This document is an Addendum #1 for a high school doors and frames renovation project for Berrien Springs Public Schools in Berrien Springs, Michigan. The project encompasses four high school improvement projects: A) 15 new doors and frames meeting building code ratings and ADA requirements, with 23 additional openings receiving new hardware sets; B) additional power outlets in Robotics and Engineering rooms; C) converting an unused greenhouse to a storage room for science rooms; and D) reconfiguring the high school counseling center to add a third guidance counselor office. The pre-bid meeting was held on March 4, 2025, with addenda scheduled for release on March 7, March 11, and potentially March 17, 2025. Bids are due on March 21, 2025, at 3:00 PM, with bid award anticipated at the Board of Education meeting on April 10, 2025. The project's substantial completion date is set for August 18, 2025.
The project will be executed as a single contract, with separate draw requests required for the doors and frames portion due to specific funding sources. The project is not tax-exempt, and bidders will need to provide a bid bond, payment/performance bonds, and AIA contract documents. The doors and frames portion is grant-funded, with a funding deadline of the end of June, necessitating timely submissions. The hardware specifications include detailed requirements for hinges, locks, exit devices, cylinders, and other door hardware, with specific manufacturers and products specified. The project emphasizes compatibility with existing conditions, adherence to building codes, and meeting ADA requirements.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum #2.pdf | ||
| Addendum #3.pdf | ||
| Invitation to Bid.pdf | ||
| Project Manual.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
High School Doors & Frames Berrien Springs Public Schools
March 07, 2025
This addendum forms a part of the Contract Documents and modifies the original Bidding Documents (PROJECT MANUAL dated 27 February 2025). Please acknowledge receipt of this Addendum when submitting your bid. This Addendum has been distributed to the plan holders of record only. It is the bidder’s responsibility to distribute Addendum information to subcontractors and material suppliers. This Addendum reflects modifications from the Owner, Architect, and Bidders.
ATTACHMENTS
• Pre-Bid Meeting Agenda
• Pre-Bid Sign-In Sheet
• Door Hardware Schedules & Specifications
• Drawing Sheets; A1.0-A, A2.0-D
GENERAL / CLARIFICATION
1. As discussed onsite during the pre-bid meeting, we agreed that when the existing frame and door are removed at this location, the masonry opening shall be enlarged to allow for infill using full-width stacked bond masonry coursing. This approach will ensure the finished surface matches the existing appearance on the exposed, painted site in the main corridor.
2. As discussed during the pre-bid meeting, the General Contractor (GC) shall be responsible for accounting for electrical and mechanical costs associated with the temporary removal and reinstallation of electrical boxes and controls prior to cutting out the hollow metal doors frames and installing the new frames. Quantity of electrical boxes and controls shall be provided in upcoming addendum #2. Additionally, the new hollow metal door frames shall be grouted solid during installation.
3. Please note that payment applications for doors and frames must be submitted separately from other work, as they are grant funded. The deadline for grant funding is the end of June, so timely submissions are essential.
SPECIFICATIONS
1. Door Hardware specifications Spec Section 087100; hardware groups found at the end of the section are as follows:
a. Door Hardware Specifications
b. Door Index
c. Door Hardware Sets
DRAWING SHEETS
CARMI Design Group, Inc.
210 E Main Street . P.O. Box 487 . Niles, MI 49120
P: 269.663.5073 . E: info@carmi.biz
1. Cover Sheet
2. A1.0-A
3. A2.0-D
END OF ADDENDUM NO. 1
210 E. Main Street, Suite 200 PO Box 487, Niles, MI 49120
MA
Pre-Bid Meeting Agenda
Pre-Bid Meeting: High School Miscellaneous
3.04.25 @ 3:00 PM at the High School Main Entry Vestibule
1. Introductions
• BSPS- Nick Schmidt, Project Manager
• Ron Bartz, Director of Facilities
2. Bidding Schedule
Addendum 1 Release 3/7/25, end of day
Addendum 2 Release 3/11/25, end of day
Addendum 3 Release 3/17/25, end of day (if necessary)
Bids Due: 3/21/25 @ 3:00 PM Admin Bldg; Conf Room
Bid Award 4/10/25 BOE meeting
3. Construction Schedule
Product procurement to begin upon notice to proceed
All work to be substantially complete by: August 18, 2025
4. Summary of Work: as found in the project manual:
• A- High School Doors and Frames- 15 new doors and frames which will meet building code ratings and improve ADA requirements; 23 additional openings will receive new hardware sets which meet ADA grasp-ability requirements; paint touch-ups at disturbed areas of work.
• B- Robotics and Engineering Room Power- these rooms receive additional power outlets at perimeter of room and hose reel power hung from ceiling.
• C- Greenhouse to Storage- An un-used greenhouse space is repurposed to a storage room for the science rooms that are adjacent. Improvements include new metal stud framing for walls and roof, new roofing; new insulation; new HVAC thru-wall unit; new tile flooring.
• D- High School counseling center is reconfigured to add an additional office for a third high school guidance counselor. Improvements include new mt stud framing, door and frame, new lighting, redistribution of HVAC diffusers: new cpt flooring.
5. Instructions to Bidders
210 E. Main Street, Suite 200 PO Box 487, Niles, MI 49120
Single contract- But there is a need to submit separate documents for draw requests for the A- Doors and Frames portion of work due to the owner’s source of funding.
Comparable experience and ability to adhere to schedule
Project is NOT tax exempt
Bid Bond
Payment / Performance Bonds
AIA contract and related documents
6. Owner Requirements
7. Document Distribution [Electronic]
High School MISC
PRE-BID MEETING SIGN-IN SHEET
04 March 2025 @ 3:00- 3:45 PM
NAME COMPANY PHONE EMAIL
Vern Ulig Roggow Construction (269) 231-0339 Jroggow@roggowcc.com
Douglas Shelton E&L Construction (269) 930-2947 Doug.Shelton@eandlgroup.com
Mack Green B G Construction & Engineering (269) 362-4167 Mgreen@bgcande.com
Rob Swem Pearson Construction (269) 926-7281 Rswem@pearsonconstruction.com
Josh Matthews The Rienks Group (269) 208-9879 Josh@therienksgroup.com
Jason Alphenaar The Rienks Group (269) 635-3980 Jason@therienksgroup.com
Ryan Kolb DJ Construction (269) 352-1311 Rkolb@djconstruction.com
David Shier Peerless Electric (269) 259-9422 Dave@Peerlesselectrician.com
Berrien Springs Public Schools – High School Doors and Frames
DOOR HARDWARE 087100-1
3/7/2025
SECTION 08 71 00 – DOOR HARDWARE
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes:
1. Mechanical door hardware for:
a. Swinging doors.
2. Field verification, preparation and modification of existing doors and frames to receive new door hardware.
3. The intent of the hardware specification is to specify the hardware for interior and exterior doors, and to establish a type, continuity, and standard of quality. However, it is the door hardware supplier’s responsibility to thoroughly review existing conditions, schedules, specifications, drawings, and other Contract Documents to verify the suitability of the hardware specified.
B. Section excludes:
1. Windows
2. Cabinets (casework), including locks in cabinets
3. Signage
4. Toilet accessories
5. Overhead doors
C. Related Sections:
1. Division 01 Section “Alternates” for alternates affecting this section.
2. Division 06 Section “Rough Carpentry”
3. Division 06 Section "Finish Carpentry”
4. Division 07 Section “Joint Sealants” for sealant requirements applicable to threshold installation specified in this section.
5. Division 08 Sections:
a. “Metal Doors and Frames”
b. “Flush Wood Doors”
c. “Stile and Rail Wood Doors”
6. Division 09 sections for touchup, finishing or refinishing of existing openings modified by this section.
1.02 REFERENCES
A. UL - Underwriters Laboratories
1. UL 10B - Fire Test of Door Assemblies
2. UL 10C - Positive Pressure Test of Fire Door Assemblies
3. UL 1784 - Air Leakage Tests of Door Assemblies
4. UL 305 - Panic Hardware
DOOR HARDWARE 087100-2
B. DHI - Door and Hardware Institute
1. Sequence and Format for the Hardware Schedule
2. Recommended Locations for Builders Hardware
3. Keying Systems and Nomenclature
4. Installation Guide for Doors and Hardware
C. NFPA – National Fire Protection Association
1. NFPA 70 – National Electric Code
2. NFPA 80 – 2016 Edition – Standard for Fire Doors and Other Opening Protectives
3. NFPA 101 – Life Safety Code
4. NFPA 105 – Smoke and Draft Control Door Assemblies
5. NFPA 252 – Fire Tests of Door Assemblies
D. ANSI - American National Standards Institute
1. ANSI A117.1 – 2017 Edition – Accessible and Usable Buildings and Facilities
2. ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware and
Specialties
3. ANSI/BHMA A156.28 - Recommended Practices for Keying Systems
4. ANSI/WDMA I.S. 1A - Interior Architectural Wood Flush Doors
5. ANSI/SDI A250.8 - Standard Steel Doors and Frames
1.03 SUBMITTALS
A. General:
1. Submit in accordance with Conditions of Contract and Division 01 Submittal Procedures.
2. Prior to forwarding submittal:
a. Comply with procedures for verifying existing door and frame compatibility for new hardware, as specified in PART 3, “EXAMINATION” article, herein.
b. Review drawings and Sections from related trades to verify compatibility with specified hardware.
c. Highlight, encircle, or otherwise specifically identify on submittals: deviations from Contract Documents, issues of incompatibility or other issues which may detrimentally affect the Work.
B. Action Submittals:
1. Product Data: Submit technical product data for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements.
2. Samples for Verification: If requested by Architect, submit production sample of requested door hardware unit in finish indicated and tagged with full description for coordination with schedule.
a. Samples will be returned to supplier. Units that are acceptable to Architect may, after final check of operations, be incorporated into Work, within limitations of key coordination requirements.
3. Door Hardware Schedule:
a. Submit concurrent with submissions of Product Data, Samples, and Shop Drawings.
Coordinate submission of door hardware schedule with scheduling requirements of
DOOR HARDWARE 087100-3
other work to facilitate fabrication of other work critical in Project construction schedule.
b. Submit under direct supervision of a Door Hardware Institute (DHI) certified Architectural Hardware Consultant (AHC) or Door Hardware Consultant (DHC) with hardware sets in vertical format as illustrated by Sequence of Format for the Hardware Schedule published by DHI.
c. Indicate complete designations of each item required for each opening, include:
1) Door Index: door number, heading number, and Architect’s hardware set number.
2) Quantity, type, style, function, size, and finish of each hardware item.
3) Name and manufacturer of each item.
4) Fastenings and other pertinent information.
5) Location of each hardware set cross-referenced to indications on Drawings.
6) Explanation of all abbreviations, symbols, and codes contained in schedule.
7) Mounting locations for hardware.
8) Door and frame sizes and materials.
9) Degree of door swing and handing.
4. Key Schedule:
a. After Keying Conference, provide keying schedule that includes levels of keying, explanations of key system's function, key symbols used, and door numbers controlled.
b. Use ANSI/BHMA A156.28 “Recommended Practices for Keying Systems” as guideline for nomenclature, definitions, and approach for selecting optimal keying system.
c. Provide 3 copies of keying schedule for review prepared and detailed in accordance with referenced DHI publication. Include schematic keying diagram and index each key to unique door designations.
d. Index keying schedule by door number, keyset, hardware heading number, cross keying instructions, and special key stamping instructions.
e. Provide one complete bitting list of key cuts and one key system schematic illustrating system usage and expansion. Forward bitting list, key cuts and key system schematic directly to Owner, by means as directed by Owner.
f. Prepare key schedule by or under supervision of supplier, detailing Owner’s final keying instructions for locks.
5. Templates: After final approval of hardware schedule, provide templates for doors, frames and other work specified to be factory or shop prepared for door hardware installation.
C. Informational Submittals:
1. Provide Qualification Data for Supplier, Installer and Architectural Hardware Consultant.
2. Provide Product Data:
a. Certify that door hardware approved for use on types and sizes of labeled fire-rated doors complies with listed fire-rated door assemblies.
b. Include warranties for specified door hardware.
D. Closeout Submittals:
1. Operations and Maintenance Data: Provide in accordance with Division 01 and include:
a. Complete information on care, maintenance, and adjustment; data on repair and replacement parts, and information on preservation of finishes.
b. Catalog pages for each product.
DOOR HARDWARE 087100-4
c. Factory order acknowledgement numbers (for warranty and service)
d. Name, address, and phone number of local representative for each manufacturer.
e. Parts list for each product.
f. Final approved hardware schedule edited to reflect conditions as installed.
g. Final keying schedule
h. Copies of floor plans with keying nomenclature
i. Copy of warranties including appropriate reference numbers for manufacturers to identify project.
1.04 QUALITY ASSURANCE
A. Qualifications and Responsibilities:
1. Supplier: Recognized architectural hardware supplier with record of successful in-service performance for supplying door hardware similar in quantity, type, and quality to that indicated for this Project and that provides certified Architectural Hardware Consultant (AHC) or Door Hardware Consultant (DHC) available to Owner, Architect, and Contractor, at reasonable times during the Work for consultation.
a. Warehousing Facilities: In Project's vicinity.
b. Scheduling Responsibility: Preparation of door hardware and keying schedules.
2. Installer: Qualified tradesperson skilled in the application of commercial grade hardware with experience installing door hardware similar in quantity, type, and quality as indicated for this Project.
3. Architectural Hardware Consultant: Person who is experienced in providing consulting services for door hardware installations that are comparable in material, design, and extent to that indicated for this Project and meets these requirements:
a. For door hardware: DHI certified AHC or DHC.
b. Can provide installation and technical data to Architect and other related subcontractors.
c. Can inspect and verify components are in working order upon completion of installation.
4. Single Source Responsibility: Obtain each type of door hardware from single manufacturer.
B. Certifications:
1. Fire-Rated Door Openings:
a. Provide door hardware for fire-rated openings that complies with NFPA 80 and requirements of authorities having jurisdiction.
b. Provide only items of door hardware that are listed products tested by Underwriters Laboratories, Intertek Testing Services, or other testing and inspecting organizations acceptable to authorities having jurisdiction for use on types and sizes of doors indicated, based on testing at positive pressure and according to NFPA 252 or UL 10C and in compliance with requirements of fire-rated door and door frame labels.
2. Smoke and Draft Control Door Assemblies:
a. Provide door hardware that meets requirements of assemblies tested according to UL 1784 and installed in compliance with NFPA 105
b. Comply with the maximum air leakage of 0.3 cfm/sq. ft. (3 cu. m per minute/sq. m) at tested pressure differential of 0.3-inch wg (75 Pa) of water.
DOOR HARDWARE 087100-5
3. Accessibility Requirements:
a. Comply with governing accessibility regulations cited in “REFERENCES” article 087100, 1.02.D3 herein for door hardware on doors in an accessible route. This project must comply with all Federal Americans with Disability Act regulations and all Local Accessibility Regulations.
C. Pre-Installation Meetings
1. Keying Conference
a. Incorporate keying conference decisions into final keying schedule after reviewing door hardware keying system including:
1) Function of building, flow of traffic, purpose of each area, degree of security required, and plans for future expansion.
2) Preliminary key system schematic diagram.
3) Requirements for key control system.
4) Address for delivery of keys.
2. Pre-installation Conference
a. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
b. Inspect and discuss preparatory work performed by other trades.
c. Review required testing, inspecting, and certifying procedures.
d. Review questions or concerns related to proper installation and adjustment of door hardware.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Inventory door hardware on receipt and provide secure lock-up for hardware delivered to Project site. Promptly replace products damaged during shipping.
B. Tag each item or package separately with identification coordinated with final door hardware schedule, and include installation instructions, templates, and necessary fasteners with each item or package. Deliver each article of hardware in manufacturer’s original packaging.
C. Maintain manufacturer-recommended environmental conditions throughout storage and installation periods.
D. Provide secure lock-up for door hardware delivered to Project. Control handling and installation of hardware items so that completion of Work will not be delayed by hardware losses both before and after installation.
E. Handle hardware in manner to avoid damage, marring, or scratching. Correct, replace or repair products damaged during Work. Protect products against malfunction due to paint, solvent, cleanser, or any chemical agent.
F. Deliver keys to manufacturer of key control system for subsequent delivery to Owner.
DOOR HARDWARE 087100-6
1.06 COORDINATION
A. Coordinate layout and installation of floor-recessed door hardware with floor construction.
Cast anchoring inserts into concrete.
B. Installation Templates: Distribute for doors, frames, and other work specified to be factory or shop prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.
C. Security: Coordinate installation of door hardware and keying with Owner's security consultant.
D. Existing Openings: Where existing doors, frames and/or hardware are to remain, field verify existing functions, conditions and preparations and coordinate to suit opening conditions and to provide proper door operation.
1.07 WARRANTY
A. Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within published warranty period.
1. Warranty does not cover damage or faulty operation due to improper installation, improper use or abuse.
2. Warranty Period: Beginning from date of Substantial Completion, for durations indicated in manufacturer’s published listings.
a. Mechanical Warranty
1) Locks
a) Schlage L Series: 10 years
b) Schlage ND Series: 10 years
2) Exit Devices
a) Von Duprin: 10 years
3) Closers
a) LCN 4000 Series: 30 years
1.08 MAINTENANCE
A. Furnish complete set of special tools required for maintenance and adjustment of hardware, including changing of cylinders.
B. Turn over unused materials to Owner for maintenance purposes.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. The Owner requires use of certain products for their unique characteristics and project suitability to ensure continuity of existing and future performance and maintenance standards. After investigating available product offerings, the Awarding Authority has elected to prepare proprietary specifications. These products are specified with the notation: “No Substitute.”
DOOR HARDWARE 087100-7
1. Where “No Substitute” is noted, submittals and substitution requests for other products will not be considered.
B. Approval of manufacturers and/or products other than those listed as “Scheduled Manufacturer” or “Acceptable Manufacturers” in the individual article for the product category shall be in accordance with QUALITY ASSURANCE article, herein.
C. Approval of products from manufacturers indicated in “Acceptable Manufacturers” is contingent upon those products providing all functions and features and meeting all requirements of scheduled manufacturer’s product.
D. Where specified hardware is not adaptable to finished shape or size of members requiring hardware, furnish suitable types having same operation and quality as type specified, subject to Architect's approval.
2.02 MATERIALS
A. Fasteners
1. Provide hardware manufactured to conform to published templates, generally prepared for machine screw installation.
2. Furnish screws for installation with each hardware item. Finish exposed (exposed under any condition) screws to match hardware finish, or, if exposed in surfaces of other work, to match finish of this other work including prepared for paint surfaces to receive painted finish.
3. Provide concealed fasteners for hardware units exposed when door is closed except when no standard units of type specified are available with concealed fasteners. Do not use thru-bolts for installation where bolt head or nut on opposite face is exposed in other work unless thru-bolts are required to fasten hardware securely. Review door specification and advise Architect if thru bolts are required.
4. Install hardware with fasteners provided by hardware manufacturer.
B. Modification and Preparation of Existing Doors: Where existing door hardware is indicated to be removed and reinstalled.
1. Provide necessary fillers, Dutchmen, reinforcements, and fasteners, compatible with existing materials, as required for mounting new opening hardware and to cover existing door and frame preparations.
2. Use materials which match materials of adjacent modified areas.
3. When modifying existing fire-rated openings, provide materials permitted by NFPA 80 as required to maintain fire-rating.
C. Provide screws, bolts, expansion shields, drop plates and other devices necessary for hardware installation.
1. Where fasteners are exposed to view: Finish to match adjacent door hardware material.
2.03 HINGES
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Ives 5BB series
DOOR HARDWARE 087100-8
2. Acceptable Manufacturers and Products:
a. Hager BB1191/1279 series
b. Stanley FBB series
B. Requirements:
1. Provide hinges conforming to ANSI/BHMA A156.1.
2. Provide five knuckle, ball bearing hinges.
3. 1-3/4 inch (44 mm) thick doors, up to and including 36 inches (914 mm) wide:
a. Exterior: Standard weight, bronze or stainless steel, 4-1/2 inches (114 mm) high
b. Interior: Standard weight, steel, 4-1/2 inches (114 mm) high
4. 1-3/4 inch (44 mm) thick doors over 36 inches (914 mm) wide:
a. Exterior: Heavy weight, bronze/stainless steel, 5 inches (127 mm) high
b. Interior: Heavy weight, steel, 5 inches (127 mm) high
5. 2 inches or thicker doors:
a. Exterior: Heavy weight, bronze or stainless steel, 5 inches (127 mm) high
b. Interior: Heavy weight, steel, 5 inches (127 mm) high
6. Adjust hinge width for door, frame, and wall conditions to allow proper degree of opening.
7. Provide three hinges per door leaf for doors 90 inches (2286 mm) or less in height, and one additional hinge for each 30 inches (762 mm) of additional door height.
8. Where new hinges are specified for existing doors or existing frames, provide new hinges of identical size to hinge preparation present in existing door or existing frame.
9. Hinge Pins: Except as otherwise indicated, provide hinge pins as follows:
a. Steel Hinges: Steel pins
b. Non-Ferrous Hinges: Stainless steel pins
c. Out-Swinging Exterior Doors: Non-removable pins
d. Out-Swinging Interior Lockable Doors: Non-removable pins
e. Interior Non-lockable Doors: Non-rising pins
2.04 MORTISE LOCKS
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Schlage L9000 series
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide mortise locks conforming to ANSI/BHMA A156.13 Series 1000, Grade 1, and UL Listed for 3-hour fire doors.
2. Indicators: Where specified, provide indicator window measuring a minimum 2-3/5-inch x 3/5 inch with 180-degree visibility. Provide messages color-coded using ANSI Z535
DOOR HARDWARE 087100-9
Safety Red with full text and/or symbols, as scheduled, for easy visibility. When applicable allows for lock status indication on both sides of the door.
3. Provide locks manufactured from heavy gauge steel, containing components of steel with a zinc dichromate plating for corrosion resistance.
4. Provide lock case that is multi-function and field reversible for handing without opening case. Cylinders: Refer to “KEYING” article, herein.
5. Provide locks with standard 2-3/4 inches (70 mm) backset with full 3/4 inch (19 mm) throw stainless steel mechanical anti-friction latchbolt. Provide deadbolt with full 1-inch (25 mm) throw, constructed of stainless steel.
6. Provide standard ASA strikes unless extended lip strikes are necessary to protect trim.
7. Lever Trim: Solid brass, bronze, or stainless steel, cast or forged in design specified, with wrought roses and external lever spring cages. Provide thru-bolted levers with 2-piece spindles.
a. Lever Design: 17A
2.05 CYLINDRICAL LOCKS – GRADE 1
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Schlage ND series
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide cylindrical locks conforming to ANSI/BHMA A156.2 Series 4000, Grade 1, and UL Listed for 3-hour fire doors.
2. Cylinders: Refer to “KEYING” article, herein.
3. Provide locks with standard 2-3/4 inches (70 mm) backset, unless noted otherwise, with
1/2-inch latch throw. Provide proper latch throw for UL listing at pairs.
4. Provide locksets with separate anti-rotation thru-bolts, and no exposed screws.
5. Provide independently operating levers with two external return spring cassettes mounted under roses to prevent lever sag.
6. Provide standard ASA strikes unless extended lip strikes are necessary to protect trim.
7. Provide electrified options as scheduled in the hardware sets.
8. Lever Trim: Solid cast levers without plastic inserts and wrought roses on both sides.
a. Lever Design: Sparta (SPA).
2.06 EXIT DEVICES
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Von Duprin 98/35A series
2. Acceptable Manufacturers and Products:
a. No Substitute
DOOR HARDWARE 087100-10
B. Requirements:
1. Provide exit devices tested to ANSI/BHMA A156.3 Grade 1 and UL listed for Panic Exit or Fire Exit Hardware.
2. Cylinders: Refer to “KEYING” article, herein.
3. Provide smooth touchpad type exit devices, fabricated of brass, bronze, stainless steel, or aluminum, plated to standard architectural finishes to match balance of door hardware.
4. Touchpad must extend a minimum of one half of door width. No plastic inserts are allowed in touchpads.
5. Provide exit devices with deadlatching feature for security and for future addition of alarm kits and/or other electrified requirements.
6. Provide exit devices with weather resistant components that can withstand harsh conditions of various climates and corrosive cleaners used in outdoor pool environments.
7. Provide flush end caps for exit devices.
8. Provide exit devices with manufacturer’s approved strikes.
9. Provide exit devices cut to door width and height. Install exit devices at height recommended by exit device manufacturer, allowable by governing building codes, and approved by Architect.
10. Mount mechanism case flush on face of doors or provide spacers to fill gaps behind devices. Where glass trim or molding projects off face of door, provide glass bead kits.
11. Provide cylinder or hex-key dogging as specified at non fire-rated openings.
12. Removable Mullions: 2 inches (51 mm) x 3 inches (76 mm) steel tube. Where scheduled as keyed removable mullion, provide type that can be removed by use of a keyed cylinder, which is self-locking when re-installed.
13. Provide factory drilled weep holes for exit devices used in full exterior application, highly corrosive areas, and where noted in hardware sets.
14. Provide electrified options as scheduled.
15. Top latch mounting: double- or single-tab mount for steel doors, face mount for aluminum doors eliminating requirement of tabs, and double tab mount for wood doors.
16. Provide exit devices with optional trim designs to match other lever and pull designs used on the project.
2.07 CYLINDERS
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Schlage Everest 29 R
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide cylinders/cores compliant with ANSI/BHMA A156.5; latest revision; cylinder face finished to match lockset; manufacturer’s series as indicated. Refer to “KEYING” article, herein.
2. Provide cylinders in the below-listed configuration(s), distributed throughout the Project as indicated.
a. Patented Restricted Small Format: cylinder with small format interchangeable cores (SFIC) with restricted, patented keyway.
DOOR HARDWARE 087100-11
3. Patent Protection: Cylinders/cores requiring use of restricted, patented keys, patent protected.
4. Nickel silver bottom pins.
C. Construction Keying:
1. Replaceable Construction Cores.
a. Provide temporary construction cores replaceable by permanent cores, furnished in accordance with the following requirements.
1) 3 construction control keys
2) 12 construction change (day) keys.
b. Owner or Owner’s Representative will replace temporary construction cores with permanent cores.
2.08 KEYING
A. Provide a factory registered keying system, complying with guidelines in ANSI/BHMA A156.28, incorporating decisions made at keying conference.
B. Requirements:
1. Provide permanent cylinders/cores keyed by the manufacturer according to the following key system.
a. Master Keying system as directed by the Owner.
2. Forward bitting list and keys separately from cylinders, by means as directed by Owner.
Failure to comply with forwarding requirements will be cause for replacement of cylinders/cores involved at no additional cost to Owner.
3. Provide keys with the following features:
a. Material: Nickel silver; minimum thickness of .107-inch (2.3mm)
b. Patent Protection: Keys and blanks protected by one or more utility patent(s).
4. Identification:
a. Mark permanent cylinders/cores and keys with applicable blind code for identification.
Do not provide blind code marks with actual key cuts.
b. Identification stamping provisions must be approved by the Architect and Owner.
c. Stamp cylinders/cores and keys with Owner’s unique key system facility code as established by the manufacturer; key symbol and embossed or stamped with “DO NOT DUPLICATE” along with the “PATENTED” or patent number to enforce the patent protection.
d. Failure to comply with stamping requirements will be cause for replacement of keys involved at no additional cost to Owner.
e. Forward permanent cylinders/cores to Owner, separately from keys, by means as directed by Owner.
5. Quantity: Furnish in the following quantities.
a. Change (Day) Keys: 3 per cylinder/core.
b. Permanent Control Keys: 3.
c. Master Keys: 6.
d. Key Blanks: quantity as determined in the keying meeting.
DOOR HARDWARE 087100-12
2.09 KEY CONTROL SYSTEM
A. Manufacturers:
1. Scheduled Manufacturer:
a. Telkee
2. Acceptable Manufacturers:
a. HPC
b. Lund
B. Requirements:
1. Provide key control system, including envelopes, labels, tags with self-locking key clips, receipt forms, 3-way visible card index, temporary markers, permanent markers, and standard metal cabinet, all as recommended by system manufacturer, with capacity for 150% of number of locks required for Project.
a. Provide complete cross index system set up by hardware supplier, and place keys on markers and hooks in cabinet as determined by final key schedule.
b. Provide hinged-panel type cabinet for wall mounting.
2.10 DOOR CLOSERS
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. LCN 4040XP series
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide door closers conforming to ANSI/BHMA A156.4 Grade 1 requirements by BHMA certified independent testing laboratory. ISO 9000 certify closers. Stamp units with date of manufacture code.
2. Provide door closers with fully hydraulic, full rack and pinion action with high strength cast iron cylinder, and full complement bearings at shaft.
3. Cylinder Body: 1-1/2-inch (38 mm) diameter with 5/8-inch (16 mm) diameter double heat-treated pinion journal.
4. Hydraulic Fluid: Fireproof, passing requirements of UL10C, and requiring no seasonal closer adjustment for temperatures ranging from 120 degrees F to -30 degrees F.
5. Spring Power: Continuously adjustable over full range of closer sizes, and providing reduced opening force as required by accessibility codes and standards.
6. Hydraulic Regulation: By tamper-proof, non-critical valves, with separate adjustment for latch speed, general speed, and backcheck.
7. Provide closers with solid forged steel main arms and factory assembled heavy-duty forged forearms for parallel arm closers.
8. Pressure Relief Valve (PRV) Technology: Not permitted.
DOOR HARDWARE 087100-13
9. Finish for Closer Cylinders, Arms, Adapter Plates, and Metal Covers: Powder coating finish which has been certified to exceed 100 hours salt spray testing as described in ANSI Standard A156.4 and ASTM B117, or has special rust inhibitor (SRI).
10. Provide special templates, drop plates, mounting brackets, or adapters for arms as required for details, overhead stops, and other door hardware items interfering with closer mounting.
11. Through-bolt all wood door closers.
2.11 PROTECTION PLATES
A. Manufacturers:
1. Scheduled Manufacturer:
a. Ives
2. Acceptable Manufacturers:
a. Burns
b. Trimco
B. Requirements:
1. Provide protection plates with a minimum of 0.050 inch (1 mm) thick, beveled four edges as scheduled. Furnish with sheet metal or wood screws, finished to match plates.
2. Sizes plates 2 inches (51 mm) less width of door on single doors, pairs of doors with a mullion, and doors with edge guards. Size plates 1 inch (25 mm) less width of door on pairs without a mullion or edge guards.
3. At fire rated doors, provide protection plates over 16 inches high with UL label.
2.12 OVERHEAD STOPS AND OVERHEAD STOP/HOLDERS
A. Manufacturers:
1. Scheduled Manufacturers:
a. Glynn-Johnson
2. Acceptable Manufacturers:
a. No Substitute
B. Requirements:
1. Provide overhead stop at any door where conditions do not allow for a wall stop or floor stop presents tripping hazard.
2.13 DOOR STOPS AND HOLDERS
A. Manufacturers:
1. Scheduled Manufacturer:
a. Ives
DOOR HARDWARE 087100-14
2. Acceptable Manufacturers:
a. Trimco
b. Burns
B. Provide door stops at each door leaf:
1. Provide wall stops wherever possible. Provide concave type where lockset has a push button of thumbturn.
2. Where a wall stop cannot be used, provide overhead stops.
2.14 THRESHOLDS, SEALS, DOOR SWEEPS, AUTOMATIC DOOR BOTTOMS, AND GASKETING
A. Manufacturers:
1. Scheduled Manufacturer:
a. Zero International
2. Acceptable Manufacturers:
a. National Guard
b. Reese
B. Requirements:
1. Provide thresholds, weather-stripping, and gasketing systems as specified and per architectural details. Match finish of other items.
2. Smoke- and Draft-Control Door Assemblies: Where smoke- and draft-control door assemblies are required, provide door hardware that meets requirements of assemblies tested according to UL 1784 and installed in compliance with NFPA 105.
3. Provide door sweeps, seals, astragals, and auto door bottoms only of type where resilient or flexible seal strip is easily replaceable and readily available.
4. Size thresholds 1/2 inch (13 mm) high by 5 inches (127 mm) wide by door width unless otherwise specified in the hardware sets or detailed in the drawings.
2.15 SILENCERS
A. Manufacturers:
1. Scheduled Manufacturer:
a. Ives
2. Acceptable Manufacturers:
a. Burns
b. Trimco
B. Requirements:
1. Provide "push-in" type silencers for hollow metal or wood frames.
2. Provide one silencer per 30 inches (762 mm) of height on each single frame, and two for each pair frame.
3. Omit where gasketing is specified.
DOOR HARDWARE 087100-15
2.16 FINISHES
A. Finish: Generally Satin Chromium BHMA 626/652 (US26D). Provide finish for each item as indicated.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Prior to installation of hardware, examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, labeled fire-rated door assembly construction, wall and floor construction, and other conditions affecting performance. Verify doors, frames, and walls have been properly reinforced for hardware installation.
B. Field verify existing doors and frames receiving new hardware and existing conditions receiving new openings. Verify that new hardware is compatible with existing door and frame preparation and existing conditions.
C. Examine roughing-in for electrical power systems to verify actual locations of wiring connections before electrified door hardware installation.
D. Submit a list of deficiencies in writing and proceed with installation only after unsatisfactory conditions have been corrected.
3.02 PREPARATION
A. Where on-site modification of doors and frames is required:
1. Carefully remove existing door hardware and components being reused. Clean, protect, tag, and store in accordance with storage and handling requirements specified herein.
2. Field modify and prepare existing doors and frames for new hardware being installed.
3. When modifications are exposed to view, use concealed fasteners, when possible.
4. Prepare hardware locations and reinstall in accordance with installation requirements for new door hardware and with:
a. Steel Doors and Frames: For surface applied door hardware, drill and tap doors and frames according to ANSI/SDI A250.6.
b. Wood Doors: DHI WDHS.5 "Recommended Hardware Reinforcement Locations for Mineral Core Wood Flush Doors."
c. Doors in rated assemblies: NFPA 80 for restrictions on on-site door hardware preparation.
3.03 INSTALLATION
A. Mount door hardware units at heights to comply with the following, unless otherwise indicated or required to comply with governing regulations.
1. Standard Steel Doors and Frames: ANSI/SDI A250.8.
2. Custom Steel Doors and Frames: HMMA 831.
3. Interior Architectural Wood Flush Doors: ANSI/WDMA I.S. 1A
4. Installation Guide for Doors and Hardware: DHI TDH-007-20
DOOR HARDWARE 087100-16
B. Install each hardware item in compliance with manufacturer’s instructions and recommendations, using only fasteners provided by manufacturer.
C. Do not install surface mounted items until finishes have been completed on substrate. Protect all installed hardware during painting.
D. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate as necessary for proper installation and operation.
E. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards.
F. Install operating parts so they move freely and smoothly without binding, sticking, or excessive clearance.
G. Hinges: Install types and in quantities indicated in door hardware schedule but not fewer than quantity recommended by manufacturer for application indicated.
H. Lock Cylinders:
1. Install construction cores to secure building and areas during construction period.
2. Replace construction cores with permanent cores as indicated in keying section.
3. Furnish permanent cores to Owner for installation.
I. Key Control System: Tag keys and place them on markers and hooks in key control system cabinet, as determined by final keying schedule.
J. Door Closers: Mount closers on room side of corridor doors, inside of exterior doors, and stair side of stairway doors from corridors. Mount closers so they are not visible in corridors, lobbies and other public spaces unless approved by Architect.
K. Closer/Holders: Mount closer/holders on room side of corridor doors, inside of exterior doors, and stair side of stairway doors.
L. Thresholds: Set thresholds in full bed of sealant complying with requirements specified in Division 07 Section "Joint Sealants."
M. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door hardware schedule. Do not mount floor stops where they may impede traffic or present tripping hazard.
N. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame.
O. Meeting Stile Gasketing: Fasten to meeting stiles, forming seal when doors are closed.
P. Door Bottoms and Sweeps: Apply to bottom of door, forming seal with threshold when door is closed.
3.04 FIELD QUALITY CONTROL
A. Inspection and Testing:
1. Provide functional testing and inspection of fire door assemblies by a qualified person in accordance with NFPA 80.
DOOR HARDWARE 087100-17
a. Schedule fire door assembly inspection within 90 days of Substantial Completion of the Project.
b. Submit a signed, written final report as specified in Paragraph 1.03.E.1.
c. Correct all deficiencies and schedule a reinspection of fire door assemblies noted as deficient on the inspection report.
d. Inspector to reinspect fire door assemblies after repairs are made.
2. Provide inspection of required egress door assemblies by a qualified person in accordance with NFPA 101.
a. Schedule egress door assembly inspection within 90 days of Substantial Completion of the Project for the required openings.
b. Submit a signed, written final report as specified in Paragraph 1.03.E.2.
c. Correct all deficiencies and schedule a reinspection of egress door assemblies noted as deficient on the inspection report.
d. Inspector to reinspect required egress door assemblies after repairs are made.
3.05 ADJUSTING
A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.
1. Door Closers: Adjust sweep period to comply with accessibility requirements and requirements of authorities having jurisdiction.
B. Occupancy Adjustment: Approximately three to six months after date of Substantial Completion, examine and readjust each item of door hardware, including adjusting operating forces, as necessary to ensure function of doors and door hardware.
3.06 CLEANING AND PROTECTION
A. Clean adjacent surfaces soiled by door hardware installation.
B. Clean operating items per manufacturer’s instructions to restore proper function and finish.
C. Provide final protection and maintain conditions that ensure door hardware is without damage or deterioration at time of Substantial Completion.
3.07 DOOR HARDWARE SCHEDULE
A. The intent of the hardware specification is to specify the hardware for interior and exterior doors, and to establish a type, continuity, and standard of quality. However, it is the door hardware supplier’s responsibility to thoroughly review existing conditions, schedules, specifications, drawings, and other Contract Documents to verify the suitability of the hardware specified.
B. Discrepancies, conflicting hardware, and missing items are to be brought to the attention of the architect with corrections made prior to the bidding process. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application.
DOOR HARDWARE 087100-18
C. Hardware items are referenced in the following hardware schedule. Refer to the above specifications for special features, options, cylinders/keying, and other requirements.
D. Hardware Sets:
Hardware Group No. 01
For use on Door #(s):
118B
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA WALL STOP WS406/407CCV 630 IVE
3 EA SILENCER SR64 GRY IVE
NOTES:
1) DOOR 118B PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 02
For use on Door #(s):
118C
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA OH STOP 100S 630 GLY
3 EA SILENCER SR64 GRY IVE
NOTES:
1) DOOR 118C PART OF COUNSELING CENTER PACKAGE.
DOOR HARDWARE 087100-19
Hardware Group No. 03
For use on Door #(s):
118A
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
BALANCE OF HARDWARE TO
REMAIN
1) FIELD VERIFY EXISTING CONDITIONS. VERIFY/COORDINATE PREPS ON EXISTING DOORS
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
COVER EXISTING DOOR AND FRAME PREPARATIONS.
2) DOOR 118A PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 04
For use on Door #(s):
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA CLASSROOM LOCK ND70BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
COVER EXISTING DOOR AND FRAME PREPARATIONS.
DOOR HARDWARE 087100-20
Hardware Group No. 05
For use on Door #(s):
202 204
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA CLASSROOM SECURITY
W/INSIDE INDICATOR
L9071BDC 17A IS-LOC 626 SCH
2 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA SURFACE CLOSER 4040XP RW/PA
- PUSH-SIDE
689 LCN
1 EA KICK PLATE 8400 10" X 1 1/2" LDW B-CS 630 IVE
1 EA WALL STOP WS33(X) 626 IVE
1 EA GASKETING 488S BK ZER
Hardware Group No. 07
131 132 133A 134 201 206
207 208 209A 209B 210
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA CLASSROOM SECURITY
W/INSIDE INDICATOR
L9071BDC 17A IS-LOC 626 SCH
2 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
DOOR HARDWARE 087100-21
Hardware Group No. 08
For use on Door #(s):
109 119 121 123 126 128
130 300 301 302 303
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA CLASSROOM SECURITY
W/INSIDE INDICATOR
ND78BDC SPA IS-CRS 626 SCH
2 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA SURFACE CLOSER 4040XP RW/PA
- PUSH-SIDE
689 LCN
1 EA KICK PLATE 8400 10" X 1 1/2" LDW B-CS 630 IVE
Hardware Group No. 10
111 118 127 133B 306
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA CLASSROOM SECURITY
W/INSIDE INDICATOR
ND78BDC SPA IS-CRS 626 SCH
2 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
2) DOOR 118 PART OF COUNSELING CENTER PACKAGE.
DOOR HARDWARE 087100-22
Hardware Group No. 11
For use on Door #(s):
120C
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA STOREROOM LOCK ND80BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA KICK PLATE 8400 10" X 1 1/2" LDW B-CS 630 IVE
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
COVER EXISTING DOOR AND FRAME PREPARATIONS.
2) DOOR 120C PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 12
For use on Door #(s):
201A 207A
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA STOREROOM LOCK ND80BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
2) DOOR 120C PART OF COUNSELING CENTER PACKAGE.
DOOR HARDWARE 087100-23
Hardware Group No. 13
For use on Door #(s):
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA STOREROOM LOCK ND80BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
COVER EXISTING DOOR AND FRAME PREPARATIONS.
2) DOOR 120C PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 14
For use on Door #(s):
120A 120B
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA FIRE EXIT HARDWARE 98-EO-F 626 VON
1 EA SURFACE CLOSER 4040XP RW/PA
- PUSH-SIDE
689 LCN
1 EA KICK PLATE 8400 10" X 1 1/2" LDW B-CS 630 IVE
Hardware Group No. 15
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
2 EA SFIC RIM CYLINDER 80-116 (W/DISP CONST CORE) 626 SCH
2 EA SFIC EVEREST CORE 80-037 626 SCH
1) FIELD VERIFY CYLINDER COMPATIBIITY WITH EXISTING LOCKING HARDWARE PRIOR TO
ORDER OF MATERIALS.
END OF SECTION 087100
Door# HwSet#
109 08
111 10
118 10
118A 03
118B 01
118C 02
119 08
120 15
120A 14
120B 14
120C 11
121 08
123 08
126 08
127 10
128 08
129 04
130 08
131 07
132 07
133A 07
133B 10
134 07
201 07
201A 12
202 05
204 05
206 07
207 07
207A 12
208 07
209A 07
209B 07
210 07
300 08
301 08
302 08
303 08
304 13
306 10
Hardware Group No. 01
118B
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA WALL STOP WS406/407CCV 630 IVE
3 EA SILENCER SR64 GRY IVE
1) DOOR 118B PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 02
118C
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
1 EA OH STOP 100S 630 GLY
3 EA SILENCER SR64 GRY IVE
1) DOOR 118C PART OF COUNSELING CENTER PACKAGE.
Hardware Group No. 03
118A
Each to have:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA ENTRANCE LOCK ND53BDC SPA 626 SCH
1 EA SFIC EVEREST CORE 80-037 626 SCH
AND FRAMES TO ENSURE THE COMPATIBILITY OF NEW HARDWARE PRIOR TO ORDER OF NEW
MATERIALS. PROVIDE FIELD MODIFICATIONS AND/OR NECESSARY FILLERS (PAINT TO MATCH
WHERE EXISTING IS PREVIOUSLY PAINTED), REINFORCEMENTS AND FASTENERS, COMPATIBLE
WITH EXISTING MATERIALS REQUIRED FOR MOUNTING NEW SPECIFIED HARDWARE AND TO
2) DOOR 118A PART OF COUNSELING CENTER PACKAGE.