Price Schedule.xlsx

XLSX spreadsheet 70 KB Posted

Attached to
RPR Storage Warehouse 970 Federal contract opportunity
Solicitation number
FA557520B0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This construction cost estimate breakdown provides pricing details for repair and new construction work at the RPR Storage Warehouse 970 at Moron Air Base in Spain. The estimate includes line items for architectural, mechanical, electrical, fire protection, and earth works with costs for materials, labor, and equipment. The base bid for repair work is EUR 0, the base bid for new construction is EUR 0, and Option 1 adds costs for transport and disposal of 20% contaminated excess land. The total proposed contract price will be determined from the sums of the base bids and selected options. The federal contract opportunity notice seeks proposals for Project QUUG 17-1020 to perform this work. Proposals are due by 1:00 hours local time on August 3, 2020. In accordance with the agreement between the U.S. and Spain, Spanish materials, labor and equipment should be utilized where feasible and consistent with requirements. Funding is not guaranteed and the solicitation may be cancelled before or after the closing date without reimbursement to offerors.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Storage Warehouse 970, newest first.
File Type Posted
Questions and Answers.pdf PDF
Drawings.pdf PDF
Schedule of Material Submittals AF66.xlsx XLSX spreadsheet
Specifications.pdf PDF
Solicitation - FA557520B0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE BID - REPAIR WORK

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR STORAGE WAREHOUSE, 970 - BASE BID - REPAIR WORK0.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG07-1020MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
REPAIR WORKS Bldg 970
TRABAJOS DE REPARACIÓN ED. 970
ARCHITECTURAL WORKS Bldg 970
TRABAJOS DE ARQUITECTURA ED. 970
Previous and Demolition Works Bldg 970
Trabajos Previos y de Demolición Edif. 970
1Demolish Mechanical Systems
Demolición Sistemas MecánicosEa
2Remove Plumbing and Drainage Installation
Eliminar Instalación de Fontanería y SaneaminetoJOB
3Remove Electrical Installation, including Lighting and Accessories
Eliminar Instalaciones Eléctricas, Iluminación y AccesoriosJOB
4Remove Fire Protection Installation.
Eliminar Instalación de Detección y Extinción de IncendiosJOB
5Remove Roof Metal Sheets and Accessories
Eliminar Chapas de cubierta y AccesoriosSM
6Remove Exterior walls Metal Sheets and Accessories
Eliminar Chapas de Cerramiento y AccesoriosSM
7Remove Exterior Doors
Desmontaje de Puertas de AccesoSM
8Remove RISER Fire Sprinkler system room
Demolición del cuarto del RISER del Sistema de RociadoresEa
9Remove Lineal Drain
Eliminar Sumidero LinealLm
10Remove concrete slab for grounding system
Demoler losa de hormigón armado para red de tierrasLm
11Excavation of ditch for grounding system
excavación en zanja para red de tierrasM3
12Transpor of leftover land to landfill
Transporte de tierras a vertederoM3
13Separate, Load and Transport the waste to Authorized Dump
Separar, Cargar y Transportar residuos a Vertedero AutorizadoJOB
Total Previous and Demoliton Works
Total Trabajos Previos de Demolición
Metal Works
Trabajos de Metalistería
14Auxiliar profile for siding include shop primer epoxi-zinc
Estructura auxiliar para cerramiento de fachada incluye imprimación de epoxi zincKg
15Foundation fire suppression shelter. Slab thickness 20 cms reinforce 2x#15.15 cmas diam 16 mm
Cimentación de la caseta del Ris. Losa canto 20 cms, 2x#15.15 cms diam 16mmM3
Total Metal Works
Total Trabajos de Metalistería
Roof System and Siding panels
Sistema de Cubierta y Paneles de Fachada
16Roof panel and accessories
Panel de cubierta y accesoriosSM
17Ridge edge and flashing
Cumbreras y rematesLm
18Roofing lifeline
Linea de vida de cubiertaLm
19Gutter, End finishing, Downspout Connections and ccessories
Canalón, extremos, embocaduras y accesoriosLm
20Downspouts, Specials Fitting, Brackets and Accessories
Bajantes, Piezas Especiales, Fijaciones y AccesoriosLm
21Dinamyc Gravity Roof Ventilators and Accessories
Aspiradores Dinámicos y AccesoriosEa
22Siding panel, Flashing and Accessories
Panel de Fachada, Remates y AccesoriosSm
Total Roof System and Siding
Total Sistema de Cubierta y Panel de Fachada
Finishes Works
Trabajos de Acabados
23Epoxy resin pavement applied in 4 layers
Pavimento de resina epoxy aplicadado en 4 capasSM
24Surface Preparation Works (For Epoxy Flooring application)
Trabajos de preparación del soporte (para aplicación de revestimiento de suelo)granalladoSM
25Structure Treatment: cleaning, shop primer and epoxi finish paint
Tratamiento de la estructura existente: limpieza, imprimación y capa de acabado de epoxiSM
26Profile siding panel epoxi finish paint
Acabo de estructura auxiliar de fachada de pintura de epoxiSM
27Interior Signage Painting
Señalización de SueloLm
28Sealing of floor joint with polyurethane filler
Sellado de juntas de pavimento con macilla de poliuretanoLm
Total Finishes Works
Total Trabajos de Acabado
Steel Doors and Windows
Ventanas y Puertas de acero
29Install metal door IV, Louvers and hardware
Instalar Puerta Metalica IV, Rejillas y CerrajeríaSM
30Steel Louvers and insect screen h=85 cms
Rejillas Fijas de Lamas de Acero Galvanizado con malla anti-insecto h=85 cmLm
31Sliding door 4000x3980 mm w/pedestrian door
Puerta corredera 4000x3980 mm con puerta peatonalEa
Steel Doors and Windows
Total Ventanas y Puertas de Acero
Civil Works
Trabajos de Civil
32Soil test
Prueba de contaminación de sueloJob
Total Civil Works
Total Trabajos de Obra Civil
ARCHITECTURAL WORK SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Demolition Works
Trabajos de Demolición
Metal Works
Trabajos de Metalistería
Roof System and Siding
Sistema de Cubierta y Panel de Fachada
Finish work
Trabajos de acabados
Steel Doors and Windows
Ventanas y Puertas de Acero
Civil work
Trabajos de obra civil
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
MECHANICAL WORK Bldg 970
OBRA MECÁNICA Edificio 970
Interior drainage, Plumbing Fixtures and Accessories
Desagües de Aparatos Sanitarios y Accesorios
33Galvanised steel drain pipe UNE EN1453 B ( 2" ø)
Tubo desagüe acero galvanizado UNE EN1453 B (2" ø)Lm
Total Sewage, Plumbing Fixtures and Accessories
Total Saneamiento, Aparatos Sanitarios y Accesorios
Exterior Plumbing
Fontanería Exterior
34Polyethylene Pipe 1 1/2" and connection accessories
Tubería polietileno 1/2" y accesorios de conexiónLm
35Gate valve in valve box
Llave de corte general en arqueta prefabricadaEa
36Reduce Pressure Principle Device and accessories (RPPD) 1 1/2"
Dispositivo principal de reducción de presión y accesorios 1 1/2"Ea
37Galvanized steel pipe 1 1/2" from connection to backflow
Tuberías acero galvanizado 1 1/2" para conexión de backflowEa
Total Exterior Plumbing
Total Fontanería Exterior
Interior Plumbing
Fontanería Interior
38New standard water meter
Nuevo contador de agua estandarLm
39Galvanized steel pipe 1 1/2" and connection accessories
Tubería acero galvanizado 1 1/2" y accesorios de conexiónLm
40Galvanized steel pipe 1 1/4" and connection accessories
Tubería acero galvanizado 1 1/4" y accesorios de conexiónLm
41Galvanized steel pipe 1" and connection accessories
Tubería acero galvanizado 1" y accesorios de conexiónLm
42Galvanized steel pipe 3/4" and connection accessories
Tubería acero galvanizado 3/4" y accesorios de conexiónLm
43Hose bibbs
Grifo de mangueraLm
44Relocation of eyewash station
Reubicación de estación de lavado de ojosEa
45Install alarm eyeswash station.
Instalar alarma en los lavabos de ojosEa
Total Interior Plumbing
Total Fontanería Interior
HVAC system
Instalación de Calefacción, Ventilación y Climatización
46Split Air Conditioning Equipment 2200 kcal/h including accessories, piping and electrical connection
Split mural 2200 kcal/h incluso p.p. de accesorios, tuberías e interconexión electricaEa
47Steel Louver and insect screen dimensions 60x60 cms
Rejillas Fijas de Lamas de Acero Galvanizado con malla anti-insecto 60x60 cmsEa
Total HVAC system
Total Instalación de Calefacción, Ventilación y Climatización
MECHANICAL WORK SUMMARY Bldg 970
RESUMEN OBRA MECANICA Edificio 970
Interior drainage, plumbing fixtures and accessories
desagües de aparatos sanitarios y accesorios
Exterior Plumbing
Fontanería Exterior
Interior plumbing
Fontanería interior
HVAC system
Instalación de Acondicionamiento de Aire
TOTAL MECHANICAL WORK (BLDG 970)
TOTAL OBRA MECANICA (EDIF 970)
ELECTRICAL WORK Bldg 970
OBRA ELECTRICA Edificio 970
Electrical System
Sistema Eléctrico
48Works in transformer switch board
trabajos de acometida en cuadro de baja tensión el Centro de TransformaciónEa
492 way ductbank ext. Diam. 160 mm. polyethylene. Main electrical line for Bldg. 970 y Bldg. 971
Prisma de 2 tubos de polyetileno dia. Ext. 160 mm. Linea de acometida eléctrica para edificio 970 y edificio 971Lm
50Service power supply line of 3 wires 25 mm2 + 25 mm2 neutral each for Bldg. 970
Circuito de acometida 3x25mm2 cu+25 mm2 neutro para Edif. 970Lm
51Service power supply line of 3 wires 25 mm2 + 25 mm2 neutral each for Bldg. 971
Circuito de acometida 3x25mm2 cu+25 mm2 neutropaa Edif. 971Lm
52Reinstall existing electrical meter
Reinstalar contador existenteEa
53Metallic enclosure IP66 capacity 48 elememts main panel
Armario metálico IP66 para albergar un cuandro de mando y distibución con capacidad para 48 elementosEa
54Metallic enclosure IP66 capacity 12 elements panel FACP (Fire Alarm Control Panel)
Armario metálico IP66 para albergar cuadro de mando y protección FACP (Cuandro de Control de Alarma Conta Incendio)Ea
55Metallic enclosure IP66 capacity 12 elements panel FACP (Fire Alarm Control Panel)
Armario metálico IP66 para albergar cuadro de mando y protección FACP (Cuandro de Control de Alarma Conta Incendio)Ea
56Main braiker 4P 63A 25 KA
interruptor magnetotérmico 4P 63A 25 KAEa
57Surge Protection Device 3P+N 30A
interruptor protección sobre tensiones 3P+N 30AEa
58breaker 2P 20A 10 KA
interruptor magnetotérmico 2P 20A 10 KAEa
59breaker 1P+N 20 A
interruptor magnetotérmico 1P+N 20AEa
60Circuit 4 mm2 P+4mm2 N copper in galvanised steel conduit 3/4"
Circuito monofásico 4mm2 Fase+4mm Neutro bajo tubo de acero galvanizado 3/4"Lm
61Circuit 2x4 mm2 P copper in galvanised steel conduit 3/4"
Circuito monofásico 2x4mm2 Fase bajo tubo de acero galvanizado 3/4"Lm
62Multiphase 208V 20A double power socket include conduits & wiring
Toma de corriente doble multifase 208V 20A incluso cableado y conductosEa
63single phase 120V 20A double power socket included conduits & wiring
Toma de corriente doble monofásica 120V 20A incluso p.p. cableado y conductosEa
64new threeway lighting toggle switch
Interruptor conmutadoEa
65Weatherproof daylight sensor for exterior lighting including conduits & wiring
Sensor de luminosidad estanco para iluminación exterior incluso p.p. de conductos y cablesEa
66Passive intraed occupancy sensor for interor lighing,
Sensor pasivo de ocupación infrarrojos para iluminació interiorEa
67Suspended type led luminaire including conduits & wiring.
Luminaria pendular led incluso p.p. de conductos y cableadoEa
68Suspended type led luminaire with kits ballast included conduits & wiring
Luminaria pendular led con balastro de emergencia incluso p.p. de conductos y cableadoEa
69Water proof linear led luminaire including conduits & wiring
Luminaria lineal estanca led incluso p.p de coductos y cableadoEa
70Emergency lighting fixtures 395x179 mm including conduits & wiring
Luminaria de emergencia 395x179 mm incluido p.p. de conductos y cableadoEa
71Emergency lighting fixtures 330x228 mm including conduits & wiring
Luminaria de emergencia 330x228 mmincluso p.p.de conductos y cableadoEa
72Outdoor led spotlight including conduits & wiring
Luminaria estanca exterior incluso p.p. de conductos y cableadoEa
73Grounding electrode conductor bare copper 35 mm2
Instalación de Puesta a TierraLm
74Copper clad grounding rod 3/4" diameter 3 meter long in plastic box
Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plásticoLm
75Grounding installation bounding jumper metallic structure, new fence, to com system and splinkler system
Conexión Puesta a Tierra, de la estructura metálica, nuevo vallado y red de rociadoresEa
Electrical System Total
Total Sistema Eléctrico
Fire Alarm System
Sistema de Alarma Contraincendios
76Analogic control panel
Panel de control analógicoEa
77Class A adapter module
Modulo adaptador clase AEa
78Sealed lead Acid battery 12 Vdc
Fuente de alimentación 12 VdcEa
79Sealed lead Acid battery 12 Vdc
Fuente de alimentación 12 VdcEa
80Monitor module-single input
Módulo monitor de entrada únicaEa
81Control relay module
Módulo de control de releEa
82Manual pull station. Single action, single stage fire alarm station
Pulsador de alarma contraincendios de acción simpleEa
83Temporal Horn/strobe 24 Vdc. Red110 CD
Alarma óptica 24 Vdc roja 110 CDEa
84Reflective beam smoke detector
Detector de humosEa
85Ground level test station
Dispositivo de comprabocación de red de tierraEa
86Dual imput nodule
Módulo de entrada dualEa
87booster power supply
Fuente de alimentaciónEa
88Installation in galvanized steel pipe and equipment connection
Instalación bajo tubo de acero galvanziado y conexionado de equiposLm
89Existing radio transmitter antenna for communications with Air Base "SACADA" Notificaction System Reinstallation
Reinstalación de antena de sistema de transmisión para comunicación con Sistema de Comunicación SCADA de la BaseEa
90Programming and system set up
Programación y puesta en marchaJOB
Fire Alarm System Total
Total Alarma Contraincendios
Lightning Protection System
Sistema de Protección contre el Rayo
91Air terminal, stainless steel, Ø10mm according to NFPA 780
Punta de acero inoxidable, Ø10mm según NFPA 780Ea
92Conductor insulated cooper 25 mm2 minimum supporterd each 3 ft (900 mm)
Conductor de cobre aislado 50 mm2 fijado mínimo cada 900 mm (3 ft)Lm
93Strike events counter
contador de rayosEa
Lightning Protection System Total
Total Sistema de Protección contra el Rayo
ELECTRICAL WORK SUMMARY Bldg 970
RESUMEN OBRA ELÉCTRICA Edificio 970
Electrical System
Sistema Eléctrico
Fire Alarm System
Sistema de Alarma Contraincendios
Lightning Protection System
Sistema de Protección contre el Rayo
TOTAL ELECTRICAL WORK (BLDG 970)
TOTAL OBRA ELÉCTIRCAICA (EDIF 970)
FIRE PROTECTION WORK Bldg 970
INSTALACIÓN CONTRA INCENDIOS Edif 970
Splinkler system Bldg 970
Instalación de rociadores Edif. 970
94New buried pipe HDPE diameter 6" for conection balflow preventer with riser
Nueva tubería enterrada de HDPE de 6" de diámetro para conectar el backflow preventer con el riserEa
95New riser asembly including control valve, FD twin connection, retard chamber and water motor alarm
Nuevo sistema de riser inclye valvula de control, conecxión para el departamento de bomberos, cámara de retardo alarma gongEa
96Flow detector
Detector de flujoEa
97Galvanized steel pipe 1 1/4" and connection accessories, painted in red
Tubería acero galvanizado 1 1/4" y accesorios de conexión, pintada de rojaLm
98Galvanized steel pipe 1 1/2" and connection accessories, painted in red
Tubería acero galvanizado 1 1/2" y accesorios de conexión, pintada de rojaLm
99Galvanized steel pipe 2" and connection accessories, painted in red
Tubería acero galvanizado 2" y accesorios de conexión, pintada de rojaLm
100Galvanized steel pipe 3 1/2" and connection accessories, painted in red
Tubería acero galvanizado 3 1/2" y accesorios de conexión, pintada de rojaLm
101Galvanized steel pipe 4" and connection accessories, painted in red
Tubería acero galvanizado 4" y accesorios de conexión, pintada de rojaLm
102Galvanized steel pipe 5" and connection accessories, painted in red
Tubería acero galvanizado 5" y accesorios de conexión, pintada de rojaLm
103Galvanized steel pipe 6" and connection accessories, painted in red
Tubería acero galvanizado 6" y accesorios de conexión, pintada de rojaLm
104New Upright splinkler
Nuevo rociador tipo UprightEa
105New Pendant splinkler
Nuevo rociador tipo PendantEa
106Test point and cleaning
Punto de limpieza y de pruebaEa
107New ABC dry chemical extinguisher. BUCKEYE 20 lb.
Nuevo extintor de polvo ABC. Buckeye 20 lb.Ea
Total Fire Protection Work Bldg 970
Total Instalación Contraincendios Edif 970
TOTAL FIRE PROTECTION WORK (BLDG 970)
TOTAL INST. CONTRA INCENDIOS (EDIF 970)
SUMMARY REPAIR WORKS
RESUMEN TRABAJOS DE REPARACIÓN
TOTAL ARCHITECTURAL WORK BLG 970
TOTAL TRABAJOS ARQUITECTURA ED 970
TOTAL MECHANICAL WORK BLDG 970
TOTAL OBRA MECANICA EDIF 970
TOTAL ELECTRICAL WORK BLDG 970
TOTAL OBRA ELECTRICA EDIF 970
FIRE PROTECTION WORK BLDG 970
TOTAL EXTINCIÓN DE INCENDIOS 970
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY &"Times New Roman,Normal"Page &P of &N

BASE BID- NEW CONSTRUCTION WORK

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR STORAGE WAREHOUSE, 970 - BASE BID (NEW CONSTRUCTION WORKS)0.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG07-1020MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(3)(2)(3)(4)(5)(6)(7)(8)(9)(10)
NEW CONSTRUCTION WORKS Bldg 970
NUEVA CONSTRUCCIÓN ED. 970
Previous and Demolitions Works
Trabajos previos y de demolición
1Cleaning existing vegetation
Limpieza y desbroce del terrenoSM
2Remuve existing buried electrical line
Demolición de linea de acometida electricaLm
3Remove buried waspe pipe
Demolición de saneamiento enterradoJOB
4Remove existing telecom line on roof
Demolición de cable de telecomunicaciones sobre cubiertaJOB
Total Previous and demolitions Works
Total Trabajos Previos y de demolición
Excavations Works
Trabajos de excavaciones
5Previous and Excavations works
Excavación para explanadaM3
6Transpor of leftover land to landfill
Transporte de tierras a vertederoM3
7Dumping tax of soil
Canon de vertedero de tierrasM3
Total excavations Works
Total excavations de Acabado
Civil Works
Trabajos de Civil
8Geotextile GEOTEXAN NT 35
Geotextil GEOTEXAN NT 35Lm
9selected soil typ. 2
Suelo seleccionado tipo 2m3
10Levelled ground stabilised S-EST3
Suelo estabilizado S-EST3m3
11Compacted graded aggregate layer 20 cms thickness
Capa de zahorra compacta20 cms de espesorm2
12Primer irrigation C60BF4 IMP
Riego de imprimación tipo C60BF4m2
13Bituminous mixture AC 16 SURF 35/50 thickness 5 cms
Mezcla bituminosa AC 16 SURF 35/50 espesor 5 cmsm2
14Polymer concrete Linear drain
Ejecución de sumidero lineal de horm. PolimeroLm
15Precast concrete back splash curb line
Rigola prefabricada de hormigónLm
16Concrete urbankment downspount for open drainage
Nuevos bajantes de talud de hormigón prefabricadopara drenaje abiertoLm
17Precast concrete electrical manhole type A1
Arqueta prefabricada de hormigón electrica tipo A1Ea
18Cover and frame of ductil cast iron D400 1100x1100 mm
Tapa y marco de acero de fundición D400 1100x1100 mmEa
19Vertical traffic stop sign
Señal vertical de tráfico de stopEa
20Pavement traffic paint (Stop lettering and stop lines with reflexive paint)
Marca y símbolo de tráfico (letrero de stop y simbolos de stop con pintura reflexiva)Ea
21Traffic, lettering and sign
Marca de calzada con pintura reflexivaLm
Total civil Works
Total Trabajos de Civil
Gate and fence
Puertas y vallado
22fence doors 6,00x2,00 m and barbed wire 0,30m
Puertas metálicas de malla de simple torsió 6,00x2,00 m mas 0,30 de alambre de espinosEa
23Steel fence and barbed wire h=2,30 m
Cerramiento de malla de simple torsión con alambre de espino h=2,30 mLm
24foundations fence
Cimentacion de Vallado y puertasm3
Total Gate and Fence
Total Puertas Vallado
NEW CONSTRUCTION SUMMARY
RESUMEN NUEVA COSTRUCCIÓN
Previous and demolitions work
Trabajos previos y de demolicones
Excavations works
Trabajos de excavación
Civil work
Trabajos de obra civil
Gate and fence
Trabajos de obra civil
TOTAL NEW CONSTRUCTION BLDG 970
TOTAL NUEVA CONSTRUCCIÓN EDIF. 970
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY Page &P of &N

OPTION 1

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR STORAGE WAREHOUSE, 970 - OPTION 10.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG07-1020MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(2)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION 1 WORK
TRABAJOS OPCIÓN 1
EARTH WORK (With 20% Contaminated Soil)
MOVIMIENTO DE TIERRAS (Con 20% de Tierras Contaminadas)
1Transpor of contaminated leftover land to landfill 20%
Transporte de tierra contaminada a vertedero autorizado 20%m3
2Dumping tax of contaminated soil 20%
Canon de vertedero de tierras contaminadas 20%m3
3Deduct Dumping tax of soil 20% included in Base Bid - New Construction
deducir Canon de vertedero de tierras contaminadas 20%m3
4Deduct Transpor leftover land to landfill 20% included in Base Bid - New Construction
Deducir Transporte de tierra a vertedero autorizado 20% incluido en el Paquete Básico - Nueva Construcción.m3
Total Repair Works option #1
Total Trabajos de reparación opción #1
EARTH WORK (with 20% Contaminatd Soil) SUMMARY
RESUMEN MOVIMIENTOS DE TIERRAS (con 20% de Tierras Contaminadas)
Civil work option #1
Trabajos de obra civilopción #1
TOTAL EARTHWORKs
TOTAL TRABAJOS DE MOVIMIENTO DE TIERRAS
SUMMARY OPTION 1
RESUMEN OPCIÓN 1
TOTAL EART WORK (with 20% Contamined Soil)
TOTAL MOVIMIENTO DE TIERRAS (con 20% de tierras contaminadas)
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY Page &P of &N

NEW SUMMARY

CONSTRUCTION COST ESTIMATE SUMMARY
CONTRACTORADDRESS
MORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR STORAGE WAREHOUSE, 970
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG07-1020MORÓN AIR BASE, SPAIN
MATERIAL COSTLABOR COSTOTHER DIRECT COSTLINE TOTAL COST

BASE BID - REPAIR WORK

PAQUETE BÁSICO - TRABAJOS DE DE REPARACIÓN

BASE BID - NEW CONSTRUCTION

PAQUETE BÁSICO - NUEVA CONSTRUCCIÓN

OPTION 1

OPCIÓN 1

GRAND TOTAL GRAN TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .