Plans - VA ERFO NPS BLRI 202-1(2).pdf
PDF 16 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000006
About this file
This solicitation is for permanent slide repairs on the Blue Ridge Parkway in Virginia. The project consists of slide repair at mile markers 119.7 and 127.9, and includes slope stabilization with soil nails, a mechanically stabilized earth wall, shoulder reconstruction, pavement markings, and other miscellaneous work. The work will be split into multiple schedules with a total expected cost between $2 million to $5 million. Sealed bids from certified Small Business Concerns will be accepted until the due date specified in the solicitation. Interested vendors must register online to receive notifications and bid documents. Bidders must have valid SAM registration and meet security requirements for access to government buildings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO- VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0004 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0003 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0002 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0001 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Geotechnical Report.pdf | ||
| VETS-4212 Form.pdf | ||
| RIP Report.pdf | ||
| NEPA Documents_ESC Narrative.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| FP14_Eng.pdf | ||
| NEPA Documents_VADEQ ESC Approval Letter.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - VA ERFO NPS BLRI 2020-1(2).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols and Abbreviations
Location Maps
Typical Sections
Summaries and Schedules
Erosion and Sediment Control Narrative
Erosion and Sediment Control Plan
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.09 Mile
ADT (2020)
ADT (2040)
DHV
% Trucks
% Buses
V (MPH)
168 VPH
< 1%
0 (not allowed)
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max) 10% and other miscellaneous work.
reconstruction at MP 127.9, pavement markings, a mechanically stabilized earth wall and pavement system and shoulder reconstruction at MP 119.7, Work includes slope stabilization repairs with soil nail
1,342
ROANOKE COUNTY, VIRGINIA
PERMANENT SLIDE REPAIRS AT MP 119.7 AND MP 127.9
(mile)
RIP Data Length Lane MilepostDescriptionSchedule
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
A02-A03
A04-A05
B01-B02
C03-C10
M01-M03
M04-M05
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
BLUE RIDGE PARKWAY
VA ERFO NPS BLRI 2020-1(2)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: WIDTH
5'
SURFACE BASE SUBGRADE
4" ACP 6" Aggr. N/A
ROAD: WIDTH SURFACE BASE SUBGRADE
N/A
BLRI-0001BA, MP 119.7
JANUARY 2022
Project Manager
Sheila Foronda
Lead Designer
Shoukat Nawaz
Highway Design Manager
Alondra Sierra
0.18 Mile
N
0 4040
SCALE IN MILES
Richmond
Arlington
Charlottesville
Front
Royal
KEY MAP
STATE OF VIRGINIA
NO SCALE
VA ERFO NPS BLRI 2020-1(2)
VA ERFO NPS BLRI 2020-1(2)
B BLRI-0001BA 119.7 0.11
P01-P02 Permanent Striping Plan
S01-S21 Standards and Details
A BLRI-0001BA 127.9 0.07
N
MP 127.9
MP 119.7
D01-D03 Plans and Profiles
A06-A07 Survey Information
T01-T15 Cross Sections
Tabulation of QuantitiesC01-C02
N01-N07 Temporary Traffic Control Plan
Cycle 5
Cycle 5
(mile)
0.03
0.06
21' 5.5" ACP 6" Aggr. N/ABLRI-0001BA, MP 127.9
(only shoulder widening)
Disaster No. VA2020-1-NPS
:4
P
M
D e c e m b e r
A
T it le S h e e t
S h e e t]
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\A V
A E
R F
O B
L R
I N
P S
-1
(2 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A01
NPS Drwg No. 601/175166 NPS PMIS No. 311372 pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
BLUE RIDGE PARKWAY
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:2 e c e m b e r
D
O N
O T
U S
E
S H
E E
T
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y
D E
S \C
A D
D \9
\A
-A
V
A E
R F
O B
L R
I N
P S
-1 (2 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A02
AREA PATTERN
SYMBOLS AND ABBREVIATIONS
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Aggregate-Topsoil Course
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Reinforced Soil SlopeRSS
Reinforced Soil Slope Wall
Paved Waterway
Blue Ridge ParkwayBLRI
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
Sheet 2 of 2
:2 e c e m b e r
S
H E
E
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\A -A
V
A E
R F
O B
L R
I N
P S
-1
(2 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A03
LOCATION MAP
VA ERFO NPS BLRI 2020-1(2)
MP 119.7 - Schedule B
N
BEGIN WORK
E=3609008.1520
N=11064683.1014
200+00.00
END WORK
E=3608915.5888
N=11064960.9889
202+94.67
NO SCALE
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
MP 119.7
Sheet 1 of 2
:5
A e c e m b e r
A
L o c a ti o n
M a p
M P
.7
S h e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\A -A
V
A E
R F
O B
L R
I N
P S
-1
(2 lo c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A04
VA ERFO NPS BLRI 2020-1(2)
MP 127.9 - Schedule A
LOCATION MAP
BEGIN WORK
END WORK
E=3593943.5465
N=11031413.8895
100+20.00
E=3593966.1579
N=11031592.0225
102+00.00
NO SCALE
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
Sheet 2 of 2
:5 e c e m b e r
A
L o c a ti o n
M a p
M P
.9
S h e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\A -A
V
A E
R F
O B
L R
I N
P S
-1
(2 lo c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A05
TBAR1338.22411064741.0633609005.8601901
TBAR1320.69111064989.7353608897.8601900
NUMBER
REMARKSELEVATIONEASTINGNORTHINGPOINT
: GEOID12A(Conus)Geoid Model
: Geodetic Ref System 1980Ellipsoid Name
: NAVD 1988Vertical Datum
: NAD 1983 (Conus)Horizontal Datum
: Virginia South 4502Zone
: US State Plane 1983Coordinate System x .0
'C
M P
TBAR
Twin Oak
18"Φ
Oak Bench
18"Φ
TBAR
A Z
.8
.6
AZ 267.09°
65.16'
AZ 311.46°
36.2'
AZ 79
.47°
32.31
NTS NTS
NN
SURVEY CONTROL POINTS REFERENCES
SURVEY CONTROL POINTS
COORDINATE SYSTEM
Azimuth angle shown is based on north axis at clockwise rotation
Note:
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
SURVEY INFORMATION
:4 e c e m b e r
A
S u rv e y I n fo rm a ti o n S h e
P
R O
J E
C T
S \b lr i\ -1
(2
H W
Y D
E S
\C A
D D
\9
\A -A
V
A E
R F
O B
L R
I N
P S
-1
(2 s u r.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A06
TBAR1602.59711031312.2643593902.9061202
TBAR1592.86911031465.2423593954.2851201
TBAR1587.70711031574.1743593972.7011200
NUMBER
REMARKSELEVATIONEASTINGNORTHINGPOINT
: GEOID12A(Conus)Geoid Model
: Geodetic Ref System 1980Ellipsoid Name
: NAVD 1988Vertical Datum
: NAD 1983 (Conus)Horizontal Datum
: Virginia South 4502Zone
: US State Plane 1983Coordinate System
SURVEY CONTROL POINTS REFERENCES
SURVEY CONTROL POINTS
COORDINATE SYSTEM
T B
A R
TBAR
"x
.7
'C
M P
IN
V
.1
INV 1597.41'
8"CMP
N
N N
NTS NTS NTS
A Z
.2
.6
AZ 274.74°
24.58' A
Z
.1
.1
AZ 102.06°
132.06'
A Z
.5
.3
AZ 283.07°24.59'
AZ 298.44°
20.09'
A Z
.2
.7
AZ 2
.45
°22 .39
AZ 123.61°
37.41'
T B A R
AZ 286.6°
74.81'
Azimuth angle shown is based on north axis at clockwise rotation
Note:
U.S. DEPARTMENT OF TRANSPORTATION
SURVEY INFORMATION
:5 e c e m b e r
A
S u r v e y I n f o r m a ti o n
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\A
-A
V A
E R
F O
B L
R I
N P
S
-1
(2 s u r.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
A07
Rolled erosion control product, Type 2.C. (typ.) See Detail E629-01.
See Detail E259-A
Install soil nail (typ.)
Turf establishment and topsoil
Existing pavement asphalt
Existing aggregate base
L travel lane
Proposed travel lane
Proposed
L
Existing
Match concrete barrier
Remove existing concrete barrier
Remove existing
Type 5. See Detail E608-05.
4" depth paved waterway, Remove and replace damaged
Clean drainage structure in place.
pavement markings
Remove existing C
Proposed C profile grade line.
Match existing surfaces, in accordance with Section 625.
disturbed areas, except paved or rock otherUse Meadow seed mix for all
Establish turf seed mix on shoulders.7.
and submit to the CO for approval.
construction and temporary stability, Determine the sequence of soil nail6.
Section 625.
disturbed areas in accordance with
Use meadow seed mix for all other 5.
accordance with Section 625.
Establish turf seed mix on shoulders in4.
Section 259.
Construct soil nails in accordance with3.
See Detail E259-A.
conditions as approved by the CO.
Adjust the soil nails locations to fit site
10 feet o.c. horizontally and vertically.
Install soil nail spaced approximately at 2.
approved by the CO.
disturbance that interfere with work as minor vegetation within the limits of
Clear all trees, bushes, vines, and other 1.
NOTES:
LC
Sawcutting pavement
Existing
Match
NO SCALE
Existing ground (typ.)
shoulder
Existing
Roadway excavation
Place aggregate-topsoil, 4" depth topsoil, 4" depth
Furnishing and placing
3% slope
Shoulder, (typ.)
max.
(1V:4H) Varies
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
20' (typ.)
ty p ty p.
Limits of Construction
11' 11'
0'-4.5' Varies
2'3' 2'
:5
D e c e m b e r
B
M P
.7
T y p ic a l
S e c ti o n
S h e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\B -B
V
A E
R F
O B
L R
I N
P S
-1
(2 ty p .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
B01
See Notes 1 and 2
S e e N o te
See Note 8.
Select granular backfill (typ.)
Granular backfill. See Note 7.
V :1
H
18''
L C
NOTES:
Va rie s
Ground
Existing
(m ax
1V:2 H)Va rie s
Travel lane
10.5'2'
Travel lane
10.5'
See Pavement Structure Detail e% construction
Embankment geotextile, class 2, type E
Separation-stabilization
Profile grade line
SLOPE REPAIR - REINFORCED SOIL SLOPE
See Detail A A
A
See Detail B
W a ll H e ig h t, V a r ie s
S e e N o te
SECTION A-A
Granular backfill. See Note 7.
6" non-perforated outlet pipe
Class 2, Type E Separation-stabilization geotextile, locations and heights.
See Plan and Profile sheets for RSS 14.
replaced. See Cross Sections for locations.
goes through the RSS wall and is not to be
Protect the portion of the existing pipe that 13.
granular backfill.
top RSS layer 18 inches beyond select
Extend geotextile separation layer for the 12.
as directed by the CO.
consolidation during subsequent work, Apply a compactive effort to avoid
Construct facing and basket simultaneously. 11.
See Section 204 for excavation requirements.10.
to Subsection 714.04
9. Furnish geogrid reinforcement conforming
Subsection 704.08.
Furnish select granular backfill conforming to8.
Subsection 703.03(a).
Furnish granular backfill conforming to 7.
directed by the CO.
Remove trees near the slide repair area as 6.
areas in accordance with Section 625.
Use meadow seed mix for all other disturbed 5.
accordance with Section 625.
Establish turf seed mix on shoulders in 4.
Section 261.
Construct reinforced soil slope according to 3.
0.5% slope.
perforated collector pipe at a minimum
Place 6-inch non-perforated outlet pipe and 2.
points or as directed by the CO.
Install a minimum of three outlet pipes at low 1.
NO SCALE
(1V:4H) Varies guardrail system SBTA Remove and replace
2' 2' 2'
12" depth (typ.)
Place aggregate-topsoil course, e% and topsoil (typ.)
Turf establishment
Type V. See Note 9
Reinforcement geogrid, Select granular backfill. See Note 8.
Class 2, Type E Separation-stabilization geotextile, Support Strut
Type 2.C. (typ.)
control product, Rolled erosion
Place topsoil (typ.)
FACING
DETAIL B
seeding (typ.)
Place meadow
See Detail E255-A welded wire face;
Reinforced soil slope, seed mix
Place meadow
Roadway excavation
PAVEMENT STRUCTURE DETAIL
NMSA, <0.3 X 10⁶ ESAL, PG 64-22"8
3Gyratory Mix, 1.5" Asphalt Concrete Pavment, ESAL, PG 64-22
6" NMSA, <0.3 X 104
3Gyratory Mix, 4" Asphalt Concrete Pavement, Tack Coat
6" Aggregate Base, Grading C or D
Class 2, Type E Separation-Stabilization Geotextile, Existing 5.5" Asphalt Concrete Pavement
Existing 6" aggregate base construction Embankment
COLLECTOR PIPE
DETAIL A
1V:4H pipe and geotextile separation between Provide 2" (min.)
geotextile, Class 2, Type E Separation-stabilization
Granular backfill. See Note 7.
See Note 2.
collector pipe.
6" perforated
See Notes 1 and 2.
outlet pipe.
6" non-perforated
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
1'
Varies
Reinforcement Length, 35'
4' (typ.)
18" (typ.)
(t y p
18" (typ.)
36" 9"
24" Overlap
:5
J a n u a ry
B
M P
.9
T y p ic a l S e c ti o n S h e
P
R O
J E
C T
S \b lr i\ -1
(2
H W
Y D
E S
\C A
D D
\9
\B -B
V
A E
R F
O B
L R
I N
P S
-1
(2 ty p .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
B02
SCHEDULE A
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TABULATION OF QUANTITIES
:5 e c e m b e r
T a b u la ti o n o f Q u a n ti ti e s
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C01
SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TABULATION OF QUANTITIES
:5
J a n u a r y
T a b u la ti o n o f Q u a n ti ti e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C02
Sheet 1 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SUMMARIES AND SCHEDULES
MP 119.7 and MP 127.9 e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C03
Sheet 2 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C04
Sheet 3 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C05
Sheet 4 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C06
Sheet 5 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:0 e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C07
Sheet 6 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C08
Sheet 7 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C09
Sheet 8 of 8
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\C -C
V
A E
R F
O B
L R
I N
P S
-1
(2 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
C10
S81° 08'03
"E S62°37'10"E
.8
C
.0
P O
B
.6
P O
E x .0
'C
M P
I N
V
.8
I N
V
.0
TBAR
18"Φ Twin Oak18"Φ
Oak Bench
N
BEGIN WORK END WORK
200+00.00 N=11064683.1014 E=3609008.1520
202+94.67 N=11064960.9889 E=3608915.5888
PI 201+47.75
Δ = 13°05'54" (RT)
R = 835.48' T = 95.92' L = 191.00' e = ___
Proposed C L
Existing CL
Proposed EOP
Blue R idge P arkway
240 lnft. See Detail E608-05.
paved waterway, Type 5, Remove and replace damaged
C1
Roadway excavation, 25 cuyd.
4-inch depth, 55 sqyd.
Aggregate-topsoil course, 225 lnft. See Note 1.
concrete barrier, Remove existing
See Note 1.
drums.
existing Remove
See Note 1.
drums.
existing Remove
See Note 1.
drums.
existing Remove
See Note 1.
drums.
existing Remove
Existing EOP
See Typical Section.
Install soil nails (typ.), 820 lnft.
215 lnft. See Note 1.
concrete barrier, Remove existing
Limits of soil nail stabilization
Sawcutting pavement, 240 lnft
Proposed EOP
Cut line 4-inch depth Furnishing and placing topsoil, NOTE:
1. Ensure signs and barricades have been removed conforming to Subsection 203.03.
SCALE IN FEET
0 10 20
U.S. DEPARTMENT OF TRANSPORTATION
PLAN
:0 e c e m b e r
D
M
P
.7
S h e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y
D E
S \C
A D
D \9
\D
V A
E R
F O
B L
R I
N P
S
-1
(2
M P
.7
.d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
D01
N79°02'12 "E
70 1570
75 1575
TBAR
PK
70 1570
75 1575
TBAR
PK
70 1570
75 1575
N
L
BEGIN WORK
END WORK
102+13.68
N=11031605.7012
E=3593965.7719
100+00.00
N=11031394.2545
E=3593939.7429
Existing C
PI 101+47.97
Δ = 14°00'48" (RT)
R = 540.12' T = 66.38' L = 132.10' e = ___
C1
Blue Ridge Parkway
"x
0.
'R
C P
See Typical Section.
100+20 to 102+13.68 Roadway reconstruction, See Typical Section.
100+00 to 102+13.68 Remove and replace guardrail, Place Riprap, Method A, Class 2.
headwall for 18-inch pipe culvert.
Locate and replace damaged concrete
Slope stake limit
See Cross Sections.
100+60 to 102+00.
Install RSS Wall, damaged 18-inch pipe, 45 lnft
Remove and replace
Existing headwall
Proposed EOP (typ.)
12-inch depth, 110 sqyd (typ.)
Aggregate-topsoil course, NOTE:
1. Protect the portion of the existing 18-inch pipe culvert that goes through the RSS wall and is not to be replaced.
See Cross Sections for locations.
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
O
B
.0
P C
.5
P C
C
.6
.5
.5
.5
.5
:2
J a n u a ry
D
P la n M
P
.9
S h e
P
R O
J E
C T
S \b lr i\ -1
(2
H W
Y D
E S
\C A
D D
\9
\0 -B lr i2
-1
(2 )M p c o r.
d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
D02
100+60, Elev. 1,594.00
100+60, Elev. 1,570.00
100+70, Elev. 1,561.00
100+80, Elev. 1,558.00
Reinforcement geogrid, Type V (typ.)
100+90, Elev. 1,555.00
101+00, Elev. 1,552.00
101+10, Elev. 1,549.00 RSS (typ.)
Bottom of Elev. 1,555.00
101+60
Elev. 1,558.00 101+70
Elev. 1,561.00 101+80
Elev. 1,567.00 101+90
100+70, Elev. 1,592.50 101+20, Elev. 1,589.50
101+00, Elev. 1,591.00 101+40, Elev. 1,588.00
Existing ground
Top of RSS (typ.)
Profile grade line
101+70, Elev. 1,586.50
Elev. 1,597.70
100+20
RECONSTRUCTION
BEGIN ROADWAY
El. 1,586.24
102+13.68
RECONSTRUCTION
END ROADWAY
NOTE:
1. Protect the portion of the existing 18-inch pipe culvert that goes through the RSS wall and is not to be replaced.
INV Elev. 1556.13 101+50 Existing 18-inch pipe culvert
INV Elev. 1552.88 101+60
Existing 18-inch pipe culvert
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
PROFILE
100+00 101+00 102+00
1,470 1,470
1,480 1,480
1,490 1,490
1,500 1,500
1,510 1,510
1,520 1,520
1,530 1,530
1,540 1,540
1,550 1,550
1,560 1,560
1,570 1,570
1,580 1,580
1,590 1,590
1,600 1,600
1,610 1,610
1,620 1,620
1,630 1,630
1,640 1,640
-5.926%
-5.915%
-5.926%
.0
' VC100
9,079K =
'INFHLSD = 1
,5
.7
Excavation Quantity: 6,144 CUYD
100+20 100+40 100+60 100+80 101+20 101+40 101+60 101+80 102+20 102+40 102+60
:5
J a n u a r y
D
P r o f il e
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\D
V
A E
R F
O B
L R
I N
P S
-1 (2
M
P
.9 .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
D03
Structural Practices
Adhere to the Minimum Standards of VESCH unless waived or approved by variance.
Specifications of the Virginia Erosion and Sediment Control Handbook, 3rd Edition (VESCH) and FP-14 detail drawings.
maintain all vegetative and structural erosion and sediment control practices according to Minimum Standards and sediment control measure required for compliance with DEQ regulations. Unless otherwise indicated, construct and
Erosion and Sediment Control measure, fiber roll is proposed for this project. Install and maintain the erosion and
Erosion and Sediment Control control measures. Direct storm runoff to vegetated buffer areas and do not discharge directly into surface waters.
sediment outside the project limits. Do not allow construction equipment to operate down-slope of the perimenter construction access will be permitted through a wetland or waterway. Do not allow construction vehicles to track
Do not modify the type, size, or location of any measure or practice without prior approval from the CO. No
Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Provisions.
Erosion and Sediment Control measures are defined and outlined in the Standard Specifications for Construction of
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment. The
General Guidelines
8802.
40 CFR 112. Report spills large enough to discharge to surface waters to the National Response Center at 1-800-424-
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
clearly marked containers away from other nonwasted materials. Do not dispose of hazardous waste materials into the activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in appropriate and generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect and contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent garbage, and sanitary waste.
materials; fuels, oils, and equipment-related compounds; soaps and solvents used for vehicle washing; and, waste, The following discharges are prohibited: wash-water from concrete, paint, curing compounds, and other construction
Prohibited Discharges must first be approved by the Contracting Officer (CO).
The surrounding off-site area will not be affected by any land-disturbing activities. Any foreign fill to be brought in
Off-site and Critical Areas
Summary stabilized earth wall and pavement reconstruction at MP 127.9, pavement markings, and other miscellaneous work.
Work includes slope stabilization repairs with soil nail system and shoulder reconstruction at MP 119.7, a mechanically
Project Description vegetation can provide long-term stabilization
Fiber Roll (E157-04): Fiber roll is placed as shown on the plans to trap sediment and moisture on slopes until included in the plans by variance.
Fiber Roll is a EFLHD FP-14 detail area for Schedule A (MP 127.9) is 2,603 SQYD or 0.54 acre. The total disturbed area for Schedule B (MP 119.7) is 1,581 SQYD or remove silt fence only after all upslope areas are stabilized and vegetation is well established all culvert outlet protection, riprap basins, and stabilized channels; remove all devices used for dewatering; and inspect, clean, and repair or pavement) before routing drainage through completed culverts ensure that culvert entrances, outlets, and outlet channels are at final grade and are stabilized (with vegetation, riprap, Install inlet protection prior to diverting water through inlets. Upon completion of culverts, fiber roll fiber roll, check dam, silt fence, and inlet protection
A
Camocca fine sand, hydrologic soil group is classified as reseeded as needed to establish and maintain a good stand of vegetation.
Check the seeded areas regularly to ensure that a good stand of vegetation is maintained. Areas must be 2.
Replace damaged erosion and sediment control measures within 24 hours of inspection.
sediment deposits from the erosion and sediment control measures when it reaches half the height of the device.
Inspect fiber roll, check dam, silt fence, and inlet protection weekly and after each runoff event. Remove 1.
apply permanent turf establishment to disturbed areas where vegetation has not established;
apply permanent turf establishment to any remaining disturbed areas; where necessary, replace eroded topsoil and re-
After completion of roadway construction, do the following as directed by the CO: finish grading, place riprap, and
Phase III: Final Construction/Stabilization pits and staging areas.
within 7 days of stockpiling. Provide watering for dust control within the construction limits, on active haul roads, and in stockpiled excavated roadway material. Apply temporary seeding to stockpiles remaining in place longer than 14 days around all grading operations, shape earthwork to minimize and control erosion from storm runoff. Provide
Prior to any heavy machinery or truck vehicles entering the site, construct a SCE. At the end of each day’s rough
Phase II: Intermediate Controls
.leave the project site. Perimeter controls include Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment does not
Phase I: Establish Perimeter Controls
Sequence of Construction
The following soil types were identified within the project site:
Soils duration), and in accordance with the Stormwater Pollution Prevention Plan (SWPPP). In particular, check the following:
In general, check all erosion and sediment control measures daily, after every significant rainfall (0.5�”in a 24-hour
Maintenance and Inspection
CO.
sheets in the site plan drawings. In all seeding operations, seed must be applied prior to mulching as approved by the immediately following grading. Seeding will be done in accordance with the planting schedule provided on the notes All disturbed areas that will remain dormant for more than one year must be stabilized with permanent seeding
Permanent Stabilization removed.
After achieving adequate stabilization, the temporary erosion and sediment controls must be cleaned up and 5.
sediment control practices.
The responsible land disturber must be responsible for the installation and maintenance of all erosion and 4.
Clearly mark areas which are not to be disturbed with flags, signs, etc.3.
Temporary seeding or other stabilization must follow immediately after grading.2.
Sequence construction so that grading operations can begin and end as quickly as possible.1.
Management Strategies
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
NARRATIVE
EROSION AND SEDIMENT CONTROL
:3 e c e m b e r
M
S h e
P
R O
J E
C T
S \b lr i\ -1
(2
H W
Y D
E S
\C A
D D
\9
\M -M
V
A E
R F
O B
L R
I N
P S
-1
(2
E S
C N a rr a ti v e .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
M01
Regulations, MS-1MS-19 must be addressed.
minimum standards (from the Virginia Erosion & Sediment Control
6 of the Virginia Erosion & Sediment Control Handbook. All applicable
This section presents the guidelines & requirements identified in Chapter
VESCH Minimum Standards (MS-19) dormant for more than one year.
stabilization shall be applied to areas to be left dormant for longer than 13 days. Permanent may not be at final grade but will remain applied within seven days to denuded areas that of the site. Temporary soil stabilization shall be days after final grade is reached on any portion shall be applied to denuded areas within seven
1. Permanent or temporary soil stabilization transferred offsite.
onsite and borrow areas or soil intentionally stabilization shall be applied to all soil stockpiles
Temporary protection and permanent or protected with sediment trapping measures.
stockpiles and borrow areas shall be stabilized
2. During construction of the project, soil enough to survive and will inhibit erosion.
ground cover is achieved that is uniform, mature shall not be considered established until a permanently stabilized. Permanent vegetation established on denuded areas not otherwise
3. Permanent vegetative cover shall be takes place.
made functional before upslope land disturbance step in any land-disturbing activity and shall be to trap sediment shall be constructed as a first sediment barriers and other measures intended
4. Sediment basins and traps, perimeter dikes, other diversions immediately after installation.
earthen structures such as dams, dikes and
5. Stabilization measures shall be applied to
24 hours.
integrity of the basin during a 25 year storm of shall at a minimum maintain the structural yards/acre of drainage area. The outfall system minimum storage capacity of 134 cubic drainage areas less than three acres with
Sediment traps shall be constructed to control drainage area to be served by the trap or basin.
designed and constructed based upon the total
6. Sediment traps and sediment basins shall be corrected.
slope stabilization measures until the problem is stabilization shall be provided with additional excessively within on year of permanent erosion. Slopes that are found to be eroding constructed in a manner that will minimize
7. Cut and fill slopes shall be designed and flume or slope drain structures.
adequate temporary or permanent channel, or fill slopes unless contained within an
8. Concentrated runoff shall not flow down cut
14 days.
remain dormant for longer than denuded areas which will temporary stabilization to all temporary seeding or other
1. Contractor must apply seven (7) days.
which will remain longer than stabilization to soil stockpiles temporary or permanent
2. Contractor must apply project site without approval.
soil can be brought into the all denuded areas. No foreign mix, approved by the CO, to topsoil and permanent seed
3. Contractor must apply use of Fiber Roll.
Environmental Quality for the requested from Department of
A written exception will be land disturbing activity.
perimeter controls prior to any
4. Contractor must establish
5. Not Applicable and wetlands.
adjacent natural features footprint and impact on would have too great of a
Installation of these features requested from DEQ.
6. A written exception will be with these plans.
cut/fill slopes in accordance
7. Contractor must grade remain sheet flow.
8. Not Applicable. All flow must provided adequate drainage or other protection shall be
9. Whenever water seeps from a slope face, otherwise treated to remove sediment.
conveyance system without first being filtered or so that sediment-laden water cannot enter the operable during construction shall be protected
10. All storm sewer inlets that are made channel and receiving channel.
shall be installed in both the conveyance required temporary or permanent channel lining operational, adequate outlet protection and any conveyance channels or pipes are made
11. Before newly constructed stormwater armored by non-erodible cover materials.
Earthen fill may be used for these structures if construction of causeways and cofferdams.
Non-erodible material shall be used for the greatest extent possible during construction.
transport and stabilize the work area to the minimize encroachment, control sediment performed, precautions shall be taken to
12. When work in a live watercourse is shall be provided.
crossing constructed of non-erodible material month period, a temporary vehicular stream construction vehicles more than twice in any six-
13. When a live watercourse must be crossed by live watercourses shall be met.
regulations pertaining to working in or crossing
14. All applicable federal, state, and local watercourse is completed.
stabilized immediately after work in the
15. The bed and banks of a watercourse shall be addition to other applicable criteria:
accordance with the following standards in
16. Underground utility lines shall be installed in above the groundwater table.
roadway is in a fill section
9. Not anticipated. Proposed
10. Not Applicable.
11. Not Applicable.
live watercourse.
12. No work anticipated in
13. Not Applicable.
adjacent to them.
watercourses when working
Contractor must protect live
14. Not Applicable.
them.
when working adjacent to must protect live watercourses
15. Not Applicable. Contractor and promote stabilization.
properly compacted in order to minimize erosion
D. Material used for backfilling trenches shall be accordance with these regulations.
E. Re-stabilization shall be accomplished in complied with.
F. Applicable safety regulations shall be sedimentation.
stabilized to prevent further erosion and temporary measures shall be permanently soil areas resulting from the deposition of authority. Trapped sediment and the disturbed otherwise authorized by the local program measures are no longer needed, unless final site stabilization or after the temporary measures shall be removed within 30 days after
18. All temporary erosion and sediment control performed.
outfall of the pipe or pipe system shall be sites, downstream stability analyses at the channel, pipe, or storm sewer system. For those into adequate natural or man-made receiving development site shall be discharged directely
Concentrated stormwater runoff leaving a the following standards and criteria.
storm of 24-hour duration in accordance with of stormwater runoff for the stated frequency increases in volume, velocity and peak flow rate sediment deposition, erosion and damage due to development sites shall be protected from the
19. Properties and waterways downstream from plans and specifications.
trenches in accordance with the
D. Contractor to compact achieved.
permanent stabilization is any disturbed area until
E. Contractor must re-stabilize applicable safety regulations.
F. Contractor to adhere to all within the project area.
streets and allay dust daily
17. Contractor to sweep out.
and prior to project close following final stabilization temporary filter barriers
18. Contractor must remove unless otherwise directed.
directly to the open space treated or filtered runoff
19. Contractor must discharge be opened at one time.
A. No more than 500 linear feet of trench may uphill side of trenches.
B. Excavated material shall be placed on the streams on off-site property.
manner that does not adversely affect flowing trapping device, or both, and discharged in a filtered or passed through an approved sediment
C. Effluent from dewatering operations shall be
500 linear feet.
utility trenches greater than
A. Contractor must backfill utility trenches.
excavated material uphill from
B. Contractor must place device prior to discharge.
maintain sediment trapping
Contractor shall install and runoff or groundwater.
discharge sediment-laden
C. Contractor must not land disturbing activities.
individual development lots as well as to larger in this manner. This provision shall apply to shall be allowed only after sediment is removed sediment control disposal area. Street washing shoveling or sweeping and transported to a
Sediment shall be removed from the roads by cleaned thoroughly at the end of the day.
public road surface, the road surface shall be
Where sediment is transported onto a paved or by vehicular tracking onto the paved surface.
be made to minimize the transport of sediment intersect paved or public roads, provisions shall
17. Where construction vehicles access routes
Sheet 2 of 3
16. Not Applicable
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:1 e c e m b e r
M
S h e
P R
O J E
C T
S \b lr i\
-1
(2
H W
Y D
E S
\C A
D D
\9
\M -M
V
A E
R F
O B
L R
I N
P S
-1
(2
E S
C N a rr a ti v e .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
M02
Sheet 3 of 3 seeding dates, as listed above, may not require mulch.
Temporary seeding applications performed under favorable soil and site conditions during optimum spring and fall according to Section 625, except that hydromulches shall not be acceptable during these periods.
Seed applied in the fall for winter cover and seed applied during hot and dry summer months shall be mulched
Mulching Procedures:
1 inch deep. Plant grasses and legumes with no less than one quarter inch soil cover.
Apply seed evenly with a broadcast seeder, cultipack seeder, or hydroseeder. Plant small grains with no more than
Seeding Procedures:
The following criteria shall apply to all seed species listed above:
Meadow/Non-Road Shoulder Seeding Rates
Species (lbs./acre)
Rate
June through October
(Pycnanthemum incanum)
(Asclepias incarnata), Hoary Mountain Mint Swamp Milkweed
Goldenrod (Solidago rugosa), Common Milkweed (Asclepias syriaca), Appalachian Beardtongue (Penstemon laevigatus), Wrinkle Leaf
(Lespedeza capitata), Wild Geranium (Geranium maculatum), Partridge Pea (Chamaecrista fasciculata), Round-Headed Bushclover
White Wood Aster (Aster divaricatus), Heath Aster (Aster pilosus), Mix of Forbes:
(Dichanthelium clandestinum)
Sedge (Carex crinita), Softrush (Juncus effusus), Deer Tongue
(Sorghastrum nutans), Fox Sedge (Carex vulpinoidea), Fringed
(Elymus hystrix), Pathrush (Juncus tenuis), Indiangrass scoparium), Big Bluestem (Andropogon gerardii), Bottlebrush Grass
(Schizachyrium Virginia Wildrye (Elymus virginicus), Little Bluestem
Mix of Grasses: See Section 625
Turf Seeding Rates
March through September
October through February
(lbs./acre)
Rate Planting Dates
Planting Dates
“Kentucky 31”), Red Top (Agrostis alba) (Festuca rubra “chewings"), Fescue, Kentucky 31 (Festuca Summer Annual Rye Grass (Lolium multiflorum), Fescue, chewings
(Festuca “Kentucky 31”), Winter rye grain (Secale cereale) Fescue, chewings (Festuca rubra “chewings"), Fescue, Kentucky 31
See Section 625
See Section 625
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:4
D e c e m b e r
M
S h e
P
R O
J E
C T
S \b lr i\ -1
(2
H W
Y D
E S
\C A
D D
\9
\M -M
V
A E
R F
O B
L R
I N
P S
-1
(2
E S
C N a rr a ti v e .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
M03
S81° 08'03
"E S62°37'10"E
.0
P O
B
.6
P x .0
'C
M P
I N
V
.8
I N
V
.0
18"Φ Twin Oak18"Φ
Oak Bench
N
PI 201+47.75
Δ = 13°05'54" (RT)
R = 835.48' T = 95.92' L = 191.00' e = ___
Blue R idge P arkway
C1
See Detail E157-02.
Place silt fence, 240 lnft
Limits of disturbance, 1581 sqyd
See Detail E157-04 Place check dam as needed.
NOTES:
1. See Plan sheets for construction work.
2. Install Rolled Erosion Control Product, Type 2.C. on disturbed areas above turf establishment limits on slope. See Detail E629-01, and Typical Sections.
3. Install inlet protection where shown unless otherwise directed by the CO. See Detail E157-02.
4. Equipment access will be allowed only within the limits of disturbance as approved by the CO.
5. Clear and grub each site within the limits of disturbance as approved by the CO.
See Detail E157-02.
Place silt fence, 235 lnft (typ.)
202+94.67 N=11064960.9889 E=3608915.5888
END WORK200+00.00
N=11064683.1014 E=3609008.1520
BEGIN WORK
See Note 3.
protection.
Install inlet
See Note 2.
Install Rolled Erosion Control Product, Type 2.C.
SCALE IN FEET
U.S. DEPARTMENT OF TRANSPORTATION
:4
J a n u a ry
M
M
P
.7
S h e
P
R O
J E
C T
S \b lr i\
-1
(2
H W
Y
D E
S \C
A D
D \9
\M
V A
E R
F O
B L
R I
N P
S
-1
(2
M P
.7
.d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
M04
N79°02'12 "E
70 1570
75 1575
TBAR
PK
70 1570
75 1575
TBAR
PK
70 1570
75 1575
N
L
BEGIN WORK
END WORK
102+13.68
N=11031605.7012
E=3593965.7719
100+00.00
N=11031394.2545
E=3593939.7429
PI 101+47.97
Δ = 14°00'48" (RT)
R = 540.12' T = 66.38' L = 132.10' e = ___
C1
"x
0.
'R
C P
See Detail E157-02.
Place silt fence, 95 lnft.
NOTES:
1. See Plan sheets for construction work.
2. Install inlet protection where shown unless otherwise directed by the CO.
See Detail E157-02.
3. Equipment access will be allowed only within the limits of disturbance as approved by the CO.
4. Place stabilized construction exit as directed by the CO. See Detail E157-01.
5. Clear and grub each site within the limits of disturbance as approved by the CO.
2603 sqyd Limits of disturbance, Blue Ridge Parkway
See Detail E157-02.
Place silt fence, 40 lnft.
See Detail E157-02.
Place silt fence, 70 lnft.
80 lnft (Typ.)
Place fiber roll, See Detail E157-02.
Place silt fence, 30 lnft.
See Cross Sections.
100+60 to 102+00.
Install RSS Wall, cutslope Proposed
See Detail E157-02.
25 lnft.
Place silt fence, See Detail E157-02.
20 lnft.
Place silt fence, See Detail E157-02.
50 lnft.
Place silt fence, Install inlet protection. See Note 2.
See Typical Section.
100+20 to 102+13.68 Roadway reconstruction, See Detail E251-01.
Class 2, 3 cuyd.
Place Riprap, Method A, U.S. DEPARTMENT OF TRANSPORTATION
P O
B
.0
P C
.5
P C
C
.6
.5
.5
.5
.5
:4
J a n u a ry
M
M
P
.9
S h e
P
R O
J E
C T
S \b lr i\
-1
(2
H W
Y
D E
S \C
A D
D \9
\M
V A
E R
F O
B L
R I
N P
S
-1
(2
M P
.9
.d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
M05
12 at 20' spacing (typ.)
Place temporary drum, N
Blu e R idg e P ark way
NOTES:
1. Remove conflicting pavement markings.
2. Final location and spacing of traffic control devices may be changed to fit field conditions as approved by the CO.
3. Place reflectors on barrier at 25-foot intervals. Place reflectors on drums.
4. Mount type B warning lights on drums.
5. Maintain single lane closure with traffic signals according to Detail ET 635-9.
6. Ensure signs, drums, and concrete barrier have been removed conforming to Subsection 203.03.
Place crash cushion (typ.)
Existing EOP (typ.)
See Note 6.
temporary signs.
Remove existing
See Note 6.
temporary signs.
Remove existing reduction markings (typ.)
Existing temporary speed
See Detail ET 635-13.
Place concrete barrier, 250 lnft.
.5
Ta pe r
Taper
Proposed EOP
60'
60'
Ta pe r
Taper
50' 50'
See Detail ET 635-13.
Place concrete barrier, 225 lnft.
U.S. DEPARTMENT OF TRANSPORTATION
TEMPORARY TRAFFIC CONTROL
Sheet 1 of 7
:2
J a n u a r y
T
T C
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\N
V
A E
R F
O B
L R
I N
P S
-1 (2 tt c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
N01
B lu e
R id g e
P a rk w a y
N
River Pkwy Roanoke
Dale Ave SE
Bullitt Ave SE
W. Virginia Ave
E. Virginia Ave
Hardy Rd
By Pass Rd
Roanoke Mountain Rd
Mill Mountain Pkwy
Brandon Ave SW
Main St SW
Elm Ave
Williamson Rd NE
Roanoke River signs in View A as directed by the CO.
Place three portable changeable message4.
for detour.
is restricted along Bullitt Ave SE (RT 24) than 48" where median and shoulder space
Use signs scaled to have a width no greater3.
the southbound and northbound detours.
right shoulder and in the median for both
Install signs shown on Route 220 in both the2.
information.
Temporary Traffic Control Plan for sign
Refer to Sign and Traffic Device Key of the 1.
T C
H L
IN
E N
Roanoke Mountain Rd
VIEW A
See View A
See View B
See Note 4
Explore Park
Control Plans
See Temporary Traffic
MP 119.7
NO SCALE
VIEW B
barricade type 3, 27 LNFT.
Install temporary traffic control, NOTES:
See Detail E619-09.
Install gate, chain link, 12 feet width.
Sheet 2 of 7
U.S. DEPARTMENT OF TRANSPORTATION
DETOUR
:5
D e c e m b e r
N
D e to u r
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\N
-N
V A
E R
F O
B L
R I
N P
S
-1
(2 tt c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
N02 yaw kr a P e g d i R e ul B y a wkr aP eg di R eulB
NOTES:
M A
T C
H L
IN
E N
Callaway Rd
Ramp
19 20 barricade type 3, 27 LNFT.
Install temporary traffic control, N
VIEW C
VIEW D
4 5 Ramp message sign. See Note 2.
Install portable changeable
See View C
MP 127.9
See View D
Paoges Mill Overlook
MP 129.3
Mason Knob Overlook
MP 126.2
as directed by the CO.
the portable changeable message signs
Provide Explore Park access information on 2.
for sign information.
of the Temporary Traffic Control Plan
Refer to Sign and Traffic Device Key 1.
See Detail E619-09.
Install gate, chain link, 12 feet width.
Sheet 3 of 7
U.S. DEPARTMENT OF TRANSPORTATION
DETOUR
:2 e c e m b e r
N
D e to u r
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\N
-N
V A
E R
F O
B L
R I
N P
S
-1
(2 tt c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
N03
A01
1 2 3 4 5
9 10
BARRICADE
MOUNT ON TYPE 3
11 12
DETOUR
NORTH
PARKWAY
BLUE RIDGE
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
DETOUR
PARKWAY
BLUE RIDGE
ROAD
CLOSED
PARKWAY
RIDGE
BLUE
DETOUR
PARKWAY
RIDGE
BLUE
DETOUR
CLOSED
ROAD
1000 FT
END
DETOURAHEAD
DETOUR
DETOUR
NORTH
PARKWAY
BLUE RIDGE
W20-2 W20-2 W20-3 M4-8a
R11-2
Special Sign 2 Special Sign 3 Special Sign 4 Special Sign 9 Special Sign 6 Special Sign 7 light, type B
Mount warning
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 8
1 MILE
DETOUR
DETOUR
PARKWAY
BLUE RIDGE
Special Sign 5
66" x 66" 66" x 72"66" x 72" 60" x 72" 60" x 72" 66" x 72" 66" x 72" 66" x 72"
18 19
W20-3
CLOSED
ROAD
1 MILE
W20-3
CLOSED
ROAD
1/2 MILE
W20-2
1/2 MILE
DETOUR
FOLLOW DETOUR
NO THRU TRAFFIC
M.P. 121.0 AND 136.0
PARKWAY CLOSED AT
Special Sign 12
96" x 60"
66" x 72"
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 15
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 18
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 19
66" x 72"66" x 72"
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 20
66" x 72"
60" x 72"
PARKWAY
RIDGE
BLUE
DETOUR
Special Sign 21
66" x 72"
DETOUR
NORTH
PARKWAY
BLUE RIDGE
Special Sign 22
UNTIL M.P. 121.0
ACCESS OPEN
PARKWAY
Special Sign 11
96" x 48" light, type B
Mount warning
3-foot spacing (typ.)
Place drums across road as directed by the CO typ.
NOTES:
66" x 72"
DETOUR
SOUTH
PARKWAY
BLUE RIDGE
Special Sign 14
NO SCALE
Mount warning light, type B on all signs placed on the Blue Ridge Parkway as approved by the CO.6.
Install temporary concrete barriers in accordance with Section 635.5.
(MUTCD), latest edition.
Install traffic control devices in accordance with the "Manual on Uniform Traffic Control Devices" 4.
For special signs dimensions, see Sheets 5 through 7 of 7 of the Temporary Traffic Control Plan.3.
as approved by the CO.
Maintain all signs along detour route for the duration of the Blue Ridge Parkway closure 2.
Adjust signs to meet field conditions as approved by the CO.1.
Sheet 4 of 7
U.S. DEPARTMENT OF TRANSPORTATION
SIGN AND TRAFFIC DEVICE KEY
:2 e c e m b e r
N
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\N
-N
V A
E R
F O
B L
R I
N P
S
-1
(2 tt c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
N04
.1
5.7 22.8 6 25.8
10.8 44.4
.5
15.5 35
.3
21.4 23.2
5.7
10.8
15.5
21.4
.1
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 9;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [DETOUR] E Mod;
Arrow 16 - 29.0" 44{ White;
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
-0 .0
.5
.8
.1
.8
.4
.7
.4
BLUE RIDGE
PA RKWAY
DETOUR
.9
18.6 22.8
17.1 25.8
7.8 44.4
.2
12.5 35
22.4 15.2
18.6
17.1
7.8
12.5
22.4
.9
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 2;
6.0" Radius, 1.3" Border, Black on Orange;
[BLUE] E Mod; [RIDGE] E Mod; [PARKWAY] E Mod;
[DETOUR] E Mod; Arrow 80 - 17.0" 90{;
.6
.9
.6
.9
.1
.4 .1
.2
.5
7.
.8
.0
.4
.1
.8
.2
-0 .0
.5
.8
.1
.8
.4
.7
.4
BLUE
RIDGE
PA RKWAY
DETOUR
.6
18.6 22.8
17.1 25.8
7.8 44.4
.3
12.5 35
.5
18.9 22.2
18.6
17.1
7.8
12.5
18.9
.6
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 3;
6.0" Radius, 1.3" Border, Black on Orange;
[BLUE] E Mod; [RIDGE] E Mod; [PARKWAY] E Mod;
[DETOUR] E Mod; Standard Arrow Custom 22.3" X 13.5" 180{;
.6
.9
.6
.9
.1
.4 .1
.2
.5
7.
.8
.0
.4
.1
.8
.2
-0 .0
.5
.8
.1
.8
.4
.7
.9
BLUE
RIDGE
PA RKWAY
DETOUR
.5
5.7 22.8 6 25.8
10.8 44.4
18.3 29.4
.5
15.5 35
.5
21.9 22.2
5.7
10.8
18.3
15.5
21.9
.5
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 4;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [NORTH] E Mod;
[DETOUR] E Mod; Standard Arrow Custom 22.3" X 13.5" 180{;
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
.3
.6
.2
.2
.9
-0 .0
.5
.8
.1
.8
.4
.7
.9
BLUE RIDGE
PA RKWAY
NORTH
DETOUR
.3
5.7 22.8 6 25.8
10.8 44.4
.9
.6
15.5 35
27 12
5.7
10.8
15.5
.2
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 5;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [DETOUR] E Mod;
45 Deg Advance Turn Arrow 12.0" X 16.0";
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
-0 .0
.5
.8
.1
.8
.4
.7
.0
BLUE RIDGE
PA RKWAY
DETOUR
.5
5.7 22.8 6 25.8
10.8 44.4
18.5 29
.5
15.5 35
.5
21.9 22.2
5.7
10.8
18.5
15.5
21.9
.5
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 6;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [SOUTH] E Mod;
[DETOUR] E Mod; Standard Arrow Custom 22.3" X 13.5" 180{;
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
.5
.5
.0
.1
.8
-0 .0
.5
.8
.1
.8
.4
.7
.9
BLUE RIDGE
PA RKWAY
SOUTH
DETOUR
.5
5.7 22.8 6 25.8
10.8 44.4
18.3 29.4
.5
15.5 35
.5
21.9 22.2
5.7
10.8
18.3
15.5
21.9
.5
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 7;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [NORTH] E Mod;
[DETOUR] E Mod; Standard Arrow Custom 22.3" X 13.5" 0{;
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
.3
.6
.2
.2
.9
-0 .0
.5
.8
.1
.8
.4
.7
.9
BLUE RIDGE
PA RKWAY
NORTH
DETOUR
.8
5.7 22.8 6 25.8
10.8 44.4
18.3 29.4
.9
.6
15.5 35
25 16
5.7
10.8
18.3
15.5
.7
Job Number : BLRI 1M20;
State : VA;
Sign # : SPECIAL 8;
9.0" Radius, 1.5" Border, Black on Orange;
[BLUE RIDGE] E Mod; [PARKWAY] E Mod; [NORTH] E Mod;
[DETOUR] E Mod; 90 Deg Advance Turn Arrow 16.0" X 13.0";
5.
.0
.7
.0
.5
.8 .5
.5
.9
.8
.8
.0
.4
.1
.8
.2
.3
.6
.2
.2
.9
-0 .0
.5
.8
.1
.8
.4
.7
.0
BLUE RIDGE
PA RKWAY
SOUTH
DETOUR
A01
NO SCALE
Special Sign 2 Special Sign 3 Special Sign 4 Special Sign 5
Special Sign 6 Special Sign 7 Special Sign 8
Special Sign 9
Sheet 5 of 7
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL SIGNS
:0
D e c e m b e r
N
S h e
P R
O J E
C T
S \b lr i\
-1 (2
H
W Y
D
E S
\C A
D D
\9
\N
-N
V A
E R
F O
B L
R I
N P
S
-1
(2 tt c .d g n
STATE PROJECT
NUMBER
SHEET
VA
2020-1(2)
VA ERFO NPS BLRI
N05
8" 92" 8"
9'-0"
Panel Style: BLRI_large.ssi
M.U.T.C.D.: 2009 Edition
BORDER
R=7"
TH=1.25"
.9
.2
.9
BORDER
R=9"
TH=1.5"
.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .