POSTING RD.pdf

PDF 8 KB Posted

Attached to
PUMP, CENTRIFUGAL
Solicitation number
70Z08523Q49029B00
Issued by

About this file

This document outlines requirements for overhauling a centrifugal pump part used by the U.S. Coast Guard. The contractor must open, inspect, repair, preserve, package, mark, and barcode the pump part in accordance with the attached statement of work. The contractor must guarantee the part for up to two years after delivery against defects that could lead to failure if installed within 90 days. Acceptance will occur at destination when a government representative verifies correct part and order information and compliance with preservation, packaging, and marking requirements. The part must be packaged individually in a wooden box marked with stock number, name, part number, and order information, and preserved for a minimum of two years. The related solicitation is for this centrifugal pump part repair from the Department of Homeland Security's U.S. Coast Guard.

View the file

Other files

File Type Posted
TAB 3 SOW.docx DOCX document
TAB 12 FAR CLAUSES.pdf PDF
TAB 12 RFQ.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME PUMP,CENTRIFUGAL

STOCK NUMBER 4320-01-424-4583

PART NUMBER E-4671 (E-4672 PIECE 48)

USED ON WLB-225A, WLM-175

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

Open, inspect, repair, preserve, package, mark, and bar-code NSN 4320-01-424- 4583 in accordance with the attached Statement of Work (SoW).

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

FOR OFFICIAL USE ONLY

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4320-01-424-4583

PUMP,CENTRIFUGAL

E-4671 (E-4672 PIECE 48)

PRESERVATION / PACKAGING:

A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

X B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"