This is a Request for Proposals (RFP) issued by the County of San Diego, Department of Purchasing and Contracting, for Progressive Design-Build services for the Rosecrans Property Development project. The County seeks qualified firms to provide preconstruction and construction services for the development of a new Behavioral Health Wellness Campus on approximately 8.24 acres of County-owned property at 3851 Rosecrans Street in San Diego. The project will include approximately 120,000 square feet of new facilities designed to provide comprehensive behavioral health services, along with associated site improvements including parking, landscaping, utility infrastructure, and temporary construction-related facilities. The pre-proposal conference and job walk are scheduled for September 3, 2026, at 9:00 a.m. Questions are due by September 23, 2026, prior to 5:00 p.m., and proposals must be submitted by October 30, 2026, prior to 3:00 p.m. The delivery method is Progressive Design-Build with a Base Scope and potential Contract Options, wherein the contractor will collaborate with the County during preconstruction to develop a Guaranteed Maximum Price (GMP) for the construction phase. The County may exercise its option for construction upon acceptance of the GMP or may not exercise the option if agreement cannot be reached.
The Budget Not-To-Exceed for the Base Scope is $212,000,000.00. The project is funded through a conditional grant award of approximately $99.5 million from the California Department of Health Care Services under the Behavioral Health Continuum Infrastructure Program (BHCIP) Bond Round 2, with grant funds required to be obligated and expended by June 30, 2031. Proposers must meet essential requirements including possession of a valid Class B General Building Contractor license, current California Department of Industrial Relations registration, professional liability insurance of at least $2,000,000 per occurrence, general liability insurance of at least $5,000,000 per occurrence and $10,000,000 aggregate, workers' compensation insurance, bonding capacity equal to 100% of the Budget NTE, and acceptable safety records. Evaluation criteria include experience of proposer (up to 200 points), experience of personnel (up to 200 points), project plan (up to 200 points), price proposal (up to 200 points), contract terms and conditions (up to 100 points), financial strength (up to 100 points), and optional interviews (up to 200 points). The project must comply with California prevailing wage requirements, California Labor Code section 1770, skilled and trained workforce requirements, and sustainable design specifications. Proposers must provide evidence of financial strength through reviewed or audited financial statements and demonstrate they are not currently or have not been in bankruptcy within the last five years.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAGGIE RAMSBERGER
INTERIM DIRECTOR
DEPARTMENT OF PURCHASING AND CONTRACTING
5560 OVERLAND AVENUE, SUITE 270, SAN DIEGO, CALIFORNIA 92123-1204
Phone (858) 505-6367 Fax (858) 715-6452
BRENDA MILLER
ASSISTANT DIRECTOR
August 20, 2026
COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP)
13320
GENERAL SERVICES
PROGRESSIVE DESIGN BUILD
ROSECRANS PROPERTY DEVELOPMENT
The County of San Diego (County) is requesting proposals (Proposal) from firms qualified to provide Progressive Design Build services for the preconstruction and construction phases of
ROSECRANS PROPERTY DEVELOPMENT.
The delivery method for this Project is “Progressive Design Build” (PDB). The Project will consist of a Base Scope and, at the County’s discretion, one or more Contract Options. The Base Scope and each Contract Option will have an individual preconstruction phase and, at County’s option, a construction phase. During the preconstruction phase, the Contractor will collaborate with the County on existing conditions, design, constructability, cost, and schedule and develop a Guaranteed Maximum Price (GMP) for the construction phase. Upon the County acceptance of the GMP, the County may exercise its option for the construction phase. If the County and the Contractor do not agree upon a GMP, the County may not exercise its option for the construction phase to the Contractor.
The current estimated budget not to exceed for this Project, including the Base Scope, is $212,000,000.00. Refer to the section titled, “Project Description,” for additional information.
The Contracting Officer for this solicitation is Kristen N. McEachron, Senior Procurement Contracting Officer (kristen.mceachron@sdcounty.ca.gov) mailto:kristen.mceachron@sdcounty.ca.gov
00 11 19 Request for Proposal (Rev. 07/29/26) Page 2 of 59
TABLE OF CONTENTS
ARTICLE 1 PROCUREMENT INFORMATION
1.1 RFP TIMELINE
1.2 PRE-PROPOSAL CONFERENCE
1.3 QUESTIONS
1.4 PROPOSAL SUBMITTAL
1.5 BONDING AND INSURANCE
1.6 RETENTION
1.7 PREVAILING WAGE COMPLIANCE
1.8 LICENSING OF PROPOSER
1.9 VEHICLE EMISSIONS DISCLOSURE & COMPLIANCE REQUIREMENT
1.10 NO SUBSTITUTIONS
ARTICLE 2 PROJECT OVERVIEW
2.1 PROJECT DESCRIPTION
2.2 PURPOSE
2.3 SCOPE OF WORK
2.4 BUDGET NOT TO EXCEED
2.5 FIRMS ASSOCIATED WITH PROJECT
ARTICLE 3 RFP INSTRUCTIONS AND RULES
3.1 RFP PROCESS
3.2 INSTRUCTIONS FOR SUBMITTING A PROPOSAL
3.3 PROPOSAL ORGANIZATION
3.4 EVALUATION AND SELECTION
3.5 DEFINITIONS
3.6 COUNTY COMMITMENT
3.7 LATE, MODIFIED, OR WITHDRAWN PROPOSAL
3.8 INFORMATION AVAILABLE TO PROPOSERS
3.9 DUTY TO INQUIRE, QUESTIONS, AND EXPLANATION TO PROPOSERS
3.10 PROTEST PROCEDURE
3.11 DEBRIEF AND REVIEW OF CONTRACT FILES
3.12 PROPOSER COMMUNICATIONS
3.13 CLAIMS AGAINST THE COUNTY
3.14 SOLICITING EMPLOYEES
3.15 PROHIBITED CONTRACTS
3.16 PUBLIC CONTRACT CODE COMPLIANCE
3.17 CALIFORNIA REVENUE AND TAXATION CODE § 18662
3.18 W-9 FORM
3.19 ORGANIZATIONAL CONFLICT OF INTEREST POLICY FOR DESIGN BUILD PROJECTS .. 21
3.20 COMMITMENT TO USE A SKILLED AND TRAINED WORKFORCE
3.21 DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
3.22 SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 4 EVALUATION CRITERIA
4.1 ESSENTIAL REQUIREMENTS – PASS/FAIL
4.2 ACCEPTABLE SAFETY RECORD – PASS/FAIL
4.3 EXPERIENCE OF PROPOSER – UP TO 200 POINTS
4.4 EXPERIENCE OF PERSONNEL – UP TO 200 POINTS
4.5 PROJECT PLAN – UP TO 200 POINTS
COUNTY OF SAN DIEGO – REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
00 11 19 Request for Proposal (Rev. 07/29/26) Page 3 of 59
4.6 PRICE PROPOSAL – UP TO 200 POINTS
4.7 CONTRACT TERMS AND CONDITIONS – UP TO 100 POINTS
4.8 FINANCIAL STRENGTH – UP TO 100 POINTS
4.9 INTERVIEW – UP TO 200 POINTS (OPTIONAL)
ARTICLE 5 SUBMITTAL ITEMS
5.1 PROPOSAL COVER PAGE (PC600)
5.2 REPRESENTATIONS AND CERTIFICATIONS FORM (PC601)
5.3 PROPOSER INFORMATION
5.4 ESSENTIAL REQUIREMENTS
5.5 SAFETY RECORD
5.6 EXPERIENCE OF PROPOSER
5.7 EXPERIENCE OF PERSONNEL
5.8 PROJECT PLAN
5.9 PRICE PROPOSAL(S)
5.10 CONTRACT TERMS AND CONDITIONS
5.11 CONFIDENTIAL/PROPRIETARY EXHIBIT; NONDISCLOSURE INDEMNIFICATION
AGREEMENT (PC620)
5.12 AUTHORIZATION FOR RELEASE OF INFORMATION AND WAIVER OF LIABILITY FOR
REFERENCES
5.13 NON-COLLUSION DECLARATION
5.14 IRAN CONTRACTING ACT CERTIFICATION
5.15 FLEET COMPLIANCE CERTIFICATION
5.16 SURETY DECLARATION FORM
ARTICLE 6 ATTACHMENTS
6.1 DIVISION 00 DOCUMENTS
6.2 GENERAL REQUIREMENT SPECIFICATIONS, DIVISION 01 DOCUMENTS
00 11 19 Request for Proposal (Rev. 07/29/26) Page 4 of 59
ARTICLE 1 PROCUREMENT INFORMATION
1.1 RFP TIMELINE
Below is the County’s timeline for this RFP. This timeline is subject to change at any time. The County will issue an addendum for changes to the pre-proposal conference date, Questions due date, or proposal due date. The actual timing and sequence of events resulting from this RFP shall ultimately be determined by the County.
Event Description Date and Time (San Diego Time)
Pre-Proposal Conference & Job Walk September 3, 2026, at 9:00 a.m.
Questions due September 23, 2026, prior to 5:00 p.m.
Proposals due October 30, 2026, prior to 3:00 p.m.
1.2 PRE-PROPOSAL CONFERENCE
1.2.1 A pre-proposal conference will be held on the Date and Time listed in the timeline at the County Administration Center, 1600 Pacific Highway, Board Chamber (Third Floor, Room 310), San Diego, CA 92101. The County will provide an overview of the RFP process and may provide a program/technical overview and other information. Requests for clarification related to definition or interpretation of this RFP shall be submitted in writing via BuyNet as Questions in accordance with the section titled “Duty to Inquire, Questions, and Explanation to Proposers.” Attendance at the pre-proposal conference is encouraged but not mandatory.
1.2.2 A job walk/site inspection will follow the pre-proposal conference at the Health Services Complex, 3851 Rosecrans Street, San Diego, CA 92110. Attendance at the job walk/site inspection is encouraged but not required.
1.2.3 Information provided by the County, both written and oral, at a pre-proposal conference and job walk/site inspection is non-binding. Written information provided at a pre-proposal conference is not a Contract Document and should not be relied upon by Proposers.
Requests for clarification related to definition or interpretation of this RFP shall be submitted in writing via BuyNet as Questions in accordance with the section titled, “Duty to Inquire, Questions, and Explanation to Proposers.”
1.3 QUESTIONS
1.3.1 Questions regarding this RFP shall be submitted in writing via BuyNet to the Contracting Officer by the Date and Time listed in the timeline, in accordance with the section titled, “Duty to Inquire, Questions, and Explanation to Proposers.” Oral explanations or responses to Questions will not be binding upon the County.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 5 of 59
1.3.1.1 Please be aware that the County has changed its procedure for submitting Questions. In order to see all information related to this RFP, to submit Questions, and to receive notifications of updates, Proposers must select “Participate in RFx” for this solicitation in BuyNet. Questions should be submitted via BuyNet, by sending a message to the Contracting Officer through the “Discussions” functionality in accordance with the section titled, “Duty to Inquire, Questions, and Explanation to Proposers.” Non-Proposers should direct inquiries regarding this solicitation to the Contracting Officer.
1.3.2 Concerns or comments regarding this solicitation should be directed to the Contracting Officer.
1.4 PROPOSAL SUBMITTAL
1.4.1 The County has posted this solicitation on its official BuyNet website at https://sdbuynet.sandiegocounty.gov/. Proposers should go to BuyNet for the most up-to-date information and to submit Questions and proposals. In order to see all information related to this RFP, to submit Questions, and to receive notifications of updates, Proposers must select “Participate in RFx” for this solicitation in BuyNet.
1.4.2 Proposer must submit a complete original proposal in accordance with the format provided in this solicitation to the County of San Diego, Department of Purchasing and Contracting through electronic upload to BuyNet by the Date and Time listed in the timeline.
1.4.3 If Proposer is unable to submit via BuyNet for any reason, Proposer may submit via electronic files on CD/DVD or a printed proposal at the Purchasing and Contracting front desk. If delivering the RFP at the Purchasing and Contracting front desk on the due date, Proposer should plan to arrive early, as parking may be limited. When submitting via BuyNet, allow extra time to submit by an alternate method in the event of technical difficulties.
1.4.4 The County's decision about the timeliness or responsiveness of any submitted document shall be final, and the County has the discretion to waive or not waive any non-material defect or nonconformance.
1.5 BONDING AND INSURANCE
1.5.1 Proposer shall demonstrate a minimum bonding capacity of 100% of the Budget NTE for all Contract Options in response to this RFP.
1.5.2 The selected Proposer shall provide a Payment Bond and Performance Bond as specified in the article titled “Insurance and Bonds” of the General Conditions.
1.5.3 The selected Proposer shall provide insurance as specified in as described in 00 73 16 Insurance Requirements.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 6 of 59
1.5.4 The successful Proposer shall provide Installation Floater/Builders Risk insurance including Acts of God for the total replacement cost of the Project, as described in 00 73 16 Insurance Requirements. (California Public Contract Code § 7105.)
1.6 RETENTION
The County will withhold retention in the amount of 5% of each progress payment. Pursuant to California Public Contract Code § 22300, the successful Proposer may substitute certain securities for funds withheld by County to ensure Proposer/Contractor’s performance under the Contract.
1.7 PREVAILING WAGE COMPLIANCE
1.7.1 The undertaking and accomplishment of this Project is required by State law to comply with the requirements of California Labor Code §§ 1770, et seq. Nothing in this RFP is intended to nor should be interpreted as contravening the provisions of that code.
1.7.2 The Proposer shall be fully knowledgeable of and shall comply with the provisions of California Labor Code § 1770, including the general prevailing wage rate requirements, requirements for subcontracts, and forfeiture penalties.
1.7.3 Department of Industrial Relations Compliance Monitoring and Enforcement:
1.7.3.1 County public works projects are subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR) in accordance with California Labor Code § 1771.4(a)(1). As part of this program, contractors and subcontractors on public works projects are required to be registered with DIR in accordance with California Labor Code § 1725.5. Unregistered contractors are not qualified to bid on, be listed in a bid proposal, listed as a subcontractor, or engage in the performance of any public works contract, all as more particularly described in California Labor Code § 1771.1(a). The successful Contractor shall be required to post the job site with all notices required by regulations per California Labor Code § 1771.4(a)(2), whether or not the County also posts.
1.7.3.2 Pursuant to California Labor Code § 1770, the Director of the DIR has ascertained the general prevailing rate of per diem wages and a general prevailing rate for legal holiday and overtime work for each craft required for execution of the contract.
1.7.3.3 In accordance with California Labor Code § 1773.2, copies of the prevailing rate of per diem wages are on file and can be viewed during normal business hours at the County Department of Purchasing and Contracting, located at 5560 Overland Avenue, Suite 270, San Diego, CA 92123-1294. Contractor shall post a copy of the applicable prevailing wage rates at the job site.
1.7.3.4 Wage rates set forth are the minimum that may be paid by the Contractor.
Nothing herein shall be construed as preventing Contractor from paying more
00 11 19 Request for Proposal (Rev. 07/29/26) Page 7 of 59 than the minimum rates set. No extra compensation whatsoever will be allowed by the County due to the inability of the Contractor to hire labor at minimum rates, nor for necessity for payment by Contractor of subsistence, travel time, overtime, or other added compensations, all of which possibilities are elements to be considered and ascertained to the Contractor’s own satisfaction in preparing its Proposal.
1.7.3.5 If it becomes necessary to employ crafts other than those listed in the General Prevailing Wage Rate, Contractor shall obtain a wage rate determination. The rates thus determined shall be applicable as minimum from the time of initial employment. Contractor shall be responsible for paying the applicable rate.
1.7.3.6 Contractor and each subcontractor shall keep and make available accurate payroll record in accordance with California Labor Code §§ 1771.4(a)(3) and 1776. The record shall contain the names, addresses, social security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor and/or subcontractors in connection with the work. Payroll records shall be certified and shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as those forms. A copy of all payrolls shall be submitted weekly to in accordance with the Contract. Contractor and subcontractors’ certified payroll records shall be available for inspection at the principal office of Contractor, or at the job site should the principal office be located outside of San Diego County.
1.8 LICENSING OF PROPOSER
Unless otherwise provided in the Contract Documents, Contractor shall possess, at the time its Proposal is submitted, at the time the Contract is awarded, and at all times when Work is performed, a valid license in accordance with the provisions of the Contractor’s State License Law (Cal. Bus. & Prof. Code § 7000 et seq.) with the following license classification: Class “B” General Building Contractor.
1.9 VEHICLE EMISSIONS DISCLOSURE & COMPLIANCE REQUIREMENT
All Proposers shall comply with California Air Resources Board (“CARB”) In-Use Off-Road Diesel- Fueled Fleets regulations in California Code of Regulations Title 13, Division 3 ( “Regulation”).
Proposers shall complete the attached Fleet Compliance Certification and, as applicable, submit valid Certificate(s) of Reported Compliance with the Proposal. In responding to this solicitation, it shall be the Proposer’s sole responsibility to evaluate and account for the cost of complying with all vehicle and equipment emissions requirements under this Agreement and applicable law, including the Regulation, in its Proposal.
1.10 NO SUBSTITUTIONS
Pursuant to California Public Contract Code § 3400(c), the County has made findings designating certain materials, products, things, or services by specific brand or trade name. Such findings and
00 11 19 Request for Proposal (Rev. 07/29/26) Page 8 of 59 the materials, products, things, or services and their specific brand or trade names are set forth in the 01 61 10 Products Specified by Brand Name. Proposers shall review the Contract Documents to understand the extent to which the Project incorporates those brand name materials, products, things, or services.
ARTICLE 2 PROJECT OVERVIEW
2.1 PROJECT DESCRIPTION
2.1.1 The Project will be delivered in a Base Scope and, at the County’s discretion, one or more Contract Options. Refer to the section titled, “Contract Options,” within the 00 72 95 General Conditions and the section titled, “Contract Options for Extra Work,” within the 00 52 96 Agreement for additional information.
2.1.2 Base Scope Behavioral Health Wellness Campus
Development of a new Behavioral Health Wellness Campus on approximately 8.24 acres of County-owned property located at 3851 Rosecrans Street in San Diego. The Campus will include approximately 120,000 square feet of new facilities designed to provide a comprehensive continuum of behavioral health services for adults, including outpatient treatment, crisis stabilization, residential substance use treatment, mental health rehabilitation, social rehabilitation, peer support, administrative and operational support functions, and related behavioral health programs.
Associated site improvements, including parking, circulation, landscaping, outdoor therapeutic and recreational spaces, utility infrastructure, signage, lighting, security features, stormwater features and other improvements necessary to support campus operations.
To maintain uninterrupted operation of the adjacent County psychiatric hospital during construction, temporary construction-related improvements and facilities, such as temporary offices, storage containers, utility connections, fencing, parking modifications, and other temporary operational support facilities, all of which will be removed or restored upon completion of construction.
In June 2025, the California Department of Health Care Services (DHCS) released the Behavioral Health Continuum Infrastructure Program (BHCIP) Bond Round 2: Unmet Needs funding opportunity. The County applied for development of the Wellness Campus and on March 11, 2026, received notice of a conditional grant award totaling approximately $99.5 million. The BHCIP Grant Program Funding Agreement (PFA) imposes the following non-negotiable requirements:
• Any BHCIP grant funds not obligated and expended by June 30, 2031, must be returned to the State.
• The Campus must include approximately 118,052 square feet of new facilities.
• The development of the Campus must meet the requirements of Health & Safety Code
§50675.1.5 and Welfare & Institutions Code §5960.31.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 9 of 59
2.1.3 Contract Option 1 Redevelopment of Remaining Property
Redevelopment, renovation, and/or construction of improvements on the remaining approximately 3.4 acres of County property at 3851 Rosecrans Street (“Remaining Property”).
This is subject to availability of funding, compliance with California Environmental Quality Act (CEQA), and receipt of Board of Supervisors’ approval.
Upon County issuance of a notice to proceed with Phase 1 Preconstruction, perform a comprehensive feasibility study to evaluate existing site conditions, facility condition, structural systems, utility infrastructure, operational requirements, code compliance, environmental constraints, historic resource considerations, and opportunities to improve functionality, resilience, sustainability, and long-term asset performance. Develop and evaluate multiple alternatives, including renovation of existing facilities, partial reconstruction, and complete site redevelopment. Prepare conceptual designs, planning-level cost models, schedules, phasing strategies, life-cycle cost analyses, risk assessments, and implementation recommendations.
Upon County’s selection of a preferred alternative, provide complete architectural, engineering, and preconstruction services necessary to advance the Contract Option through final design and permitting. Coordinate a design that supports uninterrupted County operations to the maximum extent practicable.
Upon County issuance of a notice to proceed with Phase 2 Construction, commence with Construction Work and achieve Substantial Completion within the Contract Time.
Proposer is not required to provide a Price Proposal for this Contract Option at this time.
2.2 PURPOSE
To utilize a Progressive Design Build (PDB) process whereby a single contract will be awarded to include preconstruction services and, at County’s option, construction services necessary to deliver the Project. The County may, for example, at its discretion, proceed with construction along with the Design Professionals, but hire a different general contractor to build the Project.
(Please refer to the section titled Contractual Off-Ramp of the 00 56 96 Agreement for additional information.)
2.3 SCOPE OF WORK
Refer to 00 54 13 Scope of Work for additional information.
2.4 BUDGET NOT TO EXCEED
The Budget Not-To-Exceed (Budget NTE) for Base Scope Behavioral Health Wellness Campus of the Progressive Design Build contract is $212,000,000.00. Refer to the Price Proposal(s) for the County’s estimates of Direct Pass-Through Costs, Allowances, and County Controlled Contingency. Refer to the section titled, “Budget Not-to-Exceed” in 00 52 96 Agreement for additional information.
2.5 FIRMS ASSOCIATED WITH PROJECT
00 11 19 Request for Proposal (Rev. 07/29/26) Page 10 of 59
2.5.1 The County of San Diego engaged the following firms to provide design, environmental, and construction documents for this construction procurement:
Bolder Associates 300 Spectrum Center Drive #730 Irvine, CA 92618
O’Connor Construction Management Inc. (OMCI) 2550 Fifth Avenue, Suite 720 San Diego, CA 92103
Carrier Johnson San Diego, 185 F Street, Suite 500 San Diego, CA 92101
Abramson Architects / Moon-Majoras Architects
5171 W. Jefferson Blvd, Los Angeles, CA 90016
Sillman Architects 7515 Metropolitan Dr. Ste. 400 San Deigo, CA 92108
CannonDesign 797 J Street, San Diego, CA 92101
Jones Lang Lasalle (JLL) 4727 Executive Dr. 11th floor, San Diego, CA 92121
Nova Services, Inc.
4373 Viewridge Ave., B, San Diego, CA 92123
BWE, Inc.
9449 Balboa Ave., San Diego, CA 92123
Helix Environmental Planning 7578 El Cajon Blvd., La Mesa, CA 91942
RECON Environmental 3111 Camino Del Rio N. Ste. 600 San Diego, CA 92108
PanGIS, Inc.
8745 Aero Dr. #101, San Diego, CA 92123
TerraPacific Consultants 4010 Morena Blvd. Suite 108, San Diego, CA 92117
Ninyo & Moore 5710 Ruffin Rd.
San Diego, CA 92123
Latitude 33 10731 Treena St., San Diego, CA 92131
KPFF Consulting Engineers 3131 Camino Del Rio N. #1080, San Diego, CA 92108
MA Engineers Inc.
5160 Carroll Canyon Rd., San Diego, CA 92121
The Dry Utility Group, Inc.
PO BOX 1292
San Marcos, CA 92079
Chicago Title 2365 Northside Dr. Suite 600 San Diego, CA 92108
Cumming Group 15010 Avenue of Science Suite 100 San Diego, CA 92128
00 11 19 Request for Proposal (Rev. 07/29/26) Page 11 of 59
Project Management Advisors, Inc.
420 Stevens Ave., #170 Solana Beach, CA 92075
BNBuilders 5825 Oberlin Dr. #1 San Diego, CA 92121
Kitchell Contractors, Inc.
9915 Mira Mesa Blvd. #300 San Diego, CA 92231
AECOM
401 W A St. Unit 1200 San Diego, CA 92101
2.5.2 The firms noted above have been associated with this Project and are provided for informational purposes only. This information is not intended to be relied on for purposes of compliance with any conflict-of-interest rules or applicable laws or regulations affecting this Project. The Proposer is solely responsible for due diligence in identifying and avoiding all potential conflicts of interest related to contracting for, and construction of, this Project.
ARTICLE 3 RFP INSTRUCTIONS AND RULES
3.1 RFP PROCESS
3.1.1 RFPs shall normally be made available on the County of San Diego’s BuyNet Website at https://sdbuynet.sandiegocounty.gov. If you are unable to download this document, you may request a hard copy from Purchasing and Contracting’s front desk or contact clerical support at (858) 505-6367.
3.1.2 To the extent required by California Public Contract Code § 20103.7, upon request from a contractor plan room service, the County shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room service.
3.1.3 The County reserves the right to host pre-proposal conference(s). If scheduled, the date, time, and location for the pre-proposal conference(s) will be as set forth in this RFP or as otherwise provided on BuyNet.
3.1.4 Proposers must submit all Questions by the due date and time specified herein.
3.1.5 Proposals received, including any additions, revisions, and clarifications, will be evaluated by a Source Selection Committee (SSC) appointed by a Source Selection Authority(s)
(SSA).
3.1.6 If, at any point in the selection process, the County determines that a proposal will no longer be considered for award, the Contracting Officer will attempt to notify the Proposer.
3.1.7 During the selection process, the SSA may determine that a Proposer’s proposal is no longer in the competitive range and that it will no longer be considered for award.
3.1.8 The County reserves the right to request clarification and/or additional information from Proposers. The Contracting Officer will determine the appropriate means of clarification, 00 11 19 Request for Proposal (Rev. 07/29/26) Page 12 of 59 which may include telephonic, email, letter, presentations, oral interviews, or as an addendum or revision to the proposal. The County is not obligated to seek clarification, so Proposers are advised to submit complete and accurate information in the proposal.
3.1.9 The County may invite one, some, or all Proposers to make a presentation to, or participate in interviews with, the County at a date, time and location determined by the County.
3.1.10 At any point in the selection process, the SSA may authorize discussions to be held with one or more Proposers in the competitive range. Discussions may include, without limitation, requests for revised proposals, Best and Final Offers (BAFOs), interviews, presentations, or addenda to the proposal, and may contain additional selection factors.
3.1.11 The SSC may recommend to the SSA that award be made to one or more Proposers.
3.1.12 After receipt and approval of the SSA’s decision, the Contracting Officer will post a Notice of Intent to Award.
3.1.13 Upon Posting of the Notice of Intent to Award (NOI) a contract to the Proposer(s) whose proposal(s) has been ranked highest by the County on the basis of best value to the County, the Contracting Officer may enter into contract finalization negotiations and, upon the successful completion, award a contract(s).
3.1.14 The County may rescind or modify the NOI at any time for any reason or for no reason.
3.1.15 The County may, at any time, restart evaluations, modify or replace the membership of the SSC, or correct any deficiencies in the procurement process or evaluation.
3.1.16 The County, in its sole discretion, shall determine the timing and sequence of events described in this RFP.
3.1.17 In the event that a Proposer is involved in a merger, acquisition, or other change in control, the County reserves the right to award a contract to a resulting entity.
3.1.18 All proposals become the property of the County. A Proposer may request the return of its proposal upon withdrawal as specified in the section titled, “Late, Modified, or Withdrawn Proposal,” which return County may grant or deny in its sole discretion.
3.1.19 The County has the right to withhold all information regarding this procurement until after contract award, including but not limited to: the number of proposals received; identity of Proposer(s); content of proposals; the County evaluation and results; and the identity of the members of the SSC. Information releasable after award is subject to the disclosure requirements of the Public Records Act, California Government Code § 7920.000 and following.
3.2 INSTRUCTIONS FOR SUBMITTING A PROPOSAL
00 11 19 Request for Proposal (Rev. 07/29/26) Page 13 of 59
3.2.1 It is the Proposer’s responsibility to submit a proposal based on the most current RFP, addenda thereto, responses to Questions, any Information Available to Proposers, and any other information posted on BuyNet. Proposers must consistently check BuyNet for information and must comply with anything posted on BuyNet relating to this RFP. The County has no obligation to contact Proposers directly with any such RFP-related information.
3.2.1.1 In order to see all information related to this RFP, to submit Questions, and to receive notifications of updates, Proposers must select “Participate in RFx” for this solicitation in BuyNet.
3.2.2 Proposers shall submit one original proposal prior to the date and time specified and through the means specified in the section titled, “Proposal Submittal.”
3.2.3 When requested, Proposer shall submit additional copies of the proposal in the manner requested. Copies should be clearly marked as copies and numbered.
3.2.4 For proposals submitted electronically through BuyNet, the time on the BuyNet server shall be considered the official time for purposes of determining timely submittal. For proposals submitted at the Purchasing and Contracting front desk, the time stamp at the front desk shall be considered official time for purposes of determining timely submittal.
3.2.5 In the event of multiple submittals of an original proposal by a Proposer, the County will only consider the most recent submittal submitted by the due date and time. The County will not review or consider previous submittals, whether submitted at the front desk or through BuyNet. Proposers are strongly encouraged to submit only one original proposal and withdraw or replace any previous submittals in the event they choose to update their proposal. Proposals may be found non-conforming if the County is unable to determine which is the most recent, timely submittal.
3.2.6 All signatures required by this RFP shall be signed by an authorized officer or employee of the Proposer. Scanned images of pages containing original signatures are acceptable for submission of an electronic file. Electronic or digital signatures will not be accepted.
3.2.7 The proposal must be submitted in compliance with the following format, unless otherwise specified in this RFP:
3.2.7.1 Submit electronic proposals as files in .pdf format. Separate each exhibit into one or more files. Clearly name files as to the exhibit and order. Other pages may be scanned or converted to .pdf from other file formats. Converted and searchable formats are preferred.
3.2.7.2 Proposals shall be formatted to print on 8-1/2” x 11” page size with no less than ½” margins and eleven (11) point font. Proposals may include 11”x17” page sizes where required by this RFP.
3.2.7.3 Pages shall be consecutively numbered within the bottom or top margin of each
00 11 19 Request for Proposal (Rev. 07/29/26) Page 14 of 59 page, including attachments.
3.2.7.4 Each proposal shall be typed and be concise but comprehensive. Proposals shall not include unnecessarily elaborate brochures, visual or other presentations, or artwork beyond what is sufficient to present a complete and effective proposal.
3.2.7.5 Proposers shall submit one file for Forms, Qualifications, Price Proposal, and Proposal Attachments. If applicable, Proposers shall submit a second file with Section 5 - Confidential/Proprietary Exhibit components of their proposal.
3.3 PROPOSAL ORGANIZATION
3.3.1.1 Cover Page signed by an authorized officer or employee
3.3.1.2 A Table of Contents listing, by page number, the contents of the proposal.
3.3.1.3 Section 1 – Qualifications
3.3.1.3.1 Essential Requirements
3.3.1.3.2 Safety Record
3.3.1.3.3 Experience of Proposer
3.3.1.3.4 Experience of Personnel
3.3.1.4 Section 2 – Project Information
3.3.1.4.1 Project Plan
3.3.1.4.2 Price Proposal
3.3.1.4.3 Work Breakdown Structure
3.3.1.5 Section 3 – Forms
3.3.1.5.1 PC 600 Form
3.3.1.5.2 Representations and Certifications Form
3.3.1.5.3 Proposer Information Form
3.3.1.5.4 Listed Subcontractors Form
3.3.1.5.5 Disclosure Requirement to Listed Subcontractors Forms
3.3.1.5.6 Self-Performed Work Form
00 11 19 Request for Proposal (Rev. 07/29/26) Page 15 of 59
3.3.1.5.7 Non-Collusion Declaration
3.3.1.5.8 Iran Contracting Act Certification
3.3.1.5.9 Fleet Compliance Certification
3.3.1.5.10 Surety Declaration Form, Notarized
3.3.1.5.11 Authorization for Release of Information and Waiver of Liability for References
3.3.1.5.12 Contract Terms and Conditions Form and, if applicable, a description of issues with Contract Documents
3.3.1.6 Section 4 – Proposal Attachments
3.3.1.6.1 Licenses for Proposer, Design Professionals, and Listed Subcontractors
3.3.1.6.2 Evidence of Current Registration with Department of Industrial Relations (DIR) for Proposer and Listed Subcontractors
3.3.1.6.3 Evidence of General Liability Insurance Coverage, Professional Liability Insurance Coverage, and Workers’ Compensation Coverage
3.3.1.6.4 Statement by Workers’ Compensation insurance carrier verifying periods of workers’ compensation insurance coverage for the last five years
3.3.1.6.5 Evidence of Financial Strength
3.3.1.6.6 Letter from Surety Insurer
3.3.1.6.7 Organizational Documents or Agreement Committing to Form the Organization
3.3.1.6.8 Contractor Assessment Reports, if any
3.3.1.6.9 Any other required information.
3.3.1.7 Section 5 – Confidential/Proprietary Exhibit (if applicable).
3.3.1.7.1 Confidential/Proprietary Exhibit
3.3.1.7.2 Completed and signed Nondisclosure Indemnification Agreement
3.4 EVALUATION AND SELECTION
00 11 19 Request for Proposal (Rev. 07/29/26) Page 16 of 59
3.4.1 The County will evaluate proposals in accordance with the article titled, “Evaluation Criteria,” and the Submittal Items.
3.4.2 The County has the discretion, but not the obligation, to construe any submission as non-conforming and ineligible for consideration if it does not conform to the requirements of the Request for Proposals. The County shall also have the discretion to waive any non-material irregularities or deviations from the requirements of the Request for Proposals in any submission.
3.4.3 The County may consider information known to the County in addition to the information provided in response to the RFP.
3.4.4 When evaluating Proposer’s proposal, the County may consider the environmental impact of proposed products and delivery of services. For more information, Proposers shall refer to the Board of Supervisors Policy B-67, Environmentally Preferable Procurement.
Proposers are encouraged to include such information in their proposals.
3.4.5 When evaluating a Proposer’s pricing, the County may also consider the effect of the proposal on the overall total cost to the County.
3.5 DEFINITIONS
Capitalized terms used herein, but not defined herein, have the definitions provided in 00 72 95 General Conditions.
3.6 COUNTY COMMITMENT
3.6.1 This RFP does not commit the County to award a Contract. Nor does the RFP commit the County to pay any cost incurred in the submission of a proposal or in making necessary studies or designs for the preparation thereof. Further, no reimbursable cost may be incurred in anticipation of or prior to contract execution.
3.6.2 The County reserves the right to accept or reject any or all proposals received as a result of this RFP or to separately procure the same or similar goods or services.
3.6.3 The County reserves the right to terminate this RFP in part or in its entirety at any time prior to contract execution.
3.6.4 No prior, current, or post award communication with any officer, agent, or employee of the County shall affect or modify any terms or obligations of this RFP except as explicitly provided for in this RFP.
3.7 LATE, MODIFIED, OR WITHDRAWN PROPOSAL
3.7.1 A proposal that is received but that is not received at the office or by the electronic means designated in the RFP by the time specified for receipt will not be considered unless:
00 11 19 Request for Proposal (Rev. 07/29/26) Page 17 of 59
3.7.1.1 The proposal is received before award is made;
3.7.1.2 The County determines that it is in its best interest to accept the proposal; and either
3.7.1.2.1 The proposal was sent by mail or personal delivery and the County determines that the late receipt was due solely to mishandling by the County after receipt by the County; or
3.7.1.2.2 No timely and conforming proposal was submitted.
3.7.2 Proposals may not be modified after the due date, except when the Contracting Officer requests a revised proposal or Best and Final Offer (BAFO) or issues an addendum to the proposal so permitting.
3.7.3 Proposals may be withdrawn by written notice signed by a duly authorized representative of Proposer if received prior to time and date proposals are due.
3.7.4 Proposals constitute firm offers, subject to negotiation, that shall remain open and may not be revoked, withdrawn, or modified for a period of six months from the time and date proposals are due.
3.7.5 Any request to withdraw a proposal after time and date proposals are due must be made in accordance with California Public Contract Code § 5100 et seq. and must be submitted in writing within five (5) working days of the time and date proposals are due specifying in detail the basis for request for withdrawal.
3.8 INFORMATION AVAILABLE TO PROPOSERS
3.8.1 Non-Sensitive Information Available to Proposers is posted on BuyNet. Sensitive Information Available to Proposers, if any, may be obtained from the Contracting Officer upon execution and delivery of a Nondisclosure Agreement (NDA), which may be obtained from the Contracting Officer.
3.8.2 County, its agents, advisors, and representatives make no representation or warranty, express or implied, as to the accuracy or completeness of any Information Available to Proposers. Without limiting the generality of the foregoing, the Information Available to Proposers may include certain statements, estimates, and projections provided by or with respect to the County. Such statements, estimates, and projections reflect various assumptions made by the County, which may or may not prove to be correct. No representations are made by the County as to the accuracy of such statements, estimates, projections, or assumptions.
3.8.3 Proposers are encouraged take the necessary actions to verify measurements, conditions, and other attributes of the site(s) during a site visit. The Selected Proposer(s) shall not be entitled to any adjustment of the Contract Sum in the event of a discrepancy that was discovered or should have reasonably been discovered during the site visit.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 18 of 59
3.8.4 Proposers shall become fully informed regarding all existing and expected conditions and matters which could affect any Work or performance of any Work in any way, and especially the cost of performing any Work. Proposers shall investigate the site, all public records applicable to the Project, and Contract Documents before submitting their proposals. The County has no duty to disclose information that is reasonably available or that the County has provided Proposer with opportunity to discover.
3.8.5 Any failure to fully investigate the site or the conditions mentioned in the previous paragraph shall not relieve Proposer from responsibility for estimating the difficulty or cost of successfully performing any Work. Neither the County nor any of its representatives or agents assume any responsibility for any understanding or representation not in the Contract Documents with respect to the site, surface, and subsurface conditions made by County or any of its representatives or agents prior to the execution of the Agreement pursuant to the Contract Documents.
3.8.6 Refer to the section titled, “Information Available to Proposers,” in 00 72 95 General Conditions, for additional information.
3.9 DUTY TO INQUIRE, QUESTIONS, AND EXPLANATION TO PROPOSERS
3.9.1 Should a Proposer find discrepancies in or omissions from, or be in doubt as to the meaning of, the RFP or related documents, Proposer must immediately notify the County.
Such notifications or other requests for explanation regarding the RFP or related documents shall be directed to the Contracting Officer in writing as a question (“Question”).
3.9.2 In order to see all information related to this RFP, to submit Questions, and to receive notifications of updates, Proposers must select “Participate in RFx” for this solicitation in BuyNet. Questions should be submitted through BuyNet by sending a message to the Contracting Officer using the “Discussions” functionality. Proposer is responsible for ensuring that Questions are received by the County. The County may choose not to respond to Questions received after the due date for Questions listed herein.
3.10 PROTEST PROCEDURE
3.10.1 County Board of Supervisors Policy A-97, Protest Procedures for Award of Contracts, sets forth the procedures for filing and resolving protests related to this RFP. Board Policy A- 97 is available from the Clerk of the Board, 1600 Pacific Highway, San Diego, CA 92101, or on the internet at https://codelibrary.amlegal.com/codes/san_diego/latest/overview.
3.10.2 All protests must be filed in accordance with Board Policy A-97, which requires among other things that a protest must be filed timely, be submitted in writing to the Contracting Officer identified in the solicitation package, and be based on a protestable action and established grounds for protest.
3.11 DEBRIEF AND REVIEW OF CONTRACT FILES
https://codelibrary.amlegal.com/codes/san_diego/latest/overview
00 11 19 Request for Proposal (Rev. 07/29/26) Page 19 of 59
3.11.1 Proposer may request a “debriefing” from the Contracting Officer on the findings about Proposer’s proposal (with no comparative information about proposals submitted by others) after Proposer has been notified by the Contracting Officer that the Proposer’s proposal is no longer being considered for award.
3.11.2 After contract execution, the proposals, the Source Selection Committee Report, and any other releasable documents may be reviewed. Copies of any documents desired by the requestor will be prepared at the requestor’s expense in accordance with current County rates for such copies.
3.12 PROPOSER COMMUNICATIONS
3.12.1 All communications from the Proposer (including Proposer’s employees, agents, and representatives) to the County or the County’s officers and employees (including consultants working on or assisting with this procurement) related to this RFP or the Proposer’s proposal must be directed in writing exclusively to the Contracting Officer, unless otherwise authorized in writing by the Contracting Officer. The County, in its sole discretion, may eliminate the Proposer from consideration for contract award for any improper contact.
3.12.2 If Proposer issues any public announcement or otherwise engages in communication that, in the County’s sole determination, compromises the integrity of this RFP process or attempts to restrain competition, Proposer may be removed from consideration for award.
3.12.3 Audio and/or video recording of pre-proposal conferences, presentations, discussions, negotiations, debriefings, or other communications with the County regarding this RFP are prohibited, unless specifically authorized in writing by the Contracting Officer.
3.13 CLAIMS AGAINST THE COUNTY
Neither Proposer nor any of its representatives shall have any claims whatsoever against the County or any of its respective officials, agents, or employees arising out of or relating to this RFP or these procedures (other than those arising under a definitive contract with Proposer in accordance with the terms thereof).
3.14 SOLICITING EMPLOYEES
Until contract award, Proposers shall not, directly or indirectly, solicit any employee of the County to leave the County’s employ in order to accept employment with the Proposer, its affiliates, actual or prospective contractors, or any person acting in concert with the Proposer, without prior written approval of the County’s Contracting Officer. This paragraph does not prevent the employment by a Proposer of a County employee who has initiated contact with the Proposer.
3.15 PROHIBITED CONTRACTS
3.15.1 In accordance with § 67 of the San Diego County Administrative Code, the County shall not contract with and shall reject any bid or proposal submitted by the person or entities specified below, unless the Board of Supervisors finds that special circumstances exist which justify the approval of such contract:
00 11 19 Request for Proposal (Rev. 07/29/26) Page 20 of 59
3.15.1.1 Persons employed by the County or public agencies for which the Board of Supervisors is the governing body;
3.15.1.2 Profit making firms or businesses in which employees described in § 3.15.1.1 serve as officers, principals, partners or major shareholders;
3.15.1.3 Persons who, within the immediately preceding twelve (12) months, came within the provisions of § 3.15.1.1, and who (1) were employed in positions of substantial responsibility in the area of service to be performed by the contract, or (2) participated in any way in developing the contract or its service specifications; and
3.15.1.4 Profit-making firms or businesses in which the former employees described in § 3.15.1.3 serve as officers, principals, partners or major shareholders.
3.15.2 Proposer certifies it is not a person or entity specified above and that it will promptly notify the County in the event it becomes a person or entity specified above.
3.16 PUBLIC CONTRACT CODE COMPLIANCE
The undertaking and accomplishment of this Project is required by State law to comply with the requirements of California Public Contract Code §§ 22185, et seq. Nothing in this RFP is intended to nor should be interpreted as contravening the provisions of the Public Contract Code. The Proposer shall be fully knowledgeable of and shall comply with the provisions of California Public Contract Code §§ 22185, et seq., including bidding and subcontracting requirements.
3.17 CALIFORNIA REVENUE AND TAXATION CODE § 18662
3.17.1 In compliance with California Revenue and Taxation code § 18662, if Proposer is a non-resident of California (out-of-state invoices) that receives California source income and has not completed FTB Form 590, there may be a backup withholding on all payments.
Fifteen (15) business days prior to the first payment, new suppliers or suppliers with expired forms or forms with incorrect information must submit new forms to the County (forms are available from the Franchise Tax Board website listed below).
3.17.2 Under certain circumstances, Proposers may be eligible for reduced or waived nonresident withholding. If Proposer has already received a waiver or a reduced withholding response from the State of California and the response is still valid, Proposer should submit the response to the County in lieu of the forms. Failure to submit the required forms will result in withholding of payments. Proposers should to the Franchise Tax Board websites (listed below) for tax forms and information on non-resident withholding, including waivers or reductions. The County will not give Proposers any tax advice. It is recommended that Proposers speak with their tax advisers and/or the State of California for guidance. Franchise Tax Board Websites:
00 11 19 Request for Proposal (Rev. 07/29/26) Page 21 of 59
3.17.2.1 https://www.ftb.ca.gov
3.17.2.2 https://www.ftb.ca.gov/forms/Search/Home/FormRequest/1619
3.17.2.3 https://www.ftb.ca.gov/forms/search/
3.17.3 If selected for award, the Proposer is to submit forms to the Auditor & Controller via fax at
(858) 694-2060 or mail originals to: County of San Diego, 5530 Overland Avenue, Suite 410, San Diego, CA 92123. The P.O. Number or Contract Number (if available) and “California Revenue and Taxation Code Section 18662” must appear on fax cover sheet and/or the outside of the mailing envelope.
3.18 W-9 FORM
If selected for award, the Proposer must complete and submit a W-9 form if a current form is not on file with the County.
3.19 ORGANIZATIONAL CONFLICT OF INTEREST POLICY FOR DESIGN BUILD
PROJECTS
3.19.1 Pursuant to California Public Contract Code § 22185.2, the County has adopted an organizational conflict of interest policy for design-build projects, available at https://www.sandiegocounty.gov/content/sdc/purchasing/policies.html
3.19.2 The Proposer shall be thoroughly knowledgeable of and comply with said policy.
3.20 COMMITMENT TO USE A SKILLED AND TRAINED WORKFORCE
Per California Public Contract Code § 22185.3(b), the Proposer shall not be evaluated for selection unless the Proposer provides an enforceable commitment to the County that the Proposer and its subcontractors at every tier will use a skilled and trained workforce to perform all Work on the Project or Contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with California Public Contract Code Chapter 2.9 (commencing with § 2600) of Part 1. Consequently, the Proposer, by submitting its proposal to the County, agrees that, if selected, Proposer and its subcontractors at every tier will comply with the requirements of California Public Contract Code § 22185.3(b) and that the Proposer will provide the County with evidence, on a monthly basis while the Project is being performed, that the Proposer and its subcontractors are complying with the requirements of California Public Contract Code § 22185.3(b).
3.21 DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the California Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to § 1777.1 or § 1777.7 of the California Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred https://www.ftb.ca.gov/ https://www.ftb.ca.gov/forms/Search/Home/FormRequest/1619 https://www.ftb.ca.gov/forms/search/ https://www.sandiegocounty.gov/content/sdc/purchasing/policies.html
00 11 19 Request for Proposal (Rev. 07/29/26) Page 22 of 59 subcontractor by the Contractor shall be returned to County. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor used on the Work. (Refer to California Public Contract Code § 6109.)
3.22 SUBCONTRACTORS, SUPPLIERS, AND OTHERS
3.22.1 Proposer’s attention is directed to California Public Contract Code § 4100 et seq.