POSTING RD.pdf

PDF 11 KB Posted

Attached to
PUMP, ROTARY
Solicitation number
70Z08523Q49008B00
Issued by

View the file

Other files

File Type Posted
POSTING AN054 JOTFOC.pdf PDF
TAB 12 RFQ AN054.docx DOCX document
POSTING FAR CLAUSES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME PUMP,ROTARY

STOCK NUMBER 4320-01-413-9050

PART NUMBER 4P-1383

USED ON 225' WLB EDG FUEL INJECTOR PUMP

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

This description is for a purchase of remanufactured Fuel Injector-Rotary Pump, P/N: 4P-1383 or P/N: 20R-4731 through the Caterpillar core exchange program using HSCG40-14-D-40002.

The Contractor shall furnish a remanufactured rotary pump, P/N: 20R-4731.

The Government will furnish a defective core for evaluation. If the core is found to be repairable, the Contract shall refund the core deposit amount.

Individually packaged in accordance with MIL-STD-2073-1 E Method 10, cushioned in a double layer of 3/4 IN bubble wrap and packed in an appropriately sized ASTM- D6251 Type III, Class 1 Wood-Cleated Panelboard Shipping Box or ASTM-D6880 Class 2 Heavy Duty screwed Wooden Box.

Marking IAW MIL-STD-129R and shall read as follows:

NATIONAL STOCK NUMBER 4320-01-413-9050

ITEM NAME PUMP, ROTARY

PART NUMBER 20R-4731

ALTERNATE PART NUMBER 4P-1383

CONTRACT NUMBER (see purchase order)

COAST GUARD SFLC MATERIAL, CONDITION "A"

Bar Coding shall be in accordance with ISO/IEC-16388-2007, Code 39 Symbology.

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for

90 days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

OVERHAUL DESCRIPTION

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4320-01-413-9050

PUMP,ROTARY

4P-1383

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

TBJenkins Cross-Out

File details come from the government source that posted it. Updated .