Project Manual - Addendum 02.pdf

PDF 3 MB Posted

Attached to
Amandera - Beadle Lane Phase 1 Landscape
Solicitation number
TMTt506
Issued by
Fort Bend County, Texas

About this file

This is a Project Manual and Addendum 02 for a landscape construction contract issued by Fort Bend County Municipal Utility District No. 210 in Richmond, Texas. The project, Amandera - Beadle Lane Phase 1 Landscape, encompasses concrete trails, minor drainage, minor electrical for irrigation, planting, irrigation systems, and three months of landscape maintenance. The scope of work is divided into six lump sum bid items: General Conditions/Permits/Fees, Site Grading and Drainage, Site Paving, Irrigation, Planting, and Landscape Maintenance, with detailed unit price items for site work, concrete paving, irrigation components, trees, shrubs, and ground cover. A non-mandatory pre-bid conference was scheduled for September 2, 2026, at 11:00 a.m. via Zoom. Sealed bids were due by 4:00 p.m. local time on Tuesday, October 6, 2026, with public opening and reading at SWA Group Landscape Architects' office in Houston, Texas. The contract duration is 120 calendar days from the Notice to Proceed, with Substantial Completion required within the specified timeframe and Final Completion within 30 days thereafter. Bidding documents were available for download at no charge through www.CivcastUSA.com.

Each bid must be accompanied by a bid bond or certified check equal to 2% of the total bid amount as security. The successful bidder must furnish performance and payment bonds each equal to 100% of the contract price and a one-year maintenance bond for 100% of construction costs, all from a surety company holding a Texas permit with a minimum Best Key Rating of "B+" or better. Contractor license numbers, evidence of out-of-state incorporation authorization, and a completed Texas Ethics Commission Form 1295 are required for bid consideration. Minimum wage rates as specified in Attachment B of the General Conditions apply, with contractors subject to a $60 per worker per day penalty for non-compliance. No economic disincentives are specified for schedule delays. Bidders must provide a contractor's statement of qualification within five calendar days of award notification. The contract requires a construction schedule using critical path method, submission of shop drawings within 15 days of Notice to Proceed, and monthly schedule updates. Owner is exempt from Texas sales and use taxes as a political subdivision, and contractors must pass tax savings to the Owner on exempt materials.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL FOR

AMANDERA - BEADLE LANE

PHASE 1 LANDSCAPE

RICHMOND, TEXAS

for:

TPHTM 359, LLC a Delaware Limited Liability Company on behalf of

Fort Bend County Municipal Utility District No. 210 3250 Briarpark Dr., Suite 300

Houston, Texas 77042

Project No.

SWA No. TMTt506

Issue for Bidding 9/23/2026 prepared by:

SWA GROUP

Landscape Architects

712 Main St., 6th Floor

Houston, TX 77002

Phone (713) 868-1676

Issued for Bid TABLE OF CONTENTS 23 September 2026

Amandera - Beadle Lane Phase 1 Landscape Richmond, Texas SWA Project No. TMTt506 pg. 1

SPECIFICATIONS

DIVISION 0 – SPECIAL SECTIONS

INVITATION TO BIDDERS

INSTRUCTIONS TO BIDDERS

004113 BID FORM

AGREEMENT

GENERAL CONDITIONS

SPECIAL CONDITIONS PART A (INSURANCE REQUIREMENTS)

SPECIAL CONDITIONS PART B (MINIMUM WAGE RATE)

SPECIAL CONDITIONS OF THE CONTRACT PART A

SPECIAL CONDITIONS OF THE CONTRACT PART B

TEXAS SALES AND USE TAKE EXEMPTION CERTIFICATE FORM

PAYMENT BOND

PERFORMANCE BOND

MAINTENANCE BOND

DIVISION 1 - GENERAL REQUIREMENTS

010100 SUMMARY OF WORK

010270 APPLICATION FOR PAYMENT

010350 MODIFICATION PROCEDURES

010400 COORDINATION

010500 FIELD ENGINEERING

010600 REGULATORY REQUIREMENTS

012000 PROJECT MEETINGS

013000 SUBMITTALS

014100 TESTING LABORATORY SERVICES

015000 CONSTRUCTION FACILITIES & TEMPORARY CONTROLS

017000 CONTRACT CLOSEOUT

017100 CLEANING

DIVISION 3 - CONCRETE

033053 LANDSCAPE SITE CONCRETE

DIVISION 4 - MASONRY

044101 MORTAR AND ACCESSORIES

044200 STONE MASONRY

DIVISION 31 - EARTHWORK

312000 EARTH MOVING

312219 FINE GRADING

DIVISION 32 – EXTERIOR IMPROVEMENTS

320273 AGGREGATE SURFACING

321313 CONCRETE PAVING

321316 INTEGRAL COLOR CONCRETE PAVING

321513 CONCRETE PAVING JOINT SEALANT

328400 LANDSCAPE IRRIGATION

329113 SOIL PREPARATION

Issued for Bid TABLE OF CONTENTS 23 September 2026

Amandera - Beadle Lane Phase 1 Landscape Richmond, Texas SWA Project No. TMTt506 pg. 2

329200 TURF AND GRASSES

329300 PLANTING

329400 LANDSCAPE MAINTENANCE FOR THREE (3) MONTHS

DIVISION 33 – UTILITIES

334100 SUBDRAINAGE

INVITATION TO BIDDERS

Sealed Bids addressed to Fort Bend County Municipal Utility District No. 210, will be received, until 4:00 p.m. Local Time, Tuesday, October 6, 2026, and then publicly opened and read at the office of SWA

Group Landscape Architects, 712 Main St., 6th Floor, Houston, Texas 77002 for construction of

Amandera – Beadle Lane Phase 1 Landscape project.

Scope of Work of the Contract includes but is not limited to the following: concrete trails, minor drainage, minor electrical for irrigation, planting, irrigation, and maintenance.

In addition to the opening of sealed Bids at the address above, you may view the public opening of sealed Bids via Zoom. Meeting ID: 962 9476 4020 and use Passcode: 383801 or https://swagroup.zoom.us/j/96294764020?pwd=SyI6wdJnnKR38JBl1P5hoKjAn6joYn.1

Bids received after the closing time will not be considered. A NON-MANDATORY pre-bid conference will be held by Zoom teleconference on Wednesday, September 2, 2026, at 11:00 a.m. Local Time.

Meeting ID: 996 7516 4017 and use Passcode: 889614 or https://swagroup.zoom.us/j/99675164017?pwd=Uar20JbiXXNVF50bIdwfDcmFn2snY3.1

Each Bid must be accompanied by a Bid Bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.

Copies of the bidding documents may be reviewed and obtained from www.CivcastUSA.com: search

SWA project name. Bidders must register on this website in order to view and/or download specifications, plans, and associated documents for this Project. There is NO charge to view or download documents.

Bidder submitting electronic Bids through Civcast must submit its Bid and Bid Securities in compliance with

Owner’s Order Adopting Section 49.2731 Electronic Bidding Rules and all electronic Bids and Bid Securities must be submitted through www.CivcastUSA.com. Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website.

By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature, as defined by and in accordance with Owner’s Electronic Signature

Rules for Construction Contracts.

The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the

Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

https://swagroup.zoom.us/j/96294764020?pwd=SyI6wdJnnKR38JBl1P5hoKjAn6joYn.1 https://swagroup.zoom.us/j/99675164017?pwd=Uar20JbiXXNVF50bIdwfDcmFn2snY3.1 http://www.civcastusa.com: /

FORT BEND COUNTY MUD NO. 210 INSTRUCTIONS TO BIDDERS

Instructions to Bidders September 2026

INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form. In addition, if submitting a paper Bid, the Bid must be submitted in duplicate.

All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form. See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder; if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.

The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation shall be shown below the signature.

When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS.

State contractor license number, if any, must also be shown.

The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the Invitation to Bidders.

2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.

Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system or for such information to Landscape Architect not less than seven (7) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.

Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Landscape Architect in writing. It is the responsibility of each bidder to determine if it has received all addenda, complete files of

4937-4644-5658 v.14937-4644-5658 v.1 http://www.civcastusa.com/

Instructions to Bidders September 2026 which will be maintained at the Landscape Architect’s office and the office designated to receive the Bids, if any.

Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract Documents and to complete the Work for the consideration in its Bid.

3. PRE-BID CONFERENCE. A NON-MANDATORY pre-bid conference among Owner, Landscape Architect, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The NON-MANDATORY pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda.

4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents.

If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.

5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price. The successful bidder must also provide a one-year

(1) Maintenance Bond for one-hundred (100) percent of the cost of the construction of the improvements.

The Bonds must be in the form prescribed by the Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better.

The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of

Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of

4937-4644-5658 v.1

Instructions to Bidders September 2026 authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.

It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price.

Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.

If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner; Developer, if there is a Special Conditions of the Contract Part B; and Landscape Architect and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.

6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.

7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an “equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.

Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.

8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value; however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.

9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.

Instructions to Bidders September 2026

10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under Section 1.01 of the General Conditions of the

Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day; (iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time;

(vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any provision of the Contract Documents.

11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, within five (5) calendar days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Landscape Architect. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided.

Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.

12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its Bid and the Bid Security will be returned.

13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code Section

2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name and the contract ID number are as listed on the project manual cover; and the description of goods and services is the name of the project. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295.

BIDDERS SHOULD SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE CONTRACT

WILL NOT BE AWARDED TO A BIDDER UNLESS A TEC FORM 1295 HAS BEEN

COMPLETED BY THE BIDDER.

Instructions to Bidders September 2026

14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid.

Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.

In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.

Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.

Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.

BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL

INVESTIGATIONS INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR

EXPERIENCE, AND OTHER FACTORS PERTAINING TO BIDDER’S PERFORMANCE OF THE

WORK, AS OWNER DEEMS NECESSARY IN ITS SOLE DISCRETION, AND FOR THAT

PURPOSE, SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC AUTHORIZATION TO

PERSONS AND ENTITIES CONTACTED BY OWNER IN CONNECTION WITH SUCH

INVESTIGATIONS TO PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER

AND TO DISCUSS AND EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY

SUBMISSION OF A BID, BIDDER AGREES TO FULLY AND FOREVER WAIVE AND RELEASE

ANY CLAIM (KNOWN OR UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER,

LANDSCAPE ARCHITECT, DEVELOPER AND THEIR RESPECTIVE ATTORNEYS,

EMPLOYEES, CONSULTANTS, REPRESENTATIVES, AND AGENTS (“THE EVALUATING

PARTIES”) ARISING OUT OF OR IN CONNECTION WITH THE: (1) ADMINISTRATION,

EVALUATION, OR RECOMMENDATION (OR LACK THEREOF) OF ANY BID; (2) WAIVER OF

ANY REQUIREMENTS UNDER THE BID DOCUMENTS OR THE CONTRACT DOCUMENTS;

AND (3) ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD OF THE CONTRACT.

Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items” or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.

If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.

Instructions to Bidders September 2026

If the Contract is to be awarded, Owner will give the successful bidder a notice of award within sixty (60) days after the day of the Bid opening. All bidders must honor the Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.

Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Landscape Architect the payment and performance bonds and all information or other items necessary to complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. See SAFETY under Section 5.20 of the General

Conditions of the Contract. The successful bidder must return the fully executed Contract Documents to Landscape Architect within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.

15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use

Tax Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items.

Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.

16. INTENTIONALLY DELETED.

17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER.

The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument.

18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached.

19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.

Owner, Landscape Architect, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others.

Owner, Landscape Architect, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.

https://www.lawinsider.com/clause/counterparts-and-electronic-signatures

Instructions to Bidders September 2026

20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.

(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.

The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.

(B) The minimum wage rates that apply to this Contract are specified in Attachment B to the General Conditions of the Contract. Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.

21. ECONOMIC DISINCENTIVES. The Contractor and the Owner agree that time is of the essence of this Contract. The Contractor and the Owner agree that a breach of this Contract by failure to complete the Work in the specified time will cause harm to the Owner. Therefore, the

Contractor and the Owner agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the time limit(s) set in the Contract, or as extended under the provisions of these General Conditions (including, without limitation, due to a delay caused by Contractor’s failure to comply with the Contract Documents or due to Owner’s termination of Contractor for default under the Contract Documents), Contractor shall be liable to

Owner for economic disincentives under Section 49.271(e) of Texas Water Code, in the amount of

NONE for each such calendar day. The Owner shall have the option to deduct and withhold said amount from any monies that the Owner owes the Contractor or its sureties or to recover such amount from the Contractor or the sureties on the Contractor’s bond.

22. INTENTIONALLY DELETED.

Issue for Bidding 23 September 2026 - Addendum 02

Section 004113 Bid Form

TO:

Enclosed are the Forms required at the Bid Opening:

l. Proposal Form (Including acknowledgement of Receipt of Addenda).

ll. Bid Bond lll. TEC 1295 Form

IV. Bid Form in Microsoft Excel format

BID FOR AMANDERA

BEADLE LANE PHASE 1 LANDSCAPE

RICHMOND, TEXAS

LETTER OF TRANSMITTAL

Fort Bend County MUD #210 c/o SWA Group

712 Main Street, 6th Floor

Houston, Texas 77002

ATTENTION:

Mr. Robert Oliver

BIDDER

Amandera - Beadle Lane Phase 1 Landscape Richmond, TX 004113 - 1

Section 004113 Bid Form

TO:

ALL:

(Figures)

1 General Conditions, Permits, Fees, etc. LS 2 Site Grading and Drainage LS 3 Site Paving LS 4 Irrigation LS 5 Planting LS 6 Landscape Maintenance LS

LS

BID FOR AMANDERA

BEADLE LANE PHASE 1 LANDSCAPE

RICHMOND, TEXAS

BIDDER:

Modifications to this form are prohibited and any changes are considered grounds for bid disqualification.

Contractor shall proivde a PDF digital version as well as the excel file at time of bid submission.

The bidder, in compliance with your Invitation for a Bid for the above mentioned project, having examined the Plans dated September 23, 2026, and Specifications, dated September 23, 2026, with related documents and the site of the proposed work, and being familiar with all of the conditions of this proposed project including the availability of materials and labor hereby proposes to furnish all labor, materials, and supplies and to construct the project in accordance with the Contract Documents, at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, including related work which may not be specifically mentioned, but implied, of which this proposal is a part. This bid will remain subject to acceptance for 60 days after the date of Bid opening.

Houston, Texas 77002

Fort Bend County MUD #210 c/o SWA

712 Main St, 6th Floor

LUMP SUM BASE BID DETAIL:

SINGLE CONTRACT LUMP SUM BID:

(Words)

LUMP SUM BASE BID

Richmond, TX 004113 - 2

Section 004113 Bid Form a.

b.

c.

UNIT

a General Conditions LS b Bonds LS c Fees and Permits LS

a. Finish Grading SF

b. Rough Grading SF

c. Imported Common Fill CY

a. P1 - Concrete Trail - 6' Width SF

b. P2 - Concrete Trail - 5' Width SF

Unit prices govern additions to or deductions from the Lump Sum Base Bid.

1. GENERAL COND., ETC…

ADD OR DEDUCT

UNIT PRICES:

The following unit prices shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished work of several kinds called for. Changes shall be processed in accordance with the General Conditions.

DESCRIPTION

2. SITE GRADING AND DRAINAGE

3. SITE PAVING

Items not listed on the unit price list below do not relieve the responsibility of the successful bidder to provide all items in the Contract Documents, complete in place.

Richmond, TX 004113 - 3

Section 004113 Bid Form

a. Bore and set PVC Sleeves a1. 3" Sleeve Sch. 40 LF a2. 4" Sleeve Sch. 40 LF a2. 6" Sleeve, CL. 200 LF b.

Trench and set schedule PVC sleeves, including backfill and compaction) b1. 3" Sleeve Sch. 40 LF b2. 4" Sleeve Sch. 40 LF b3. 6" Sleeve CL. 200 LF

c. Irrigation Point of Connection c1. New 2" irrigation water meter and 2" domestic water service tap EA c2.

Backflow assembly for domestic irrigation system connections, complete in place EA c3.

Master control valve with valve box and decoder, complete in place EA c4.

Flow sensor with valve box and decoder complete in place EA

d. Quick Coupler Valve d1. 1" valve with isolation valve, stake and valve box, complete in place EA

e. Remote Control Valve e1. 1" valve, with decoder, grounding and box, complete EA e2. 1 1/2" valve, with decoder, grounding and box, complete EA

f. Isolation Ball Valve f1. 3", with 10” round box, complete EA

g. Pressurized main line, installed:

g1. 3" line LF

h. Lateral line, installed:

h1. 3/4" line LF h2. 1" line LF h3. 1 1/4" line LF h4. 1 1/2" line LF h5. 2" line LF

i. Emission Devices i1. 4" pop-up head with bubbler & swing joint, complete EA i2. 4” pop-up rotor head with nozzle & swing joint EA i3. 6" pop-up spray head with nozzle & swing joint, complete EA i4. 12" pop-up spray head with nozzle & swing joint, complete EA

j. Miscellaneous j1. Mainline Air Relief Valve and Box, installed EA j2. Concrete for thrust blocks LS

4. IRRIGATION

Richmond, TX 004113 - 4

Section 004113 Bid Form

a. 6" MM Pine EA

b. 65 gal. Pine EA

c. 45 gal. Pine EA

d. 30 gal. Pine EA

e. 15 gal. Pine EA

f. 6" MM Live Oak EA

g. 45 gal. Live Oak EA

h. 30 gal. Texas Red Oak EA

i. 30 gal. Shumard Oak EA

j. 30 gal. White Oak EA

k. 15 gal. Cedar Elm EA

l. 45 gal. Texas Redbud EA

m. 15 gal. Texas Redbud EA

n. 65 gal. White Fringe Tree EA

o. 45 gal. White Fringe Tree EA

p. 15 gal. Possumhaw EA

q. 45 gal. Yaupon Holly EA

r. 30 gal. Yaupon Holly EA

s. 15 gal. Yaupon Holly EA

t. 15 gal. Drummond Red Maple EA

u. 100 gal. Southern Magnolia EA

v. 30 gal. Southern Magnolia EA

w. 100 gal. Muskogee Crape Myrtle EA

x. 65 gal. Muskogee Crape Myrtle EA

y. 45 gal. Chase Tree EA

z. 30 gal. Chaste Tree EA

aa. 30 gal. Wax Myrtle EA

bb. 1 gal. Purple Trailing Lantana EA

cc. 1 gal. Dallas Red Lantana EA

dd. 1 gal. Flax Lily EA

ee. 1 gal. Gulf Coast Muhly EA

ff. 1 gal Lindeheimer Muhly EA

gg. 3 gal. Coral Drift Rose EA

hh. 3 gal. Lemon Drift Rose EA

ii. Solid Sod Bermuda SF

jj. Seed Bermuda Turf SF

kk. Pine Straw Mulch SF

ll. Hardwood Mulch CY

mm. Planting Mix Soil CY

a. Landscape Maintenance MO

5. PLANTING

6. LANDSCAPE MAINTENANCE

Richmond, TX 004113 - 5

Section 004113 Bid Form

Addendum Date

The contract duration for this project is 120 calendar days.

SUB‐CONTRACTOR LIST:

Work to be PerformedSub‐Contractor

All Other Charges: ‐$

Pursuant to the Texas State Tax Code, contracts must be separated for materials to be exempt from the sales tax. The following information is provided to qualify as a separated contract.

The undersigned agrees to commence work within ten (10) days after the day of a written notice to commence

STATEMENT OF MATERIAL AND OTHER CHARGES

BIDDER ACKNOWLEDGES RECEIPT OF THE FOLLOWING ADDENDA:

CONSTRUCTION DURATION:

Addendum Number

Materials incorporated into the Project:

Richmond, TX 004113 - 6

Section 004113 Bid Form

ATTEST:

(Signature)

(Printed Name)

RESPECTFULLY SUBMITTED:

(Company)

(Printed Name)

Secretary of Corporation

(Email)

(Telephone Number)

(Date)

(Title)

(Buisness Address and Zip Code)

(Seal ‐ if Bid is by a Corporation)

(Signature)

Richmond, TX 004113 - 7

FORT BEND COUNTY MUD NO. 210 CONTRACT

Contract 1 of 2 September 2026

CONTRACT

STATE OF TEXAS }

COUNTY OF }

THIS CONTRACT (“Contract”) is made and entered into this _____________________ day of ___________, 20__ by and between Fort Bend County Municipal Utility District NO. 210 (the

“Owner”) c/o Allen Boone Humphries Robinson LLP, 3200 Southwest Freeway, Suite 2600, Houston, Texas 77027, of _________ County, Texas, and _______________, _____________, of the City of , County of ___, and State of _____________, hereinafter termed “Contractor.”

All capitalized terms used herein shall be given the meanings set forth in the General Conditions of the Contract. SWA shall be referred to herein as the “Landscape Architect.”

For and in consideration of the mutual covenants hereinafter set forth, and under the conditions expressed in the Bonds bearing even date herewith, the Contractor and Owner hereby agree as follows:

Contractor shall commence and complete the Work generally described as follows:

for Fort Bend County Municipal Utility District NO. 210, Fort Bend County, Texas, according to those Plans and Technical Specifications prepared by Landscape Architect in the initial Contract Price of $_______________ and all Extra Work in connection therewith, under the terms as stated in the Contract Documents, and, at Contractor’s own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all Contract Documents and is thoroughly familiar therewith.

The Contractor hereby agrees to begin work within ten (10) calendar days after the written Notice to Proceed has been given by the Landscape Architect. Contractor hereby also agrees to achieve Substantial Completion of the Work within _______ calendar days after the date of the written Notice to Proceed and to achieve Final Completion of the Work within 30 calendar days after Substantial Completion.

Owner agrees to pay Contractor for completion of the Work in accordance with the Contract Documents for the initial Contract Price of ___________________ ($____________), plus or minus any increases or decreases to the initial Contract Price as provided by the Contract Documents. Contractor will be paid in current funds for the performance of the Contract in accordance with the Bid submitted therefor, subject to additions and deductions as allowed by the Contract Documents and, if applicable, approved by Change Order under the Contract Documents, and to make payments on account thereof as provided therein. If included as Special Conditions of the Contract Part B, the Developer shall act as

“Owner” for the purposes of all payments.

4900-5539-2602 v.1

FORT BEND COUNTY MUD NO. 210 CONTRACT

Contract 2 of 2 September 2026

IN WITNESS WHEREOF, the parties to these presents have executed this Contract in the year and day first above written.

Fort Bend County Municipal Utility District No. 210 Owner

ATTEST: By:

Name:

Title:

Contractor

ATTEST: By:

Name:

Title:

(The following to be executed if Contractor is a corporation)

I, _________________________________, certify that I am the secretary of the corporation named as Contractor herein; that _________________________________________________, who signed this Contract on behalf of Contractor, was then _______________________________ __________________________ of said corporation; that said Contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

Signed:

Corporate Seal

ALL BIDDERS MUST SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE OWNER

WILL NOT AWARD THE CONTRACT WITHOUT THE COMPLETED TEC FORM 1295

NOTED IN THE INSTRUCTIONS TO BIDDERS.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

4900-5539-2602 v.1

FORT BEND COUNTY MUD NO. 210 GENERAL CONDITIONS OF THE CONTRACT

General Conditions of the Contract Page 1 of 41 September 2026

GENERAL CONDITIONS OF THE CONTRACT

TABLE OF CONTENTS

ARTICLE I. DEFINITIONS

ARTICLE II. CONTRACT DOCUMENTS

ARTICLE III. PRELIMINARY MATTERS

ARTICLE IV. SITE ACCESS/ CONDITIONS/ REFERENCE POINTS

ARTICLE V. CONTRACTOR’S RESPONSIBILITIES/INDEMNITIES

ARTICLE VI. LANDSCAPE ARCHITECT’S STATUS DURING CONSTRUCTION

ARTICLE VII. EXTRA WORK/ CHANGE ORDERS/ CLAIMS

ARTICLE VIII. TESTS AND INSPECTIONS/ DEFECTIVE WORK/ WARRANTY

ARTICLE IX. MINIMUM WAGE RATE SCALE/PRICE FOR WORK/ PAYMENTS TO

CONTRACTOR …………

ARTICLE X. SUBSTANTIAL COMPLETION, PARTIAL USE,

FINAL COMPLETION AND ACCEPTANCE…………………………

ARTICLE XI. SUSPENSION OF WORK/ TERMINATION/ DEFAULT

ARTICLE XII. MISCELLANEOUS

ATTACHMENT A – INSURANCE REQUIREMENTS

ATTACHMENT B – MINIMUM WAGE RATE SCALE

4922-8689-3402 v.14922-8689-3402 v.1

General Conditions of the Contract Page 2 of 41 September 2026

GENERAL CONDITIONS OF THE CONTRACT

ARTICLE I. DEFINITIONS

1.01. DEFINITIONS. The following terms shall be defined as described below unless such definition is expressly modified by the Contract Documents. Any capitalized terms used in the Contract Documents not defined in this Section shall have the meaning assigned to such term under the Contract Documents.

a. Bid. The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.

b. Bond(s). Performance bonds, maintenance bonds and payment bonds, or any of them, as required by the Contract Documents.

c. Change Order. A document signed by Contractor, Landscape Architect, and Owner and entered into in accordance with the Contract Documents that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time.

d. Claim. A “Claim” is a claim, demand, or assertion by the Contractor seeking for itself or on behalf of a subcontractor or supplier: adjustment or interpretation of any Contract term, including without limitation, adjustment of the Contract Price or Contract Time;

payment of money; relief from obligations; or other relief or recovery with respect to the terms of the Contract. The term “Claim” also includes other disputes and matters in question asserted by the Contractor (whether for itself or on behalf of a subcontractor or supplier) arising out of or relating to the Contract.

e. Contract. The entire and integrated written agreement between the Owner and Contractor concerning the Work, including the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.

f. Contract Documents. The Bid, Contract, Instructions to Bidders, General Conditions, Addendum to the General Conditions, Special and Supplemental Conditions, if any, Technical Specifications, Plans, Change Orders, any written amendment to the Contract signed by Contractor, Landscape Architect, and Owner, Written Work Orders, addenda issued by Landscape Architect, and all other documents designated as incorporated by reference. Documents incorporated by reference are Contract Documents, whether attached or not. Approved Shop Drawings and other Contractor’s submittals, inspections, and reports, such as testing of subsurface and physical or environmental conditions, are not Contract Documents and are not part of the Contract.

g. Contractor. The entity with whom Owner has entered into this Contract.

h. Contractor Parties. The Contractor, and all its subcontractors, suppliers, and their respective agents, representatives, or employees, or any of them.

i. Contract Price. The amount of money stated in the Contract as payable by Owner to Contractor for timely completion of the Work in accordance with the Contract Documents, plus or minus any increases or decreases to the initial Contract Price agreed to by Owner as provided by the Contract.

4922-8689-3402 v.1

General Conditions of the Contract Page 3 of 41 September 2026

j. Contract Time. The number of days or the dates stated in the Contract to achieve Final Completion, expressed as a number of calendar days or as a reference to the date of Final Completion. If the Contract Time is measured by calendar days, each and every calendar day shall be counted against the Contract Time and the Contract Time will be computed to exclude the first day and include the last day of such period.

k. Contracting Information. The following: 1) information in a voucher or contract relating to the receipt or expenditure of public funds by a governmental body; 2) solicitation or bid documents relating to a contract with a governmental body; 3) communications sent between a governmental body and a vendor, contractor, potential vendor, or potential contractor during the solicitation, evaluation, or negotiation of a contract; 4) documents, including bid tabulations, showing the criteria by which a governmental body evaluates each vendor, contractor, potential vendor, or potential contractor responding to a solicitation and, if applicable, an explanation of why the vendor or contractor was selected; and 5) communications and other information sent between a governmental body and a vendor or contractor related to the performance of a final contract with the governmental body or work performed on behalf of the governmental body.

l. Landscape Architect. The design consultant so identified in the Contract, or such other firm that Owner may designate, is herein called Landscape Architect and is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Landscape Architect in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents.

m. Extra Unit Price Items. All extra unit price items or alternate unit price items so specified in the Bid.

n. Extra Work. All Work that may be required by Landscape Architect or Owner to be done by Contractor to accomplish any change, alteration, or addition to the Work shown upon the Plans, implied by the Technical Specifications, or otherwise within the Contract Documents and not covered by Contractor’s Bid. Notwithstanding the foregoing, Extra Unit Price Items or alternate unit price items so specified in the Bid and required by Landscape Architect or Owner as described herein are not included in the definition of Extra Work.

o. Final Acceptance. Action at a formal meeting of the Owner, wherein Owner accepts the completed Project.

p. Final Completion. The date on which the entire Work or an…