Beechnut Improvements Project Summary
This is a Project Manual and Contract document for the Beechnut Improvements project in Texas, outlining construction work in sitework, landscape, irrigation, and lighting. The project encompasses site development improvements with detailed specifications and requirements for contractors bidding on the work. The contract documents serve as the binding agreement between the contracting authority and the selected contractor, establishing all terms, conditions, specifications, and performance standards required for project completion. The manual provides comprehensive technical specifications, construction standards, and administrative procedures that all bidders and contractors must follow throughout the project execution phase.
The contract documents establish the framework for competitive bidding and project delivery, with all applicable terms, conditions, and specifications outlined within the Project Manual. Contractors are required to comply with all noted specifications for sitework, landscape, irrigation, and lighting components. The document serves as the authoritative reference for scope definition, quality standards, payment procedures, and contract administration, ensuring that all work performed aligns with the municipality's requirements and industry standards for the specified improvements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1333 W Loop South, Suite 1450, Houston, TX 77027 TEL 713.439.0027 FAX 713.439.0067 WEB tbgpartners.com
Contract Documents + Technical Specifications
For:
Grand Mission MUD No. 2 Beechnut Road Improvements Fort Bend County, Houston, Texas
Sitework, Irrigation, Planting, and Lighting TBG Project #: H19370
Prepared for:
Grand Mission MUD No. 2 9 Greenway Plaza, Suite 1000 Houston, Texas 77046
Prepared by:
TBG Partners 1333 West Loop South, Suite 140 Houston, Texas 77027
Date: September 1, 2026
09/01/2026
1 of 2 00 0110 - Table of Contents
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0110 - Table of Contents
00 0113 - Advertisement for Bids
00 0115 - Invitation to Bidders
00 2113 - Instructions to Bidders
00 4100 - Bid Form (Via Civcast) Bid Bond Contractor’s HB1295 Form 00 4336 - Proposed Subcontractors Form
00 4500 - Contractor’s Statement of Qualifications
00 5200 - Agreement (AIA Document A101-2017)
Exhibit A – Insurance Requirements
00 6113 - Payment Bond
00 6113 - Performance Bond
00 7200 - General Conditions (AIA Document A201-2017)
00 7300 - Supplementary Conditions
00 9111 - Addenda
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 1000 – Summary 01 2100 – Allowances 01 2200 – Unit Prices 01 2500 – Substitution Procedures 01 2600 – Contract Modification Procedures
01 2900 – Payment Procedures
01 3100 – Project Management and Coordination
01 3200 – Construction Progress Documentation
01 3233 – Photographic Documentation
01 3300 – Submittal Procedures
01 3300 a – Submittal Cover Sample
01 4000 - Quality Requirements
01 4200 – References
01 5000 – Temporary Facilities and Controls
01 5639 – Temporary Tree and Plant Protection
01 5723 – Temporary Storm Water Pollution Control
2 of 2 00 0110 - Table of Contents
01 6000 – Product Requirements
01 7300 – Execution
01 7419 – Construction Waste Management and Disposal
01 7700 – Closeout Procedures
01 7823 – Operation and Maintenance Data
01 7839 – Project Record Documents
01 7900 – Demonstration and Training
DIVISION 03 -- CONCRETE
03 3000 - Cast-in-Place Concrete
DIVISION 26 -- ELECTRICAL
26 5600 – Exterior Lighting
DIVISION 31 -- EARTHWORK
31 1000 – Site Clearing
31 2000 – Earth Moving
DIVISION 32 -- EXTERIOR IMPROVEMENTS
32 0190 – Operation and Maintenance of Planting
32 1313 – Concrete Paving
32 1373 – Concrete Paving Joint Sealants
32 8400 – Irrigation
32 9115 – Soil Preparation (Performance Specification)
32 9200 – Turf and Grasses
32 9300 – Plants
END OF SECTION
GRAND MISSION
MUNICIPAL UTILITY DISTRICT NO. 2 ADVERTISEMENT TO BIDDERS
GRAND MISSION MUNICIPAL UTILITY DISTRICT NO. 2
Electronic Bids Only, Electronic Signatures
Option, and Remote Public Bid Opening Option Page 1 of 2 April 2026
Date: 09/01/2026
INVITATION TO BIDDERS
Sealed Electronic Bids addressed to Grand Mission Municipal Utility District No. 2, Attention: Board of Directors, will be electronically received, until 10:00 a.m. Local Time, Tuesday, September 15, 2026, and then publicly opened and read at TBG Partners, 1333 W. Loop South, Suite 1450, Houston, TX 77027 for “Beechnut Road Improvements for Grand Mission Municipal Utility District No. 2, Fort Bend County, Texas” In addition to the opening of sealed Bids at the address above, you may view the public opening of sealed Bids via Microsoft Teams.
Scope of Work of the Contract Documents includes the following: Sitework, Landscape, Irrigation &
Lighting
To join the Bid Opening via Microsoft Teams:
https://teams.microsoft.com/meet/268032214503855?p=aKs7mX34c5gJwXfIXE
Meeting ID: 268 032 214 503 855
Passcode: KH7Um36H
Bids received after the closing time will be returned unopened. A non-mandatory pre-bid conference will be held remotely on Thursday, September 3, 2026, at 2:00 p.m. Local Time, on Microsoft Teams
Attendance by each prospective bidder or its representative at the pre-bid conference is not mandatory, but attendance is highly recommended.
To join the Pre-Bid Conference via Microsoft Teams:
https://teams.microsoft.com/meet/23809035765921?p=Tf1fEaofrw6HNQHjQE
Meeting ID: 238 090 357 659 21
Passcode: tB66Xt2T
Each Bid must be accompanied by a Bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.
Copies of the bidding documents may be reviewed and obtained from www.CivcastUSA.com: search
Grand Mission MUD 2 Beechnut Improvements. Bidders must register on this website in order to view and/or download specifications, plans, soils report, and environmental reports for this Project. There is NO charge to view or download documents.]
Bidder must submit its Bid and Bid Securities in compliance with Owner’s Order Adopting Section 49.2731
Electronic Bidding Rules and all Bids and Bid Securities must be submitted through www.civcastusa.com.
Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website.
4907-8155-3542 v.1 https://teams.microsoft.com/meet/268032214503855?p=aKs7mX34c5gJwXfIXE https://teams.microsoft.com/meet/23809035765921?p=Tf1fEaofrw6HNQHjQE
GRAND MISSION MUNICIPAL UTILITY DISTRICT NO. 2
Electronic Bids Only, Electronic Signatures
Option, and Remote Public Bid Opening Option Page 2 of 2 April 2026
By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature, as defined by and in accordance with Owner’s
Electronic Signature Rules for Construction Contracts.
The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter.
EXHIBIT 1
TO SECTION 49.2731 ELECTRONIC BIDDING RULES
LANDSCAPE ARCHITECT’S CERTIFICATE:
TEXAS WATER CODE SECTION 49.2731 ELECTRONIC BIDDING RULES
COMPLIANCE
I, the undersigned, a duly registered professional landscape architect under the laws of the State of Texas, and authorized representative of TBG Partners, the duly appointed and acting consulting landscape architect for Grand Mission Municipal Utility District No. 2
(“District”) do hereby certify that:
I am familiar with and have examined Texas Water Code Sections 49.273 and 49.2731, the District’s Electronic Bidding Rules (“Rules”), and the software under which the District received bids for the following project through electronic transmission: Grand Mission MUD No. 2 Beechnut Road Improvements
I hereby certify (i) compliance with Texas Water Code Section 49.2731 and the Rules,
(ii) that, to the best of my knowledge, said software is designed to assure the identification, security and confidentiality of the bids; and (iii) that electronically submitted bids remain effectively unopened until the proper time.
WITNESS MY HAND AND PROFESSIONAL SEAL this 1st day of September 2026
J. Wes Cegelski, Registered Professional Landscape Architect Registration No. 3326
(SEAL)
e ems at
GRAND MISSION MUD NO. 2 INSTRUCTIONS TO BIDDERS
Instructions to Bidders April 2026
INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form. In addition, if submitting a paper Bid, the Bid must be submitted in duplicate.
All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form. See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items
(if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder; if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An
“unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other
Bidders on the same Project.
The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation shall be shown below the signature.
When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of
Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS.
State contractor license number, if any, must also be shown.
The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the
Invitation to Bidders.
2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.
Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system for such information to Landscape Architect not less than three (3) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract
Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.
Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Landscape Architect in writing. It is the responsibility of each bidder to determine if it has received all addenda, complete files of
4926-9402-5094 v.1 4926-9402-5094 v.1 http://www.civcastusa.com/ which will be maintained at the Landscape Architect’s office and the office designated to receive the
Bids, if any.
Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract
Documents and to complete the Work for the consideration in its Bid.
3. PRE-BID CONFERENCE. A Non Mandatory pre-bid conference among Owner, Landscape
Architect, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The Non-Mandatory pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda.
Attendance is not mandatory, but highly recommended.
4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the “Bid
Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required
Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of
Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents.
If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid
Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.
5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price The Bonds must be in the form prescribed by the
Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the
Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety
4926-9402-5094 v.1 company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.
It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract
Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price.
Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.
If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner and Landscape Architect and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.
6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.
7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain
Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other
Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an
“equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.
Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.
8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value; however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.
9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the
Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.
10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under the General Conditions of the Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day;
(iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time; (vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any provision of the Contract
Documents.
11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, with its Bid or within five (5) calendar days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Landscape Architect. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided.
Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.
12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its
Bid and the Bid Security will be returned.
13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the
“Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code Section
2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the
Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the
Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name is Grand
Mission Municipal Utility District No. 2; the contract ID number is H25387; and the description of goods and services is Beechnut Road Improvements. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form
1295. BIDDERS SHOULD SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE
CONTRACT WILL NOT BE AWARDED TO A BIDDER UNLESS A TEC FORM 1295 HAS
BEEN COMPLETED BY THE BIDDER.
4937-4644-5658 v.1
14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid.
Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.
In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the
Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.
Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.
Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the
Contract Documents, to Owner’s satisfaction.
BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL
INVESTIGATIONS INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR
EXPERIENCE, AND OTHER FACTORS PERTAINING TO BIDDER’S PERFORMANCE OF THE
WORK, AS OWNER DEEMS NECESSARY IN ITS SOLE DISCRETION, AND FOR THAT
PURPOSE, SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC AUTHORIZATION TO
PERSONS AND ENTITIES CONTACTED BY OWNER IN CONNECTION WITH SUCH
INVESTIGATIONS TO PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER
AND TO DISCUSS AND EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY
SUBMISSION OF A BID, BIDDER AGREES TO FULLY AND FOREVER WAIVE AND RELEASE
ANY CLAIM (KNOWN OR UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER,
LANDSCAPE ARCHITECT, DEVELOPER AND THEIR RESPECTIVE ATTORNEYS,
EMPLOYEES, CONSULTANTS, REPRESENTATIVES, AND AGENTS (“THE EVALUATING
PARTIES”) ARISING OUT OF OR IN CONNECTION WITH THE: (1) ADMINISTRATION,
EVALUATION, OR RECOMMENDATION (OR LACK THEREOF) OF ANY BID; (2) WAIVER OF
ANY REQUIREMENTS UNDER THE BID DOCUMENTS OR THE CONTRACT DOCUMENTS;
AND (3) ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD OF THE CONTRACT.
Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items” or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.
If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.
If the Contract is to be awarded, Owner will give the successful bidder a notice of award within sixty (60) days after the day of the Bid opening. All bidders must honor the Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.
Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Landscape Architect the payment and performance bonds and all information or other items necessary to complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. The successful bidder must return the fully executed Contract Documents to Landscape Architect within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.
15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use
Tax Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract
Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items.
Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.
16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents, Plans and
Technical Specifications will be prepared digitally and will be sent via email link to the successful bidder.
Any additional hard copy sets may be obtained from Landscape Architect at Landscape Architect’s reproduction rates.
17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER.
The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument.
18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached..
19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.
Owner, Landscape Architect, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others.
Owner, Landscape Architect, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.
https://www.lawinsider.com/clause/counterparts-and-electronic-signatures
20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.
(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the
Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars
($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.
The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.
(B) The minimum wage rates that apply to this Contract are specified in Fort Bend County
Prevailing Wage Scale (version 2026). Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.
Proposed Subcontractors 004336 - 1
GRAND MISSION MUD NO. 2 – BEECHNUT ROAD IMPROVEMENT
Date: ____________________________________________________________
Contractor: _______________________________________________________
Address:
LIST OF SUB-CONTRACTORS
Contractor shall list the names and addresses of all sub-contractors with whom he intends to enter into Contracts for the execution of portions of the entire Work under consideration, with his Bid
Proposal. No substitutions of sub-contractors shall be made without Company's written permission first having been obtained through the Landscape Architect.
Contractor understands that, if he fails to list a sub-contractor for any portion of the Work, he shall be deemed to have agreed to do such Work with his own forces without the employment of sub-contractors, unless he first obtains Company's written approval through the Landscape Architect.
NAME: ____________________________________________________
ADDRESS: ________________________________________________
SCOPE: ___________________________________________________
1 of 2 00 4500 – Contractor’s
Statement of Qualifications
SECTION 00 4500
CONTRACTOR’S STATEMENT OF QUALIFICATIONS
Date of Contractor’s Statement:
Legal Name of Contractor
Individual
Partnership
Joint Venture
Corporation
Other ______________________________________
Address ______
Contact Name: _______________________
Office Telephone (__ ) _________ Mobile Telephone: ( )_______________
E-mail:____________________________________________
Federal Identification Number (E.I. or S.S.) ___
I certify that all information contained in this Contractor’s Statement of Qualification is true, cor-rect, and complete.
By:
(signature)
Name:
Title:
2 of 2 00 4500 – Contractor’s
CONTRACTOR INFORMATION AND EXPERIENCE QUESTIONNAIRE
ORGANIZATIONAL BACKGROUND
1. Type of Organization (circle one):
Partnership Corporation Other:
2. Date of Organization/Incorporation:
3. Dunn & Bradstreet Number:
4. Principal place(s) of business:
5. Partners/Principals/Owners (owning 10% or more):
6. Officers:
President Vice President Secretary Treasurer
7. How many years has the business been operating under its present name?
a) Under what other names has the business operated?
b) If the answer to any of the following questions is “Yes”, attach details including a list of creditors amount owed each, amounts repaid, resolution of proceedings, etc.:
i) Has the business ever defaulted, declared bankruptcy, or undergone reorganiza-tion procedures?
ii) Has a predecessor of the business defaulted, declared bankruptcy, or undergone reorganization procedures?
iii) Are there presently any outstanding claims pending against the business?
iv) Has the business been involved in litigation within the past 5 years or is it currently involved in litigation?
CONSTRUCTION EXPERIENCE
1. How many years of experience in construction work has the business had?
As a general contractor As a subcontractor
2. What types of work does the business normally perform?
3. Has the business or any officer of partner of the business ever failed to complete a construc-tion contract, forfeited a bid bond/proposal guaranty, had liquidated damages withheld from its total compensation due on a contract, or refused to enter into contract for work awarded to it?
3 of 2 00 4500 – Contractor’s
If yes, attach details, including name of project, contract amount, type of work, name and address of project engineer, contractor, and owner, when where, and why.
4. Has the business or any officer or partner of the business ever been cited or convicted for violation of any OSHA or State safety law/regulation?
If yes, attach details, including project name, project engineer, owner, when, where, govern-ing agency, and final disposition, of citation or conviction.
5. Attach a list of all projects with construction cost greater that $500,000 that the business has completed within the last 5 years in the local area (beginning with the most current and not to exceed the last ten consecutive jobs). Include the following information:
• Name of Project
• Amount
• Type of Work
• Percentage subcontracted
• Amount subcontracted
• Schedule completion date
• Date completed
• Location (city, county, state)
• Name, address, and telephone number of:
Project Architect or Engineer Contractor (if subcontractor) Owner
6. Attach a list of major construction projects the business has in process. Include the follow-ing information:
• Name of Project
• Amount
• Type of Work
• Percentage Completed
• Schedule Completion
• Location (city, county, state)
• Name, address, and telephone number of:
• Project Engineer
• Contractor (if subcontractor)
• Owner
7. Provide resumes and list construction experience of the principal individuals of your organi-zation (include not only officers and principals of the organization, but also field superinten-dents who will be in charge of the work). Add additional sheets as needed.
4 of 2 00 4500 – Contractor’s
8. Name Current Position Years w/Company Years Experience
9. Attach a list of subcontractors that are anticipated to perform any portion of the work valued at $25,000 of the total bid or more:
Include the following information:
➢ Name
➢ Address
➢ Work to be done
➢ Percentage of Contract
➢ Estimated amount of Contract
➢ Individuals responsible for work
REFERENCES
1. List all banks with which the contractor has done business during the past 5 years. List the current bank first. Add additional sheets as needed.
Bank Name Address Contact Telephone
2. Provide the following information regarding payment, performance, and maintenance bonds:
a) Name and address of surety company:
Company File Number:
b) Authorized to do business in state?
c) Authorized to issue payment, performance, and maintenance bonds in project state?
d) Maximum amount of bond authorized to issue:
e) Rating (as listed in Best’s Key Guide):
f) Financial size category (as listed in Best’s Key Guide):
3. Name and address of agent and agency (company or partnership for which agent works):
4. Does agent have appointment from insurance company authorizing agent to sign bonds?
5. Attach business financial statements, including most recent income statement and balance sheet. If most recent information available is unaudited, but business has audited state-ments available for an earlier period, include unaudited as well as audited statements.
5 of 2 00 4500 – Contractor’s
AUTHORIZATION FOR VERIFICATION AND AFFIDAVIT
STATE OF
COUNTY OF
The undersigned, , being duly sworn, deposes and says that he/she is of (the “Con-tractor”) and declares that:
1. The Contractor’s Statement of Qualifications (the “Contractor’s Statement”) is given for the express purpose of inducing the Owner to award the Contractor a contract.
2. Any person, depository, agency, or other entity named in the Contractor’s Statement is au-thorized to supply Owner or its representative with any information necessary to verify statements contained in the Contractor’s Questionnaire.
3. The Contractor’s Statement is a true and accurate statement as of the date of said Contrac-tor’s Questionnaire.
4. The Financial Statements included with the Contractor’s Statement are taken from the Con-tractor’s financial records, and are true and accurate statement of Contractor’s financial condition as of their date.
5. I am authorized to execute this Contractor’s Statement on behalf of the Contractor.
By:
Name:
(print or type)
SWORN AND SUBSCRIBED before me on this the day of , 20__
Notary Public, State of ______
END OF SECTION 00 4500
(Notary Seal) april.weems Snapshot
INSURANCE REQUIREMENTS
SECTION 3.17 - INSURANCE
3.17a The CONTRACTOR shall provide and maintain Workers' Compensation insurance coverage in accordance with Section 110.110 of Chapter 28 of the Texas Administrative Code.
3.17b.1) General Liability & Commercial Liability:
General Aggregate $2,000,000 Products - Comprehensive/Operations Aggregate $2,000,000 Personal & Advertising Injury $1,000,000 Each Occurrence $1,000,000 Damage to Rented Premises (Ea occurrence) $ 50,000 Medical Expense (Any one person) $ 5,000
3.17b.2) Comprehensive Automobile Liability - Combined Single Limit - $1,000,000.
3.17b.3) Excess Umbrella Liability: Minimum coverage of $2,000,000, each occurrence, aggregate.
District (and\or Owner) and Engineer shall be named in Contractor's General Liability, Automobile Liability, and Umbrella Liability insurance policies as an "additional insured."
The insurance carrier shall provide the Owner and Engineer with thirty (30) days advance written notice of any change, cancellation or termination of coverage.
EXHIBIT 'A'
PAYMENT BOND 00 6113.16-1
PAYMENT BOND
STATE OF TEXAS Contract Date
COUNTY OF Date Bond Executed
PRINCIPAL
SURETY
OWNER GRAND MISSION MUNICIPAL UTILITY DISTRICT NO. 2
PENAL SUM OF BOND (in words and figures) , being 100 percent of the Contract Price.
CONTRACT for for GRAND MISSION MUNICIPAL UTILITY
DISTRICT NO. 2 – BEECHNUT ROAD IMPROVEMENTS, Fort Bend County, Texas.
KNOW ALL PERSONS BY THESE PRESENTS, that we, Principal and Surety above named, are held and firmly bound unto Owner, its successors and assigns, in the penal sum of the amount stated above, for the payment of which sum well and truly to be made, we bind ourselves and our respective heirs, executors, administrators, officers, directors, shareholders, partners, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal entered into the Contract with Owner, which Contract is expressly incorporated herein for all purposes.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if
Principal shall promptly pay claimants for all labor, subcontracts, materials and specially fabricated materials performed or furnished under or by virtue of the Contract, and duly authorized modifications and normal and usual extras thereto, notice of which modifications to Surety being hereby waived, then this obligation shall be void, otherwise to remain in full force and effect. Should
Principal fail to promptly pay claimants for all labor, subcontracts, materials and specially fabricated materials performed or furnished under or by virtue of the Contract, Surety is hereby bound to make such payments on behalf of Principal up to a total aggregate amount equal to the penal sum of the
Bond. Labor, subcontracts, materials, and specially fabricated materials shall be construed in accordance with Chapter 2253, Texas Government Code.
PROVIDED, HOWEVER, that Owner having required Principal to furnish this Bond in order to comply with the provisions of Chapter 2253, Texas Government Code, all rights and remedies on this Bond shall inure solely to such claimants and shall be determined in accordance with the provisions, conditions, and limitations of the aforesaid Government Code to the same extent as if they were copied at length herein.
The bound parties have executed this instrument pursuant to authority of their respective governing body, to be effective on the same date of the Contract.
PAYMENT BOND 00 6113.16-2
ATTEST
PRINCIPAL
By By
Name Name
Title Title
Address
SURETY
By By
Name Name
Title Title
(SEAL) Physical Address:
Mailing Address:
Telephone:
Local Recording Agent Personal Identification Number:
Agency Name:
Agency Address
Agency Telephone
Surety must attach its original Power of Attorney to this Bond.
PAYMENT BOND 00 6113.16-3
CERTIFICATE AS TO CORPORATE PRINCIPAL
I,_________________________________, certify that I am the secretary of the corporation named as Principal in the Bond; that ________________________________, who signed the Bond on behalf of Principal, was then ____________________________________ of the corporation; that I know his or her signature, and his or her signature is genuine; and that the Bond was duly signed for and on behalf of the corporation by authority of its governing body.
(Corporate Seal)
Signature of Corporate Secretary
ATTACH POWER OF ATTORNEY
PERFORMANCE BOND 00 6113.13-1
PERFORMANCE BOND
STATE OF TEXAS Contract Date
COUNTY OF Date Bond Executed
PRINCIPAL
SURETY
OWNER GRAND MISSION MUNICIPAL UTILITY DISTRICT NO. 2
PENAL SUM OF BOND (in words and figures) , being 100 percent of the Contract Price.
CONTRACT for for GRAND MISSION MUNICIPAL UTILITY DISTRICT
NO. 2 – BEECHNUT ROAD IMPROVEMENTS, Fort Bend County, Texas (the “Contract”).
KNOW ALL PERSONS BY THESE PRESENTS, that we, Principal and Surety above named, are held and firmly bound unto Owner, its successors and assigns, in the penal sum of the amount stated above, for the payment of which sum well and truly to be made, we bind ourselves and our respective heirs, executors, administrators, officers, directors, shareholders, partners, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal entered into that certain Contract with Owner, which Contract is expressly incorporated herein for all purposes.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if
Principal well and truly performs the work in accordance with the plans, specifications and any other contract documents, during the original term of the Contract and any extensions thereof that may be granted by Owner, with or without notice to Surety, and during the life of any guaranty or warranty required under the Contract, then this obligation is void; otherwise it is to remain in full force and effect. Should the Principal fail to faithfully and strictly perform the work as required by the Contract in all its terms, the Surety will be liable for all damages, losses, expenses and liabilities that the
Owner may suffer in consequence thereof.
This Bond is given in compliance with the provisions of Chapter 2253 of the Texas
Government Code, as amended, which is incorporated herein by this reference. However, all of the express provisions contained herein and in the Contract are applicable whether or not within the scope of said statute.
Surety hereby agrees, for value received, that no change, extension of time, alteration or addition to the terms of the Contract or to work performed under the Contract, or to the plans, specifications or drawings accompanying the Contract, will in any way affect its obligations on this
Bond and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder.
The bound parties have executed this instrument pursuant to authority of their respective governing body, to be effective on the same date of the Contract.
PERFORMANCE BOND 00 6113.13-2
PRINCIPAL
By By
Name Name
Title Title
Address
SURETY
By By
Name Name
Title Title
(SEAL) Physical Address:
Mailing Address:
Telephone:
Local Recording Agent Personal Identification Number:
Agency Name:
Agency Address
Agency Telephone
Surety must attach its original Power of Attorney to this Bond.
PERFORMANCE BOND 00 6113.13-3
CERTIFICATE AS TO CORPORATE PRINCIPAL
I,_________________________________, certify that I am the secretary of the corporation named as Principal in the Bond; that ________________________________, who signed the Bond on behalf of Principal, was then ____________________________________ of the corporation; that I know his or her signature, and his or her signature is genuine; and that the Bond was duly signed for and on behalf of the corporation by authority of its governing body.
(Corporate Seal)
Signature of Corporate Secretary
ATTACH POWER OF ATTORNEY
31 Beechnut Road Improvements 1 of 2 00 7300 – Supplementary
Conditions
SECTION 00 7300
SUPPLEMENTARY CONDITIONS
PART 1 GENERAL
1.1 SUMMARY
§ 3.10.4 THE PROCESS OF APPROVING CONTRACTOR’S SCHEDULES AND UPDATES TO
CONTRACTOR’S SCHEDULE SHALL NOT CONSTITUTE A WARRANTY BY THE OWNER THAT
ANY NON-CONTRACTOR MILESTONES OR ACTIVITIES WILL OCCUR AS SET OUT ON
CONTRACTOR’S SCHEDULE. APPROVAL OF CONTRACTOR’S SCHEDULE DOES NOT
CONSTITUTE A COMMITMENT BY THE OWNER TO FURNISH ANY OWNER-FURNISHED
INFORMATION OR MATERIAL ANY EARLIER THAN OWNER WOULD OTHERWISE BE OBLIGATED
TO FURNISH THAT INFORMATION OR MATERIAL UNDER THE CONTRACT
DOCUMENTS. FAILURE OF THE WORK TO PROCEED IN THE SEQUENCE SCHEDULED BY
CONTRACTOR SHALL NOT ALONE SERVE AS THE BASIS FOR A CLAIM FOR ADDITIONAL
COMPENSATION OR TIME. IN THE EVENT THERE IS INTERFERENCE WITH THE…