Plans_PN15045.pdf
PDF 9 MB Posted
- Solicitation number
- 0000038700
- Issued by
- Kern County, California
About this file
This document is a set of construction plans for an Electric Vehicle Charging Station Infrastructure project at the Correctional Training Facility (CTF) operated by the California Department of Corrections and Rehabilitation (CDCR), located at Highway 101 North in Soledad, California (APN 257-021-012-000). The project involves site and electrical infrastructure improvements for the installation of one (1) Level 2 EV charger with a single charge port, limited to 32 FLA, provided by the state's contracted vendor and installed by others. The scope includes site preparation, concrete pad construction (4,000 PSI minimum), underground electrical conduit installation at 24-inch minimum burial depth, connection from the existing "Break Room" distribution panel (125 AMP, 208/120V, 1-phase, 3-wire service) to a new exterior EV junction box, pavement markings, bollard installation, and safety signage. The contractor is responsible for all materials, labor, equipment, site surveys, utility verification, and coordination with Underground Service Alert (USA) prior to excavation. All work must comply with the 2022 California Building Code, California Electrical Code, California Fire Code, and referenced standards. The plans were signed on June 16, 2025, and received preliminary fire and panic approval from the Office of the State Fire Marshal on July 18, 2025, with the project designated as reference number 25-2680. The consultant team includes structural and electrical engineers Brian Brooks and Dario Romero from Blair Church & Flynn (Clovis, CA), with project director Ryan Allgood from the Department of General Services Office of Sustainability.
The electrical work requires the installation of a 1-inch rigid metallic conduit (RMC) feeder from the existing distribution panel to an exterior EV junction box, transitioning to 1-inch schedule 40 PVC for underground installation, with three conductors: two #8 AWG copper conductors (L1, L2) and one #8 AWG copper ground conductor, all rated 90°C THWN-2 or equivalent. A 40-ampere, 2-pole breaker will be installed in the existing panel to serve the EVCS-1 charge port at 3,328 volt-amperes (6.656 KVA), resulting in a total facility demand of 20.02 KVA at 96.26 amps (77 percent of the main breaker capacity). Concrete improvements require 4,000 PSI compressive strength minimum, with all aggregate and cement conforming to ASTM standards; rebar clear cover shall be 2 inches minimum in the center of slabs, and all exposed concrete corners shall have 3/4-inch chamfers. The contractor must provide emergency shut-off labeling on the charger, conduct arc-flash hazard assessments per NFPA 70E, and perform 50 percent testing of all expansion anchors used for equipment anchorage with special inspection during installation. All work shall be confined within the construction limits shown on the plans, and no work shall commence until a building permit or notice to proceed is issued. No specific contract award value, budget allocation, or bidding timeline is disclosed in these construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05_Exhibit_A-1,_Drawings.pdf | ||
| 08_Exhibit_B-1,_Rate_Sheet.xlsx | XLSX spreadsheet | |
| 00_IFB_Number_C5613288-D.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF CONSULTANTS:
STRUCTURAL: ELECTRICAL:
BRIAN BROOKS
BLAIR CHURCH & FLYNN
451 CLOVIS AVE. STE 200
CLOVIS, CA 93612
(559) 326-1400
DARIO ROMERO
BLAIR CHURCH & FLYNN
451 CLOVIS AVE. STE 200
CLOVIS, CA 93612
(559) 326-1400
PROJECT DIRECTOR I:
RYAN ALLGOOD
OFFICE OF SUSTAINABILITY
DEPARTMENT OF GENERAL SERVICES (DGS)
707 3RD STREET, 4TH FLOOR,
WEST SACRAMENTO, CA 95605
PHONE: (916) 375-4115
CELL: (916) 215-6663
EMAIL: RYAN.ALLGOOD@DGS.CA.GOV
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027EXP 06/30/2026
06-16-2025 14
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F ti .d w g L a y o u t1
B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665
Date Signed:
06/16/2025
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
TITLE SHEET
T1.0
SHEET INDEX
SHEET NO. TITLE
T1.0 TITLE SHEET
C1.0 OVERALL SITE MAP
C2.0
TOPOGRAPHIC SURVEY & DEMOLITION PLAN -
LOCATION 1
C3.0 SITE & GRADING PLAN - LOCATION 1
C4.0 DETAILS
E1.0 ELECTRICAL CONDUIT PLAN - LOCATION 1
E2.0 CONDUIT SECTIONS & DETAILS
E3.0 ELECTRICAL SCHEDULE & CIRCUITS
R1.0 REFERENCE DRAWINGS
R2.0 TITLE 24 DOCUMENTS
TOTAL NUMBER OF SHEETS = 14
LOCATION MAP
NOT TO SCALE
PROJECT LOCATION:
PROJECT IS LOCATED AT:
HIGHWAY 10 NORTH,
SOLEDAD, CA 93960
APN: 257-021-012-000
SCOPE OF EV IMPROVEMENT WORK:
1. SITE AND ELECTRICAL INFRASTRUCTURE IMPROVEMENTS FOR INSTALLATION OF EV
CHARGERS.
2. IMPACTED EXISTING PARKING = 0 TOTAL SPACES; 0 STANDARD SPACES
3. ALTHOUGH THE CONTRACTOR MAY NOT PROCURE OR PERFORM THE FINAL INSTALLATION OF
THE EVSE, SUCH WORK IS IN THE PERMIT SCOPE AND MAY BE PERFORMED BY OTHERS.
OWNER/REPRESENTATIVE
INFORMATION:
DEPARTMENT OF GENERAL SERVICES (DGS)
707 3RD STREET, 4TH FLOOR,
WEST SACRAMENTO, CA 95605
EMAIL: RYAN.ALLGOOD@DGS.CA.GOV
CONTACT: RYAN ALLGOOD
ANCHORAGE NOTES:
1. ANCHOR SYSTEMS:
A. EPOXY ANCHORS: COMPLYING WITH ICC ESR-2508, OR ICC ESR-3187, OR ICC ESR-3298.
B. MECHANICAL ANCHORS: COMPLYING WITH ICC ESR-4266, OR ICC ESR-2502
2. INSTALLATION: SEE MANUFACTURER'S WRITTEN INSTRUCTIONS AND REFERENCED ICC ES
REPORT.
A. MATERIALS NOT TO BE PENETRATED BY FASTENERS OR ANCHORS: POST-TENSIONED
CONCRETE AND PRECAST CONCRETE, PRESTRESSED CONCRETE UNLESS SPECIFICALLY
DETAILED HEREIN OR AS ACCEPTED IN WRITING BY ARCHITECT (STRUCTURAL ENGINEER).
WHEN INSTALLATION IS PERMITTED, LOCATE PRESTRESSING AND POST-TENSIONED
TENDONS ACCURATELY PRIOR TO INSTALLATION.
B. DRILLING HOLES IN EXISTING CONCRETE FOR ANCHORS: USE NON-PNEUMATIC, ROTARY
HAMMER TOOLS WITH ANSI COMPLIANT NON-REBAR CUTTING DRILL BITS TO DRILL HOLES
TO PROPER TOLERANCE. LOCATE EXISTING REBAR INCLUDING PRESTRESSING AND
POST-TENSIONING TENDONS USING NON-HAZARDOUS, NON-DESTRUCTIVE METHODS
WITH ACCURATE LOCATION TOLERANCES (PLUS OR MINUS ONE INCH PRIOR TO DRILLING
HOLES TO AVOID CUTTING OR DAMAGING EXISTING REINFORCING OR
PRESTRESSING/POST-TENSIONING TENDONS. HOLES SHALL BE THOROUGHLY CLEANED
PER THE MANUFACTURERS WRITTEN RECOMMENDATIONS PRIOR TO INSTALLATION OF
ANCHORS.
C. DELETERIOUS MATERIALS: KEEP ANCHORS, INCLUDING HOLES FOR DRILL AND EPOXY
ANCHORS AND MECHANICAL ANCHORS FREE OF DUST, GREASE, AND OTHER MATERIALS
THAT IMPAIR CHEMICAL AND MECHANICAL BOND.
3. TESTING FOR EXPANSION ANCHORS:
A. SPECIAL INSPECTION: SPECIAL INSPECTOR WILL PERFORM CONTINUOUS SPECIAL
INSPECTION DURING INSTALLATION.
B. TEST QUANTITY: INSPECTOR SHALL TEST 50% OF ANCHORS USED FOR
EQUIPMENT/NON-STRUCTURAL COMPONENT ANCHORAGE.
C. TEST LOADS FOR:
A. 3/8"Ø (ICC ESR-4266) OR (ICC ESR-2502)
· TORQUE TEST FOR 3/8" EXPANSION ANCHOR: 25 FT-LBS
B. 1/2"Ø (ICC ESR-4266) OR (ICC ESR-2502)
· TORQUE TEST FOR 1/2" EXPANSION ANCHOR: 40 FT-LBS
C. 5/8"Ø (ICC ESR-4266) OR (ICC ESR-2502)
· TORQUE TEST FOR 5/8" EXPANSION ANCHOR: 60 FT-LBS
D. HIGH-STRENGTH EPOXY ADHESIVE COMPLYING WITH ICC ESR-2508, ICC ESR-3298 OR
ICC ESR-3187
D. TESTING METHOD:
A. HYDRAULIC RAM METHOD: THE ANCHORS SHALL BE TESTED BY DIRECT PULL WITH A
HYDRAULIC JACK. DURING THE TEST, THE ANCHORS SHALL HAVE NO OBSERVABLE
MOVEMENT.
B. TORQUE WRENCH METHOD: THE ANCHORS SHALL BE TESTED BY THE USE OF A
CALIBRATED WRENCH. THE APPLICABLE TEST LOAD SHALL BE REACHED WITHIN
ONE-HALF TURN OF THE NUT.
E. FAILED ANCHORS: IF ANY ANCHOR(S) FAIL IN TESTING, TESTING OF REMAINING ANCHORS
OF THE SAME SIZE AND CATEGORY NOT PREVIOUSLY TESTED SHALL BE COMPLETED.
4. POST-INSTALLED ANCHORAGE: CONTRACTOR SHALL INSTALL ANCHORAGE AT ALL LOCATIONS
ILLUSTRATED IN THE CONSTRUCTION DOCUMENTS. POST-INSTALLED ANCHORS SHALL
CONFORM TO CBC REQUIREMENTS, AND BE INSPECTED BY A SPECIAL INSPECTOR.
CONCRETE NOTES:
1. CONCRETE COMPRESSIVE STRENGTH: ALL CONCRETE SHALL ATTAIN A MINIMUM
COMPRESSIVE STRENGTH AS SHOWN IN THE CONCRETE STRENGTH TABLE BELOW AT 28
DAYS, U.N.O. ON PLANS. SEE ALSO SULFATE CONTENT NOTES
2. AGGREGATES IN CONCRETE: SHALL BE NATURAL SAND AND ROCK (150 LB/CU. FT)
CONFORMING TO ASTM C33. AGGREGATE SHALL HAVE PROVEN SHRINKAGE
CHARACTERISTICS OF LESS THAN 0.04% PER ASTM C157. DO NOT CHANGE SOURCE OF
AGGREGATE DURING COURSE OF WORK WITHOUT WRITTEN CONSENT OF ENGINEER.
3. CEMENT: SHALL BE PORTLAND CEMENT CONFORMING TO ASTM C150. CEMENT SHALL BE
TYPE II OR AS REQUIRED TO SATISFY SITE SOIL CONDITIONS. REFER TO TABLE 4 OF ASTM
C150 FOR CONCRETE CEMENT REQUIREMENTS ON SOIL CONTAINING SULFATE. REFER TO
THE CONCRETE STRENGTH TABLE FOR MAXIMUM WATER TO CEMENT RATIO. USE A MINIMUM
OF (6) SACK OF CEMENT FOR EACH CUBIC YARD OF CONCRETE.
CONCRETE STRENGTH
CONDITION
MIN 28-DAY
COMPRESSIVE
STRENGTH,
F'C
CONCRETE
TYPE*
MAXIMUM
AGGREGATE
SIZE
WATER TO
CEMENT
RATIO
MAX
SLUMP**
SLAB ON
GRADE/
CONC PADS
4,000 PSI
NORMAL-WEIGHT
CONCRETE
(NWC)
3/4" 0.50 4"
* MAXIMUM DRY WEIGHT OF LIGHTWEIGHT CONCRETE SHALL BE 115 PCF.
** SLUMP SHALL BE MEASURED PRIOR TO THE ADDITION OF SUPERPLASTICIZER (IF USED.)
REBAR CLEAR COVER IN CONCRETE: THE FOLLOWING MINIMUM CLEAR DISTANCES BETWEEN
REINFORCING STEEL AND FACE OF CONCRETE SHALL BE MAINTAINED UNLESS NOTED OTHER
WISE:
REBAR CLEAR COVER FOR CAST-IN-PLACE CONCRETE
CONDITION COVER
SLAB ON GRADE CENTER OF SLAB OR 2" MIN
4. VIBRATION: VIBRATION OF CONCRETE SHALL BE IN ACCORDANCE WITH GENERAL
PROVISIONS OUTLINED IN PORTLAND CEMENT ASSOCIATION SPECIFICATION ST26.
5. CURING: CONCRETE SHALL BE MAINTAINED AT IN A MOIST CONDITION FOR A MINIMUM OF
FIVE DAYS AFTER IS PLACEMENT. FOR CONCRETE OTHER THAN SLAB ON GRADE, APPROVED
CURING COMPOUNDS MAY BE USED IN LIEU OF MOIST CURING. ONLY IF APPROVED BY THE
ENGINEER OR ARCHITECT.
6. INSPECTIONS, TESTING & QUALITY ASSURANCE: REFER TO SHEET SN1 FOR DEPUTY SPECIAL
INSPECTION, TESTING & STRUCTURAL OBSERVATION REQUIREMENT. A MINIMUM OF ONE
COMPRESSION TEST AT 7 DAYS AND 2 TESTS AT 28 DAYS FOR ALL CONCRETE SAMPLES.
TAKE TEST AT A FREQUENCY OF ONCE EVERY 150 CU. YDS OR 5,000 SQ. FT MINIMUM.
7. DOWELS, INSERTS: SHALL BE TIED IN PLACE PRIOR TO POURING CONCRETE.
8. ANCHOR BOLTS: SHALL BE WEDGE ANCHORS.
9. CONSTRUCTION AND POUR JOINTS: LOCATIONS SHALL BE APPROVED BY ENGINEER PRIOR
TO POURING CONCRETE.
10. FORMWORK: FORMWORK TOLERANCE SHALL BE IN ACCORDANCE WITH THE C.B.C. AND A.C.I
STANDARDS.
11. PIPES IN CONCRETE: PIPES MAY PASS THROUGH STRUCTURAL CONCRETE IN SLEEVES, BUT
SHALL NOT BE EMBEDDED THEREIN. PIPES OR DUCTS EXCEEDING ONE-THIRD THE SLAB OR
WALL THICKNESS SHALL NOT BE PLACED IN THE STRUCTURAL CONCRETE UNLESS
SPECIFICALLY DETAILED.
12. EXPOSED CORNERS: PROVIDE 3/4" CHAMFERS AT ALL EXPOSED CORNERS.
13. DRYPACK OR GROUT: SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2,000 PSI AND BE
COMPOSED OF ONE PART PORTLAND CEMENT TO NOT MORE THAN THREE PARTS SAND.
14. FLY ASH: NOT PERMITTED.
NOTE:
1. CODE COMPLIANCE: ALL WORK SHALL CONFORM TO BE PERFORMED IN ACCORDANCE
WITH THE APPLICABLE CODES, STANDARDS, AND ORDINANCE AS SET FORTH BY THE
AUTHORITIES HAVING JURISDICTION (AHJ) AND THEIR LATEST ADOPTED EDITIONS (IN
EFFECT AT THE TIME OF THE BUILDING PERMIT APPLICATION) OF THE FOLLOWING
PUBLICATIONS:
- CALIFORNIA CODE OF REGULATIONS TITLE 24:
· 2022 CALIFORNIA ELECTRICAL CODE (CEC)
· 2022 CALIFORNIA FIRE CODE (CFC)
· 2022 CALIFORNIA BUILDING CODE (CBC)
· 2022 CALIFORNIA ADMINISTRATIVE CODE (CAC)
· 2022 CALIFORNIA REFERENCED STANDARDS CODE (CRSC)
· 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
· AMERICANS WITH DISABILITIES ACT (ADA)
· TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
· APPLICABLE YEARS OF NFPA ETC. WITH CALIFORNIA AND OTHER LOCAL
AMENDMENTS AS APPLICABLE
2. PRIOR TO MAKING REVISIONS TO THE EXISTING PHASE SERVICE, VERIFY EXISTING
SEQUENCE OF THE CIRCUITS AND MAKE CERTAIN THAT EVERY ITEM IS THOROUGHLY
PREPARED. PRIOR TO SCHEDULED OUTAGES MAKE CERTAIN THAT EVERY ITEM IS
THOROUGHLY PREPARED, THAT ALL REQUIRED MATERIALS ARE ON-SITE 7 DAYS PRIOR
TO THE SCHEDULED OUTAGE, THAT SPARE MATERIALS ARE AVAILABLE IN THE EVENT
OF DAMAGE OR DEFECTS, AND THAT THE REQUIRED PERSONNEL ARE AVAILABLE TO
COMPLETE THE WORK DURING THE SCHEDULED OUTAGE. DO THE ACTUAL WORK AT AN
OFF-PEAK TIME, OR OVERTIME, AS ARRANGED WITH THE STATE'S PROJECT DIRECTOR
OR AS HEREINAFTER SPECIFIED. ONCE THE WORK IS STARTED, VIGOROUSLY
PROSECUTE IT TO COMPLETION TO KEEP DOWNTIME TO A MINIMUM. ENSURE THAT
EXISTING ELECTRICAL PHASE SEQUENCE (ELECTRICAL PHASE ROTATION) OF THE
SYSTEM IS MAINTAINED. BE PREPARED TO TEMPORARILY SERVE THE EXISTING SERVICE
OR DISCONTINUE THE NECESSARY REVISIONS IN THE EVENT OF AN EMERGENCY OR
OTHER CONDITION WHICH MAKES IT IMPOSSIBLE TO FINISH THE SCHEDULED WORK ON
TIME.
3. NAMEPLATES:
A. PROVIDE NAMEPLATES ON EQUIPMENT, DEVICES, PANELS AND FIELD MOUNTED
INSTRUMENTS (PRESSURE SWITCHES, LIMIT SWITCHES, ETC.) TO IDENTIFY EACH ITEM
WITH ITS RESPECTIVE SERVICE OR FUNCTION. USE BLACK-ON-WHITE LAMINATED
PLASTIC (WHITE LETTERING ON BLACK BACKGROUND), WITH BEVELED EDGES AND
ENGRAVED LETTERING NOT LESS THAN 1/4 INCH HIGH UNLESS OTHERWISE NOTED.
ATTACH WITH 1/4-INCH-LONG NO. 4 PHILLIPS, ROUND HEAD, COARSE THREAD, TYPE
410 STAINLESS STEEL, THREAD-CUTTING SCREWS WITH BLUNT POINT UNLESS
OTHERWISE SPECIFIED. FOR EXTERIOR NAMEPLATES, PROVIDE SILICON SEAL FOR
SCREW PENETRATIONS. FOR CAST IRON ENCLOSURES MOUNT NAMEPLATES WITH
SETON TUFF-BOND #TB2 ADHESIVE.
B. PROVIDE NAMEPLATES FOR INTERNAL DEVICES OF EQUIPMENT (CONTROL RELAYS,
CONTACTORS, TIMERS, TERMINAL BLOCKS, ETC.). MOUNT NAMEPLATES ADJACENT
TO, NOT ON, THE DEVICE.
C. PROVIDE SINGLE, DEDICATED NAMEPLATES FOR DEVICES MOUNTED WITHIN AND ON
EQUIPMENT. PROVIDE AS A MINIMUM A SINGLE DEDICATED NAMEPLATE FOR EACH
DEVICE (RELAY, SWITCH, TERMINAL BLOCK, METER, ETC.). NAMEPLATE SHALL AGREE
WITH IDENTIFICATION ON MANUFACTURER'S DRAWING. ON DEVICES MOUNTED IN
FRONT COMPARTMENT DOORS, PROVIDE EACH DEVICE WITH TWO NAMEPLATES, ONE
ON THE FRONT AND ONE ON THE BACK OF THE FRONT COMPARTMENT DOOR. THE
NAMEPLATES MOUNTED ON THE BACK OF THE DOOR SHALL BE STICK-ON TYPE.
4. FINAL TERMINATION
A. CONTRACTOR TO PROVIDE FEEDERS COILED IN THE NEAREST PULL BOX OR
JUNCTION BOX FOR FINAL TERMINATION.
FIRE SAFETY NOTES:
1. FIRE DEPARTMENT ACCESS ROAD SHALL BE MAINTAINED AT ALL TIMES, AND SHALL BE
PROVIDED TO BE WITHIN 100 FEET OF TEMPORARY FIRE DEPARTMENT CONNECTIONS.
(2022 CFC SECTION 3310)
2. FIRE SAFETY DURING DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CBC
CHAPTER 33 AND CFC CHAPTER 33.
GENERAL CONTRACT NOTES:
1. CONTRACTOR SHALL PROVIDE ALL MATERIALS SUCH AS TOOLS, EQUIPMENT, LABOR, AND
INCIDENTALS REQUIRED INCLUDING THE CONSTRUCTION OF ALL PROPOSED IMPROVEMENTS
SHOWN ON THE PLANS AND AS SPECIFIED BY THE GOVERNING STANDARDS AND/OR THE
CIVIL AND ELECTRICAL ENGINEERS.
2. CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO
CONSTRUCTION OF THE PROPOSED IMPROVEMENTS.
3. IF DAMAGED DURING CONSTRUCTION, THE CONTRACTOR SHALL REPLACE IN KIND ALL
EXISTING STRUCTURES, WALKWAYS, CURB & GUTTER, LANDSCAPING, AND/OR OTHER
IMPROVEMENTS TO AN EXISTING OR BETTER CONDITION.
4. CONTRACTOR SHALL REPLACE ALL EXISTING STRIPING, SIGNAGE AND MARKINGS DAMAGED
DUE TO PROJECT CONSTRUCTION ACTIVITIES. CONTRACTOR TO REMOVE EXISTING
STRIPING BEFORE PLACING PROPOSED STRIPING PATTERNS.
5. ALL WORK SHALL BE CONFINED WITHIN THE EASEMENTS AND/OR CONSTRUCTION LIMITS AS
SHOWN ON THE PLANS.
6. APPROVAL OF THESE PLANS BY THE AUTHORITIES HAVING JURISDICTION DOES NOT
AUTHORIZE ANY WORK TO BE PERFORMED UNTIL A PERMIT OR NOTICE TO PROCEED HAS
BEEN ISSUED.
7. BEFORE COMMENCING WORK, THE CONTRACTOR SHALL NOTIFY ALL UTILITY AUTHORITIES
OR UTILITY COMPANIES HAVING POSSIBLE INTEREST IN THE WORK OF THE CONTRACTOR'S
INTENTION TO EXCAVATE PROXIMATE TO EXISTING FACILITIES AND THE CONTRACTOR SHALL
VERIFY THE LOCATION OF ANY UTILITIES IN THE WORK AREA. THE CONTRACTOR SHALL
NOTIFY UNDERGROUND SERVICE ALERT (U.S.A.) TWO (2) DAYS PRIOR TO BEGINNING ANY
EXCAVATION.
8. THE CONTRACTOR SHALL OBTAIN WRITTEN AUTHORIZATION FROM ANY PROPERTY OWNER
GIVING HIM PERMISSION TO ENTER HIS PROPERTY FOR THE PURPOSE OF CONSTRUCTING
THE IMPROVEMENTS DELINEATED ON THE PLANS AND TRANSITION THERETO.
9. ALL BILL OF MATERIALS AND/OR EQUIPMENT SHALL BE PROVIDED AS SPECIFIED WITHIN THIS
SET OR APPROVED EQUAL. ALL BILL OF MATERIALS AND/OR EQUIPMENT SHALL MATCH THE
SAME QUALITY AND CAPACITY AS INDICATED HEREIN.
10. CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IDENTIFIED BY THE
PROFESSIONAL ENGINEERING SEAL AND SIGNATURE ON THESE PLANS, OF ANY SITE
CONDITION(S) AND/OR DESIGN INFORMATION THAT PREVENTS THE CONTRACTOR FROM
COMPLYING WITH THE LAWS, REGULATIONS AND/OR BUILDING CODES.
11. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH DGS STANDARD
CONSTRUCTION SPECIFICATIONS.
12. CHARGING STATIONS SHALL BE PROVIDED BY THE STATE (DEPARTMENT OF GENERAL
SERVICES) AND INSTALLED BY THE CURRENT STATE ELECTRIC VEHICLE CHARGING STATION
VENDOR. ALL FINAL TERMINATIONS AND SPLICING SHALL BE COMPLETED BY THE STATE
VENDOR.
DESIGN CRITERIA:
CALIFORNIA ADMINISTRATIVE CODE (CAC) 2022
CALIFORNIA BUILDING CODE (CBC) 2022
CALIFORNIA ELECTRICAL CODE (CEC) 2022
CALIFORNIA FIRE CODE (CFC) 2022
CALIFORNIA REFERENCED STANDARDS CODE (CRSC) 2022
TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
NATIONAL ELECTRICAL CODE (NEC) 2020
CDCR DESIGN CRITERIA GUIDELINES (DCG) 2025
ARC-FLASH NOTE:
1. ALL NEW ELECTRICAL SWITCHGEAR, SWITCHBOARDS AND PANELBOARDS SHALL BE
PROVIDED WITH AN ARC-FLASH HAZARD WARNING LABEL/MARKING BY THE ELECTRICAL
CONTRACTOR, IN COMPLIANCE TO THE THE REQUIREMENTS OF THE LATEST CEC 110.16. AN
ARC-FLASH ASSESSMENT STUDY WHICH SHALL ADHERE WITH THE LATEST NFPA 70E - 130.5,
SHALL BE PERFORMED BY THE ELECTRICAL CONTRACTOR.
THE ARC-FLASH ASSESSMENT STUDY SHALL BE PERFORMED BY THE ELECTRICAL
CONTRACTOR AND ADHERE TO NFPA 70E-130.5.
THE ARC-FLASH ASSESSMENT STUDY AND THE ARC-FLASH HAZARD WARNING
LABEL/MARKING TEMPLATE/S SHALL BE SUBMITTED TO THE ELECTRICAL ENGINEER OF
RECORD (EEOR) FOR REVIEW AND APPROVAL.
PROPOSED EV CHARGER TABULATION
EV CHARGER NO. OF EVCS(S) NO. OF FLEET PORT(S)
SINGLE (LEVEL 2) 1 1
TOTAL TOTAL EVCS(S) = 1 TOTAL PORT(S) = 1
CONSIDER USING THIS NOTE FOR 11B-228.3.2 EXCEPTION 1: THE EVCS FOR THIS PROJECT ARE
NOT AVAILABLE TO THE GENERAL PUBLIC AND INTENDED FOR THE USE BY A DESIGNATED
VEHICLE OR DRIVER; THEREFORE, PER CBC SECTION 11B-228.3.2 EXCEPTION 1, THE EVCS SHALL
NOT BE REQUIRED TO COMPLY WITH SECTION 11B-228.3.2 THE EVCS FOR THIS PROJECT ARE NOT
DESIGNED TO COMPLY WITH 11B-228.3.2 ACCESS REQUIREMENTS.
PROJECT
LOCATION
HW
Y 101
SO
LE
D
AD
P R
IS
O N R D
S A
LI
N A S V A
LL
E Y
S
TA
TE
P R
IS
O N R
D
DESIGN INFORMATION & PARAMETERS:
1. BASIC WIND SPEED (99 MPH) AND WIND EXPOSURE CATEGORY C.
2. LATITUDE = 36.476201, LONGITUDE = -121.371718
3. S1 = 0.6, SD1 = 0.93, SS = 0.93
G
, SDS = 1.1
G
(SITE CLASS D ASSUMED)
FLOOD ZONE NOTES:
1. PROJECT SITE LOCATED WITHIN FLOOD HAZARD ZONE X; 0.2% ANNUAL CHANCE FLOOD
HAZARD, AREAS OF 1% ANNUAL CHANCE FLOOD WITH AVERAGE DEPTH LESS THAN ONE
FOOT OR WITH DRAINAGE AREAS OF LESS THAN ONE SQUARE MILE.
2. FIRM PANEL: 06053C0625H.
3. MAP EFFECTIVE DATE; NOVEMBER 30, 2023.
4. MAP IS MONTEREY COUNTY, CALIFORNIA. PANEL 625 OF 2050.
UTILITY NOTE:
UTILITY INFORMATION SHOWN HEREON IS BASED ON RECORD INFORMATION SUPPLIED TO
THE ENGINEER BY UTILITY COMPANIES, PUBLIC AGENCIES AND THE PROPERTY OWNER AND
OBSERVATION OF VISIBLE EVIDENCE BY A FIELD SURVEY. THE ENGINEER CAN MAKE NO
GUARANTEE AS TO THE ACCURACY OR COMPLETENESS OF THE UNDERGROUND UTILITY
FACILITIES SHOWN. PRIOR TO ANY SITE EXCAVATIONS, THE CONTRACTOR SHALL CONTACT
THE OWNER AND UNDERGROUND SERVICE ALERT (U.S.A.) AND REQUEST THAT THEY
IDENTIFY THE LOCATION OF ALL UNDERGROUND UTILITIES AT THE SITE. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2680
PROJECT LOCATION:
SEE DEMOLITION PLAN ON SHEET
C2.0, SITE PLAN ON SHEET C3.0,
AND ELECTRICAL CONDUIT PLAN
ON SHEET E1.0
LP
SD
SDSDSD
PP
EPB
BO
BOBO
OVERALL SITE PLAN
C1.0
0 100 300 600 1200
SCALE IN FEET
SCALE: 1"=600'
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F s i0
.d w g C .0
O v e ra ll S it e M a p B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
OWNER: SOLEDAD STATE PRISON
APN: 257-021-012-000
OWNER: CROCKER CITIZENS
NATIONAL BANK
APN: 257-041-019-000
OWNER: WELLS FARGO BANK TR
APN: 257-041-011-000
OWNER: GLOBAL AG
PROPERTIES II USA LLC
APN: 257-021-018-000
OWNER: RCT LAND COMPANY LP
APN: 417-151-027-000
OWNER: RCT LAND COMPANY LP
APN: 257-021-013-000
OWNER: JACKSON FAMILY
ESTATES II LLC
APN: 257-021-014-000
OWNER:
ASELLUS-MONTEREY LLC
APN: 257-031-004-000
OWNER: GRISETTI JOHN TR
APN: 257-031-003-000
OWNER: SMITH-MONTEREY LLC
APN: 257-021-025-000
OWNER: SILVERADO GONZALES
VINEYARDS LLC
APN: 257-021-009-000
OWNER: ASELLUS-MONTEREY LLC
APN: 417-151-026-000
OWNER: ASELLUS-MONTEREY LLC
APN: 417-151-001-000
OWNER: ANDRUS SANDRA P TR
APN: 257-021-024-000
SYMBOL LEGEND:
EXISTING PROPERTY LINE
AREA OF WORK
HIGHW
AY 101
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
LP
SDSDSDSD
PP
EPB
BO
DEMOLITION PLAN
C2.0
SCALE IN FEET
0 5 10 20
SCALE: 1"=10'
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F ts
.d w g C .0
T o p o g ra p h ic S u rv e y B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
DEMOLITION NOTES:
1. THE "LIMIT OF DEMOLITION" SHOWN IS APPROXIMATE AND IS GENERALLY
CONSIDERED TO BE THE MINIMUM REMOVAL REQUIREMENTS. CONTRACTOR MUST
COORDINATE AS NOTED IN THE LEGEND.
2. CONTRACTOR SHALL LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS OFF SITE.
3. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITY IMPROVEMENTS NOT
SPECIFICALLY DESIGNATED FOR REMOVAL.
4. THE ON-SITE UNDERGROUND UTILITIES SHOWN ON THIS SHEET ARE AT AN
APPROXIMATE LOCATION. THE EXTENT, LOCATIONS AND SIZES ARE UNKNOWN. THE
CONTRACTOR SHALL POTHOLE TO LOCATE AND VERIFY THE UNDERGROUND UTILITY
LINES PRIOR TO REMOVAL.
5. CONTRACTOR TO PROTECT AND PRESERVE IN PLACE ANY FOUND SURVEY
MONUMENTS. ANY MONUMENTS DISTURBED SHALL BE RESET BY A LICENSED
SURVEYOR AND THE APPROPRIATE PAPERWORK FILED WITH THE CITY OR COUNTY.
6. ALL HAZARDOUS MATERIALS ENCOUNTERED DURING SITE DEMOLITION SHALL BE
REMEDIATED AND DISPOSED OF PER STATE AND EPA REQUIREMENTS.
7. CONTRACTOR SHALL CONTACT AND COORDINATE WITH ALL UTILITY AGENCIES PRIOR
TO THE START OF ANY DEMOLITION OR CONSTRUCTION.
8. ANY EXISTING UTILITIES AND/OR IMPROVEMENTS THAT BECOME DAMAGED DURING
CONSTRUCTION SHALL BE COMPLETELY RESTORED TO THE SATISFACTION OF THE
OWNER AND AGENCY HAVING AUTHORITY, AT THE CONTRACTOR'S SOLE EXPENSE.
DEMOLITION LEGEND:
PROTECT EXISTING CONCRETE CURB TO REMAIN
PROTECT EXISTING BUILDING TO REMAIN
PROTECT EXISTING UTILITY TO REMAIN
PROTECT EXISTING BRICK WALL TO REMAIN
REMOVE AND LAWFULLY DISPOSE OF CONCRETE:
7 S.F.
REMOVE EXISTING IMPROVEMENTS AS NECESSARY
TO CONSTRUCT NEW IMPROVEMENTS SHOWN ON
THESE PLANS UNLESS OTHERWISE NOTED ON THE
PLAN. THE REMOVAL OF IMPROVEMENTS MUST BE
COORDINATED WITH ALL PLAN SHEETS.
CONTRACTOR MUST ALSO COORDINATE REMOVAL
OF IMPROVEMENTS WITH UTILITY AGENCIES.
PROTECT ALL IMPROVEMENTS NOT DESIGNATED
FOR REMOVAL. SEE NOTE 1
EXISTING SYMBOL LEGEND:
SAFETY DISCONNECT
DISTRIBUTION PANEL
ELECTRICAL TRANSFORMER
STORM DRAIN GRATE
LIGHT POST
POWER POLE
CHAIN LINK FENCE
EXISTING CONCRETE BLOCK WALL
EXISTING BUILDING
EXISTING CONCRETE
EXISTING ELECTRICAL LINE
SD
LP
PP
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
PP
EPB
BO
BOBO
9'
5' -7
3'-6"
A
B
C
D
1' -4
E
O N
LY
C H
AR
G
IN
G
EV
E
F
3'-3"
4' -9
SITE PLAN
C3.0
SCALE IN FEET
0 5 10 20
SCALE: 1"=10'
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F s i0
.d w g C .0
S it e
G ra d in g P la n B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
CONSTRUCTION LEGEND:
CONSTRUCT EQUIPMENT PAD PER DETAIL [C/E2.0]
FURNISH AND INSTALL FIXED BOLLARDS PER DETAIL
[B/C4.0]
FURNISH AND INSTALL FIXED FLEET CHARGING
SIGN PER DETAIL [A/C4.0]
SEE ELECTRICAL CONDUIT PLAN FOR ADDITIONAL
ELECTRICAL IMPROVEMENTS
PAINT 4" WIDE OSHA SAFETY GREEN - 14120 STRIPE
PAINT EV CHARGING STALL PAVEMENT MARKINGS
PER DETAIL [C/C4.0]
PROPOSED CHARGEPOINT [MODEL
CP6011B-80A-L7-CHIP] SINGLE CHARGE PORT
PEDESTAL STYLE CHARGERS TO BE INSTALLED BY
OTHERS. SEE DETAILS [A/R1.0], [B/R1.0], [C/R1.0],
AND [D/R1.0]. SEE ELECTRICAL NOTE 10. (SHOWN
FOR REFERENCE ONLY)
PROPOSED (OSHA SAFETY GREEN - 14120) STRIPING
IMPROVEMENTS
LIMITS OF CONCRETE IMPROVEMENTS
A
B
C
D
E
F
PROPOSED EV CHARGER
EVCS-#
WALL/PEDESTAL
MOUNT EVCS
SINGLE/DUAL
EVCS
STALL/CHARGE
PORT #
CHARGE PORT
TYPE
POWER
SELECT
(FLA)
POWER
SHARE
(Y / N/A)
CHARGE
PORT
TYPE
1 PEDESTAL SINGLE FLEET 32 N/A FLEET1
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
M
IN
ONLY
CHARGING
EV
PAINT 12" HIGH WHITE
"EV CHARGING ONLY"
WORDING
ALIGN
PAINT 4" WIDE
OSHA SAFETY
GREEN - 14120
STRIPE
BOBO
3'-6"
DETAILS
C4.0
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F d t0
.d w g C .0
D e ta ils B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
FINISHED CONCRETE
OR GROUND SURFACE
2" SCH. 40 GALV. STEEL POST
18 GA STEEL WITH FIELD OF
GREEN, 1/2" WHITE BORDER,
AND WHITE LETTERING, ALL
OF REFLECTIVE SHEETING
FASTENER: 1/4" DIA. HEX. BOLT W/
LOCK WASHER 1-1/2" FROM TOP
AND BOTTOM OF SIGN
GALV.
STEEL POST
CAP
CONCRETE
12"
(M
IN
C L E A R
M
IN
8"
A
C4.0
FIXED FLEET CHARGING SIGN
NOT TO SCALE
B
C4.0
STANDARD CDCR - FIXED BOLLARD
NOT TO SCALE
1'-6"
MIN. DIA.
FILL PIPE WITH CONCRETE
AND ROUND OFF TOP WITH
GROUT CAP
2" ADHESIVE REFLECTIVE
STRIPE ALL AROUND
FIELD PRIME BOLLARDS
WITH 2 COATS OF
ZINC-RICH PRIMER. PAINT
BOLLARDS WITH 2 COATS
OF INDUSTRIAL YELLOW
ENAMEL
6"Ø STD WT GALVANIZED
STEEL PIPE, GRIND
SMOOTH ALL ROUGH
AREAS AND EDGES
1/4" SLOPE
TOP OF FINISH
GRADE OR
SURFACE MATERIAL
FINISH
GRADE
CONCRETE
ENCASEMENT
C
C4.0
EVCS PAVEMENT MARKINGS
NOT TO SCALE
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
PP
EPB
BO
BOBO
9'
A
B
(K1)
E
C D
(K2) JB
ELECTRICAL CONDUIT PLAN
E1.0
SCALE IN FEET
0 5 10 20
SCALE: 1"=10'
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 06/30/2026
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F e l0
.d w g E .0
E le c tr ic a l C o n d u it P la n B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665
Date Signed:
06/16/2025
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
A
E1.0
CONDUIT SCHEDULE
CONDUIT SCHEDULE
CONDUIT
NUMBER
FROM TO
CONDUCTORS ALL 90°C THWN-2 OR
SIMILAR UNLESS NOTED OTHERWISE
CONDUIT SIZE
AND TYPE
COMMENTS
K1
EXISTING DISTRIBUTION PANEL
"BREAK ROOM"
EV JUNCTION BOX
(2) #8 AWG Cu, (1) #8 AWG Cu GND, TAGGED
(EVCS-1, L1, L2, GROUND)
1" RMC
EXISTING PANEL TO PROPOSED
EV JUNCTION BOX
K2 EV JUNCTION BOX
EVCS-1
(CHARGE POINT 1)
EMPTY CONDUIT (PROVIDE PULL STRING) 1" RMC/PVC
PROPOSED EV JUNCTION BOX TO
PROPOSED CHARGING PAD
(CONDUCTORS TO BE INSTALLED
BY OTHERS)
ELECTRICAL NOTES:
1. ELECTRICAL UTILITY LINE TO BE PROTECTED IN PLACE WHEN POSSIBLE. IF EXISTING LINES INTRODUCE EXCESSIVE CONSTRAINTS
DURING THE INSTALLATION OF THE ELECTRICAL EQUIPMENT, REMOVE AND RELOCATE EXISTING LINES AS NEEDED, USING THE PROPOSED UTILITY TRENCH. IF THE ELECTRICAL LINE CANNOT BE SALVAGED THE CONTRACTOR MUST LAWFULLY DISPOSE OF THE
ELECTRICAL LINE AND REPLACE WITH LIKE-IN-KIND.
2. ALL ELECTRICAL POWER IN CLOSE PROXIMITY TO THE INSTALLATION OF THE ELECTRICAL EQUIPMENT MUST BE POWERED OFF PRIOR
TO THE START OF CONSTRUCTION, TO PREVENT ANY ELECTRICAL INJURIES.
3. HAND DIG ALL UTILITIES IN CLOSE PROXIMITY TO THE INSTALLATION OF THE ELECTRICAL EQUIPMENT TO AVOID DAMAGING ANY
UTILITY LINE.
4. SEE SINGLE LINE DIAGRAM ON SHEET E3.0.
5. SEE CONDUIT SCHEDULE FOR WIRE SIZE, CONDUIT FILL AND WIRE TAGS.
6. THE METHODS CONTAINED IN CEC/NEC ARTICLE 250 SHALL BE FOLLOWED TO COMPLY WITH GROUNDING AND BONDING OF ELECTRICAL SYSTEMS AND NON-CURRENT CARRYING CONDUCTIVE MATERIALS, ENCLOSURES, OR ITEMS FORMING PART OF ANY SUCH EQUIPMENT THAT ENCLOSES OR CARRIES ELECTRICAL CONDUCTOR OR EQUIPMENT THAT IS LIKELY TO BECOME
ENERGIZED. SEE CEC/NEC 250.4(A)(1) THROUGH (5) FOR FURTHER DESCRIPTION.
7. MINIMUM CONDUIT BURIAL DEPTH SHALL BE 24".
8. PER CEC/NEC 110.26 "ACCESS AND WORKING SPACE SHALL BE PROVIDED AND MAINTAINED ABOUT ALL ELECTRICAL EQUIPMENT TO
PERMIT READY AND SAFE OPERATION AND MAINTENANCE OF SUCH EQUIPMENT."
9. CONDUIT BODIES, PULL BOXES AND JUNCTION BOXES SHALL BE USED AS NEEDED TO MAINTAIN LESS THAN 360° OF CONDUIT BENDS
BETWEEN PULL POINTS.
10. ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE) TO BE SINGLE CHARGE PORT. THE CHARGE PORT TO BE 'POWER SELECT" LIMITED TO
32 FLA.
ELECTRICAL LEGEND:
EXISTING DISTRIBUTION PANEL "BREAK ROOM",
REFER TO DETAIL [B/E3.0] FOR LOAD SCHEDULE.
FURNISH AND INSTALL EXTERIOR CONDUIT AND
EV JUNCTION BOX PER DETAILS [C/E2.0] AND
[D/E2.0]
SEE DETAIL [E/E2.0] FOR THE FURNISHING AND
INSTALLATION OF BELOW GRADE PVC CONDUIT.
SEE CONDUIT SCHEDULE FOR COUNT AND
CONDUIT SIZE.
CONSTRUCT CHARGEPOINT CP6000 CHARGER
CONCRETE PAD PER DETAIL [B/E2.0]. SEE
ELECTRICAL NOTE 10
CORE DRILL THROUGH WALL PER DETAIL [F/E2.0]
PROPOSED CHARGEPOINT [MODEL
CP6011B-80A-L7-CHIP] SINGLE CHARGE PORT
PEDESTAL STYLE CHARGERS TO BE INSTALLED BY
OTHERS. SEE DETAILS [A/R1.0], [B/R1.0], [C/R1.0],
AND [D/R1.0]. SEE ELECTRICAL NOTE 10. (SHOWN
FOR REFERENCE ONLY)
PROPOSED JUNCTION BOX
ELECTRICAL CONDUIT; SIZE AND COUNT AS
NOTED
A
B
C
D
E
JB
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 06/30/2026
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F d t0
.d w g E .0
C o n d u it S e c ti o n s
D e ta ils B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665
Date Signed:
06/16/2025
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
CONDUIT SECTIONS & DETAILS
E2.0
EMERGENCY SHUT-OFF
EVCS-#
LOCATED IN/AT
(PANEL __)
5"
1 2
1/4"
(T Y P
1/4"
(T Y P
/8
/4
/4
/4
/4
/4
/4
/4
/8
3 4
3 4
3/8" 4 3/8" 3/8"
SEE NOTES 1, 4 & 6
SEE NOTES 1, 2, 3 & 5. TEXT TO BE PRINTED
IN THE COLOR WHITE NOT BLACK
SEE NOTE 1
NOTES:
1. ELECTRICAL VEHICLE
CHARGING STATION SHUT-OFF
LABEL TO HAVE WHITE
LETTERS ON RED FIELD. WITH
RED AND WHITE DIAGONAL
STRIPED BORDER.
2. EMERGENCY SHUT-OFF LABEL
SHALL READ THE EVCS-# THAT
IS CORRELATED WITH ONE
ANOTHER. SEE BELOW FOR
EXAMPLE:
EMERGENCY SHUT-OFF
EVCS-1
LOCATED IN/AT
(PANEL E)
3. FOR EVCS-# AND LABELING,
SEE ELECTRICAL SCHEDULE &
CIRCUITS ON SHEET E3.0.
4. EMERGENCY SHUT-OFF LABEL
TO BE SELF-ADHESIVE: VINYL,
THERMAL,
TRANSFER-PRINTED,
5.5-MIL-THICK, MULTICOLOR,
WEATHER AND UV-RESISTANT,
PRESSURE-SENSITIVE
ADHESIVE LABELS,
CONFIGURED FOR INTENDED
USE AND LOCATION.
5. THE TEXT HEIGHT SHALL BE
1/4" HIGH WITH WHITE
LETTERING.
6. EMERGENCY -SHUT-OFF LABEL
SHALL COMPLY WITH THE
FOLLOWING SPECIFICATION:
- SECTION 26 05 53,
IDENTIFICATION FOR
ELECTRICAL SYSTEMS
7. PLACE EMERGENCY SHUT-OFF
LABEL ON EACH EVCS
CHARGER.A
E2.0
EMERGENCY SHUT-OFF LABEL
NOT TO SCALE
C
E2.0
EXTERIOR CONDUIT INSTALLATION
TO EV CHARGER PAD
NOT TO SCALE
EV CAHRGER JUNCTION BOX
DETAIL, REFER TO DETAIL [D/E2.0]
EV PAD, REFER TO
DETAIL [B/E2.0]
D
E2.0
EV CHARGER JUNCTION BOX
NOT TO SCALE
F R
O M
B R
E A K R
O O
M
E X
IS
T
IN
G P
A N E L
T O
F L E E T
C H A R G
E R
(M
IN
(M
IN
2"
VARIES
(SEE PLAN)
7-INCH OF 3/4-INCH MEDIUM, TYPE B ASPHALT CONCRETE
SAWCUT T-SECTION AND MATCH ADJACENT
ASPHALT CONCRETE
METALLIC WARNING TAPE
95% MINIMUM RELATIVE
COMPACTED NATIVE
BACKFILL UNDER CONCRETE
AND ASPHALT AREAS, PER
ASTM D1557. 90% MINIMUM
RELATIVE COMPACTED
NATIVE BACKFILL UNDER
LANDSCAPE AREAS, PER
ASTM D1556 AND ASTM
D1557. SEE NOTE 3 ELECTRICAL CONDUIT,
SEE ELECTRICAL PLANS
FOR SIZE AND COUNT
(TYP). SEE NOTE 3
24" (MAX) DEPTH, AT LEAST 12" ABOVE
CONDUIT (SEE NOTE 1)
EXISTING ELECTRICAL CONDUIT WHERE
APPLICABLE
EXISTING ELECTRICAL
CONDUIT CROSSING
WHERE APPLICABLE
MINIMUM CONDUIT
BURIAL DEPTH
SHALL BE 24".
TRENCH RESURFACING
IN CONCRETE AREA
TRENCH RESURFACING
IN ASPHALT AREA
95% MINIMUM RELATIVE
COMPACTED NATIVE
MATERIAL IN TOP 2' OF
TRENCH
SAWCUT AND
MATCH
ADJACENT
CONCRETE
6"
(MIN)
CALTRANS CLASS 3
CONCRETE
EXISTING CONCRETE
6"
EXISTING ASPHALT CONCRETE PAVEMENT
EXISTING
CURB
6"
SEE NOTE 2
NOTES:
1. PER NEC 300.5 (D)(3), UNDERGROUND
SERVICE CONDUCTORS THAT ARE
NOT ENCASED IN CONCRETE AND
THAT ARE BURIED 450MM (18") OR
MORE BELOW GRADE SHALL HAVE
THEIR LOCATION IDENTIFIED BY A
WARNING RIBBON THAT IS PLACED IN
THE TRENCH AT LEAST 300MM (12")
ABOVE THE UNDERGROUND
INSTALLATION.
2. APPLY SLURRY COAT IN A UNIFORM
THICKNESS IN ACCORDANCE WITH
ASTM D3910 AND ALLOW TO CURE
FOR A MINIMUM OF 5 DAYS. ROLL
SLURRY SEAL TO REMOVE RIDGES
AND PROVIDE A UNIFORM, SMOOTH
SURFACE.
3. DIRECT BURIED UTILITY TRENCH
BACKFILL SHALL COMPLY WITH THE
FOLLOWING SPECIFICATIONS:
- SECTION 31 20 00, EARTH MOVING
- SECTION 26 05 43, UNDERGROUND
DUCTS AND RACEWAYS FOR
ELECTRICAL SYSTEMS
- SECTION 32 12 16, ASPHALT PAVING
- SECTION 03 30 00, CAST-IN-PLACE
CONCRETE
3" CLEAN SAND BEDDING
TO BE PLACED BELOW
AND ABOVE CONDUIT
PER ASTM C33/C33M;
FINE AGGREGATE
E
E2.0
TYPICAL ELECTRICAL UTILITY TRENCH
NOT TO SCALE
F
E2.0
TYPICAL CONDUIT WALL PENETRATION
NOT TO SCALE
ELECTRICAL NOTES:
1. THE METHODS CONTAINED IN CEC/NEC ARTICLE 250 SHALL BE
FOLLOWED TO COMPLY WITH GROUNDING AND BONDING OF
ELECTRICAL SYSTEMS AND NON-CURRENT CARRYING CONDUCTIVE
MATERIALS, ENCLOSURES, OR ITEMS FORMING PART OF ANY SUCH
EQUIPMENT THAT ENCLOSES OR CARRIES ELECTRICAL CONDUCTOR
OR EQUIPMENT THAT IS LIKELY TO BECOME ENERGIZED. SEE CEC/NEC
250.4(A)(1) THROUGH (5) FOR FURTHER DESCRIPTION.
2. WHERE TWO OR MORE GROUND RODS ARE TO BE INSTALLED, THE
MINIMUM SEPARATION SHALL BE 6' PER CEC/NEC 250.53 (A)(2), AND (3)
RESISTANCE OF ELECTRODES.
3. MINIMUM CONDUIT BURIAL DEPTH SHALL BE 24".
4. PER CEC/NEC 110.26 "ACCESS AND WORKING SPACE SHALL BE
PROVIDED AND MAINTAINED ABOUT ALL ELECTRICAL EQUIPMENT TO
PERMIT READY AND SAFE OPERATION AND MAINTENANCE OF SUCH
EQUIPMENT."
5. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED FOR TERMINATION OF
ELECTRICAL CONDUCTORS RATED 75°C OR HIGHER.
6. CONTRACTOR TO SCAN FOR REBAR OR OTHER STRUCTURAL SUPPORT
PRIOR TO CORE DRILLING OR WALL MOUNTING EQUIPMENT.
7. UNDERGROUND GROUNDING CONDUCTORS TO BE BURIED AT A
MINIMUM OF 24 INCHES BELOW GRADE.
8. ALL BREAKERS INSTALLED UNDER THIS DESIGN SHALL BE ABLE TO BE
LOCKED IN THE OPEN POSITION PER NEC 625.43 AND 110.25
BILL OF MATERIALS (DETAIL [C/E2.0]
REFERENCE
NUMBER
ITEM
1 STRUT BRACKET, B22SH-120GLV
2 1" CONDUIT BODY STYLE LR
3 1" PIPE CLAMP
3/8" X 2-1/2" HEX GALVANIZED LAG SCREW
WITH WASHER IF REQUIRED
5 1" MYERS HUB
6 1" FEMALE ADAPTER
7 1" RMC
8 1" SCH. 40 PVC
9 1" SCH. 40 PVC, 6" RADIUS OR EQUAL
10 #8 CU CONDUCTOR THWN-2
#8 CU CONDUCTOR GRN INSULATION
THWN-2
CONTRACTOR TO PLACE PULL TAPE
BETWEEN JUNCTION BOX AND EVSE
CHARGER PAD.
CONTRACTOR TO PROVIDE 10 FEET
OF WIRES FOR ALL (3)
CONDUCTORS, FOR VENDOR TO
PULL.
B
E2.0
MAKE READY INSTALLATION
WITH STUB AND CAP
NOT TO SCALE
SECTION A-A
C L R
(T
Y P
M
IN
IM
U
M C
O N
D U
IT
B
U R
IA
L
D E P T H
S H
A L L B
E
3" CLR.
(TYP) #4 @ 12" O.C.
EACH WAY
FINISHED
GRADE
RIGID METALLIC CONDUIT
THREADED PLUG
SCH. 40 PVC THREADED
MALE ADAPTER
SCH. 40 PVC CONDUIT SWEEP
(K#)
TRIM EXISTING PVC
CONDUIT 12" ABOVE
CONCRETE SURFACE.
PROTECT CONDUCTORS,
TO REMAIN.
PROPOSED PVC
FROM
DISTRIBUTION
PANEL TO EVCS
CHARGER
SCH. 40 PVC CONDUIT
(AS NEEDED)
SCH. 40 PVC COUPLER
(TYP)
SCH. 40 PVC CONDUIT (TYP).
1' 1'
2'
PLAN VIEW
FRONT
BACK
3.74" DIA. CONDUIT STUB-UP
OPENING WITHIN THIS AREA
A A
PVC ELECTRICAL
CONDUIT STUB
AND CAP
PROPOSED 4,000 PSI
CONCRETE PAD
CONTRACTOR TO FURNISH AND INSTALL THE
CHARGEPOINT CONCRETE MOUNTING
TEMPLATE (CMT) PER MANUFACTURER'S
RECOMMENDATION. THE TEMPLATE INCLUDES
THE FOLLOWING UPPER TEMPLATE, LOWER
TEMPLATE, ANCHOR BOLTS, NUTS, AND
WASHERS
EXISTING DRYWALL WITH
EXTERIOR PANELING WALL
1. CORE DRILL FOR NEW CONDUIT PENETRATION.
2. WHERE CONDUIT PENETRATES FIRE RATED WALL, PROVIDE U.L. RATED FIRE STOP
SYSTEM NO. CAJ1149 (FIRE RATING - 2 HOURS).
3. IF MULTIPLE PENETRATIONS ARE NEEDED, THEN SPACE AT NO LESS THAN 12"
NOTES
/2
M
A X
/4
M
IN
CAULK AND FOAM BACKER ROD ALL
AROUND BOTH FACES OF WALL (TYP)
PROPOSED CONDUIT
EXISTING DRYWALL
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
YΔ
EXISTING DISTRIBUTION PANEL"THE BREAK ROOM",
125 AMP BUS, 125 AMP MAIN
OPERATED AT 208/120V, 1Ø, 3W
EXISTING
TRANSFORMER MAIN
125A 2P
TO EXISTING
CIRCUITS
TO EXISTING
CIRCUITS
2P 40A
4.16kV 112.5kVA, 208Y/120V, 3Ø, 4W
TO EVCS-1
CHARGE PORT 1
(32 FLA)
1" A.G. RMC TO
TRANSITION TO 1"
U.G. PVC WITH
(2) #8 Cu AND
(1) #8 Cu GND
125A, 208/120V, 2P, NEMA 3R
EXISTING SAFETY
DISCONNECT
SWITCH
(EXISTING) DISTRIBUTION PANEL "THE BREAK ROOM"
BUS AMPS: 125 MFR: SQUARE D
LOC: CORRECTIONAL TRAINING
FACILITY
MTG: RECESSED WALL MAIN AMPS: 125
PHASE: 1 WIRES: 3 VOLTS: 208/120V FEEDER: EXISTING (SEE ELECTRICAL NOTES 9 AND 10)
DESCRIPTION
VOLT-AMPS
BKR TRIP CKT
L1 L2
CKT BKR TRIP
VOLT-AMPS
DESCRIPTION
L1 L2 L1 L2
A/C UNIT 1
- 0.0
30A/2P 1 2
30A/2P
- 0.0
A/C UNIT 2
0.0 - 3 4 0.0 -
RECEPTACLES - 0.0 20A/1P 5 6 20A/1P - 0.0 RECEPTACLES
LIGHTING 0.0 - 20A/1P 7 8 20A/1P 0.0 - OUTSIDE LIGHT
EVCS-1
(CHARGE PORT 1)
3328.0 0.0 40A/2P
9 10 30A/2P
- 0.0
TRAILER
0.0 3328.0 11 12 0.0 -
- 0.0 0.0 - 13 14 - 0.0 0.0 -
- 0.0 0.0 - 15 16 - 0.0 0.0 -
- 0.0 0.0 - 17 18 - 0.0 0.0 -
- 0.0 0.0 - 19 20 - 0.0 0.0 -
- 0.0 0.0 - 21 22 - 0.0 0.0 -
- 0.0 0.0 - 23 24 - 0.0 0.0 -
ADDITIONAL LOAD > 3328.0 3328.0 ADDITIONAL TOTAL VOLT-AMPERES 0.0 0.0 < ADDITIONAL LOAD
PROPOSED ADDITIONAL LINE 1 AMP: 27.7A L1 L2 REMARKS:
PROPOSED ADDITIONAL LINE 2 AMP: 27.7A 3328.0 VA 3328.0 VA
6.656KVA TOTAL CONNECTED LOAD: 40.0A @ 1PH, 208V
(AT 125% CONTINUOUS LOAD)
ELECTRICAL SCHEDULE & CIRCUITS
E3.0
A
E3.0
SINGLE LINE DIAGRAM
NOT TO SCALE
B
E3.0
EXISTING DISTRIBUTION PANEL "THE BREAK ROOM" LOAD SCHEDULE
NOT TO SCALE
ELECTRICAL NOTES:
1. EXISTING PANELBOARD LOAD CALCULATIONS:
- EXISTING MAX DEMAND PER UTILITY RECORDS: 45.0 A @ 208V = 9.36 KVA
- ADJUST EXISTING MAX DEMAND PER NEC SECTION 220.87(2): 11.7 KVA
- ADDITIONAL DEMAND FROM CHARGERS: 6.656 KVA
- 125% CONTINUOUS DEMAND FROM CHARGERS: 8.32 KVA
- NEW TOTAL DEMAND: 20.02 KVA
- RESULTS IN TOTAL CURRENT OF 96.26 AMPS @208 VOLTS
(77% OF MAIN BREAKER OCPD)
2. STANDARD RATED SERVICE PANELS, OVER CURRENT PROTECTION DEVICES AND
WIRE SIZES BASED ON CEC/NEC REQUIREMENTS AT 125% CONTINUOUS LOAD.
100% RATED SERVICE PANELS, OVER CURRENT PROTECTION DEVICES AND WIRE
SIZES BASED ON CEC/NEC REQUIREMENTS AT 100% CONTINUOUS LOAD.
3. TRANSFORMER LOADING BASED ON KVA REQUIREMENTS OF CHARGER AT UNITY
PER PG&E (6.656 KVA/CHARGER).
4. , INDIVIDUAL CHARGE PORT NUMBER. THIS IS NOT BREAKER SPACE OR EVSE
NUMBER.
5. , INDIVIDUAL CHARGE PORT NUMBER TYPICAL FOR PORTS
THROUGH .
6. PER NEC 210.19 (A) INFORMATIONAL NOTE #4, "CONDUCTORS FOR BRANCH
CIRCUITS AS DEFINED IN ARTICLE 100, SIZED TO PREVENT A VOLTAGE DROP
EXCEEDING 3 PERCENT AT THE FARTHEST OUTLET OF POWER, HEATING, AND
LIGHTING LOADS, OR COMBINATION OF SUCH LOADS, AND WHERE THE MAXIMUM
TOTAL VOLTAGE DROP ON BOTH FEEDERS AND BRANCH CIRCUITS TO THE
FARTHEST OUTLET DOES NOT EXCEED 5%."
7. ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE) TO BE SINGLE CHARGE PORT. THE
CHARGE PORT TO BE "POWER SELECT" LIMITED TO 32 FLA.
8. MAXIMUM VOLTAGE DROP FOR CONDUCTORS:
FROM EXISTING 125A DISTRIBUTION PANEL "THE BREAK ROOM" : #8 WIRE = 0.5%
9. CONTRACTOR TO MATCH MANUFACTURER SPECIFICATIONS AND KAIC RATING
FOR NEW EV BREAKERS.
10. DO NOT USE GFCI BREAKER FOR PROPOSED EV CHARGER BREAKER.
11. CONTRACTOR TO VERIFY THE EXISTING LOAD DRAWN BY EXISTING PANEL "THE
BREAK ROOM" AND VERIFY THAT THE EXISTING PANEL AND EQUIPMENT FEEDING
THIS PANEL WILL HAVE THE CAPACITY TO SUPPORT THE PROPOSED LOADS.
12. TAGGED (CHARGE PORT-#L1/L2/L3/GND) TYPICAL FOR LEVEL 3 CHARGERS.
13. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A
NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED
STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION.
14. THE METHODS CONTAINED IN CEC/NEC ARTICLE 250 SHALL BE FOLLOWED TO
COMPLY WITH GROUNDING AND BONDING OF ELECTRICAL SYSTEMS AND NON-
CURRENT CARRYING CONDUCTIVE MATERIALS, ENCLOSURES, OR ITEMS FORMING
PART OF ANY SUCH EQUIPMENT THAT ENCLOSES OR CARRIES ELECTRICAL
CONDUCTOR OR EQUIPMENT THAT IS LIKELY TO BECOME ENERGIZED. SEE
CEC/NEC 250.4(A)(1) THROUGH (5) FOR FURTHER DESCRIPTION.
15. WHERE TWO OR MORE GROUND RODS ARE TO BE INSTALLED, THE MINIMUM
SEPARATION SHALL BE 6' PER CEC/NEC 250.53 (A)(2), AND (3) RESISTANCE OF
ELECTRODES.
16. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED FOR TERMINATION OF ELECTRICAL
CONDUCTORS RATED 75°C OR HIGHER
Date Signed:
06/16/2025
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 03/31/2027EXP 06/30/2026
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F d t0
.d w g E .0
E le c tr ic a l S c h e d u le
C ir c u it s B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665
Date Signed:
06/16/2025
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
REFERENCE DRAWINGS
R1.0
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F d t0
.d w g R .0
R e fe re n c e D ra w in g s B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
A
R1.0
CHARGEPOINT CP6000
SINGLE PORT PEDESTAL INSTALLATION
NOT TO SCALE
2'-4"
1'-10"
SECTION A-A
WEIGHT = 324 LBS
1 2
C H
A R
G E P O
IN
T C
M K A
T T A C H
M E N T H
E
IG
H T I S D
E P E N D
A N T O
N M
O D
E L C
H O
S E N
3 4
C H
A R
G E P O
IN
T C
M K A
T T A C
H M
E N T H
E
IG
H T I S D
E P E N D
A N T O
N M
O D
E L C
H O
S E N
M A X
PLAN VIEW
B
R1.0
CHARGEPOINT CP6000 HARDWARE / MODEL
NOT TO SCALE
D
R1.0
CHARGEPOINT CP6000 SPECIFICATIONS
NOT TO SCALE
C
R1.0
CHARGEPOINT CP6000 DUAL AND SINGLE
PORT PEDESTAL DIMENSIONS
NOT TO SCALE
NOTES:
1. REFER TO INSTALLATION MANUAL FOR ADDITIONAL INFORMATION.
2. CHARGERS TO BE PROVIDED BY THE VENDOR VERDEK.
"POWER SELECT 32 FLA"
EACH BOLT MUST EXTEND BETWEEN 2.4" AND 4"
ABOVE CONCRETE SURFACE
CHARGEPOINT CONCRETE MOUNTING
TEMPLATE KIT (CMT), INSTALL PER
MANUFACTURER'S RECOMMENDATIONS
6" CLR.
(TYP)
#4 @ 12" O.C.
EACH WAY
CHARGEPOINT CONCRETE
MOUNTING TEMPLATE KIT
(CMT), INSTALL PER
MANUFACTURER'S
RECOMMENDATIONS
B
E2.0
EXISTING CONDUIT
TRIM EXISTING PVC CONDUIT 12" ABOVE CONCRETE
SURFACE. PROTECT CONDUCTORS, TO REMAIN.
MAKE READY INSTALLATION
WITH STUB & CAP PER
DETAILS
C L R
C L R
A
E2.0
EMERGENCY SHUT-OFF
EVCS-#
LOCATED IN/AT
(PANEL __)
EMERGENCY SHUT-OFF
LABEL PER DETAIL
' A A
1'-2" 5" 5" 5" 5"
1'-7" 5" 5"
FRONT
BACK
CMK AND PEDESTAL
FOOTPRINT
0.63" DIA. BOLT OR
ANCHOR OPENING
(TYP OF 3)5.87" DIA. BOLT
OR ANCHOR
CIRCLE
3.74" DIA. CONDUIT
STUB-UP OPENING
WITHIN THIS AREA
CHARGEPOINT
UPPER TEMPLATE
PROPOSED 4,000 PSI
CONCRETE PAD
1'-7"
1'-2"
4'
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
TITLE 24 DOCUMENTS
R2.0
SHEETSOF
SHEET NO.
SCALE AS NOTED
DATE:
CH. BY:
DR. BY:
REF. & REV.
CONSULTANT
PROJECT LOCATION:
CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION
EXP 06/30/2026
06-16-2025 10
RF
WH
ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE
CORRECTIONAL TRAINING FACILITY
CALIFORNIA DEPARTMENT OF GENERAL SERVICES
D ra w in g P \2
-0
\S it e \C
D C
R C o rr e c ti o n a l T ra in in g F a c ili ty
C T F C o n s tr u c ti o n D o c u m e n t\ P ro d u c ti o n D ra w in g s \2
C
D C
R C
T F d t0
.d w g R .0
T it le
D o c u m e n ts
B
C F .c tb P lo t b y w h a rr is
J u n
:1 p m
PRELIMINARY QC_01
PROJECT #: 000000000012665
Date Signed:
06/16/2025
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
V1
01/31/2025
(559)326-1400
451 Clovis Ave St 200 Clovis Ca 93612
HIGHWAY 101 NORTH, SOLEDAD, CA 93960
E23227 01/31/2025
(559)326-1400
451 Clovis Ave St 200
Clovis Ca 93612
E3.0
E23227
DARIO ROMERO
DARIO ROMERO
Existing Breakroom Distribution Panel
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
07/18/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
File details come from the government source that posted it. Updated .