_Pricing_Document__148-25_pricing.xlsx
XLSX spreadsheet 134 KB Posted
- Attached to
- Competitive Selection OH|DOT14825-3
- Contract number
- DOT14825-3
- Issued by
- Ohio
About this file
This document is a comprehensive pricing sheet for a multiple-award contract (Contract 148-25) for Traffic Signal and Intelligent Transportation Systems (ITS) Equipment Installation, specifically designed for the Ohio Department of Transportation (ODOT). The contract covers pricing for various services across 12 ODOT districts, with vendors able to submit pricing for individual items and locations.
The contract encompasses an extensive range of services including detector loop installation, radar and video detection systems, pedestrian pushbuttons, wire and messenger wire installations, controller unit and GPS timeclock installations, traffic signal power services, signal head furnishing and installation, maintenance of traffic procedures, utility locates, conduit and infrastructure work, and emergency support services. Pricing is structured with standard, rush, and expedited completion options, and includes provisions for different equipment types, installation scenarios, and specific technical requirements. The document provides a granular pricing matrix that allows for precise cost estimation across multiple districts and service types, with an hourly rate of $170.00 for ITS and Signal Asset Collection services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standard Wage Pricing New
| 148-25 TRAFFIC SIGNAL & ITS EQUIPMENT INSTALLATION PRICING | ||||
| Vendor Name: | ||||
| This is a multiple award contract. Vendors may submit pricing for any of the items and locations below. | ||||
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 1 | Furnish and Install Detector Loop, Powerhead. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 2 | Furnish and Install Detector Loop, Angular Design Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 3 | Furnish and Install Loop Detector Lead-In Cable | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 4 | Loop Detector Tie In | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 5 | Install Stop Line Radar Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 6 | Install Advance Radar Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 7 | Install Video Detection System. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 8 | Furnish and Install Accessible Pedestrian Pushbutton. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 9 | Furnish and Install Tether Wire, with Accessories (Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 10 | Furnish and Install Tether Wire, with Accessories (Non-Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 11 | Furnish and Install Messenger Wire, with Accessories (Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 12 | Furnish and Install Messenger Wire, with Accessories (Non-Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 13 | Unlash and Relash Messenger Wire | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 14 | Raise Span and Tether Wire | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 15a | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Siemens Model 2070LX with SEPAC software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15b | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Siemens Model M60, TS-2 Type 2 with SEPAC software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15c | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Cobalt TS-2 Type 2 with EOS software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15d | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Econolite Rackmount Cobalt with EOS software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15e | Install only GPS timeclock | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 16 | Install Cabinet (traffic) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 17 | Install traffic signal power service | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 18a | Furnish and replace UPS batteries | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 18b | Furnish and replace an Uninterruptible Power Supply | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 19a | Furnish and Install Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19b | Furnish and Install Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19c | Realign Existing Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19d | Realign Existing Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19e | Remove Existing Signal Head | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19f | Furnish and Install Auxillary Output File in a Caltrans 332 or 336 cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19g | Configure Cabinet for Operation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 20a | Furnish and Install Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20b | Furnish and Install Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20c | Realign Existing Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20d | Realign Existing Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20e | Remove Existing Signal Head | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20f | Furnish and Install Auxillary Output File in a Caltrans 332 or 336 cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20g | Configure Cabinet for FYA Operations | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 21 | 2-Way Stop to All-Way Stop Conversion | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 22 | Conversion of Overhead Flasher to 2-Way or All-Way Stop | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 23 | Signal Inspection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 24a | Furnish and remove/ replace CCTV Lowering Units | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 24b | Remove/ replace CCTV Lowering Units (Install Only) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 25 | Furnish and install fiber optic cable, 24 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 26 | Furnish and install fiber optic cable, 72 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 27 | Furnish and install tracer wire | Feet | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 28 | Furnish and install type 1 communication cable markers: Cottmark 511, Frick Flexpost, or Carsonite Curv-Flex Marker | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 29 | Furnish and install type 2 communication cable markers: Cott Bigfink, Frick Testpost, or Rhinodome Test Station | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 30 | Troubleshoot and find cause of fiber optic issues | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 31 | Furnish and install fiber termination panel, 24 fiber | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 32 | Furnish and install fiber termination panel, 72 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 33a | Furnish and install a 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33b | Furnish and install a 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33c | Furnish and deliver a 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33d | Furnish and deliver a 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33e | Install Only an ODOT provided 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33f | Install Only an ODOT provided 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33g | Remove and dispose a 70' concrete camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33h | Remove and deliver a 70' concrete camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33i | Remove and dispose a 70' concrete camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33j | Remove and deliver a 70' concrete camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33k | Remove and dispose a 70' steel camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33l | Remove and deliver a 70' steel camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33m | Remove and dispose a 70' steel camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33n | Remove and deliver a 70' steel camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33o | Concrete Camera Pole Wrapping, Furnish and Install | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33p | Concrete Camera Pole Wrapping, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 34a | Move an existing power service to a new pole | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34b | Furnish and install a new disconnect switch on an existing power service | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34c | Furnish and install a step-down transformer rack | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34d | Furnish and install power service, ground mounted (120/ 240 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34e | Furnish and install power service, pole mounted (120/ 240 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34f | Furnish and install power service, ground mounted (240/ 480 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34g | Furnish and install power service, pole mounted (240/ 480 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34h | Furnish and install power service to nearby cabinet by utilizing unused leg of nearby 120/240V service. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34i | Furnish and install power service tied into existing highway lighting control center. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34j | Furnish and install power service meter base and conduit riser replacement | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34k | Install Only ODOT provided meter base | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34l | Install Only ODOT provided meter base and disconnect | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34m | Remove and dispose a power service pole and equipment | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 35 | Furnish and install an Intelight model 2070LDX controller unit with ramp metering software Maxtime 2.0.11 or newer | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 36 | Furnish and install a ramp meter pedestal with T-base with signal heads | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 37a | Furnish and install a 334 Ramp Meter Cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 37b | Install Cabinet (ITS) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 38a | Remove and dispose of an entire ramp meter site | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 38b | Remove an entire ramp meter site and deliver select components to ODOT | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 39 | Remove a pedestal pole with equipment and dispose | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 40 | Remove a pedestal pole with equipment and deliver to ODOT | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 41 | Remove a truck parking sign with equipment and dispose | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 42 | Remove a truck parking sign with equipment and deliver to ODOT | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 43 | Remove a truck parking sign with equipment and dispose sign but deliver cabinet & electrical components to ODOT | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 44a | Fiber Optic Cable Install Only | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 44b | Pushable/Blowable Fiber Optic Cable Install Only | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 45a | Install one 10mm/8mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 45b | Install one 10mm/8mm micro-duct with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 45c | Install two 10mm/8mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 45d | Install two 10mm/8mm micro-ducts with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 45e | Install four 10mm/8mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 45f | Install four 10mm/8mm micro-ducts with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 46a | Furnish and install one 10mm/8mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 46b | Furnish and install one 10mm/8mm micro-duct with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 46c | Furnish and install two 10mm/8mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 46d | Furnish and install two 10mm/8mm micro-ducts with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 46e | Furnish and install four 10mm/8mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 46f | Furnish and install four 10mm/8mm micro-ducts with Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 47a | Install one 14mm/10mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 47b | Install one 14mm/10mm micro-duct and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 47c | Install two 14mm/10mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 47d | Install two 14mm/10mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 47e | Install four 14mm/10mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 47f | Install four 14mm/10mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 48a | Furnish and install one 14mm/10mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 48b | Furnish and install one 14mm/10mm micro-duct and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 48c | Furnish and install two 14mm/10mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 48d | Furnish and install two 14mm/10mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 48e | Furnish and install four 14mm/10mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 48f | Furnish and install four 14mm/10mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 49a | Install one 22mm/16mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 49b | Install one 22mm/16mm micro-duct and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 49c | Install two 22mm/16mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 49d | Install two 22mm/16mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 49e | Install four 22mm/16mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 49f | Install four 22mm/16mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 50a | Furnish and install one 22mm/16mm micro-duct through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 50b | Furnish and install one 22mm/16mm micro-duct and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 50c | Furnish and install two 22mm/16mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 50d | Furnish and install two 22mm/16mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 50e | Furnish and install four 22mm/16mm micro-ducts through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 50f | Furnish and install four 22mm/16mm micro-ducts and Tracer Wire through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| 51a | MICRO-DUCT PATHWAY, 4 CELL 14/10, INSTALLATION ONLY | Each | Standard |
| Rush | |||
| Expedited | |||
| 51b | MICRO-DUCT INNERDUCT, 10/8, INSTALLATION ONLY | Foot | Standard |
| Rush | |||
| Expedited | |||
| 51c | MICRO-DUCT INNERDUCT, 14/10, INSTALLATION ONLY | Foot | Standard |
| Rush | |||
| Expedited | |||
| 51d | CONDUIT, 4", MULTICELL, HDPE WITH 4 - 1” INNERDUCTS, INSTALLATION ONLY | Foot | Standard |
| Rush | |||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 52a | Remove and dispose a Dynamic Message Sign | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52b | Remove and deliver a Dynamic Message Sign | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52c | Remove and dispose a DMS truss structure | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52d | Remove and deliver a DMS truss structure | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52e | Remove and dispose a DMS pedestal structure | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52f | Remove and deliver a DMS pedestal structure | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52g | Remove and dispose a ground mounted DMS and associated Beams | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52h | Remove and deliver a ground mounted DMS and associated Beams | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52i | Install a DMS on an existing support, including all power and comm wiring needed (also ODOT provided) from the ITS cabinet to the DMS. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 52j | Erect extrusheet sign onto existing structure | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 53a | 60 Ft Extra Heavy Tilt Tower, Installation only, as per plan & Instructions | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 53b | Extra heavy duty steel tube foundation, installation only, as per plan | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 54a | Remove and reerect a pole up to 30' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54b | Remove and dispose a pole up to 30' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54c | Remove and deliver a pole up to 30' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54d | Remove and reerect a pole up to 40' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54e | Remove and dispose a pole up to 40' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54f | Remove and deliver a pole up to 40' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54g | Remove and reerect a pole up to 50' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54h | Remove and dispose a pole up to 50' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54i | Remove and deliver a pole up to 50' | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54j | Reinstall knocked down or leaning Pole on an existing foundation with minor repair (height up to 30 ft or less) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 54k | Reinstall knocked down or leaning Pole on an existing foundation with minor repair (height up to 50 ft) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 54l | Pick up and install a Pole on an existing foundation (height up to 60 ft) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 54m | Pick up and install a Pole on an existing foundation (height up to 70 ft) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 54n | Pick up and install a Pole on an existing foundation (height up to 80 ft) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 54o | Furnish and install a 35 ft. wood pole | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54p | Strain Pole, Type TC-81.11, Design 10, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54q | Strain Pole, Type TC-81.11, Design 12, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54r | Signal Support, TC-81.22, Design 2, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54s | Signal Support, TC-81.22, Design 12, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54t | Signal Support, TC-81.22, Design 14, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54u | Signal Support, TC-81.22, Design 2 Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54v | Signal Support, TC-81.22, Design 10 Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54w | Signal Support, TC-81.22, Design 12 Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54x | Strain Pole, Type TC-81.11, Design 10, Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54y | Strain Pole, Type TC-81.11, Design 12, Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 54z | Install only rotating base | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 55a | PULL BOX, 725.08, 18", INSTALLATION ONLY | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55b | PULL BOX, 725.08, 24", INSTALLATION ONLY | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55c | 32" ITS PULL BOX, INSTALLATION ONLY | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55d | 32" ITS PULL BOX WITH PAD, INSTALLATION ONLY | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55e | PULL BOX REMOVED AND REPLACED | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55f | PULL BOX, MISC.: CONCRETE MOW PAD PER ITS-14.11 | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55g | Ground Rod | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55h | Pedestal Foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55i | Light Pole Foundation, Misc.: Up to 70 FT CCTV Pole | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55j | Repair a light pole or pedestal foundation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55k | Remove a concrete foundation to a minimum of 1’ below grade | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 55l | ITS CONTROLLER WORK PAD | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
1 2 3 4 5 6 7 8 9 10 11 12
| 56 | Troubleshooting underground and above ground circuitry problem | Each | Standard |
| Rush | |||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 57 | Emergency bucket truck/ crane and personnel | Day | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 58 | ITS and Signal Asset Collection | Hour | Standard | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 |
| Rush | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | |||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 59 | Install device attached to existing support | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 60 | Install cable pulled through existing infrastructure | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 61a | OUPS Utility Locates - 250' Radius | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 61b | OUPS Utility Locates - 500' Radius | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 61c | OUPS Utility Locates - 1000' Radius | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 62a | Repair existing conduit | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62b | CONDUIT, 2", 725.051, FURNISH AND INSTALL | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62c | CONDUIT, 3", 725.051, FURNISH AND INSTALL | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62d | CONDUIT, 2", 725.051, INSTALLATION ONLY | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62e | CONDUIT, 3", 725.051, INSTALLATION ONLY | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62f | CONDUIT, 2", 725.052, FURNISH AND INSTALL | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62g | CONDUIT, 2", 725.052, INSTALLATION ONLY | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 62h | Trench, 30" Deep | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 63 | Maintenance of Traffic, One Lane Closure on a Two Lane Highway | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 64 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Divided Highway | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 65 | Maintenance of Traffic, One Lane Closure on a Multi-Lane Undivided Highway | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 66 | Maintenance of Traffic, Lane Closure on the Near Side of an Intersection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 67 | Maintenance of Traffic, Lane Closure on the Far Side of an Intersection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 68 | Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 69 | Maintenance of Traffic, Multiple Lane Closures at an Intersection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 70 | Maintenance of Traffic, Closure at the Side of an Intersection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 71 | Maintenance of Traffic, Shoulder Closure on Any Highway | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 72 | Maintenance of Traffic, Closure of Two-Way Left Turn Lane | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 73 | Maintenance of Traffic, Closure of Thru Lane of Three Lane Section with Two-Way Left Turn Lane | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 74 | Maintenance of Traffic, Flagger Closing 1 Lane of a 2-Lane Highway - Stationary Operation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 75 | Maintenance of Traffic, Lane Closure at Entrance Ramp | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 76 | Maintenance of Traffic, Lane Closure at Entrance Ramp Acceleration Lane | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 77 | Maintenance of Traffic, Lane Closure in Deceleration Lane | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 78 | Maintenance of Traffic, Lane Closure Within Exit Ramp | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 79 | Maintenance of Traffic, Intersection Entrance Ramp and Turn Bay Closures | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 80 | Mobilization | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 81 | Law Enforcement Officer With Patrol Car for Assistance | HR | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
StandardPrevailingWagePricing
| 148-25 TRAFFIC SIGNAL & ITS EQUIPMENT INSTALLATION PRICING | ||||
| Vendor Name: | ||||
| This is a multiple award contract. Vendors may submit pricing for any of the items and locations below. | ||||
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 1 | Furnish and Install Detector Loop, Powerhead. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 2 | Furnish and Install Detector Loop, Angular Design Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 3 | Furnish and Install Loop Detector Lead-In Cable | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 4 | Loop Detector Tie In | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 5 | Install Stop Line Radar Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 6 | Install Advance Radar Detection. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 7 | Install Video Detection System. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 8 | Furnish and Install Accessible Pedestrian Pushbutton. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 9 | Furnish and Install Tether Wire, with Accessories (Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 10 | Furnish and Install Tether Wire, with Accessories (Non-Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 11 | Furnish and Install Messenger Wire, with Accessories (Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 12 | Furnish and Install Messenger Wire, with Accessories (Non-Simple Span). | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 13 | Unlash and Relash Messenger Wire | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 14 | Raise Span and Tether Wire | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 15a | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Siemens Model 2070LX with SEPAC software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15b | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Siemens Model M60, TS-2 Type 2 with SEPAC software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15c | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Cobalt TS-2 Type 2 with EOS software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15d | Furnish and Install Controller Unit and GPS timeclock (Controller Unit, Econolite Rackmount Cobalt with EOS software and Eltec TimeSync D GPS timeclock with serial interface) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 15e | Install only GPS timeclock | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 16 | Install Cabinet (traffic) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 17 | Install traffic signal power service | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 18a | Furnish and replace UPS batteries | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 18b | Furnish and replace an Uninterruptible Power Supply | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 19a | Furnish and Install Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19b | Furnish and Install Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19c | Realign Existing Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19d | Realign Existing Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19e | Remove Existing Signal Head | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19f | Furnish and Install Auxillary Output File in a Caltrans 332 or 336 cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 19g | Configure Cabinet for Operation | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 20a | Furnish and Install Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20b | Furnish and Install Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20c | Realign Existing Vehicular Signal Head - Mast Arm | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20d | Realign Existing Vehicular Signal Head - Span Wire | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20e | Remove Existing Signal Head | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20f | Furnish and Install Auxillary Output File in a Caltrans 332 or 336 cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 20g | Configure Cabinet for FYA Operations | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 21 | 2-Way Stop to All-Way Stop Conversion | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited | |||||||||||||||
| 22 | Conversion of Overhead Flasher to 2-Way or All-Way Stop | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 23 | Signal Inspection | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 24a | Furnish and remove/ replace CCTV Lowering Units | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 24b | Remove/ replace CCTV Lowering Units (Install Only) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 25 | Furnish and install fiber optic cable, 24 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 26 | Furnish and install fiber optic cable, 72 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 27 | Furnish and install tracer wire | Feet | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 28 | Furnish and install type 1 communication cable markers: Cottmark 511, Frick Flexpost, or Carsonite Curv-Flex Marker | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 29 | Furnish and install type 2 communication cable markers: Cott Bigfink, Frick Testpost, or Rhinodome Test Station | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 30 | Troubleshoot and find cause of fiber optic issues | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 31 | Furnish and install fiber termination panel, 24 fiber | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 32 | Furnish and install fiber termination panel, 72 fiber | Foot | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 33a | Furnish and install a 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33b | Furnish and install a 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33c | Furnish and deliver a 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33d | Furnish and deliver a 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33e | Install Only an ODOT provided 70 ft concrete camera pole w/ 12' embedment (82' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33f | Install Only an ODOT provided 70 ft concrete camera pole w/ 25' embedment (95' overall length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33g | Remove and dispose a 70' concrete camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33h | Remove and deliver a 70' concrete camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33i | Remove and dispose a 70' concrete camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33j | Remove and deliver a 70' concrete camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33k | Remove and dispose a 70' steel camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33l | Remove and deliver a 70' steel camera pole with up to 16' embedment (86' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33m | Remove and dispose a 70' steel camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33n | Remove and deliver a 70' steel camera pole with up to 30' embedment (100' total length) | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33o | Concrete Camera Pole Wrapping, Furnish and Install | Each | Standard | ||||||||||||
| n/a | |||||||||||||||
| n/a | |||||||||||||||
| 33p | Concrete Camera Pole Wrapping, Install Only | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 34a | Move an existing power service to a new pole | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34b | Furnish and install a new disconnect switch on an existing power service | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34c | Furnish and install a step-down transformer rack | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34d | Furnish and install power service, ground mounted (120/ 240 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34e | Furnish and install power service, pole mounted (120/ 240 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34f | Furnish and install power service, ground mounted (240/ 480 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34g | Furnish and install power service, pole mounted (240/ 480 volt) | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34h | Furnish and install power service to nearby cabinet by utilizing unused leg of nearby 120/240V service. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34i | Furnish and install power service tied into existing highway lighting control center. | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34j | Furnish and install power service meter base and conduit riser replacement | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34k | Install Only ODOT provided meter base | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34l | Install Only ODOT provided meter base and disconnect | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a | |||||||||||||||
| 34m | Remove and dispose a power service pole and equipment | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| n/a |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 35 | Furnish and install an Intelight model 2070LDX controller unit with ramp metering software Maxtime 2.0.11 or newer | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 36 | Furnish and install a ramp meter pedestal with T-base with signal heads | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
| Item | ||||
| Number | Item | Unit of Measure | Completion | Unit Bid Price for ODOT District Including Prevailing Wage Rates |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| 37a | Furnish and install a 334 Ramp Meter Cabinet | Each | Standard | ||||||||||||
| Rush | |||||||||||||||
| Expedited |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .