Pre-Solicitation Notice_20B0020.pdf
PDF 148 KB Posted
- Attached to
- Plunge Pool Repairs at Salt Creek, NE
- Solicitation number
- W9128F20B0020
About this file
This document provides details on an upcoming federal contract opportunity for plunge pool repairs. The U.S. Army Corps of Engineers Omaha District intends to issue an Invitation for Bid on or around July 20, 2020 for repairs to damaged plunge pools and outlet channels caused by the 2019 flood event in Salt Creek, Nebraska. Bids will be due around August 19, 2020. The project scope involves grading and reshaping sloughed banks, placing riprap and bedding material around plunge pool perimeters, removing accumulated sediment and debris, and seeding disturbed areas. The contract is anticipated to include a base contract with options. Site work must be conducted between September 1 and March 1. Prior to construction, reservoirs will be drawn down below intake structures. The performance period is 180 calendar days. The estimated value is between $1,000,000 and $5,000,000. Solicitation documents will be posted on Beta SAM.gov.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
On or about 20 July 2020, U.S. Army Corps of Engineers (USACE) – Omaha District, intends to issue an Invitation for Bid (IFB) for Plunge Pool Repairs at Salt Creek, NE. The solicitation will close on or about 19 August 2020.
This project is intended to repair damaged plunge pools and outlet channels caused by the 2019 Flood Event. High releases resulted in riprap displacement and sloughed channel banks. In general, repairs will involve grading and reshaping of sloughed banks, placing riprap and bedding material around plunge pool perimeters, along with removal of accumulated sediment/debris as needed to ensure adequate downstream channel capacity. Seeding of disturbed areas will be required. It is anticipated that the contract will consist of a base contract with options. Site work will be conducted during a September 1st to March 1st construction period. Prior to commencement of construction at each site, the reservoirs will be drawn down as necessary to be below the ungated inlet of the intake structure so that water will not be flowing into the work area from the outlet conduit. Construction duration will be 180 Calendar Days.
Estimated Magnitude of Construction is between $1,000,000 and $5,000,000.
All solicitation documents will be posted to the web via Beta SAM.gov (beta.sam.gov).