POSTING RD.pdf
PDF 8 KB Posted
- Attached to
- PUMP, CENTRIFUGAL
- Solicitation number
- 70Z08523Q49029B00
About this file
This document outlines requirements for overhauling a centrifugal pump part used by the U.S. Coast Guard. The contractor must open, inspect, repair, preserve, package, mark, and barcode the pump part in accordance with the attached statement of work. The contractor must guarantee the part for up to two years after delivery against defects that could lead to failure if installed within 90 days. Acceptance will occur at destination when a government representative verifies correct part and order information and compliance with preservation, packaging, and marking requirements. The part must be packaged individually in a wooden box marked with stock number, name, part number, and order information, and preserved for a minimum of two years. The related solicitation is for this centrifugal pump part repair from the Department of Homeland Security's U.S. Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TAB 3 SOW.docx | DOCX document | |
| TAB 12 FAR CLAUSES.pdf | ||
| TAB 12 RFQ.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME PUMP,CENTRIFUGAL
STOCK NUMBER 4320-01-424-4583
PART NUMBER E-4671 (E-4672 PIECE 48)
USED ON WLB-225A, WLM-175
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Open, inspect, repair, preserve, package, mark, and bar-code NSN 4320-01-424- 4583 in accordance with the attached Statement of Work (SoW).
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
4320-01-424-4583
PUMP,CENTRIFUGAL
E-4671 (E-4672 PIECE 48)
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
File details come from the government source that posted it. Updated .