NEPA Documents_ESC Narrative.pdf
PDF 1 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000006
About this file
This solicitation is for a construction project to repair slides along the Blue Ridge Parkway. Work includes slope stabilization with soil nails and a mechanically stabilized earth wall, as well as pavement and drainage repairs. The project is split into multiple schedules estimated to cost between $2,000,000 and $5,000,000. Bids are due in March 2022 from certified small businesses for the Federal Highway Administration project located in Roanoke County, Virginia. Annual contractor representations and certifications must be completed on SAM.gov, along with VETS-4212 reporting. Questions should be directed to the Eastern Federal Lands Highway Division.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO- VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0004 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0003 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0002 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Amendment 0001 - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| Geotechnical Report.pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - VA ERFO NPS BLRI 2020-1(2).pdf | ||
| RIP Report.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| FP14_Eng.pdf | ||
| NEPA Documents_VADEQ ESC Approval Letter.pdf | ||
| Plans - VA ERFO NPS BLRI 202-1(2).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version: June 11, 2015
PROJECT NAME: ____________________________________________ SUBMITTAL#: _________
PLANS DATED: _____________
PLAN SUBMITTER'S CHECKLIST
FOR EROSION AND SEDIMENT CONTROL PLANS
Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write N/A by items that are not applicable.
GENERAL
Plan Submission Date Project Name ______________________________________________________________________ VSMP Permit Number ______________________________________________________________ Site Plan Number Site Address _______________________________________________________________________ Applicant ___________________________________________ Phone Number ________________ Applicant Legal Address _____________________________________________________________ Owner _____________________________________________ Phone Number ________________ Principal Designer ____________________________________ Phone Number ________________ General Contractor ___________________________________ Phone Number ________________
______ Complete set of plans- Include all sheets pertaining to the site grading and stormwater and any activities impacting erosion and sediment control and drainage:
Existing conditions Demolition Site grading Erosion and sediment control Storm sewer systems Stormwater management facilities Utility layout Landscaping On-site and off-site borrow and disposal areas that do not have separate approved ESC Plans
______ Professional's seal - The designer's original seal, signature, and date are required on the cover sheet of each Narrative and each set of Plan Sheets. A facsimile is acceptable for subsequent Plan Sheets.
______ Number of plan sets - Two sets of ESC Plans should be submitted. The DEQ office will retain all submitted plans.
______ Variances - Variances requested at the time of plan submission are governed by Section 9VAC25-
840-50 of the Virginia Erosion and Sediment Control Regulations.
______ Certified Responsible Land Disturber (RLD) - A certified RLD is required during all stages of construction, from the initial land disturbance through final site stabilization. The name of the project RLD must be provided before any land disturbance may begin. Notify DEQ in a timely manner if the RLD changes during the course of the project.
September 30, 2021 Blue Ridge Parkway Emergency Slide Repairs VA ERFO NPS BLRI 2020-1(2) n/a, project will have less than 1 acre disturbance n/a
Blue Ridge Parkway, Milepost 119.7, 127.9, Roanoke County Federal Highway Administration 703-404-6240
22001 Loudoun Co. Pkwy, Bldg E2 Suite 200, Ashburn, VA 20147 Federal Government
Federal Highway Administration 571-434-1541 571-434-1541
TBD
x x x x
NA
x
NA
x
NA
NA
Federal exemption per Virginia Code Section 54.1-4011 pdf
X
X No Sediment traps are proposed;
A variance request for use of fiber roll is included with this submittal.
TBD
VA ERFO NPS BLRI 2020-1(2)
9/28/2021
KEY MAP
STATE OF VIRGINIA
4,0 2 4,0
SCALE IN MILES
DESCRIPTION OF PROJECT
IMPROVEMENT: Work includes slope stabilization repairs with soil nail system at MP 119.7 and a mechanically stabilized earth wall at MP 127.9, temporary traffic control measures and other miscellaneous work.
PROJECT LENGTH: 0.071 Mile
LANE MILES:
ROAD:
BLRI-000lBA
BRIDGE: N/A
0.142 Mile
WIDTH SURFACE
22' 3.5" ACP
DESIGN DESIGNATION:
ADT (2020)
ADT (2040)
DHV
% Buses
% Trucks
V (MPH)
e(max)
SPECIFICATIONS:
1,342
168 VPH
<1%
0 (not allowed)
10%
"Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", FP-14.
Project Manager Highway Design Manager Lead Designer
Sheila Foronda Shoukat Nawaz Alondra Sierra
BASE
6" Aggr.
SUBGRADE
N/A
NPS PMIS No. 311372 NPS Drw No. 601/175166
STATE PROJECT
SHEET
NUMBER
VA A ERFO BLRI NPS 2020-1(2 A0l
OJF THE INTERIOR
NATIONAL PARK SERVICE
BLUE RIDGE lPARKWAY
PLANS FOR PROPOSED
VA ERFO NPS BLRI 2020-1(2)
PERMANENT SLIDE REPAIRS AT MP 119.7 AND MP 127.9
ROANOKE COUNTY, VIRGINIA
VA ERFO NPS BLRI 2rf20-1 (2) 9w
Gkmvar
West Salem Forest
Wabun
Schedule
A
B
= WoodedAcres
Cllri'Spur19
Starkey
Description
BLRI-000lBA
BLRI-000lBA
01o1f,e1<11 Cloverdale
@) 8
@ Webster
Alp1neH1IIS @) }IJ"l
Holhns Bo1etourtEast
Roanoke-Blacksburg @ @)
Regional Airport
Apple�ood
GJ @)
Vinton
Foxfire
Explore Park
Hao
@ MP 11�7 @)
Narrows @) @
NO SCALE
Milepost Length RIP Data
(mile)
119.7 0.044 Cycle 5
127.9 0.027 Cycle 5
INDEX TO SHEETS
SHEET DESCRIPTION
NO
A0l Title Sheet
A02-A03 Symbols and Abbreviations
A04-A05 Location Maps
A06-A07 Survey Information
B01-B02 Typical Sections
C01-C02 Tabulation of Quantities
C03-C09 Summaries and Schedules
D01-D03 Plans and Profiles
M01-M03 Erosion and Sediment Control Narrative
M04-M05 Erosion and Sediment Control Plan
N01-N08 Temporary Traffic Control Plan
P0l Permanent Striping Plan
S01-S15 Standards and Details
T01-T15 Cross Sections
Know what's below.
Call before you dig.
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
SEPTEMBER 2021
Disaster No. VA2020-1-NPS
APPROVED
COMMONWEALTH OF VIRGINIA
DEQ WATER DIVISION
September 30, 2021
ESC Plan #2021-0332 October 15, 2021
KEY MAP
STATE OF VIRGINIA
4,0 2 4,0
SCALE IN MILES
DESCRIPTION OF PROJECT
IMPROVEMENT: Work includes slope stabilization repairs with soil nail system at MP 119.7 and a mechanically stabilized earth wall at MP 127.9, temporary traffic control measures and other miscellaneous work.
PROJECT LENGTH: 0.071 Mile
LANE MILES:
ROAD:
BLRI-000lBA
BRIDGE: N/A
0.142 Mile
WIDTH SURFACE
22' 3.5" ACP
DESIGN DESIGNATION:
ADT (2020)
ADT (2040)
DHV
% Buses
% Trucks
V (MPH)
e(max)
SPECIFICATIONS:
1,342
168 VPH
<1%
0 (not allowed)
10%
"Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", FP-14.
Project Manager Highway Design Manager Lead Designer
Sheila Foronda Shoukat Nawaz Alondra Sierra
BASE
6" Aggr.
SUBGRADE
N/A
NPS PMIS No. 311372 NPS Drw No. 601/175166
STATE PROJECT
SHEET
NUMBER
VA A ERFO BLRI NPS 2020-1(2 A0l
OJF THE INTERIOR
NATIONAL PARK SERVICE
BLUE RIDGE lPARKWAY
PLANS FOR PROPOSED
VA ERFO NPS BLRI 2020-1(2)
PERMANENT SLIDE REPAIRS AT MP 119.7 AND MP 127.9
ROANOKE COUNTY, VIRGINIA
VA ERFO NPS BLRI 2rf20-1 (2) 9w
Gkmvar
West Salem Forest
Wabun
Schedule
A
B
= WoodedAcres
Cllri'Spur19
Starkey
Description
BLRI-000lBA
BLRI-000lBA
01o1f,e1<11 Cloverdale
@) 8
@ Webster
Alp1neH1IIS @) }IJ"l
Holhns Bo1etourtEast
Roanoke-Blacksburg @ @)
Regional Airport
Apple�ood
GJ @)
Vinton
Foxfire
Explore Park
Hao
@ MP 11�7 @)
Narrows @) @
NO SCALE
Milepost Length RIP Data
(mile)
119.7 0.044 Cycle 5
127.9 0.027 Cycle 5
INDEX TO SHEETS
SHEET DESCRIPTION
NO
A0l Title Sheet
A02-A03 Symbols and Abbreviations
A04-A05 Location Maps
A06-A07 Survey Information
B01-B02 Typical Sections
C01-C02 Tabulation of Quantities
C03-C09 Summaries and Schedules
D01-D03 Plans and Profiles
M01-M03 Erosion and Sediment Control Narrative
M04-M05 Erosion and Sediment Control Plan
N01-N08 Temporary Traffic Control Plan
P0l Permanent Striping Plan
S01-S15 Standards and Details
T01-T15 Cross Sections
Know what's below.
Call before you dig.
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
SEPTEMBER 2021
Disaster No. VA2020-1-NPS
APPROVED
COMMONWEALTH OF VIRGINIA
DEQ WATER DIVISION
September 30, 2021
ESC Plan #2021-0332 October 15, 2021
______ Local Consideration – Plans have been provided to the applicable jurisdictions.
Dulles Airport (MWAA) Fairfax County Loudoun County Town of Herndon Dulles Greenway (Trip II)
VDOT
CHECKLIST PREPARER
I certify that I am a professional in adherence to all minimum standards and requirements pertaining to the practice of that profession in accordance with Chapter 4 (§ 54.1-400 et seq.) of Title 54.1 of the Code of Virginia and attendant regulations. By signing this checklist I am certifying that this document and all attachments are, to the best of my knowledge and belief, true, accurate, and complete.
SIGNATURE ________________________________________________
PRINTED NAME ____________________________________________
QUALIFICATIONS __________________________________________
DATE ______________________________________________________
NA
Ryan Kimberley
Employee of the United States
9/30/2021
VA ERFO NPS BLRI 2020-1(2)
9/28/2021
NARRATIVE
Please reference plan sheet numbers where the information may be found.
______ Project description - Briefly describe the nature and purpose of the land-disturbing activity. Provide the area (acres) to be disturbed.
______ Existing site conditions - A description of the existing topography (% slopes), ground cover, and drainage (on-site and receiving channels).
______ Adjacent areas - A description of all neighboring areas such as residential developments, agricultural areas, streams, lakes, roads, etc., that might be affected by the land disturbance.
______ Off-site areas - Describe any off-site land-disturbing activities that may occur (borrow sites, disposal areas, easements, etc.). Identify the Owner of the off-site area and the entity responsible for plan review. Include a statement that any off-site land-disturbing activity associated with the project must have an approved ESC Plan. Submit documentation of the approved ESC Plan for each of these sites.
_____ Soils - Provide a description of the soils on the site, giving such information as soil name, mapping unit, erodibility, permeability, surface runoff, and a brief description of depth, texture and soil structure. Show the site location on the Soil Survey, if it is available. Include a plan showing the boundaries of each soil type on the development site.
______ Critical areas - A description of areas on the site that have potentially serious erosion problems or that are sensitive to sediment impacts (e.g., steep slopes, watercourses, wet weather / underground springs, etc.).
______ Erosion and sediment control measures - A description of the structural and vegetative methods that will be used to control erosion and sedimentation on the site. Controls should satisfy applicable minimum standards and specifications in Chapter 3 of the 1992 Virginia Erosion and Sediment Control Handbook (VESCH) or more stringent local requirements.
______ Management strategies / Sequence of construction - Address management strategies, the sequence of construction, and any phasing of installation of ESC measures.
______ Permanent stabilization - A brief description, including specifications, of how the site will be stabilized after construction is completed.
______ Maintenance of ESC measures - A schedule of regular inspections, maintenance, and repair of erosion and sediment control structures should be set forth.
______ Calculations for temporary erosion and sediment control measures - For each temporary ESC measure, provide the calculations required by the standards and specifications.
______ Stormwater management considerations - Will the development of the site cause an increase in peak runoff rates? Will the increase in runoff cause flooding or channel degradation downstream?
Describe the strategy to control stormwater runoff, including during construction.
A1,M1
M1
M1, A4-5
The slides are located on steep Blue Ridge Parkway slopes;M1
M1
M1
M01-M05, also see standard detail sheets S01-S11
M01
M01,M03
M01
M01
M01,M02
, hydraulics memo
______ Specifications / Detail Drawings for erosion and sediment control measures - For each erosion and sediment control measure employed in the plan, include, at a minimum, the detail from the standard and specification in the VESCH or more stringent local requirements. Include any approved variances or revisions to the standards and specifications.
______ Specifications for stormwater and stormwater management structures - Provide specifications for stormwater and stormwater management structures, i.e., pipe materials, pipe bedding, stormwater structures.
M01, S01-S11
M01, hydra memo, Special Contract Requirements, Standard Specifications
VA ERFO NPS BLRI 2020-1(1)
SITE PLAN
Please reference plan sheet numbers where the information may be found.
______ Vicinity map - A small map locating the site in relation to the surrounding area. Include any landmarks that might assist in locating the site.
______ Indicate north - The direction of north in relation to the site.
______ Off-site areas - Include any off-site land-disturbing activities (e.g., borrow sites, disposal areas, etc.)
not covered by a separate approved ESC Plan.
______ Legend - Provide a complete listing of all ESC measures used, including the VESCH uniform code symbol and the standard and specification number. Include any other items necessary to identify pertinent features in the plan.
______ Property lines and easements - Show all property and easement lines. For each adjacent property, list the deed book and page number and the property owner's name and address.
______ Existing vegetation – Show the existing tree lines, grassed areas, or unique vegetation.
______ Limits of clearing and grading – Delineate all areas that are to be cleared and graded.
______ Protection of areas not being cleared - Fencing or other measures to protect areas that are not to be disturbed on the site.
______ Critical areas – Note all critical areas on the plan.
______ Existing contours – Show the existing contours of the site.
______ Final contours and elevations – Show changes to the existing contours, including final drainage patterns.
______ Site development – Show all improvements such as buildings, parking lots, access roads, utility construction, etc. Show all physical items that could affect or be affected by erosion, sediment, and drainage.
______ Location of practices - The locations of erosion and sediment control and stormwater management practices used on the site. Use the standard symbols and abbreviations in Chapter 3 of the VESCH.
______ Adequate Conveyances – Ensure that stormwater conveyances with adequate capacity and adequate erosion resistance have been for provided all on-site concentrated stormwater runoff. Off-site channels that receive runoff from the site, including those receiving runoff from stormwater management facilities, must be adequate. Increased volumes of sheet flows must be diverted to a stable outlet, adequate channel, pipe or pipe system, or a stormwater management facility.
Provide exhibits showing the drainage divides, the direction of flow, and the size (acreage) of each of the site drainage areas that discharge runoff off-site, both existing and proposed.
A01,A04,A05
X
NA/M01
A02/A03
FEDERAL
D01,D02, M04,M05
M04,M05
M04,M05
M01
M04,M05, D01,D02
D01, 2,3 , M04, M05
D01,D02
M04,M05
M04,M05 x
Provide calculations for pre- and post-development runoff from these drainage areas.
Ensure that Minimum Standard 19 is satisfied for each off-site receiving channel, including those that receive runoff from stormwater management facilities.
Provide calculations for the design of each permanent stormwater management facility.
Ensure that increased volumes of sheet flows are diverted to a stable outlet, to an adequate channel, pipe or pipe system, or to a stormwater management facility.
Provide adequacy calculations for all on-site stormwater conveyances.
______ Calculations for permanent stormwater conveyances - For each permanent stormwater conveyance or structure, provide the following design calculations, as applicable:
Drainage area map with time of concentration (TC) path shown TC calculation/nomograph Locality IDF curve Composite runoff coefficient or RCN calculation Peak runoff calculations Stormwater conveyance channel design calculations Storm drain and storm sewer system design calculations Hydraulic Grade Line if any pipe in the system is more than 90% full for a 10-year storm Culvert design calculations Drop inlet backwater calculations Curb inlet length calculations
______ Direction of Flow for Conveyances - Indicate the direction of flow for all stormwater conveyances
(storm drains, stormwater conveyance channels).
______ Storm Drain Profiles - Provide profiles of all storm drains except roof drains. If the type of pipe
(RCP, CMP, HDPE, etc.) is not called out on the profiles, then the most conservative pipe material that may be specified for the project must be used in the adequacy calculations.
na na x x x x x x x x x x x no new
MINIMUM STANDARDS
Plan Sheet #
______ Minimum Standards - All Minimum Standards must be addressed.
Yes No NA
[] [] [] MS-1 Have temporary and permanent stabilization been addressed in the narrative?
[] [] [] Are practices shown on the plan?
[] [] [] Temporary and permanent seed specifications?
[] [] [] Lime and fertilizer?
[] [] [] Mulching?
[] [] [] Blankets/Matting?
[] [] [] Pavement/Construction Road Stabilization?
[] [] [] MS-2 Has stabilization of soil stockpiles, borrow areas, and disposal areas been addressed in the narrative and on the plan?
[] [] [] Have sediment trapping measures been provided?
[] [] [] MS-3 Has the establishment and maintenance of permanent vegetative stabilization been addressed?
[] [] [] MS-4 Does the plan specifically state that sediment-trapping facilities shall be constructed as a first step in land-disturbing activities?
[] [] [] MS-5 Does the plan specifically state that stabilization of earthen structures is required immediately after installation? Is this noted for each measure on the plan?
[] [] [] MS-6 Are sediment traps and sediment basins specified where needed and designed to the standard and specification?
[] [] [] MS-7 Have the design and temporary/permanent stabilization of cut and fill slopes been adequately addressed? Is Surface Roughening provided for slopes steeper than 3:1?
[] [] [] MS-8 Have adequate temporary or permanent conveyances (paved flumes, channels, slope drains) been provided for concentrated stormwater runoff on cut and fill slopes?
[] [] [] MS-9 Has water seeping from a slope face been addressed (e.g., subsurface drains)?
[] [] [] MS-10 Is adequate inlet protection provided for all operational storm drain and culvert inlets?
x x x x x x x x x x x See variance request x x x x
Yes No NA
[] [] [] MS-11 Are adequate outlet protection and/or channel linings provided for all stormwater conveyance channels and receiving channels? Is there a schedule indicating:
[] [] [] Dimensions of the outlet protection? Lining? Size of riprap?
[] [] [] Cross section and slope of the channels? Type of lining? Size of riprap, if used?
[] [] [] MS-12 Are in-stream protection measures required so that channel impacts are minimized?
[] [] [] MS-13 Are temporary stream crossings of non-erodible material required where applicable?
[] [] [] MS-14 Are all applicable federal, state and local regulations pertaining to working in or crossing live watercourses being followed?
[] [] [] MS-15 Has immediate restabilization of areas subject to in-stream construction (bed and banks) been adequately addressed?
[] [] [] MS-16 Have disturbances from underground utility line installations been addressed?
[] [] [] No more than 500 linear feet of trench open at one time?
[] [] [] Effluent from dewatering filtered or passed through a sediment-trapping device?
[] [] [] Proper backfill, compaction, and restabilization?
[] [] [] MS-17 Is the transport of soil and mud onto public roadways properly controlled? (i.e., Construction Entrances, wash racks, transport of sediment to a trapping facility, cleaning of roadways at the end of each day, no washing before sweeping and shoveling)
[] [] [] MS-18 Has the removal of temporary practices been addressed?
[] [] [] Have the removal of accumulated sediment and the final stabilization of the resulting disturbed areas been addressed?
[] [] [] MS-19 Are properties and waterways downstream from development adequately protected from sediment deposition, erosion, and damage due to increases in volume, velocity and peak flow rate of stormwater runoff? Have adequate channels been provided on-site?
x x x x x x x x x x x x x
J-1
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
SPECIAL CONTRACT REQUIREMENTS
Project VA ERFO NPS BLRI 2020-1(2)
BLUE RIDGE PARKWAY
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U. S. Department of Transportation, Federal Highway Administration:
https://highways.dot.gov/federal-lands/specs https://highways.dot.gov/federal-lands/specs
J-2
Section 104. — CONTROL OF WORK
104.03(c). Delete the first sentence of the first paragraph and substitute the following:
Furnish one full-size (24-inch by 36-inch) paper copy of the plans from the Government-provided electronic plans, and use this set of plans exclusively for as-built drawings.
104.05. Add the following:
When hauling on National Park Service roads, do not exceed the load restrictions shown in Table 104-1.
Table 104-1 Load Restrictions
Single Units Gross Vehicle Weight, pounds
2 axles 40,000 3 axles 48,000 4 or more axles 52,000
Combination Units Gross Vehicle Weight, pounds
3 axles 57,000 4 axles 62,000 5 or more axles 66,000
Where the ground is saturated with water or during periods of freezing and thawing, the CO may impose further load restrictions or suspend hauling.
104.05. Add the following:
Hauling will only be permitted from the nearest point of public access to the work site.
Minimize hauling over completed pavement.
Section 106. — ACCEPTANCE OF WORK
106.05. Add the following:
At the preconstruction conference, the Government will provide a copy of the computer program “QL-PAY”, along with instructions. QL-PAY is a Windows based program that computes the quality levels and pay factors as described in this Subsection.
J-3
Section 108. — PROSECUTION AND PROGRESS
108.01. Add the following:
Construction operations are limited as follows:
(a) No work will be permitted on Saturdays or Sundays for Schedule A.
(b) No work will be permitted on National legal holidays.
(c) All construction work is required to be completed by 10/01/22.
(d) No work will be permitted on days with special events occurring in the vicinity, as determined by the CO.
(e) No tree cutting between 04/15 to 09/30 for trees 3-inch diameter at breast height or greater.
If the Contractor finds it necessary to work on one of these restricted days, request approval from the CO at least 7 days before the planned work.
Coincident with this contract, other contracts for construction projects may be underway or may commence during the construction of this project. Coordinate with the CO and other contractors to minimize disruption to this project and to other construction projects in the area.
108.03(c). Add the following:
Under FAR Clause 52.249-10, Default (Fixed-Price Construction), the Contractor can request a time extension for a delay due to unusually severe weather as defined under Section
155. If a time extension is requested for unusually severe weather, submit a time impact analysis according to Subsection 108.03(b) and include supporting historical weather data according to Subsections 155.04A and 155.04B. The following criteria will be used for determining a time extension for unusually severe weather:
(1) Time adjustment for rain delays. If the net number of actual workdays lost to rain is less than the total lost days for the month in question, then no time adjustment will be made. If the net number of actual workdays lost to rain is more than the total lost days for the month in question, then a time extension may be granted.
(2) Time adjustment for other weather delays. If a time extension is requested for other unusually severe weather conditions such as snow, extreme cold or heat, high winds, etc., follow the same calculation, submittal, and criteria procedures as outlined for rain delays.
J-4
Section 109. — MEASUREMENT AND PAYMENT
109.08(b). Add the following:
Submit invoices by the 7th day after the closing date. Invoices received after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following month’s invoice.
109.08(c). Add the following:
The Government’s designated billing office is:
Federal Highway Administration Eastern Federal Lands Highway Division Quantum Park 22001 Loudoun County Parkway Building E-2, Suite 200 Ashburn, Virginia 20147
ATTN: CONSTRUCTION OFFICE
Section 152. — CONSTRUCTION SURVEY AND STAKING
152.04(b). Add the following:
When GPS and RTS are used, submit a quality control plan which includes how control will be established and maintained.
152.04. Delete the last sentence of the eighth paragraph and substitute the following:
Reestablish any missing initial reference lines, control points, and stakes set by the Government.
152.05. Delete the text of Subsections (h), (j) and (k); they are not required.
Section 154. — CONTRACTOR SAMPLING AND TESTING
154.02. Add the following:
Submit proposals for using alternate AASHTO or state department of transportation approved test methods in writing for approval. Alternate methods may be allowed based on documented equivalence to the method specified and if approved by the CO.
154.03. Add the following:
Provide the Government’s portion of the sample or split sample in an acceptable container suitable for shipment to the CO. The CO will sign and seal the sample with specialty chain-of-
J-5 custody security tape. Ship the security-sealed sample to the EFLHD Central Laboratory at the following address within 24 hours of receiving the sample from the CO:
Federal Highway Administration Eastern Federal Lands Highway Division 1827 Jack Delozier Drive Sevierville, Tennessee 37876
ATTN: MATERIALS LABORATORY
For the split sample of asphalt concrete pavement material, provide 5-gallon metal buckets with lids. As an alternative, provide boxes that are coated with silicone-coated paper throughout the interior.
154.05. Add the following:
For items accepted under Subsection 106.05, use the QL-PAY software program to determine pay factors and report pay factors determined by QL-PAY. Submit a copy of all current test results and pay factor calculations based on those tests on a weekly basis. When large quantities are produced, calculate pay factors as soon as possible. Use this information to make any necessary adjustments to operations to achieve acceptable pay factors. See Subsection 106.01 for conditions upon which the Government may use the Contractor’s test results.
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
155.02. Add the following:
(g) Reasonably predictable weather. The number of workdays that can expect to be lost in any month due to rainfall based on 10-year historical weather data.
(h) Rain day. A potentially lost workday on which rainfall is equal to or greater than 0.10 inches.
(i) Drying day. A workday immediately following a rainfall equal to or greater than 1.00 inch which is potentially lost because of wet ground conditions.
(j) Workday. A day not excluded from work by Section 108.
(k) Unusually severe weather. When the number of actual workdays lost is greater than the reasonably predictable weather for a specific month.
155.04(f). Add the following:
If a subcontract has not yet been awarded for a certain portion of the work, include the schedule for that work.
J-6
155.04. Add the following:
(j) A completed Table 155-1 prepared according to Subsection 155.04A.
Add the following after Subsection 155.04:
155.04A Reasonably Predictable Weather. Determine reasonably predictable weather for this contract by completing Table 155-1. Calculate data for Table 155-1 by computing the average number of workdays lost (rain days plus drying days) for each month and the standard deviation from the average, using the last 10 years of historical weather data from the nearest National Oceanic and Atmospheric Administration (NOAA) weather data collection station. Add the average number of workdays lost to the standard deviation. The total number of lost days (average workdays lost plus 1 standard deviation, rounded to whole days) will be considered normal for each month.
155.04B Unusually Severe Weather. If requesting a time extension due to unusually severe weather, calculate the number of actual workdays lost by totaling the actual rain days plus the actual drying days occurring in the month in question. From this total, deduct any workdays meeting any one of the following conditions:
(a) The rain day or drying day occurred on a non-work weekday such as a holiday.
(b) The rainfall occurred at a time when no weather dependent work was in progress or occurred during planned or unplanned shutdowns due to other circumstances such as equipment failure, strikes, material supplies, delays, etc.
(c) The Contractor was still working or able to work on weather dependent activities to the extent that less than 50 percent of the workday was lost due to weather.
If the net number of actual workdays lost is greater than the total lost days, then unusually severe weather occurred during the month in question.
Table 155-1 Reasonably Predictable Weather
Project Number:
Project Location:
NOAA Station Location:
Data Years (10-year history):
Month Average
Workdays Lost
Standard Deviation
Total Lost Days
January February March April
J-7
Table 155-1 Reasonably Predictable Weather
Project Number:
Project Location:
NOAA Station Location:
Data Years (10-year history):
Month Average
Workdays Lost
Standard Deviation
Total Lost Days
May June July August September October November December
155.05. Delete the first sentence and substitute the following:
Prepare and submit a Bar Chart Method (BCM) initial construction schedule.
155.05(a)(1)(c). Add the following:
Include unreflected items, or components of work within a pay item, as separate activities as directed by the CO.
155.06. Delete the first sentence of the second paragraph and substitute the following:
Unless previously approved by the CO, changes to the construction schedule for work that is still to be completed can only be changed with a time impact analysis according to Subsection 108.03, and a Baseline Construction Schedule revision according to Subsection 155.07.
155.07. Delete the third sentence and substitute the following:
Continue to submit monthly schedule updates according to Subsection 155.06 until a baseline construction schedule revision is approved.
Section 156. — PUBLIC TRAFFIC
156.04. Delete the first paragraph and substitute the following:
Accommodate traffic according to the MUTCD, contract traffic control plan, Section 635, and
J-8 this Section. An alternate traffic control plan may be submitted for approval in accordance with Subsection 104.03 and the following:
(a) Ensure safe and efficient pedestrian, bicycle, and vehicular traffic (including emergency vehicles) at all times during construction;
(b) Schedule and perform work to minimize disruption to public traffic; and
(c) Accommodate the construction operations as approved under Section 155.
Submit alternate traffic control plans at least 30 days before its intended use. After the initial traffic control plan is approved, revise it as necessary to accommodate approved changes in the construction schedule. Submit the revised traffic control plan at least 14 days before implementation, unless otherwise approved by the CO.
156.04. Add the following:
Maintain one lane of traffic at MP 119.7 at all times.
Use single lane closures on at MP 119.7 according to Section 635 and as shown in the plans.
Use full lane closures on at MP 127.9 according to Section 635.
Install (insert devices) according to Section 635 and as shown in the plans or as directed by the CO, at least (insert minimum amount) days before beginning work.
156.05(f). Add the following:
Ensure that drains and inlets within the project limits are fully functional throughout the duration of the project.
156.07(d). Delete the first sentence and substitute the following:
The Contractor may use Gum Spring Overlook, MP 120.4 on the Mill Mt. Spur Rd as a staging area. Obtain approval from the CO before using this location for staging.
156.07(d). Add the following:
Restore staging areas to their original condition as directed by CO.
156.07. Add the following:
(k) Limit lane closures to 1,000 feet unless otherwise approved by the CO.
156.08. Delete the second paragraph and substitute the following:
J-9
Nighttime operations are not permitted.
156.09. Delete the second sentence and substitute the following:
The superintendent may serve as the traffic control supervisor provided the requirements of Subsection 156.03 are met.
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
157.04. Add the following:
Do not use soil erosion or sediment control products with plastic netting or straw.
Upon completion of construction, submit a Notice of Termination (NOT) to the (insert State permitting agency). Provide a copy of the NOT and evidence of its submission.
157.14 Add the following:
A Responsible Land Disturber certified in the State of Virginia is required during all stages of construction, from the initial land disturbance through final site stabilization. The name of the project RLD shall be provided by the contractor to the Virginia Department of Environmental Quality before any land disturbance may begin.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.03. Add the following:
Salvage signs, delineators, concrete barrier, and crash cushions designated for removal. Deliver salvage material to the NPS as approved by the CO.
203.05(b). Delete the Subsection and substitute the following:
(b) Burn. Burning is prohibited.
203.05(c). Delete the Subsection and substitute the following:
(c) Bury. Burying debris is prohibited.
Section 261. —REINFORCED SOIL SLOPES
261.02 Add the following:
Select granular backfill 704.08
J-10
Mechanically-stabilized earth wall material – wire facing 720.01(b)
261.03 Add the following:
(d) Qualification. Submit the following for approval at least 30 days before starting work:
a. Names of personnel; and
b. A résumé for each individual describing their experience on at least three reinforced soil slope projects of similar complexity over the past 5 years. Include project names, locations, and contact information for project owners.
261.05 Add the following:
261.05A Welded wire-faced walls. Install the facing units according to the manufacturer’s recommendations. Place the facing units at the elevations and to the extent shown in the plans.
Butt the ends of the front faces of adjacent facing units with the extending horizontal wires of one unit overlapping the adjacent unit. Place wire support struts according to the manufacturer’s recommendations, with spacing not less than 24-inch centers. Place one strut between the two end wires to support the joint between adjacent facing units. Place subsequent courses of facing units on previous courses at a setback complying with the batter specified in the plans.
Install reinforcement geogrid according to the manufacturer’s recommendations. Place reinforcement geogrid at the elevations and to the extent shown in the plans. Lay reinforcement geogrid for soil reinforcement horizontally on compacted fill. Place the geogrid in the main reinforcement direction perpendicular to the face of the wall. Connect the facing units to the reinforcement geogrid according to the manufacturer’s recommendations.
261.05B Backfilling. Backfill the stabilized volume with granular backfill according to Subsection 209.09. Place granular backfill material from the back of the wall face to the end of the reinforcement. Ensure that no voids exist below the reinforcement. Compact each layer according to Subsection 209.10, except use an acceptable lightweight mechanical or vibratory compactor within 36 inches (900 millimeters) of the facing. Consolidate facing backfill by rodding or other approved means to produce a uniform, tight facing fill.
Do not damage or disturb the facing or reinforcing elements. Do not operate equipment directly on top of the reinforcing mesh or strips. Correct damaged, misaligned, or distorted wall elements.
Backfill and compact behind the stabilized volume with unclassified borrow according to Subsections 209.09 and 209.10. At the end of the day's operation, slope the last lift of backfill away from the wall face to direct surface runoff away from the wall. Do not allow surface runoff from adjacent areas to enter the wall construction area.
Section 301. — UNTREATED AGGREGATE COURSES
301.03. Add the following to the second paragraph:
J-11
Submit the representative 300-pound sample to the EFLHD Central Laboratory in Sevierville, Tennessee at the address shown in Subsection 154.03.
301.03. Add the following:
An alternate state department of transportation aggregate gradation that is produced according to Subsection 703.05 may be submitted for approval. Provide target values within the allowable target value range of the state department of transportation aggregate gradation. When target values are not provided, the preproduction target values will be the midpoint of the allowable target value range of the state department of transportation aggregate gradation. The allowable deviation (±) from the target values will be according to Table 703-2A. The maximum allowable pay factor under Subsection 301.10 for a state department of transportation aggregate gradation will be 1.00.
Section 401. — ASPHALT CONCRETE PAVEMENT
BY GYRATORY MIX DESIGN METHOD
401.03. Add the following:
At the option of the Contractor, an alternate state department of transportation asphalt concrete pavement mixture that has the same nominal maximum size aggregate, traffic level (design ESAL), and asphalt binder grade as specified may be submitted for approval.
401.03(a). Delete the Subsection and substitute the following:
(a) RAP. Limit the quantity of RAP by mass in the JMF for the top lift of surface course to 15 percent. Limit the quantity of RAP by mass in the JMF for intermediate and base courses to 30 percent. For intermediate and base courses containing 20 to 30 percent by mass RAP, reduce the asphalt binder performance grade by 6°C for both high temperature and low temperature performance grades.
401.03(c). Add the following after the first sentence:
Submit all JMF materials and information to the EFLHD Central Laboratory in Sevierville, Tennessee, with a copy to the CO as directed.
401.03(c). Add the following:
If a state department of transportation asphalt concrete pavement mixture is requested for approval, submit a state department of transportation JMF approved within the past 12 months. Include documentation from a state department of transportation official certifying that the JMF is an approved state department of transportation asphalt concrete pavement mixture.
J-12
401.03(c)(4). Add the following:
For JMFs with percentages of RAP greater than 15 percent, submit a quality control plan that includes the methods used to control the RAP percentage.
401.03(d). Add the following after the first sentence:
Allow a minimum of 21 days for verification of each JMF after receipt of all material and information at the EFLHD Central Laboratory.
401.05(b). Add the following:
Use an MTV for paving operations.
401.13. Add the following:
Begin paving operations at the furthest location from the asphalt plant and proceed towards the plant.
Section 412. — ASPHALT TACK COAT
412.06. Delete the second paragraph and substitute the following:
Apply the asphalt tack coat according to Subsection 407.09 and at a rate indicated in Table 412-1.
Provide the CO with the target residual and bar application rates within the range specified in Table 412-1. Control the rate of application within plus or minus 0.01 gallons per square yard of the target application rate and within the allowable range. Provide the CO with the specific gravity of the bituminous material corrected for spray temperature.
Set spray bar height to ensure uniform coverage and at least a double overlap, but not to exceed triple overlap coverage. Set nozzle angle settings between 15 to 30 degrees from the center of the spray bar axis. Use the same size nozzles, all set at the same angle, open, and functioning properly.
J-13
Table 412-1
Asphalt Tack Coat Application Rate(1)
Pavement Type Residual Rate(2)
Bar Rate PG Binder(3)
Bar Rate Undiluted Emulsion(4)
Bar Rate Diluted Emulsion(5)
(1:1 Ratio) New Asphalt Concrete Pavement 0.020 - 0.045 0.025 - 0.045 0.030 - 0.065 0.060 - 0.130
Existing Asphalt Concrete Pavement 0.040 - 0.070 0.040 - 0.060 0.060 - 0.105 0.120 - 0.210
Milled Asphalt Concrete Pavement 0.040 - 0.080 0.040 - 0.080 0.060 - 0.120 0.120 - 0.240
Portland Cement Concrete Pavement 0.030 - 0.050 0.030 - 0.050 0.045 - 0.075 0.090 - 0.150
(1) Application rates are in gallons/yd2.
(2) Residual asphalt: the remaining asphalt after an emulsion has completely cured or set.
(3) Maintain a PG binder application rate of 1.0 times the target residual tack coat rate.
(4) Maintain an undiluted application rate of 1.5 times the target residual tack coat rate.
(5) Maintain a diluted application rate of 3.0 times the target residual tack coat rate.
412.07. Delete the Subsection and substitute the following:
412.07 Acceptance. See Table 412-2 for sampling, testing, and acceptance requirements.
Emulsified asphalt properties will be evaluated under Subsections 106.02 and 106.03.
Construction of the tack coat will be evaluated under Subsections 106.02 and 106.04.
Test distributor for residual application rate and frequency in accordance with Table 412-2, ASTM D2995, Option A, and the following:
(a) Record the tare weight of the nonwoven geotextile materials;
(b) Place the nonwoven geotextile on the road surface;
(c) Apply the tack coat over the nonwoven geotextile;
(d) Immediately record the weight of the nonwoven geotextile with tack coat;
(e) Record the temperature of the tack coat;
(f) Subtract the tare weight of the nonwoven geotextile to determine the weight of tack coat;
(g) Convert the weight of tack coat to application rate according to ASTM D2995, Section 8, Calculation (Transverse Application Rate);
(h) Correct the calculated application rate using temperature correction multiplier shown in
J-14 the Asphalt Institute, A Basic Asphalt Emulsion Manual, Table B-1; and
(i) Determine the tack coat residual application rate using the residual percentages shown in ASTM D2995, Table 1.
412.08. Add the following to the second paragraph:
Material quantities placed in excess of the application rates indicated in Table 412-1 will not be measured for payment.
J-15
Table 412-2 Sampling, Testing, and Acceptance Requirements
Material or Product
(Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Remarks
Production Emulsified asphalt or asphalt binder
Measured and tested for conformance
(106.04)
Quality − ASTM D2995, Option A
1 at start of work
1 per
2500 linear feet
Behind distributor before material “breaks” and before paving
No Upon completion of measurement
Tested by Government
J-16
Section 635. — TEMPORARY TRAFFIC CONTROL
635.04(d). Add the following:
Remove or completely cover unnecessary signs in accordance with Subsection 635.07.
635.04(g). Add the following:
If “marginal” or “unacceptable” devices are not corrected in a timely manner, the CO will provide written notification of those traffic control items not in compliance with the contract.
If the Contractor fails to bring the specified items into compliance within a 24-hour period, the CO may assess a daily reduction in payment to the Contractor of $1,750 per day. The CO may continue to assess the daily reduction in payment for each additional 24-hour period until the items are corrected. This reduction in payment will be subtracted from the Contractor’s progress payments and will be unrecoverable. Use of this reduction in payment does not waive the CO’s right to suspend the work in whole or in part according to Subsection 108.05.
635.04(i). Add the following:
Submit a certification indicating that the devices are crashworthy as defined in Subsection 101.04.
635.04. Add the following:
(j) As a minimum, furnish and install the following temporary traffic control devices:
(1) Construction signing;
(2) Type 3 barricades;
(3) Drums;
(4) Cones;
(5) Type B warning lights;
(6) Flaggers;
(7) Temporary pavement markings;
(8) Temporary traffic signal
(9) Temporary concrete barrier; and
J-17
(10) Other miscellaneous temporary traffic control devices that may be required by the
CO.
635.07. Delete the third paragraph and substitute the following:
Remove or completely cover unnecessary signs, or signs that conflict with the construction signing or the approved traffic control plan. Cover signs that are not removed so that no part of the covered sign is visible to traffic. Use sign covers meeting the following requirements:
(a) Large enough to completely cover the sign;
(b) Easy to attach to and remove from the sign without damaging the sign face. Do not use adhesives, glues, tapes, or mechanical fasteners that mar face of the sign;
(c) Black, non-reflective, and opaque;
(d) Made of plywood (minimum of 3/8-inches thick), aluminum (minimum of 0.040 inches thick), or other acceptable materials that will not be lifted, bent, or damaged by wind as approved by the CO; and
(e) Durable enough to resist deterioration due to weathering and atmospheric conditions for the duration of the project.
635.07. Add the following:
Furnish 16-inch (minimum) square flags that are fluorescent orange or fluorescent red-orange in color. Mount flags on top of signs in accordance with the MUTCD.
635.11. Add the following after the first sentence of the first paragraph:
Use FHWA-approved temporary barriers meeting test level 2 (TL-2) criteria, according to industry crashworthiness standards. For a list of acceptable manufacturers and products, refer to the FHWA longitudinal barriers listing found at https://safety.fhwa.dot.gov/roadway_dept/countermeasures/reduce_crash_severity/listing.cfm?co de=long. Install temporary barriers according to manufacturer’s recommendations.
635.17. Add the following:
Patch the travelway after milling to provide a smooth, uniform traveling surface before reopening travel lanes to traffic as directed by the CO.
Section 637. — FACILITIES AND SERVICES
637.02. Add the following:
https://safety.fhwa.dot.gov/roadway_dept/countermeasures/reduce_crash_severity/listing.cfm?code=long https://safety.fhwa.dot.gov/roadway_dept/countermeasures/reduce_crash_severity/listing.cfm?code=long
J-18
Locate the Government field office within 15 miles of the project site and where high-speed Internet service, as described in Subsection 637.04(b)(3), is available. In remote locations where high-speed Internet service is not available, the field office distance range may be extended or waived by the CO. Obtain approval from the CO before delivery of a mobile field office or any rental agreements are signed.
Clean the Government field office weekly to the approval of the CO.
637.03. Delete Tables 637-1 and 637-2 and substitute the following:
Table 637-1 Minimum Requirements for Field Office and Associated Services
Property Size or Quantity
Floor space, square feet 800 Locking outside door, deadbolt with keys 1
Steps with slip-proof tread and handrails (1)
Windows with locks 2 Total window area, square feet 30
Ceiling height, 7 feet ✓
Rooms including toilet room 4 Room size, except toilet room, square feet 100 Closet, 45-cubic foot ✓ Shelves, 12-inch depth, square feet 12
Electrical lighting ✓
Heat and air conditioning(2), maintain temperature of 72±7 °F ✓
Adequate electrical outlets ✓
Surge protectors ✓
Adequate electricity (120 and 240 V, 60 cycle as applicable) ✓
Adequate potable water supply ✓
Drinking water cooler with water supply ✓
Functioning sink with faucets for both hot and cold water with paper towels supply ✓
Functioning indoor toilet with toilet paper supply ✓
Parking for three vehicles on gravel surface ✓
J-19
Table 637-1 Minimum Requirements for Field Office and Associated Services
Property Size or Quantity
6-foot high chain link fence with gate around building and parking area ✓
(1) As required by local code.
(2) If window air conditioning is provided, provide a separate unit for each room.
Table 637-2
Minimum Field Office Furnishings
Property Size or Quantity
Table, 30-inch wide × 8-foot long × 30-inch high 3 File cabinet, 2-drawer, fire resistant, metal, with lock and keys 1 File cabinet, 4-drawer, metal 1 Desk, 12-square foot(1) 2 Desk lamp(1) 2 Office chair(1) 5 Storage cabinet, 6-foot wide × 36-inch high × 18-inch deep 1 Fire extinguisher 1 Compact refrigerator, 2.4 cubic feet minimum 1 Microwave oven, 1 cubic feet and 700 watts of cooking power minimum 1
(1) Meet accepted industry standards for ergonomics.
637.03(b). Delete the Subsection and substitute the following:
(b) Equipment. Furnish the following office equipment in the Government field office:
(1) Laser copy machine. One self-feeding plain paper photocopying machine with the following minimum capabilities:
(a) Reproducing black and white, and color copies for each size paper;
(b) Equipped with 3 separate paper trays so that copying can be performed with 8½-by 11-inch (letter size), 8½- by 14-inch (legal size), and 11- by 17-inch paper without switching paper or paper trays;
(c) Automatic document feeder capable of making at least 20 copies per minute for each size paper;
(d) Reducing or enlarging originals, including duplex (double-sided) copying, for
J-20 each size paper;
(e) Copying to Universal Serial Bus (USB) flash drive in Adobe Acrobat (*.pdf) file format; and
(f) Built-in wireless technology (Wi-Fi capable).
Furnish all necessary supplies for the laser copy machine, including paper.
(2) Laser printer. One plain paper printing machine with the following minimum capabilities:
(a) Producing black and white, and color prints for each size paper;
(b) Equipped with 3 separate paper trays so that printing can be performed with 8½-by 11-inch (letter size), 8½- by 14-inch (legal size), and 11- by 17-inch paper without switching paper or paper trays;
(c) Automatic paper feeder capable of making at least 20 prints per minute for each size paper;
(d) Producing duplex (double-sided) prints for each size paper;
(e) Printing from direct personal computer (PC) and local area network (LAN) connections;
(f) Scanning to Adobe Acrobat (*.pdf) file format; and
(g) Built-in wireless technology (Wi-Fi capable).
The laser printer may be one machine in combination with the laser copy machine.
Furnish all necessary supplies for the laser printer,…
This is the start of the file's text. The full file is on GovTribe.