School Misc Projects” on the front of the submitted envelope.

PRE-BID MEETING:

A Mandatory Pre-Bid Meeting will be held on 4th March 2025 at 3:00 PM (local time) on site, at the south-side of the High School in the parking lot, which is the scope of work.

DOCUMENT AVAILABILITY AND USE:

Bid Documents may be viewed at the following Plan Rooms on or after Thursday 27th, February 2025.

OWNER: Berrien Springs Public Schools 285 Sylvester Avenue

Berrien Springs, MI 49103

(Administrative Offices)

ARCHITECT: CARMI Design Group

210 E. Main Street, Suite 200

P.O. Box 487

Niles, MI 49120

Phone: 269-663-5073

Berrien Springs Public Schools 2 Invitation to Bid

Bidding documents are available electronically at no charge, via email. Please email your request to

CARMI at cadmin@carmi.biz.

Contact with bidding questions: cadmin@carmi.biz. cc emails to Randy Boersen, randy@carmi.biz, BONDS:

A five percent (5%) Bid Bond shall accompany each bid. The successful bidder will be required to provide a Performance Bond, Labor and Material Bonds, and certificates of Liability and Worker’s Compensation Insurance.

OTHER CONDITIONS AND INFORMATION:

1. The awarded contractor will be required to pay not less than the published Berrien County, Michigan prevailing wage rates.

2. Each bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Berrien Springs Public Schools Board of Education or the superintendent of the school district.

3. No bidder may withdraw their bid for a period of Thirty (30) calendar days after the date set for bid opening.

4. Public Act 517 of 2012 (effective December 31, 2012) enacted the “Iran Economic Sanctions Act”, which prevents “Iran linked businesses” from bidding on a school district or ISD’s request for proposals (“RFP”). This law requires that persons submitting bids certify that they are not an “Iran linked business,” which is defined as either:

a) A person engaging in investment activities in the energy sector of Iran, including a person that provides oil or liquefied natural gas tankers or products used to construct or maintain pipelines used to transport oil or liquefied natural gas for the energy sector of Iran; or

b) A financial institution that extends credit to another person, if that person will use the credit to engage in investment activities in the energy sector of Iran.

5. Berrien Springs Public Schools reserves the right to reject any or all bids, to waive any defects or irregularities in bids, and to accept any bid that is deemed most advantageous to the public interest.

Builders Exchange of Kalamazoo www.builder-exchange.com

Builders Exchange of Lansing www.bxlansing.com

Builders Exchange of Michigan www.grbx.com

Construction Association of Michigan www.BuildwithCAM.com

ConstructConnect www.constructconnect.com

Dodge Construction Network www.construction.com

MACIAF (South Bend, IN) www.constructionsite.org

Berrien Springs Public Schools 1 Instructions to Bidders High School Misc Projects

INSTRUCTIONS TO BIDDERS

A. No bid received after the specified date and time for opening, whether post dated or not, will be considered.

B. If any of the required bidding documents are not included, or properly executed, the contractor’s bid may not be accepted.

C. The Owner reserves the right to reject each and every bid, to waive formalities or informalities in bidding, to accept or reject each and every alternate regardless of its order or sequence, unless otherwise called for on the bid Proposal Form.

D. The right is reserved to reject a Bid where an investigation of the available evidence of information does not satisfy the Owner that the Bidder is qualified to properly carry out the terms of the Contract Documents.

E. Bids which contain qualifications or conditions that are contrary to the text or intent of the Contract

Documents, and which are inserted in the bid for the purpose of limiting or otherwise qualifying the responsibility of the bidder, outside of the text or intent of the Contract Documents, will be subject to disqualification.

F. Failure to submit the requested information with the Bid shall be grounds for rejecting the Bid.

G. The Owner also reserves the right to reject the bid of a Bidder who has previously failed to perform properly or to complete contracts of similar nature on time, who is not in a position to perform the Contract or who has habitually and without just cause neglected the payment of bills or otherwise disregarded his obligations to subcontractors, suppliers, or employees.

H. Payment / Performance Bonds are required for this contract.

I. The ability of the Bidder to obtain or qualify for a performance bond or payment bond shall not be regarded as a sole test of such Bidders competence or responsibility.

J. The Contractor’s liability insurance shall be not less than the following:

1 General Requirements

a. Worker’s Compensation - Statutory

b. Employer’s Liability - Established by Owner

2 Comprehensive General Liability

a. Bodily Injury - $1,000,000 Each Occurrence

- $2,000,000 Aggregate

b. Personal Injury - $1,000,000 Each Occurrence

- $2,000,000 Aggregate

3 Automobile Liability

a. Bodily Injury - $1,000,000 Each Person

- $1,000,000 Each Occurrence

b. Property Damage - $1,000,000 Each Occurrence

4 Independent Contractors - $1,000,000 Each Occurrence 5 Products and Complete Operations - $1,000,000 for one (1) year, commencing with issuance of final Certificate for Payment 6 Contractual Liability - $1,000,000 Each Occurrence 7 Umbrella Coverage - $2,000,000 Each Occurrence

- $4,000,000 Aggregate

Berrien Springs Public Schools 2 Instructions to Bidders

K. This project is not tax exempt.

L. The awarded contractor will be required to pay not less than the published Berrien County, Michigan prevailing wage rates.

M. Bidder must have comparable experience with the type and scale of this project; submit a list of similar projects completed within the last 5 years. Failure to submit the requested information with the Bid shall be grounds for rejecting the Bid.

N. Bidders are required to submit a list of subcontractors who will be used on this project.

O. Scope of Work

The four High School improvement projects within the Misc. Projects drawing set consist of the following:

A- High School Doors and Frames- 15 new doors and frames which will meet building code ratings and improve ADA requirements; 23 additional openings will receive new hardware sets which meet ADA grasp-ability requirements; paint touch-ups at disturbed areas of work.

B- Robotics and Engineering Room Power- these rooms receive additional power outlets at perimeter of room and hose reel power hung from ceiling.

C- Greenhouse to Storage- An un-used greenhouse space is repurposed to a storage room for the science rooms that are adjacent. Improvements include new metal stud framing for walls and roof, new roofing;

new insulation; new HVAC thru-wall unit; new tile flooring.

D- High School counseling center is reconfigured to add an additional office for a third high school guidance counselor. Improvements include new mt stud framing, door and frame, new lighting, redistribution of HVAC diffusers: new cpt flooring.

P. The four projects as described above will have an individual place to fill in your bid on the bid tab, the combined amount for all four projects will be your bid. One contractor will be awarded all four projects- one bid. There will not be individual contractors for each scope of work. You must bid on all four projects to be considered the awarded bidder.

Q. This work is scheduled to commence no later than June 9th 2025. All material / product procurement is to be accomplished by commencement of work. Work is to be 100% complete by August 18th 2025.

R. Bidding questions. Please email cadmin@carmi.biz. cc Randy Boersen, randy@carmi.biz, The Bidder may, at his option, submit a voluntary alternate, stating the optional material and/or methods which he proposes to use, and all brochures, data manuals, etc., describing the specifics of such materials or equipment. No voluntary alternate products will be evaluated prior to bidding. The Architect and Owner reserve the right to accept or reject such options, and all Bidders, in consideration of the privilege of bidding, do now specifically waive all rights both legal and equitable which he has or might be construed to have against the Architect and Owner because of the action taken in accepting or rejecting such options and/or any other proposals or bids for any reason whatsoever. Said Bidder who files an action based thereon shall be liable for any resultant, reasonable attorneys' fees incurred by the Architect and/or Owner.

Bid Form - 1

BID FORM

PROJECT: High School Misc Projects OWNER: Berrien Springs Public Schools

285 Sylvester Avenue Berrien Springs, MI 49103

PROPOSAL FROM: __________________________________________________________________ Company Name

Address

City, State, ZIP

CONTRACT NO. 1 – High School Misc Projects combined total Bid Written Amount

A- HS Doors and Frames Bid

___________________________________________________ $______________________ Bid Written Amount

B- Robotics and Engineering Power

C- Greenhouse to Storage

D- High School Counseling Offices

Bid Form - 2

Voluntary Alternate (if provided)

Description

_________________________________________________ $______________________ (Add/Deduct)

Additional items to be included with Bid Form:

5% BID BOND YES NO

List of warranted projects YES NO

List of subcontractors YES NO

Iran Economic Sanctions Act Certification YES NO

Familial Disclosure Statement YES NO

Written Narrative for Inclusions / Exclusions YES NO

Summary Schedule YES NO

Acknowledge Receipt of

ADDENDUM NO.: ONE TWO

SUBMITTED BY:

_____________________________________________________ Date:________________, 2024 Signature

Printed

Title

Phone Number

Email

Sworn and Notarized Familial Disclosure Statement

All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid will be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Berrien Springs Public Schools Board of Education or the Superintendent of Berrien Springs Public Schools.

Bids and Proposals without this disclosure statement will not be accepted.

___ The following familial relationship exists between the owner or any employee of the bidder and member of the Berrien Springs Public Schools Board of Education or the Superintendent of Berrien Springs Public Schools.

Owner/Employee Name Related To: Relationship

1 ________________________ ________________________ _________________

2 ________________________ ________________________ _________________

3 ________________________ ________________________ _________________

4 ________________________ ________________________ _________________

5 ________________________ ________________________ _________________

Attach additional pages if necessary to disclose familial relationship.

___ There is no familial relationship that exists between the owner or any employee of the bidder and any member of the Berrien Springs Public Schools Board of Education or the Superintendent of Berrien Springs Public Schools.

The undersigned, the owner or authorized representative of bidder (insert name)

________________________________ does hereby represent and warrant that the disclosure statements herein contained are true.

Signature of Bidder Representative

Print Name

Title

STATE OF MICHIGAN / INDIANA )

) ss

COUNTY OF _____________________ )

This instrument was acknowledged before me on the _______ day of _____________________, _______, by _______________________________________________.

, Notary Public

____________________ County, Michigan/Indiana

My commission expires: _______________

Acting in the County of: ________________

IRAN ECONOMIC SANCTIONS ACT CERTIFICATION

I am the _______ __________ of _____________ _____________________, or I am (title) (bidder) bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the provision of

General Trades services to Berrien Springs Public Schools. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the school district will rely on my representations in evaluating bids.

I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.

(signature)

(printed)

(date)

Berrien Springs Public Schools 1 Owner-Contractor Agreement

OWNER-CONTRACTOR AGREEMENT

A. OWNER-CONTRACTOR AGREEMENT

AIA Document A101 (2017 Edition) Owner-Contractor Agreement is hereby included by reference as the agreement to be executed between the Owner and the Contractor. Copies of this document are available from the Architect’s office. Contract to be issued by Architect for execution of signatures.

END OF SECTION

Berrien Springs Public Schools 1 General Conditions

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

A. GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

AIA Document A201 (2017 Edition) General Conditions of the Contract for Construction is hereby the reference for this contract. Copies of this document are available from the Architect’s office.

STATE OF MICHIGAN

Wage and Hour Division PO Box 30476

Lansing, MI 48909 517-284-7800

Informational Sheet: Prevailing Wages on State Funded Projects

WHD 9918 (2/24)

REQUIREMENTS

Effective February 13, 2024

The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects that are financed or financially supported by the state Prevailing rates compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. While the prevailing wage rates are compiled through surveys of collectively bargained agreements, a collective bargaining agreement is not required for contractors to be on or be awarded state projects. The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate.

State of Michigan responsibilities:

• The department establishes the prevailing rate for each classification of construction mechanic requested by the contracting agents prior to contracts being let out for bid on a state project.

DTMB responsibilities

• If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re- determination of rates must be requested by the contracting agents.

• Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.

Contractor responsibilities:

• Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing rates prescribed in a contract.

• Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic. This record shall be available for reasonable inspection by DTMB or the department.

• Each contractor or subcontractor is liable for the payment of the prevailing rate to its employees.

• The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.

• A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.

Enforcement:

A person who has information of an alleged prevailing wage violation on a prevailing wage project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with contractual requirements, the Contracting Agent may consider the Contractor to be in material breach of the contract and may terminate the contract for cause at the sole discretion. There are also civil penalties for failure to be in compliance with Act 10. View the entire text of Act 10 of 2023 at michigan.gov/wagehour.

Informational Sheet: Prevailing Wages on State Projects

P a g e | 1 of 10

WHD-9917 2/24

General Information Regarding Fringe Benefits

Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate:

o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract or policy o If a fringe benefit is paid into a fund, for a construction mechanic

When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week).

The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:

Vacation 40 hours X $14.00 per hour = $560/2080 = $.27 Dental insurance $31.07 monthly premium X 12 mos. = $372.84 /2080 = $.18 Vision insurance $5.38 monthly premium X 12 mos. = $64.56/2080 = $.03 Health insurance $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $1.33 Life insurance $27.04 monthly premium X 12 mos. = $324.48/2080 = $.16 Tuition $500.00 annual cost/2080 = $.24 Bonus 4 quarterly bonus/year x $250 = $1000.00/2080 = $.48 401k Employer Contribution $2000.00 total annual contribution/2080 = $.96

Total Hourly Credit $3.65

Other examples of the types of fringe benefits allowed:

Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums

The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate o Legally required payments, such as:

Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions) o Reimbursable expenses, such as:

Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:

Industry advancement funds Financial or material loans

P a g e | 2 of 10

OVERTIME PROVISIONS for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE

1. Overtime is represented as a nine character code. Each character represents a certain period of time after the first 8 hours Monday thru Friday.

Monday thru Friday

Saturday

Sunday & Holidays

Four 10s

First 8 Hours 4

8 9 9th Hour 1 5

10th Hour 2 6

Over 10 hours 3 7

Overtime for Monday thru Friday after 8 hours:

the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond)

Overtime on Saturday:

the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond)

Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday

Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.

2. Overtime Indicators Used in the Overtime Provision:

H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek cannot be worked without paying overtime after 8 hours worked

3. EXAMPLES:

HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.

XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek.

P a g e | 3 of 10

ENGINEERS - CLASSES OF EQUIPMENT LIST

UNDERGROUND ENGINEERS

CLASS I

Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator.

CLASS II

Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck.

CLASS III

Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered).

CLASS IV

Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.

HAZARDOUS WASTE ABATEMENT ENGINEERS

CLASS I

Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig.

CLASS II

Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.

P a g e | 4 of 10

CARPENTER CRAFT JURISDICTION

Michigan recognizes the Carpenters for any and all work related to weatherization that has historically been the work of the Carpenter. This work shall include, but not be limited to: all work defined under the Federal Weatherization Assistance Program.

The jurisdiction of Carpenters, as to all work that has historically and traditionally been performed consisting of the milling, fashioning, joining, assembling, erecting, fastening or dismantling of all materials of wood, plastic, metal, fiber, cork, or composition and all other substitute materials, as well as the handling, cleaning, erecting, installing and dismantling of all machinery, equipment and all materials used by Carpenters.

The jurisdiction, therefore, extends over the following divisions and subdivisions of the trade: Carpenters and Joiners, Millwrights, Pile Drivers, Bridge, Dock and Wharf Carpenters, Underpinners, Timbermen, and Core-drillers, Shipwrights, Boat Builders, Ship- hand, Stair-Builders, Millmen, Wood and Resilient Floor Decorators, Floor Finishers, Carpet-layers, Shinglers, Siders, Insulators, Acoustic and Drywall Applicators, Sharers and House Movers, Loggers, Lumber and Sawmill Workers, Reed and Rattan Workers, Shingle Weavers, Casket and Coffin Makers, Railroad Carpenters and Car Builders, regardless of material used and all those engaged in the operation of woodworking or other machinery required in fashioning, milling or manufacturing of products used in the trade, and the handling, erecting and installing materials on any of the above divisions or sub-divisions, burning, welding and rigging incidental to the trade. When the term "Carpenter and Joiner" is used, it shall mean all the subdivisions of the trade. The trade autonomy of Carpenters therefore extends over the divisions and subdivisions of the trade, which are set forth as follows:

(a) The framing, erecting and prefabrication of roofs, partitions, floors and other parts of buildings of wood, metal, plastic or other substitutes; application of all metal flashing used for hips, valleys and chimneys; the erection of Stran Steel section or its equal. The building and setting of all forms and centers for brick and masonry. The fabrication and erection of all forms for concrete and decking, the dismantling of same (as per International Agreement) when they are to be re-used on the job or stored for re-use. The cutting and handling of all falsework for fireproofing and slabs. Where power is used in the setting or dismantling of forms, all signaling and handling shall be done by carpenters. The setting of templates for anchor bolts for structural members and for machinery, and the placing, leveling and bracing of these bolts. All framing in connection with the setting or metal columns. The setting of all bulkheads, footing forms and the setting of and fabrication of, screeds and stakes for concrete and mastic floors where the screed is notched or fitted, or made up of more than one member. The making of forms for concrete block, bulkheads, figures, posts, rails, balusters and ornaments, etc.

(b) The handling and erecting of rough material and drywall, the handling, assembly, setting and leveling of all fixtures, display cases, all furniture such as tables, chairs, desks, coat racks, etc., all de-mountable or moveable partitions such as Von wall, E Wall, Steel Case, Herman Miller, Haworth, American Seating, Westinghouse, Lazy Boy, rosewood, etc. All rebuilding, remodeling and setting up of all kinds of partitions, finished lumber, metal and plastic trim to be erected by Carpenters shall be handled from the truck or vehicle delivering same to the job by Carpenters.

P a g e | 5 of 10

CARPENTER CRAFT JURISDICTION

(c) The building and moving of all scaffolding runways and staging where carpenters' tools are used, the building from the ground up of all scaffolds over fourteen (14) feet in height including metal and specially designed scaffolding. The building and construction of all hoists and derricks made of wood; the making of mortar boards, boxes, trestles, all shoring, razing and moving of buildings. Lift type trucks are to be considered a tool of the trade.

Metal siding and metal roofing fall within the scope of jurisdiction for the carpenters.

(d) The cutting or framing and fireproofing of the openings for pipes, conduits, ducts, etc., where they pass through floors, partitions, walls, roofs or fixtures composed in whole or in part of wood. The laying out of making and installation of all inserts and sleeves for pipes, ducts, etc., where carpenters' tools and knowledge are required.

The making and installing of all wooden meter boards, crippling and backing for fixtures. The welding of studs and other fastenings to receive material being applied by carpenters.

(e) The installation of all grounds, furring or stripping, ceilings and sidewalks, application of all types of shingling and siding, etc.

(f) The installation of all interior and exterior trim or finish of wood, aluminum, kalamein, hollow or extruded metal, plastic, doors, transoms, thresholds, mullions and windows. The setting of jambs, bucks, window frames of wood or metal where braces or wedges are used. The installation of all wood, metal or other substitutes of casing, molding, chair rail, wainscoting, china closets, base of mop boards, wardrobes, metal partitions as per National Decisions or specific agreements, etc. The complete laying out, fabrication and erection of stairs. The making and erecting of all fixtures, cabinets, shelving, racks, louvers, etc. The mortising and application of all hardware in connection with our work. The sanding and refinishing of all wood, cork or composition floors to be sanded or scraped, filled, sized and buffed, either by hand or power machines. The assembling and setting of all seats in theaters, halls, churches, schools, auditorium, grandstands and other buildings. All bowling alley work.

(g) The manufacture, fabrication and installation of all screens, storm sash, storm doors and garage doors; the installation of wood, canvas, plastic or metal awnings or eye shades, door shelters, jalousies, etc. The laying of wood, wood block and wood composition in floors.

(h) The installation of all materials used in drywall construction, such as plasterboard, all types of asbestos boards, transite and other composition board. The application of all material which serves as base for acoustic tile, except plaster. All acoustical applications as per National Agreement or specific agreement.

(i) The building and dismantling of all barricades, hand rails, guard rails, partitions and temporary partitions. The erection and dismantling of all temporary housing on construction projects.

(j) The installation of rock wool, cork and other insulation material used for sound or weatherproofing. The removal of caulking and placing of staff bead and brick mold and all Oakum caulking, substitutes, etc., and all caulking in connection with carpentry work.

(k) The installation of all chalk boards/marker boards.

P a g e | 6 of 10

CARPENTER CRAFT JURISDICTION

(l) The operation of all hand operated winches used to raise wooden structures.

(m) The erection of porcelain enameled panels and siding.

(n) The unloading and distribution of all furnished, prefabricated and built-up sections such as door bucks, window frames, cupboards, cabinets, store fixtures, counters and show cases or comparably finished or prefabricated materials, to the job sites or points of installation as used in the construction, alteration and remodeling industry.

(o) The handling of doors, metal, wood or composite, partitions and other finished bulk materials used for trim from the point of delivery.

(p) All processing of these materials and handling after processing.

(q) The making up of panels and fitting them into walls, all bracing and securing, all removal of panels from the casting including all braces, whalers, hairpins, etc.

(r) The handling and setting of all metal pans and sections from the stock piles of reasonable distance as required by job needs shall be performed by carpenters. The stripping of such metal pans, panels or sections is to be performed by carpenters.

(s) The sharpening of all carpenter hand or power tools, or those used by carpenters.

(t). The layout, fabrication, assembling of and erection and dismantling of all displays made of wood, metal, plastic, composition board or any substitute material; the covering of same with any type of material, the crating and un-crating, the handling from the point of unloading and back to the point of loading of all displays and other materials or components.

(u) The same shall apply to all other necessary component parts used for display purposes such as turntables, platforms, identification towers and fixtures, regardless of how constructed, assembled or erected or dismantled.

(v) The make-up, handling, cutting and sewing of all materials used in buntings, flags, banners, decorative paper, fabrics and similar materials used in the display decorative industry for draperies and back drops. The decorative framing of trucks, trailers and autos used as floats or moving displays. The slatting of walls to hand fabrics and other decorative materials, drilling of all holes to accommodate such installations. Setting up and removal of booths constructed of steel or aluminum tubing as stanchions, railings, etc., handling and placing of furniture, appliances, etc., which are being used to complete the booth at the request of the exhibitor. Fabricating and application of leather, plastic and other like materials used for covering of booths. The handling of all materials, fabricating of same. The loading and unloading, erecting and assembling at the exhibit of show area, also in or out of storage when used in booth decorations.

P a g e | 7 of 10

CARPENTER CRAFT JURISDICTION

(w) A display shall be construed as any exhibit or medium of advertising, open to private or public showing, which is constructed of wood, metal, plastic or any other substitute to accomplish the objectives of advertising or displaying.

(x) Handling, fitting, draping, measuring and installation of fixtures and other hardwares for draperies, all manner of making, measuring, repairing, sizing, hanging and installation of necessary fixtures and hardware for shades and Venetian blinds.

(y) Work consisting of cutting and/or forming of all materials in preparation for installing of floors, walls and ceilings; the installation of all resilient floor and base; wall and ceiling materials to include cork, linoleum, prefabricated, laminated, rubber, asphalt, vinyl, metal, plastic, seamless floors and all other similar materials in sheet, interlocking liquid or tile form; the installation of all artificial turf, the installation, cutting and/or fitting of carpets; installation of padding, matting, linen crash and all preformed resilient floor coverings; the fitting of all devices for the attachment of carpet and other floor, wall and ceiling coverings; track sewing of carpets, drilling of holes for sockets and pins, putting in dowels and slats; and all metal trimmings used; the installation of all underlayments, sealants in preparation of floors, walls and ceilings, the unloading and handling of all materials to be installed and the removal of all materials in preparing floors when contracted for by the employer, shall be done only by employees covered under this Agreement.

(z) The installation of all sink-tops and cabinets, to include all metal trim and covering for same. All cork, linoleum, congo-wall, linewall, veos tile, plexiglass, vinawall tile, composition tile, plastic tile, aluminum tile and rubber in sheets or tile form and the application thereof. All bolta-wall and bolta-wall tile and similar products.

(aa) The handling and placing of all pictures and frames and the assembly of bed frames and accessories. The hanging and placing of all signage.

(bb) The installation of all framework partitions and trim materials for toilets and bathrooms made of wood, metal, plastics or composition materials; fastening of all wooden, plastic or composition cleats to iron or any other material for accessories.

(cc) The erection of cooling towers and tanks.

(dd) The setting, lining, leveling and bracing of all embedded plates, rails and angles. The setting of all stay in place forms.

(ee) Environmental: Clean room, any type of environmental chamber, walk in refrigerated coolers and all refrigerated rooms or buildings.

P a g e | 8 of 10

PILE DRIVING AND CAISSON DRILLING

(ff) All unloading, handling, signaling and driving of piles, whether wood, steel, pipe, beam pile, composite, concrete or molded in place, wood and steel sheeting, cofferdam work, trestle work, dock work, floating derricks, caisson work, foundation work, bridge work, whether old or new, crib work, pipe line work and submarine work. Cutting of all wood, steel or concrete pile, whether by machine or hand; welding and cutting, peeling, and heading of all wood pile, steel sheeting and wood sheeting. The erecting and dismantling of all pile driving rigs, also derricks whether on land or water; also the moving, shoring and underpinning of all buildings. The loading and unloading of all derricks, cranes and pile driving materials. The tending, maintenance and operation of all valves pertaining to the operation of driving of pile. All diving and tending essential to the completion of jurisdictional claims.

All work done in the established yards of the Company and all work not enumerated above, shall be handled and manned as the Employer decides.

The pile driver will unload all material shipped in by rail from the point that the rail car is spotted.

All cleaning and preparation of all piling prior to driving.

The welding and attachment of all boot plates, pile points, splice plates, connectors, rock crosses, driving crosses, driving rigs, point reinforcements and overboots.

The construction, reconstruction, repair, alteration, demolition and partial or complete removal of all marine work including, but not limited to, docks, piers, wharves, quays, jetties, cribs, causeways, breakwaters, lighthouses and permanent buoys, etc. (mixing and placing of concrete excepted).

The driving and pulling of all wood, steel and concrete foundation piles and sheet piling.

The heading, pointing, splicing, cutting and welding of all piles.

The placing of all wales, bolts, studs, lagging, rods and washers including the cutting, drilling, boring or breaking of all holes or openings thereof.

The removal of all materials and/or obstructions of any nature (rip-rap included) that retard or interfere with the driving of piles or with the placing of wales, bolts and rods.

P a g e | 9 of 10

This is to be subject to the discretion of the contractor who may choose to use blasting specialists or other demolition specialists.

The handling on the job of all materials used in the work.

The manning of all floating equipment (towing equipment excepted) engaged in the work enumerated, including deck engines, except machinery manned by Operating Engineers.

The placing of all rip-rap, fill stone, bedding stone, cover stone and concrete blocks in connection with marine construction. Work normally performed by Employers, such as soil tests, shoring, underpinning of buildings, cribbing, driving of sheet piling, marine divers, tenders, underwater construction workers and similar operations shall continue to be included in the jurisdiction of this Agreement.

All burning, cutting, welding and fabrication of pipe, H-beams, sheet pile (metal or wood), done on the job site or in the yard of the Employer shall be done by pile drivers. The driving of bearing piles, sheet piling with heavy equipment, caissons, pile caps, auger drilling and boring, the setting up for load testing for any type of piling, all layout and spotting for piling, caisson and boring work, all earth retention, ditch boarding, installing tiebacks.

ASBESTOS ABATEMENT CARPENTERS

(gg) All erection and maintenance of barriers and partitions used in the removing of asbestos or any abatement work.

The abatement of any materials previously installed by the carpenter such as transite, ceiling and floor tiles. All operating and maintaining of current equipment used in any abatement work.

P a g e | 10 of 10

ELECTRICIAN – SOUND AND COMMUNICATION / DATA/ VOICE JURISDICTION

The installation, testing, service and maintenance, of systems which utilize the transmission and/or transference of voice, sound, vision or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, CATV and CCTV, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school intercom and sound, burglar alarms, low voltage fire alarm systems, low voltage master clock systems, distributed antenna systems (DAS), IP data networks, and all surface-mounted (non-power) telecommunications wiremold. Shall additionally include the installation of all raceway systems of unlimited length in telecommunications rooms, entrance facilities, equipment rooms, and similar areas. Energy management systems. Security systems; perimeter, vibration, card access, access control and sonar/infrared monitoring equipment. Communications systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; SCADA (Supervisory Control and Data Acquisition), PCM (Pulse Code Modulation), Digital Data Systems, Broadband and Baseband and Carriers, POS (Point of Sale systems), VSAT Data Systems, RF and Remote Control Systems, Fiber Optic Data Systems and Voice and Data Infrastructure and Backbone.

SUSAN CORBIN

DIRECTOR

DEPARTMENT OF LABOR AND ECONOMIC OPPORTUNITY

WAGE AND HOUR DIVISION

Prevailing Wage Rates for State Funded Projects Official Rate Schedule

GRETCHEN WHITMER

GOVERNOR

ORS#: ORS-001983

Date Issued: 02/21/2025 Contract Award By Date: 05/22/2025 Contracting Agency: Berrien Springs Public Schools (CA-0120) Contracting Agency Representative: Tony Leininger, AIA (tony@carmi.biz) Project Number: 2024.044 Project Name: Middle School Ceiling and Lighting, Phase 2 Project Description: Replace lay-in ceilings and lighting. Install new grilles, diffusers, and branch ductwork as required.

ORS#: ORS-001983 | CA#: CA-0120 | Date Issued: 02/21/2025 | Contract Award By Date: 05/22/2025 Page 1 of 185

FOR ALL AWARDED CONTRACTS ONLY

• Every Contractor and Subcontractors shall keep Posted on the Construction Site, in a conspicuous place, a copy of all applicable prevailing wage rate schedules contained in a contract.

• The Prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated classifications.

• Please refer to WHD-9917 & WHD 9918 for any additional information.

Official Rate Schedule

Berrien

Classification Name Category Last Updated

Boilermaker Boilermaker 05/10/2024 Classification Description: Boilermaker

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $72.47 $107.55 $142.63 Apprentice: 1st Period $53.53 $79.15 $104.75 Apprentice: 2nd Period $55.14 $81.56 $107.97 Apprentice: 3rd Period $56.73 $83.94 $111.15 Apprentice: 4th Period $58.31 $86.31 $114.31 Apprentice: 5th Period $59.85 $88.62 $117.39 Apprentice: 6th Period $63.03 $93.39 $123.75 Apprentice: 7th Period $66.17 $98.10 $130.03 Apprentice: 8th Period $69.32 $102.83 $136.33

Overtime Provisions Over 8-hour day/40-hour week

9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82

Saturday First 8 hours $90.82 9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82

Sunday/Holiday $109.17

Four 10-hour days allowed? - Yes Make Up Day Allowed? - No

ORS#: ORS-001983 | CA#: CA-0120 | Date Issued: 02/21/2025 | Contract Award By Date: 05/22/2025 Page 2 of 185

Berrien

Classification Name Category Last Updated

Bricklayers, Stone Mason, Pointer, Cleaner & Caulker - BAC 2 - Kalamazoo Bricklayer 09/24/2024

Classification Description: Bricklayers, Stone Mason, Pointer, Cleaner & Caulker

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $56.74 $72.94 $89.14 Apprentice: Bricklayer Apprentice Level 5 $50.24 $64.19 $78.14

Apprentice: Bricklayer Apprentice Level 6 $52.00 $66.83 $81.66

Apprentice: Bricklayers Apprentice 2ndLevel $44.96 $56.27 $67.58

Apprentice: Bricklayers Apprentice 4th level $48.48 $61.55 $74.62

Apprentice: Bricklayers Apprentice Level 1 $43.20 $53.63 $64.06

Apprentice: Bricklayers Apprentice Level 3 $46.72 $58.91 $71.10

Apprentice: Bricklayers Apprentice Level 7 & 8 $53.76 $69.47 $85.18

Overtime Provisions Over 8-hour day/40-hour week

9th hour $56.74 10th hour $56.74 Beyond 10 hours $56.74

Saturday First 8 hours $56.74 9th hour $56.74 10th hour $56.74 Beyond 10 hours $56.74

Sunday/Holiday $89.14

Four 10-hour days allowed? - Yes

Between Nov. 1 and Apr 30, if inclement weather, or other conditions beyond the Employer’s control, Saturdays may be worked as make-up days. Make-up time shall be paid at the straight time rate until forty hrs are worked unless the standard workweek included a holiday, then 32 hrs straight time

Make Up Day Allowed? - Yes

ORS#: ORS-001983 | CA#: CA-0120 | Date Issued: 02/21/2025 | Contract Award By Date: 05/22/2025 Page 3 of 185

Berrien

Classification Name Category Last Updated

Journeyman Carpenter Carpenter 09/16/2024 Classification Description: Journeyman

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $50.86 $66.25 $81.63 Apprentice: 1st year $41.63 $52.40 $63.17 Apprentice: 2nd year $43.17 $54.71 $66.25 Apprentice: 3rd year $46.24 $59.32 $72.39 Apprentice: 4th year $49.32 $63.94 $78.55

Overtime Provisions Over 8-hour day/40-hour week

9th hour $50.86 10th hour $50.86 Beyond 10 hours $66.25

Saturday First 8 hours $66.25 9th hour $66.25 10th hour $66.25 Beyond 10 hours $66.25

Sunday/Holiday $81.63

Four 10-hour days allowed? - No

Base Rate Comment: Foreman wage with 3-7 employees = $2.50 above Base Rate Foreman with 8 + employees = $3.50 above base rate General Foreman = $4.00 above base rate

Saturday

ORS#: ORS-001983 | CA#: CA-0120 | Date Issued: 02/21/2025 | Contract Award By Date: 05/22/2025 Page 4 of 185

Berrien

Classification Name Category Last Updated

Journeyman Resilient Floorlayer Carpenter 09/16/2024 Classification Description: Journeyman - Resilient…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .