This construction cost estimate breakdown provides pricing details for repair and new construction work at the RPR Storage Warehouse 970 at Moron Air Base in Spain. The estimate includes line items for architectural, mechanical, electrical, fire protection, and earth works with costs for materials, labor, and equipment. The base bid for repair work is EUR 0, the base bid for new construction is EUR 0, and Option 1 adds costs for transport and disposal of 20% contaminated excess land. The total proposed contract price will be determined from the sums of the base bids and selected options. The federal contract opportunity notice seeks proposals for Project QUUG 17-1020 to perform this work. Proposals are due by 1:00 hours local time on August 3, 2020. In accordance with the agreement between the U.S. and Spain, Spanish materials, labor and equipment should be utilized where feasible and consistent with requirements. Funding is not guaranteed and the solicitation may be cancelled before or after the closing date without reimbursement to offerors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Drawings.pdf | ||
| Schedule of Material Submittals AF66.xlsx | XLSX spreadsheet | |
| Specifications.pdf | ||
| Solicitation - FA557520B0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID - REPAIR WORK
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR STORAGE WAREHOUSE, 970 - BASE BID - REPAIR WORK | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG07-1020 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| REPAIR WORKS Bldg 970 | ||||||||||
| TRABAJOS DE REPARACIÓN ED. 970 | ||||||||||
| ARCHITECTURAL WORKS Bldg 970 | ||||||||||
| TRABAJOS DE ARQUITECTURA ED. 970 | ||||||||||
| Previous and Demolition Works Bldg 970 | ||||||||||
| Trabajos Previos y de Demolición Edif. 970 | ||||||||||
| 1 | Demolish Mechanical Systems | |||||||||
| Demolición Sistemas Mecánicos | Ea | |||||||||
| 2 | Remove Plumbing and Drainage Installation | |||||||||
| Eliminar Instalación de Fontanería y Saneamineto | JOB | |||||||||
| 3 | Remove Electrical Installation, including Lighting and Accessories | |||||||||
| Eliminar Instalaciones Eléctricas, Iluminación y Accesorios | JOB | |||||||||
| 4 | Remove Fire Protection Installation. | |||||||||
| Eliminar Instalación de Detección y Extinción de Incendios | JOB | |||||||||
| 5 | Remove Roof Metal Sheets and Accessories | |||||||||
| Eliminar Chapas de cubierta y Accesorios | SM | |||||||||
| 6 | Remove Exterior walls Metal Sheets and Accessories | |||||||||
| Eliminar Chapas de Cerramiento y Accesorios | SM | |||||||||
| 7 | Remove Exterior Doors | |||||||||
| Desmontaje de Puertas de Acceso | SM | |||||||||
| 8 | Remove RISER Fire Sprinkler system room | |||||||||
| Demolición del cuarto del RISER del Sistema de Rociadores | Ea | |||||||||
| 9 | Remove Lineal Drain | |||||||||
| Eliminar Sumidero Lineal | Lm | |||||||||
| 10 | Remove concrete slab for grounding system | |||||||||
| Demoler losa de hormigón armado para red de tierras | Lm | |||||||||
| 11 | Excavation of ditch for grounding system | |||||||||
| excavación en zanja para red de tierras | M3 | |||||||||
| 12 | Transpor of leftover land to landfill | |||||||||
| Transporte de tierras a vertedero | M3 | |||||||||
| 13 | Separate, Load and Transport the waste to Authorized Dump | |||||||||
| Separar, Cargar y Transportar residuos a Vertedero Autorizado | JOB | |||||||||
| Total Previous and Demoliton Works | ||||||||||
| Total Trabajos Previos de Demolición |
| Metal Works | ||
| Trabajos de Metalistería | ||
| 14 | Auxiliar profile for siding include shop primer epoxi-zinc | |
| Estructura auxiliar para cerramiento de fachada incluye imprimación de epoxi zinc | Kg | |
| 15 | Foundation fire suppression shelter. Slab thickness 20 cms reinforce 2x#15.15 cmas diam 16 mm | |
| Cimentación de la caseta del Ris. Losa canto 20 cms, 2x#15.15 cms diam 16mm | M3 | |
| Total Metal Works | ||
| Total Trabajos de Metalistería |
| Roof System and Siding panels | ||
| Sistema de Cubierta y Paneles de Fachada | ||
| 16 | Roof panel and accessories | |
| Panel de cubierta y accesorios | SM | |
| 17 | Ridge edge and flashing | |
| Cumbreras y remates | Lm | |
| 18 | Roofing lifeline | |
| Linea de vida de cubierta | Lm | |
| 19 | Gutter, End finishing, Downspout Connections and ccessories | |
| Canalón, extremos, embocaduras y accesorios | Lm | |
| 20 | Downspouts, Specials Fitting, Brackets and Accessories | |
| Bajantes, Piezas Especiales, Fijaciones y Accesorios | Lm | |
| 21 | Dinamyc Gravity Roof Ventilators and Accessories | |
| Aspiradores Dinámicos y Accesorios | Ea | |
| 22 | Siding panel, Flashing and Accessories | |
| Panel de Fachada, Remates y Accesorios | Sm | |
| Total Roof System and Siding | ||
| Total Sistema de Cubierta y Panel de Fachada |
| Finishes Works | ||
| Trabajos de Acabados | ||
| 23 | Epoxy resin pavement applied in 4 layers | |
| Pavimento de resina epoxy aplicadado en 4 capas | SM | |
| 24 | Surface Preparation Works (For Epoxy Flooring application) | |
| Trabajos de preparación del soporte (para aplicación de revestimiento de suelo)granallado | SM | |
| 25 | Structure Treatment: cleaning, shop primer and epoxi finish paint | |
| Tratamiento de la estructura existente: limpieza, imprimación y capa de acabado de epoxi | SM | |
| 26 | Profile siding panel epoxi finish paint | |
| Acabo de estructura auxiliar de fachada de pintura de epoxi | SM | |
| 27 | Interior Signage Painting | |
| Señalización de Suelo | Lm | |
| 28 | Sealing of floor joint with polyurethane filler | |
| Sellado de juntas de pavimento con macilla de poliuretano | Lm | |
| Total Finishes Works | ||
| Total Trabajos de Acabado |
| Steel Doors and Windows | ||
| Ventanas y Puertas de acero | ||
| 29 | Install metal door IV, Louvers and hardware | |
| Instalar Puerta Metalica IV, Rejillas y Cerrajería | SM | |
| 30 | Steel Louvers and insect screen h=85 cms | |
| Rejillas Fijas de Lamas de Acero Galvanizado con malla anti-insecto h=85 cm | Lm | |
| 31 | Sliding door 4000x3980 mm w/pedestrian door | |
| Puerta corredera 4000x3980 mm con puerta peatonal | Ea | |
| Steel Doors and Windows | ||
| Total Ventanas y Puertas de Acero |
| Civil Works | ||
| Trabajos de Civil | ||
| 32 | Soil test | |
| Prueba de contaminación de suelo | Job | |
| Total Civil Works | ||
| Total Trabajos de Obra Civil |
| ARCHITECTURAL WORK SUMMARY |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Demolition Works |
| Trabajos de Demolición |
| Metal Works |
| Trabajos de Metalistería |
| Roof System and Siding |
| Sistema de Cubierta y Panel de Fachada |
| Finish work |
| Trabajos de acabados |
| Steel Doors and Windows |
| Ventanas y Puertas de Acero |
| Civil work |
| Trabajos de obra civil |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS DE ARQUITECTURA |
| MECHANICAL WORK Bldg 970 | ||
| OBRA MECÁNICA Edificio 970 | ||
| Interior drainage, Plumbing Fixtures and Accessories | ||
| Desagües de Aparatos Sanitarios y Accesorios | ||
| 33 | Galvanised steel drain pipe UNE EN1453 B ( 2" ø) | |
| Tubo desagüe acero galvanizado UNE EN1453 B (2" ø) | Lm | |
| Total Sewage, Plumbing Fixtures and Accessories | ||
| Total Saneamiento, Aparatos Sanitarios y Accesorios |
| Exterior Plumbing | ||
| Fontanería Exterior | ||
| 34 | Polyethylene Pipe 1 1/2" and connection accessories | |
| Tubería polietileno 1/2" y accesorios de conexión | Lm | |
| 35 | Gate valve in valve box | |
| Llave de corte general en arqueta prefabricada | Ea | |
| 36 | Reduce Pressure Principle Device and accessories (RPPD) 1 1/2" | |
| Dispositivo principal de reducción de presión y accesorios 1 1/2" | Ea | |
| 37 | Galvanized steel pipe 1 1/2" from connection to backflow | |
| Tuberías acero galvanizado 1 1/2" para conexión de backflow | Ea | |
| Total Exterior Plumbing | ||
| Total Fontanería Exterior |
| Interior Plumbing | ||
| Fontanería Interior | ||
| 38 | New standard water meter | |
| Nuevo contador de agua estandar | Lm | |
| 39 | Galvanized steel pipe 1 1/2" and connection accessories | |
| Tubería acero galvanizado 1 1/2" y accesorios de conexión | Lm | |
| 40 | Galvanized steel pipe 1 1/4" and connection accessories | |
| Tubería acero galvanizado 1 1/4" y accesorios de conexión | Lm | |
| 41 | Galvanized steel pipe 1" and connection accessories | |
| Tubería acero galvanizado 1" y accesorios de conexión | Lm | |
| 42 | Galvanized steel pipe 3/4" and connection accessories | |
| Tubería acero galvanizado 3/4" y accesorios de conexión | Lm | |
| 43 | Hose bibbs | |
| Grifo de manguera | Lm | |
| 44 | Relocation of eyewash station | |
| Reubicación de estación de lavado de ojos | Ea | |
| 45 | Install alarm eyeswash station. | |
| Instalar alarma en los lavabos de ojos | Ea | |
| Total Interior Plumbing | ||
| Total Fontanería Interior |
| HVAC system | ||
| Instalación de Calefacción, Ventilación y Climatización | ||
| 46 | Split Air Conditioning Equipment 2200 kcal/h including accessories, piping and electrical connection | |
| Split mural 2200 kcal/h incluso p.p. de accesorios, tuberías e interconexión electrica | Ea | |
| 47 | Steel Louver and insect screen dimensions 60x60 cms | |
| Rejillas Fijas de Lamas de Acero Galvanizado con malla anti-insecto 60x60 cms | Ea | |
| Total HVAC system | ||
| Total Instalación de Calefacción, Ventilación y Climatización |
| MECHANICAL WORK SUMMARY Bldg 970 |
| RESUMEN OBRA MECANICA Edificio 970 |
| Interior drainage, plumbing fixtures and accessories |
| desagües de aparatos sanitarios y accesorios |
| Exterior Plumbing |
| Fontanería Exterior |
| Interior plumbing |
| Fontanería interior |
| HVAC system |
| Instalación de Acondicionamiento de Aire |
| TOTAL MECHANICAL WORK (BLDG 970) |
| TOTAL OBRA MECANICA (EDIF 970) |
| ELECTRICAL WORK Bldg 970 | ||
| OBRA ELECTRICA Edificio 970 | ||
| Electrical System | ||
| Sistema Eléctrico | ||
| 48 | Works in transformer switch board | |
| trabajos de acometida en cuadro de baja tensión el Centro de Transformación | Ea | |
| 49 | 2 way ductbank ext. Diam. 160 mm. polyethylene. Main electrical line for Bldg. 970 y Bldg. 971 | |
| Prisma de 2 tubos de polyetileno dia. Ext. 160 mm. Linea de acometida eléctrica para edificio 970 y edificio 971 | Lm | |
| 50 | Service power supply line of 3 wires 25 mm2 + 25 mm2 neutral each for Bldg. 970 | |
| Circuito de acometida 3x25mm2 cu+25 mm2 neutro para Edif. 970 | Lm | |
| 51 | Service power supply line of 3 wires 25 mm2 + 25 mm2 neutral each for Bldg. 971 | |
| Circuito de acometida 3x25mm2 cu+25 mm2 neutropaa Edif. 971 | Lm | |
| 52 | Reinstall existing electrical meter | |
| Reinstalar contador existente | Ea | |
| 53 | Metallic enclosure IP66 capacity 48 elememts main panel | |
| Armario metálico IP66 para albergar un cuandro de mando y distibución con capacidad para 48 elementos | Ea | |
| 54 | Metallic enclosure IP66 capacity 12 elements panel FACP (Fire Alarm Control Panel) | |
| Armario metálico IP66 para albergar cuadro de mando y protección FACP (Cuandro de Control de Alarma Conta Incendio) | Ea | |
| 55 | Metallic enclosure IP66 capacity 12 elements panel FACP (Fire Alarm Control Panel) | |
| Armario metálico IP66 para albergar cuadro de mando y protección FACP (Cuandro de Control de Alarma Conta Incendio) | Ea | |
| 56 | Main braiker 4P 63A 25 KA | |
| interruptor magnetotérmico 4P 63A 25 KA | Ea | |
| 57 | Surge Protection Device 3P+N 30A | |
| interruptor protección sobre tensiones 3P+N 30A | Ea | |
| 58 | breaker 2P 20A 10 KA | |
| interruptor magnetotérmico 2P 20A 10 KA | Ea | |
| 59 | breaker 1P+N 20 A | |
| interruptor magnetotérmico 1P+N 20A | Ea | |
| 60 | Circuit 4 mm2 P+4mm2 N copper in galvanised steel conduit 3/4" | |
| Circuito monofásico 4mm2 Fase+4mm Neutro bajo tubo de acero galvanizado 3/4" | Lm | |
| 61 | Circuit 2x4 mm2 P copper in galvanised steel conduit 3/4" | |
| Circuito monofásico 2x4mm2 Fase bajo tubo de acero galvanizado 3/4" | Lm | |
| 62 | Multiphase 208V 20A double power socket include conduits & wiring | |
| Toma de corriente doble multifase 208V 20A incluso cableado y conductos | Ea | |
| 63 | single phase 120V 20A double power socket included conduits & wiring | |
| Toma de corriente doble monofásica 120V 20A incluso p.p. cableado y conductos | Ea | |
| 64 | new threeway lighting toggle switch | |
| Interruptor conmutado | Ea | |
| 65 | Weatherproof daylight sensor for exterior lighting including conduits & wiring | |
| Sensor de luminosidad estanco para iluminación exterior incluso p.p. de conductos y cables | Ea | |
| 66 | Passive intraed occupancy sensor for interor lighing, | |
| Sensor pasivo de ocupación infrarrojos para iluminació interior | Ea | |
| 67 | Suspended type led luminaire including conduits & wiring. | |
| Luminaria pendular led incluso p.p. de conductos y cableado | Ea | |
| 68 | Suspended type led luminaire with kits ballast included conduits & wiring | |
| Luminaria pendular led con balastro de emergencia incluso p.p. de conductos y cableado | Ea | |
| 69 | Water proof linear led luminaire including conduits & wiring | |
| Luminaria lineal estanca led incluso p.p de coductos y cableado | Ea | |
| 70 | Emergency lighting fixtures 395x179 mm including conduits & wiring | |
| Luminaria de emergencia 395x179 mm incluido p.p. de conductos y cableado | Ea | |
| 71 | Emergency lighting fixtures 330x228 mm including conduits & wiring | |
| Luminaria de emergencia 330x228 mmincluso p.p.de conductos y cableado | Ea | |
| 72 | Outdoor led spotlight including conduits & wiring | |
| Luminaria estanca exterior incluso p.p. de conductos y cableado | Ea | |
| 73 | Grounding electrode conductor bare copper 35 mm2 | |
| Instalación de Puesta a Tierra | Lm | |
| 74 | Copper clad grounding rod 3/4" diameter 3 meter long in plastic box | |
| Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plástico | Lm | |
| 75 | Grounding installation bounding jumper metallic structure, new fence, to com system and splinkler system | |
| Conexión Puesta a Tierra, de la estructura metálica, nuevo vallado y red de rociadores | Ea | |
| Electrical System Total | ||
| Total Sistema Eléctrico |
| Fire Alarm System | ||
| Sistema de Alarma Contraincendios | ||
| 76 | Analogic control panel | |
| Panel de control analógico | Ea | |
| 77 | Class A adapter module | |
| Modulo adaptador clase A | Ea | |
| 78 | Sealed lead Acid battery 12 Vdc | |
| Fuente de alimentación 12 Vdc | Ea | |
| 79 | Sealed lead Acid battery 12 Vdc | |
| Fuente de alimentación 12 Vdc | Ea | |
| 80 | Monitor module-single input | |
| Módulo monitor de entrada única | Ea | |
| 81 | Control relay module | |
| Módulo de control de rele | Ea | |
| 82 | Manual pull station. Single action, single stage fire alarm station | |
| Pulsador de alarma contraincendios de acción simple | Ea | |
| 83 | Temporal Horn/strobe 24 Vdc. Red110 CD | |
| Alarma óptica 24 Vdc roja 110 CD | Ea | |
| 84 | Reflective beam smoke detector | |
| Detector de humos | Ea | |
| 85 | Ground level test station | |
| Dispositivo de comprabocación de red de tierra | Ea | |
| 86 | Dual imput nodule | |
| Módulo de entrada dual | Ea | |
| 87 | booster power supply | |
| Fuente de alimentación | Ea | |
| 88 | Installation in galvanized steel pipe and equipment connection | |
| Instalación bajo tubo de acero galvanziado y conexionado de equipos | Lm | |
| 89 | Existing radio transmitter antenna for communications with Air Base "SACADA" Notificaction System Reinstallation | |
| Reinstalación de antena de sistema de transmisión para comunicación con Sistema de Comunicación SCADA de la Base | Ea | |
| 90 | Programming and system set up | |
| Programación y puesta en marcha | JOB | |
| Fire Alarm System Total | ||
| Total Alarma Contraincendios |
| Lightning Protection System | ||
| Sistema de Protección contre el Rayo | ||
| 91 | Air terminal, stainless steel, Ø10mm according to NFPA 780 | |
| Punta de acero inoxidable, Ø10mm según NFPA 780 | Ea | |
| 92 | Conductor insulated cooper 25 mm2 minimum supporterd each 3 ft (900 mm) | |
| Conductor de cobre aislado 50 mm2 fijado mínimo cada 900 mm (3 ft) | Lm | |
| 93 | Strike events counter | |
| contador de rayos | Ea | |
| Lightning Protection System Total | ||
| Total Sistema de Protección contra el Rayo |
| ELECTRICAL WORK SUMMARY Bldg 970 |
| RESUMEN OBRA ELÉCTRICA Edificio 970 |
| Electrical System |
| Sistema Eléctrico |
| Fire Alarm System |
| Sistema de Alarma Contraincendios |
| Lightning Protection System |
| Sistema de Protección contre el Rayo |
| TOTAL ELECTRICAL WORK (BLDG 970) |
| TOTAL OBRA ELÉCTIRCAICA (EDIF 970) |
| FIRE PROTECTION WORK Bldg 970 | ||
| INSTALACIÓN CONTRA INCENDIOS Edif 970 | ||
| Splinkler system Bldg 970 | ||
| Instalación de rociadores Edif. 970 | ||
| 94 | New buried pipe HDPE diameter 6" for conection balflow preventer with riser | |
| Nueva tubería enterrada de HDPE de 6" de diámetro para conectar el backflow preventer con el riser | Ea | |
| 95 | New riser asembly including control valve, FD twin connection, retard chamber and water motor alarm | |
| Nuevo sistema de riser inclye valvula de control, conecxión para el departamento de bomberos, cámara de retardo alarma gong | Ea | |
| 96 | Flow detector | |
| Detector de flujo | Ea | |
| 97 | Galvanized steel pipe 1 1/4" and connection accessories, painted in red | |
| Tubería acero galvanizado 1 1/4" y accesorios de conexión, pintada de roja | Lm | |
| 98 | Galvanized steel pipe 1 1/2" and connection accessories, painted in red | |
| Tubería acero galvanizado 1 1/2" y accesorios de conexión, pintada de roja | Lm | |
| 99 | Galvanized steel pipe 2" and connection accessories, painted in red | |
| Tubería acero galvanizado 2" y accesorios de conexión, pintada de roja | Lm | |
| 100 | Galvanized steel pipe 3 1/2" and connection accessories, painted in red | |
| Tubería acero galvanizado 3 1/2" y accesorios de conexión, pintada de roja | Lm | |
| 101 | Galvanized steel pipe 4" and connection accessories, painted in red | |
| Tubería acero galvanizado 4" y accesorios de conexión, pintada de roja | Lm | |
| 102 | Galvanized steel pipe 5" and connection accessories, painted in red | |
| Tubería acero galvanizado 5" y accesorios de conexión, pintada de roja | Lm | |
| 103 | Galvanized steel pipe 6" and connection accessories, painted in red | |
| Tubería acero galvanizado 6" y accesorios de conexión, pintada de roja | Lm | |
| 104 | New Upright splinkler | |
| Nuevo rociador tipo Upright | Ea | |
| 105 | New Pendant splinkler | |
| Nuevo rociador tipo Pendant | Ea | |
| 106 | Test point and cleaning | |
| Punto de limpieza y de prueba | Ea | |
| 107 | New ABC dry chemical extinguisher. BUCKEYE 20 lb. | |
| Nuevo extintor de polvo ABC. Buckeye 20 lb. | Ea | |
| Total Fire Protection Work Bldg 970 | ||
| Total Instalación Contraincendios Edif 970 | ||
| TOTAL FIRE PROTECTION WORK (BLDG 970) | ||
| TOTAL INST. CONTRA INCENDIOS (EDIF 970) |
| SUMMARY REPAIR WORKS | |
| RESUMEN TRABAJOS DE REPARACIÓN | |
| TOTAL ARCHITECTURAL WORK BLG 970 | |
| TOTAL TRABAJOS ARQUITECTURA ED 970 | |
| TOTAL MECHANICAL WORK BLDG 970 | |
| TOTAL OBRA MECANICA EDIF 970 | |
| TOTAL ELECTRICAL WORK BLDG 970 | |
| TOTAL OBRA ELECTRICA EDIF 970 | |
| FIRE PROTECTION WORK BLDG 970 | |
| TOTAL EXTINCIÓN DE INCENDIOS 970 | |
| GRAND TOTAL | |
| GRAN TOTAL | |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
| TOTAL PROJECT EUROS | |
| $1 | euros |
| TOTAL PROJECT US$ |
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY &"Times New Roman,Normal"Page &P of &N
BASE BID- NEW CONSTRUCTION WORK
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR STORAGE WAREHOUSE, 970 - BASE BID (NEW CONSTRUCTION WORKS) | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG07-1020 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (3) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| NEW CONSTRUCTION WORKS Bldg 970 | ||||||||||
| NUEVA CONSTRUCCIÓN ED. 970 | ||||||||||
| Previous and Demolitions Works | ||||||||||
| Trabajos previos y de demolición | ||||||||||
| 1 | Cleaning existing vegetation | |||||||||
| Limpieza y desbroce del terreno | SM | |||||||||
| 2 | Remuve existing buried electrical line | |||||||||
| Demolición de linea de acometida electrica | Lm | |||||||||
| 3 | Remove buried waspe pipe | |||||||||
| Demolición de saneamiento enterrado | JOB | |||||||||
| 4 | Remove existing telecom line on roof | |||||||||
| Demolición de cable de telecomunicaciones sobre cubierta | JOB | |||||||||
| Total Previous and demolitions Works | ||||||||||
| Total Trabajos Previos y de demolición |
| Excavations Works | ||
| Trabajos de excavaciones | ||
| 5 | Previous and Excavations works | |
| Excavación para explanada | M3 | |
| 6 | Transpor of leftover land to landfill | |
| Transporte de tierras a vertedero | M3 | |
| 7 | Dumping tax of soil | |
| Canon de vertedero de tierras | M3 | |
| Total excavations Works | ||
| Total excavations de Acabado |
| Civil Works | ||
| Trabajos de Civil | ||
| 8 | Geotextile GEOTEXAN NT 35 | |
| Geotextil GEOTEXAN NT 35 | Lm | |
| 9 | selected soil typ. 2 | |
| Suelo seleccionado tipo 2 | m3 | |
| 10 | Levelled ground stabilised S-EST3 | |
| Suelo estabilizado S-EST3 | m3 | |
| 11 | Compacted graded aggregate layer 20 cms thickness | |
| Capa de zahorra compacta20 cms de espesor | m2 | |
| 12 | Primer irrigation C60BF4 IMP | |
| Riego de imprimación tipo C60BF4 | m2 | |
| 13 | Bituminous mixture AC 16 SURF 35/50 thickness 5 cms | |
| Mezcla bituminosa AC 16 SURF 35/50 espesor 5 cms | m2 | |
| 14 | Polymer concrete Linear drain | |
| Ejecución de sumidero lineal de horm. Polimero | Lm | |
| 15 | Precast concrete back splash curb line | |
| Rigola prefabricada de hormigón | Lm | |
| 16 | Concrete urbankment downspount for open drainage | |
| Nuevos bajantes de talud de hormigón prefabricadopara drenaje abierto | Lm | |
| 17 | Precast concrete electrical manhole type A1 | |
| Arqueta prefabricada de hormigón electrica tipo A1 | Ea | |
| 18 | Cover and frame of ductil cast iron D400 1100x1100 mm | |
| Tapa y marco de acero de fundición D400 1100x1100 mm | Ea | |
| 19 | Vertical traffic stop sign | |
| Señal vertical de tráfico de stop | Ea | |
| 20 | Pavement traffic paint (Stop lettering and stop lines with reflexive paint) | |
| Marca y símbolo de tráfico (letrero de stop y simbolos de stop con pintura reflexiva) | Ea | |
| 21 | Traffic, lettering and sign | |
| Marca de calzada con pintura reflexiva | Lm | |
| Total civil Works | ||
| Total Trabajos de Civil |
| Gate and fence | ||
| Puertas y vallado | ||
| 22 | fence doors 6,00x2,00 m and barbed wire 0,30m | |
| Puertas metálicas de malla de simple torsió 6,00x2,00 m mas 0,30 de alambre de espinos | Ea | |
| 23 | Steel fence and barbed wire h=2,30 m | |
| Cerramiento de malla de simple torsión con alambre de espino h=2,30 m | Lm | |
| 24 | foundations fence | |
| Cimentacion de Vallado y puertas | m3 | |
| Total Gate and Fence | ||
| Total Puertas Vallado |
| NEW CONSTRUCTION SUMMARY |
| RESUMEN NUEVA COSTRUCCIÓN |
| Previous and demolitions work |
| Trabajos previos y de demolicones |
| Excavations works |
| Trabajos de excavación |
| Civil work |
| Trabajos de obra civil |
| Gate and fence |
| Trabajos de obra civil |
| TOTAL NEW CONSTRUCTION BLDG 970 |
| TOTAL NUEVA CONSTRUCCIÓN EDIF. 970 |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
| TOTAL PROJECT EUROS | |
| $1 | euros |
| TOTAL PROJECT US$ |
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY Page &P of &N
OPTION 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR STORAGE WAREHOUSE, 970 - OPTION 1 | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG07-1020 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (2) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION 1 WORK | ||||||||||
| TRABAJOS OPCIÓN 1 | ||||||||||
| EARTH WORK (With 20% Contaminated Soil) | ||||||||||
| MOVIMIENTO DE TIERRAS (Con 20% de Tierras Contaminadas) | ||||||||||
| 1 | Transpor of contaminated leftover land to landfill 20% | |||||||||
| Transporte de tierra contaminada a vertedero autorizado 20% | m3 | |||||||||
| 2 | Dumping tax of contaminated soil 20% | |||||||||
| Canon de vertedero de tierras contaminadas 20% | m3 | |||||||||
| 3 | Deduct Dumping tax of soil 20% included in Base Bid - New Construction | |||||||||
| deducir Canon de vertedero de tierras contaminadas 20% | m3 | |||||||||
| 4 | Deduct Transpor leftover land to landfill 20% included in Base Bid - New Construction | |||||||||
| Deducir Transporte de tierra a vertedero autorizado 20% incluido en el Paquete Básico - Nueva Construcción. | m3 | |||||||||
| Total Repair Works option #1 | ||||||||||
| Total Trabajos de reparación opción #1 |
| EARTH WORK (with 20% Contaminatd Soil) SUMMARY |
| RESUMEN MOVIMIENTOS DE TIERRAS (con 20% de Tierras Contaminadas) |
| Civil work option #1 |
| Trabajos de obra civilopción #1 |
| TOTAL EARTHWORKs |
| TOTAL TRABAJOS DE MOVIMIENTO DE TIERRAS |
| SUMMARY OPTION 1 | |
| RESUMEN OPCIÓN 1 | |
| TOTAL EART WORK (with 20% Contamined Soil) | |
| TOTAL MOVIMIENTO DE TIERRAS (con 20% de tierras contaminadas) | |
| GRAND TOTAL | |
| GRAN TOTAL | |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
| TOTAL PROJECT EUROS | |
| $1 | euros |
| TOTAL PROJECT US$ |
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY Page &P of &N
NEW SUMMARY
| CONSTRUCTION COST ESTIMATE SUMMARY | |||||||
| CONTRACTOR | ADDRESS | ||||||
| MORON AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||
| RPR STORAGE WAREHOUSE, 970 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG07-1020 | MORÓN AIR BASE, SPAIN | ||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COST | LINE TOTAL COST |
BASE BID - REPAIR WORK
PAQUETE BÁSICO - TRABAJOS DE DE REPARACIÓN
BASE BID - NEW CONSTRUCTION
PAQUETE BÁSICO - NUEVA CONSTRUCCIÓN
OPTION 1
OPCIÓN 1
GRAND TOTAL GRAN TOTAL
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
| TOTAL PROJECT EUROS | |
| $1 | euros |
| TOTAL PROJECT US$ |
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Normal"INDEPENDENT GOVERNMENT ESTIMATE &"Times New Roman,Normal"FOR OFFICIAL USE ONLY