Pre-Solicitation Notice.pdf
PDF 113 KB Posted
- Solicitation number
- 127EAW22R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This pre-solicitation notice provides details for an upcoming request for proposal from the United States Department of Agriculture Forest Service. The solicitation number 127EAW22R0042 will be posted on May 24th, 2022 to the System for Award Management for the Caldor Fire Phase II Storm Proofing Project located in El Dorado County, California. The project scope consists of road reconditioning, restoring drainage functions, cleaning ditches and culverts, blading and out sloping roads, and installing catch basins and metal end sections on selected roads within the Caldor Fire footprint. Proposals will only be accepted from small businesses certified in SAM. The estimated cost of the project is between $500,000 and $1,000,000, and the NAICS code is 237310 for Highway, Street, and Bridge Construction. Interested parties should register in SAM to view the full solicitation and should contact Gregory Cunningham, Contracting Officer, with any questions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR PROPOSAL (RFP). Proposals shall only be requested and accepted from contractors who are a Small Business AND certified in System for Award Management (SAM, https://sam.gov).
The United States Department of Agriculture (USDA), United States Forest Service (USFS), has a requirement for but not limited to the following:
127EAW22R0042 - Caldor Fire Phase II Storm Proofing Project:
This project consists of road reconditioning and restoring the drainage functions of the roads including cleaning ditches, leadoffs, and culvert inlets and outlets on selected roads. On native surface and gravel roads, road reconditioning also includes blading and out sloping the road wherever possible to provide proper drainage. Other items include increasing catch basin for some culverts, the installation of “Tee” and metal end sections.
Project Location: State of California, County of El Dorado, Within the Caldor Fire footprint
Solicitation Number 127EAW22R0042 for this effort will be posted to SAM.gov (https://sam.gov) on or about May 24th, 2022. This solicitation will contain all necessary specifications, drawings and other information necessary submit a proposal for this project.
There is currently no official group site visit scheduled. The solicitation will include site visit information if one is deemed necessary.
Disclosure of the magnitude of construction projects: The estimated cost of the total project is expected to be between $500,000.00 and $1,000,000.00.
NAICS Code: 237310 – Highway, Street, and Bridge Construction
Size Standard: $39.5Million
Point of Contact: Gregory Cunningham, Contracting Officer
Gregory.Cunningham@USDA.gov
(530) 575-7569
Interested firms are encouraged to register via https://beta.sam.gov/ in order to view the formal solicitation when it is released.
https://sam.gov/ https://sam.gov/ mailto:Gregory.Cunningham@USDA.gov https://beta.sam.gov/
File details come from the government source that posted it. Updated .