This file is a pricing and service specification appendix for a maintenance contract covering low-voltage and medium-voltage electrical switchgear and associated equipment at a U.S. diplomatic facility in Frankfurt, Germany. The appendix details quarterly facility management meetings, 365-day on-call service availability (including weekends and holidays), project management, certified staff requirements, and estimated incidental expenses of €5,000. The maintenance scope encompasses annual visual inspections and cleaning of low-voltage switches (77 3WE circuit breakers, 30 3WL circuit breakers, 15 3VL circuit breakers, and 5 inspection stations), medium-voltage field inspections at four stations (25 total fields), and verification that short-circuiting and grounding devices comply with rated values.
Additional maintenance requirements include periodic protection testing every four years for 18 pieces of medium-voltage equipment, comprehensive battery system checks (charging, density, connections, cell state, charger functionality, and voltage detector adjustments), transformer maintenance comprising cleaning of insulating parts and rooms, Buchholz protection functional inspections, oil measurements, and insulating agent inspection per VDE 0370 Part 2 standards. The contract also requires visual inspection and documented assessment of 16 KV boxes, with findings recorded via structured checklists and photographic evidence to identify condensation, moisture, corrosion, foreign matter, and loose connections. All personnel must hold valid manufacturer-specific certifications for Siemens systems (8DJH/8DH10 MV, SIVACON/SENTRON LV, GEAFOL/Tumetic transformers) and industrial battery systems, with core maintenance tasks and functional testing restricted to after 18:00, weekends, or public holidays to avoid disrupting diplomatic operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix D - POST De-Energized Work LOTO Policy.doc | DOC document | |
| Appendix A- Detailed equipment list Frankfurt.xlsx | XLSX spreadsheet | |
| Appendix B SOW Low and Medium Voltage Switchgear 2026 -2 .docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Item numbers Service Contract Performances Quantities Unit monthly quarterly annually once every 4 years optional List of individual prices
| General Data relating to Maintenance Contract | |||||||
| 1.01 | Quarterly Meeting of Facility Management US Consulate and Contratcor | 4.00 | pces. | x | |||
| 1.02 | 365 days /24 hours on-call service including Saturdays/Sundays and public holidays for the switchgears / Optional | 12.00 | pces. | X | |||
| 1.04 | Project management and coordination | 12.00 | pces. | x | |||
| 1.05 | Certified staff already checked by the Consulate | x | |||||
| 1.06 | Scope of Delivery and Services includes the specific circumstances relevant for the Consulate. | x | x | x | |||
| 1.07 | Estimated incidentals for extra and additional expenses | 5,000.00 | Euro | x |
| Maintenance / Inspection | |||||
| Inspection of low-voltage switches "Visual inspection and cleaning of switches at US Consulate" (once a year) | |||||
| 3.01 | 3WE circuit breaker | ||||
| 77.00 | pces. | x | |||
| 3.02 | pces. | ||||
| 3.03 | 3WL circuit breaker | ||||
| 30.00 | pces. | x | |||
| 3.04 | 3VL circuit breaker | ||||
| 15.00 | pces. | x | |||
| 3.05 | pces. | ||||
| Check that short-circuiting and grounding devices comply with rated values for the switchgear, are appropriately labeled and functional. Cleaning and inspection of stations | 5.00 | pces. | x |
| Inspection of medium voltage field "Visual inspection and cleaning of switches at US Consulate" (once a year) | |||||
| 4.01 | Station 319 medium voltage | 8.00 | fields | x | |
| 4.02 | Station 320 medium voltage | 5.00 | fields | x | |
| 4.03 | Station 336 medium voltage | 5.00 | fields | x | |
| 4.04 | Station 337 medium voltage | 7.00 | fields | x | |
| 4.05 | Check that short-circuiting and grounding devices comply with rated values for the switchgear, are appropriately labeled and functional. Cleaning and inspection of stations | 4.00 | pces. | x | |
| 4.06 | Inspection of safety and warning signs to ensure updated status and correct application. | ||||
| 4.00 | pces. | x |
| Medium voltage protection testing | |||||
| 5.01 | Periodic protection tests (once every 4 years) | 18.00 | pces. | x | |
| Maintenance of battery systems | |||||
| 6.01 | Check battery charging and density, and re-charge if required | x | |||
| 6.02 | Check connections, clean and grease if required | x | |||
| 6.03 | Check the charge state of individual cells | x | |||
| 6.04 | Check all functions of the battery charger | x | |||
| 6.05 | Check battery undervoltage and overvoltage detector, and adjust accordingly if required | x |
| Transformers | ||||||
| Maintenance of a transformer comprising cleaning the insulating parts and transformer room, including supply of cleaning agents | 8.00 | pces. | x | |||
| Functional inspection of Buchholz protection and completion of inspection record. | ||||||
| 8.00 | pces. | x | ||||
| Oil measurement at the transformer Insulating agent inspection in accordance with VDE 0370 Part 2 Inspection of water content, dielectric strength (insulation strength) color index, odor and ... | 1.00 | pces. | x | |||
| KV Boxes | ||||||
| The service includes visual inspection and written documentation of the current condition of cable connections and housings. The visual inspection focuses on detecting condensation (moisture, corrosion), identifying foreign matter (dust, dirt, residue), and checking for loose cable connections. All findings, defects, and deviations must be immediately documented in writing using a structured checklist and supported by photographic evidence. | 16.00 | pces. | x | |||
| The scope of work specified in the maintenance plan | ||||||
| applies for various network systems and need not comply | ||||||
| completely with the machine to be serviced in this | ||||||