This is a Questions and Answers (Q&A) document for Request for Quotation (RFQ) 19MU3026Q0018 concerning the Chancery Main Waterline Replacement project (X0037). The document addresses four key inquiries from potential bidders regarding technical specifications and scope clarifications for the waterline replacement work.
The Q&A clarifies critical project parameters: the distance from the Chancery wall to the Motor Pool branch manhole is approximately 55 meters, with a new 1-inch HDPE pipe to be routed through an existing 8-inch pipe. For pipeline demolition and abandonment work, locations A and B require capping in place while location C requires complete removal, as identified on the provided site drawings (Exhibit-A). The 4-inch HDPE pipe from the Motor Pool parking area must be installed within an 8-inch sleeve wherever it contacts soil, including within the Chancery zone. Additional drawing details are referenced as Drawing Exhibit-C on page 47 of the solicitation document. Bidders are directed to review the attached site drawings and exhibits to ensure accurate quotation preparation for this waterline replacement and associated demolition work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q0018 RFQ Chancery Waterline Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for RFQ 19MU3026Q0018- MCT-FAC-RSTR7901-Chancery Main Waterline Replacement (X0037)
Q: 1. Distance from Chancery Wall to Motor Pool Branch Manhole:
Please confirm the distance from the Chancery wall to the Motor Pool branch manhole, as discussed during the site visit, where the new 1-inch HDPE pipe is to be routed through the existing 8-inch pipe. (Please refer to Image 1 attached to the email.)
A: It is mentioned in the Drawing Exhibit-C as approximately 55 meters. Drawing attached.
Q: 2. Additional Drawing
Could you please share the additional drawing that was discussed during the site visit in relation to the above work?
Ans: Drawing attached (Drawing Exhibit-C) in the solicitation document page 47
Q: 3. Pipeline Demolition and Abandonment
Do we need to consider “3. Pipeline Demolition and Abandonment” mentioned on Page 44 in our quotation? If yes, could you please indicate which section of the pipeline shown in Exhibit B/C is to be capped and abandoned in place?
Ans: Drawing attached (Exhibit-A) . Location A and B need capping and C need removal.
Q: 4. 8-Inch Sleeve Requirement Inside Chancery Zone:
As specified, the 4-inch HDPE pipe from the Motor Pool parking area to the Chancery zone is to be installed inside an 8-inch sleeve. Please confirm whether the 4-inch HDPE pipe to be installed within the Chancery zone also requires an 8-inch sleeve, or whether it should be installed directly without a sleeve.
Ans: Wherever 4” HDPE pipe is in contact with soil, we need to provide an 8” sleeve.