Plans - NP-BLRI 2F27.pdf
PDF 21 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000001
About this file
This document provides details of a federal solicitation for slope stabilization repairs on the Blue Ridge Parkway. The National Park Service is seeking sealed bids from certified Small Business Concerns only for projects located in McDowell and Watauga Counties, North Carolina. Work includes fill slope stabilization with reinforced soil slopes, cut slope stabilization with rock bolts and ground anchors, minor asphalt pavement, pavement markings, and other miscellaneous tasks. The project value is estimated between $5 million to $10 million. Interested vendors must register at the provided website by October 1st, 2022 to receive solicitation documents and notifications. Bids are due at a date and location specified in the solicitation. In addition to annual representations and certifications, vendors must complete required annual forms at the listed websites. All questions should be directed to the provided email address.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO - NP BLRI 2F27_ 2F28.pdf | ||
| Amendment 0004 - NP-BLRI 2F27 2F28.pdf | ||
| Amendment 0003 - NP-BLRI 2F27 2F28.pdf | ||
| Amendment 0002 - NP-BLRI 2F27_2F28.pdf | ||
| Amendment 0001 - NP BLRI 2F27_2F28.pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| IFB Solicitation - NP-BLRI 2F27_ 2F28.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| FP14_Eng.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SYMBOLS AND ABBREVIATIONS
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:3
P
M
J u ly
S
H E
E T
C
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L
R I
F
\C A
D D
\A
-A
-B L
R I2
F
-2
F s y m
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A02
NPS Drwg No. 601/173627 NPS PMIS No. 242360
N
DI
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
SYMBOLS AND ABBREVIATIONS
NOTE:
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
Reinforced Soil Slope (RSS) Wall
Rolled Erosion Control Product RECP
Elevation El.
Gyratory Mix
Asphalt Concrete Pavement, GACP
:4
J u ly
S H
E E
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \A
-A
-B
L R
I2 F
-2
F s y m
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A03
NOT TO SCALE
E 1262270
N 910540
Sta. 100+75
Start Schedule A (MP 276.8)
E 1262043
N 910433
Sta. 103+25
End Schedule A (MP 276.8)
E 1261486
N 909159
Sta. 206+00
End Schedule B (MP 277.1)
E 1261475
N 909368
Sta. 203+90
Begin Schedule B (MP 277.1)
NOTE:
Schedule B. See Temporary Traffic Control Plans.
Close roadway to traffic during construction of Schedule A &
SCHEDULES A & B
NP-BLRI 2F27, 2F28
M il e s
C h a r lo tt e
M ile s
R o a n o k e
46 Miles
Johnson City, TN
T E
N N
E S
S E
E
N O
R T
H C
A R
O L I
N A
M ile s
S ch e d u le
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
LOCATION MAP
SCHEDULE A & B
:3
J u ly
S h e e t
A
L o c a ti o n M a p
S c h A
B
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \A
-A
-B
L R
I2 F
-2
F lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A04
SCHEDULE C
NP-BLRI 2F27, 2F28
E 1120027
N 798182
Sta. 301+25
Begin Schedule C (MP 323.25)
E 1119921
N 798256
Sta. 302+50
End Schedule C (MP 323.25)
NOTE:
temporary traffic control devices.
W21-3 (mod), and W20-3 (mod) signs plus any additional
Coordinate with the CO for the placement of the W3-4, 3.
Barricades across the entrance and exit to the overlook.
Use Bear Den Overlook as Staging Area. Place Type 3 2.
Schedule C. See Details ET635-9 & ET635-13.
Use single lane closures during construction of 1.
SCHEDULES A & B
NP-BLRI 2F27, 2F28
M il e s
C h a r lo tt e
M ile s
W in st on -S al em
27 Miles
Asheville
17 M iles
Johnson C ity, TN
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
LOCATION MAP
SCHEDULE C
:2
A
J u ly
S h e e t
A
L o c a ti o n
M a p
S c h
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \A
-A
-B
L R
I2 F
-2
F lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A05
TBAR3242.7931262111.295910486.2634112
TBAR3224.3601262366.259910545.2654111
TBAR3237.3711262186.265910486.9504110
TBAR3349.7771261491.095909311.2174002
TBAR3329.5041261491.470909553.0734001
TBAR3359.1261261497.279909191.3024000
NAIL3261.1281261913.547910364.007401
NAIL3301.6611261568.401909944.324400
TYPEELEV.EATSINGNORTHINGNAME
SURVEY CONTROL POINTS
Project Site : BLRI 2F28 MP 276
Geoid Model : GEIOD12B (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : North Carolina 3200
Coordinate System : US State Plane 1983
COORDINATE SYSTEM
NTS
NTS
NTS
DI
LONG: 81° 30' 08.96980"
LAT: 36° 13' 32.50238"
BH#1
BH#3
NTS
PARKW
AY
SP
EED
LI
MI
T
SEAT
BELT
S
FA
STE
N
PARKW
AY
SP
EED
LI
MI
T
SEAT
BELT
S
FA
STE
N
62.4' Az. 118°
A z . 1
.4
115.7'
Az. 99°
.1'
.1
Az . 6
7°
A . 3
33.
3'
A z . 1
Az.
TBAR
TBAR
NAIL
TBAR
N N
NN
SURVEY CONTROL POINTS REFERENCES
N
N N
N
SURVEY CONTROL POINTS REFERENCES
NAIL3386.5801261446.243908825.7484007
NAIL3419.1201261074.378908553.1704006
TBAR3409.9101261203.972908600.6804005
TBAR3412.2771261169.159908533.9164004
TBAR3378.5921261494.543908938.3184003
TBAR3349.7771261491.095909311.2174002
TBAR3329.5041261491.470909553.0734001
TBAR3359.1261261497.279909191.3024000
REMARKELEV.EASTINGNORTHINGNAME
PROJECT SURVEY CONTROL POINTS
Project : Blri 2F26 MP277
Geoid Model : GEIOD12B (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : North Carolina 3200
Coordinate System : US State Plane 1983
COORDIINATE SYSTEM
.2
A z.
3.71'
Az. 95°
.2
2.66'
.6
3.11'
Az. 86°
A z
Az. 85°
A z . 1
.7 to C
P
A z
1.91'
Az. 98°
TBAR
TBAR
TBAR
TBAR
SCHEDULE A - MP 276.8 SCHEDULE B - MP 277.1
NOTE
Azimuth angle shown is based on north axis at clockwise rotation.1.
SURVEY CONTROL DATA
:4
A p r il
S h e e t
A
S u r v e y C o n tr o l
I n f o
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \A
-A
-B
L R
I2 F
-2
F s u r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A06
NAIL
TBAR
2-TRUNK
12"Ø MAPLE
TBAR
NAIL
24"Ø OAK
24"Ø OAK
TBAR
24"Ø OAK
5-TRUNK
32"Ø MAPLE
TBAR
.7
44.4
22.6' Az 126°
Az 2 59°
A z
14"Ø MAPLE
40.5'
.3
.1
.5
.4 '40
.6'
Az
9° Az
A z
A z
A z
Az 287°
N N
N N
NTS NTS
NTSNTS
.6'
9°
SURVEY CONTROL POINTS REFERENCES
SCHEDULE C - MP 323.25
TBAR3229.7311119875.346798282.0724103
TBAR3250.1441120128.555798128.4174102
TBAR3240.5531119982.083798191.5574101
TBAR3238.2061119936.545798208.9684100
NAIL3291.9431119994.752798325.687105
NAIL3296.5971120129.378798227.779104
TBAR3296.5081120091.436798259.980103
NAIL3290.2491120054.143798295.093102
NAIL3252.1461120085.039798119.800101
NAIL3242.5171119967.131798181.038100
REMARKSELEVATIONEASTINGNORTHINGPOINT
SURVEY CONTROL POINTS
Project Site : BLRI 2F28 MP 323
Geoid Model : GEIOD12B (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : North Carolina 3200
Coordinate System : US State Plane 1983
COORDINATE SYSTEM
NOTE
Azimuth angle shown is based on north axis at clockwise rotation.1.
SURVEY CONTROL DATA
:2
A p r il
S h e e t
A
S u r v e y C o n tr o l
I n f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \A
-A
-B
L R
I2 F
-2
F s u r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A07
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
ALIGNMENT DATA
SCHEDULE A, B, C
:4
A u g u s t
S h e e t
A
A li g n m e n t D a ta
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\A
-B
L R
I2 F
-2 F a li
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 A08
grade line
Profile
SLOPE REPAIR - REINFORCED SOIL SLOPE
beyond select granular backfill.
Extend geotextile separation layer for the top RSS layer 18-inches 11.
See Subsection 208.03 for the excavation requirements.10.
See Plan & Profile for RSS locations and heights.9.
8. Furnish geogrid reinforcement conforming to Subsection 714.04
Furnish select granular backfill - #57 stone conforming to Subsection 704.08.7.
Furnish granular backfill conforming to Subsection 703.03(a).6.
to Section 108 for tree cutting restrictions.
Remove trees near the slide repair area as directed by the CO. Refer 5.
Establish turf on all disturbed areas in accordance with Section 625.4.
Construct reinforced soil slope according to Section 261. 3.
minimum 0.5% slope
Place 6-inch non-perforated outlet pipe and perforated collector pipe at a 2.
or as directed by the CO.
Install a minimum three outlet pipes at low points1.
NOTES: CL
NOT TO SCALE
See Note 2.
See Detail A
See Detail B
S e e N o te
See Note 7
Select granular backfill - #57 Stone (typ.)
See Note 6
Granular backfill V :1
H
18''
Embankment Construction geotextile, Class 1, Type B
Separation-stabilization
Vari es
Existing Ground
Va rie s
1:10
Travel Lane
10.5'1'9'
Buffer
Shoulder
Travel Lane
10.5'
See Pavement Structure Detail e%e%
Limits of Disturbance
PAVEMENT STRUCTURE DETAIL
1.5" GACP 3/8" NMSA, <0.3 Million ESAL, Type IV Roughness, PG 64-22
8" Aggregate Base, grading C or D
Embankment Construction (Depth Varies)
2.5" GACP, 1/2" NMSA, <0.3 Million ESAL, PG 64-22
Asphalt Tack Coat
Separation-Stabilization Geotextile, Class 2, Type E varies from 6" to 12".
Existing subbase varies from 4" to 7".
Existing asphalt pavement
COLLECTOR PIPE
DETAIL A
1V:4H pipe and geotextile separation between
Provide 2" (min.)
(See Note 6)
Granular backfill
Type B geotextile, Class 1, Separation-stabilization pipe (See Note 2)
6" non-perforated outlet pipe (See Note 2)
6" perforated collector
S e e N o te
W a ll
H e ig h t
V a r ie s
Distance Varies
& Turf Establishment Limits.
Aggregate-Topsoil Course
& turf establishment
2-Inch depth topsoil
See Detail E609-01A
6" Depth Asphalt Curb
Support Strut
Type 3.A (typ.)
control product, Rolled erosion topsoil (typ.)
Place seed and
See Detail E261-A welded wire face;
Reinforced soil slope, Geogrid, Type V
See Note 7
Select granular backfill - #57 Stone (typ.)
FACING
DETAIL B
Class 1, Type B Separation-stabilization geotextile, U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TYPICAL SECTIONS
SCHEDULE A - MP 276.8
Varries
Reinforcement Length, 25' (typ.)
36" 9"
24" Overlap
4' (typ.)
18" (typ.)
ty p
18" (typ.)
:1
A u g u s t
B
S h e e t
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.8
S c h e d u le
A \B
-B
L R
I2 F
-2
F T y p -A
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 B01
NOTES:
CL
and non-roadway shoulder mix for the area beyond the shoulder.
within the turf established limits. Apply turf shoulder mix on shoulder
Establish turf on all disturbed areas except paved or rock surfaces8.
Protect existing guardrail during construction. 7.
Match existing roadway cross slope.6.
prior to drilling.
Mark horizontal drain pipe locations for approval by the CO
Adjust horizontal drain pipe spacing to fit site conditions.
approximately 20-foot O.C. horizontally and 20-foot O.C. vertically.
Install horizontal drain pipes in a grid pattern spaced at 5.
bolt locations to fit site conditions as directed by the CO.
Refer to plans for locations and lengths of rock bolts. Adjust the rock 4.
Install Rock Bolts in accordance with Detail E260-A and Section 260.3.
and according to Subsection 204.13(e).
Scale the slope to remove soil and loose rock as directed by the CO2.
distrubance.
Clear all brush, vines, and other minor vegetation within limits of1.
10'
Blue Ridge Parkway Centerline
Anchored Wired Mesh System
See Detail E610-A and Note 5.
Install horizontal drain pipe (typ.)
See Notes 3 and 4.
Install rock bolt (typ.)
Connected to 3/4" Wire Rope
Rock bolt at 20' O.C.
ty p
(t yp
'25'
40'
15'
Limits of Disturbance
20'
Limits
Grubbing
Clearing &
(10' min.)
Varies
(See Note 8)
Limits
(2" Depth)
& Topsoil
Establishment
Turf
3' Width
Asphalt Waterway
See Note 8
4' Width
Aggregate-Topsoil (2" Depth) Limits
Turf Establishment &
10.5'
Travel laneTravel lane
10.5'
Asphalt Tack Coat varies from 6" to 12".
Existing subbase varies from 4" to 7".
Existing asphalt pavement
PG 64-22
ESAL, Type IV Roughness, 1.5" GACP 3/8" NMSA, <0.3 Million
Asphalt Pavement Milling (Depth 1.5")
See Detail E608-05
Remove and Replace Asphalt Waterway
See Note 6 (typ.)See Note 7.
Sta. 204+31 to Sta. 206+00
Existing guardrail to remain.
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SCHEDULE B - MP 277.1
:4
A u g u s t
S h e e t
B
M P
S c h B
T y p ic l
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M P
.1
S c h e d u le
B \B
-B L
R I2
F
-2
F
T y p -B
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 B02
CL
and non-roadway shoulder mix for the area beyond the shoulder.
within the turf established limits. Apply turf shoulder mix on shoulder
Establish turf on all disturbed areas except paved or rock surfaces8.
Match existing roadway cross slope.7.
stability for approval by the CO.
temporary stability. Submit sequence of construction and temporary
Determine the sequence of anchor construction and6.
Construct ground anchors in accordance with Section 256.5.
Embed anchors a minimum of 10 feet in bedrock.4.
Install top row of ground anchors at 25°. Install all other rows at 35°.3.
as apporved by the CO. See Detail E256-A.
and vertically. Adjust the ground anchor locations to fit site conditions
Install ground anchors spaced approximately at 6-foot O.C. horizontally2.
disturbance that interfere with work as approved by the CO.
Clear all brush, vines, trees, and other minor vegetation within the limits of 1.
Se e
N ot e
25'
40' embedment in rock
10' minimum (typ.)
Estimated depth to bedrock
Se e
Not e ty p.
Unclassified Borrow
55'
Finish Grade
Existing Ground
Limits of Disturbance
G round Anchor Row
G round Anchor Row
G round Anchor Row
G round Anchor Row
G round Anchor Row
G round Anchor Row
G round Anchor Row
G round Anchor Row
Ground Anchor Row 9
3' Width
Asphalt Waterway
See Note 8
3' Width
Aggregate-Topsoil (2" Depth) Limits
Turf Establishment &
10.5'
Travel laneTravel lane
10.5' varies from 6" to 12".
Existing subbase varies from 4" to 7".
Existing asphalt pavement
Coat
Asphalt Tack
PG 64-22
Type IV Roughness, <0.3 Million ESAL, 1.5" GACP 3/8" NMSA, Asphalt Pavement Milling (Depth 1.5")
See Detail E608-05
Remove and Replace Asphalt Waterway
See Note 8
Varies (3' min.)
& Topsoil (2" Depth) Limits
Turf Establishment
(typ.)
Note 7
See
See Detail E256-A and Detail E629-01
Rolled erosion control product, Type 2.B. (typ.)
See Notes 2 & 6.
Install Ground Anchor (typ.)
be removed and tiebacks to be abandoned in place.
Approximate location of existing anchor blocks to
Blue Ridge Parkway Centerline
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SCHEDULE C - MP 323.3
:5
A u g u s t
S h e e t
B
M P
S c h C
T y p ic
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.2
S c h e d u le
C \B
-B
L R
I2 F
-2
F T y p -C
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 B03
TABULATION OF QUANTITY
A u g u s t
S h e e t
C
T a b u la ti o n o f Q u a n ti ty
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C01
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SUMMARIES AND SCHEDULES
SOIL EROSION CONTROL SUMMARIES
SOIL EROSION CONTROL SUMMARIES
:3
M a y
S h e e t
C
S o il
E r o s io n C o n tr
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C03
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CLEARING AND REMOVALS SUMMARIES
CLEARING AND REMOVALS SUMMARIES
:1
M a y
S h e e t
C
C le a r in g a n d
R e m o v ls
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C04
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
EARTHWORK SUMMARIES
EARTHWORK SUMMARIES
:2
A u g u s t
S h e e t
C
E a r th w o r k
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C05
ROCK BOLT LOCATION & LENGTH TABLE
SCHEDULE B - MP 277.1
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SUMMARIES & SCHEDULES
ROCK BOLT TABLE
:2
M a y
S h e e t
C
R o c k B o lt
T a b le
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C06
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
PAVEMENT SUMMARIES
PAVEMENT SUMMARIES
:1
A u g u s t
S h e e t
C
P a v e m e n
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C07
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
DRAINAGE SUMMARIES
DRAINAGE SUMMARIES
:2
M a y
S h e e t
C
D r a in a g
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C08
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
PAVEMENT STRIPING SUMMARIES
PAVEMENT STRIPING SUMMARIES
:1
J u ly
S h e e t
C
P a v e m e n t
S tr ip in g
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C09
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONSTRUCTION SIGNS SUMMARIES
CONSTRUCTION SIGNS SUMMARIES
:3
A u g u s t
S h e e t
C
C o n s tr u c ti o n S ig s
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\C
-C
-B L
R I2
F
-2
F q ty
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C10
S66°07'32"W S61°31'38"W
.0
.2
.5
P
O E
I N
V
.0 x .9
' C
M P
I N
V
.2
BH#2
TBAR
BH#3
BH#1
TBAR
PARKWAY
SPEED LIMIT
N
L = 76.24'
T = 38.14'
R = 950.00'
Δ = 04°35'54" (LT)
PI 102+53.19
See Typical Section Install 200 feet of RSS.
Sta. 101+00 to Sta. 103+00
BEGIN ROADWAY RECONSTRUCTION
END SCHEDULE A
E 1262043 N 910433
STA. 103+25
E 1262270 N 910540
STA. 100+75
Toe of fill (typ.)
Construction Centerline
Proposed Edge of Travelway
Proposed Edge of Shoulder
See Typical Section Sta. 100+75 to Sta. 103+25 Roadway reconstruction
Existing Edge of Roadway
Sta. 100+49 to Sta. 100+75 Type 5 (Asphalt). See Detail E608-05 Install 27 lnft Paved Waterway, Offset L 15' Sta. 100+49
Offset L 11.13' Sta. 100+75
E 1262233 N 910550
STA. 100+49
BEGIN SCHEDULE A
Sta. 100+75 to Sta. 103+25 See Detail E609-01A
Install 250 lnft Asphalt Concrete Curb
25'
Taper Length Shoulder Offset L 11.50' Travelway Offset L 10.50' Sta. 101+00
Offset R 10.50' Sta. 101+00
Offset R 11.13' Sta. 100+75
25'
Taper Length
Offset R 10.50' Sta. 103+00
Offset R 10.83' Sta. 103+25
Offset R 10.83' Sta. 103+25
Shoulder Offset L 11.50' Travelway Offset L 10.50'
Sta. 103+00
Sta. 102+83 Special "FASTEN SEAT BELTS" signs.
Remove and reset R2-1 and
Sta. 100+75 to Sta. 103+25 601 sqyd Removal of Pavement, Asphalt
Sta. 100+95 to Sta. 103+25 230 lnft
Removal of Curb, Asphalt
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONSTRUCTION PLAN
SCHEDULE A - MP 276.8
SCALE IN FEET
0 10 20
:3
J u ly
S h e e t
M P
.8
P la
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M P
.8
S c h e d u le
A \D
-D
-B
L R
I2 F
-2 F
P
L N
-P R
O -2
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 D01
3,212 3,212
3,214 3,214
3,216 3,216
3,218 3,218
3,220 3,220
3,222 3,222
3,224 3,224
3,226 3,226
3,228 3,228
3,230 3,230
3,232 3,232
3,234 3,234
3,236 3,236
3,238 3,238
3,240 3,240
3,242 3,242
+7.3
+7.8
.6
' VC116
247.72K =
'1486.27SSD =
El. 3229
Sta. 101+00
El. 3223
Sta. 101+00
El. 3221.5
Sta. 101+10
El. 3230.5
Sta. 101+10
El. 3220
Sta. 101+20
El. 3232
Sta. 101+20
El. 3218.5
Sta. 101+30
El. 3217
Sta. 101+40
El. 3233.5
Sta. 101+40
El. 3214
Sta. 101+50
El. 3235
Sta. 101+70
El. 3235
Sta. 101+90
El. 3238
Sta. 102+00
El. 3239.5
Sta. 102+20 El. 3241
Sta. 102+40
El. 3218.5
Sta. 102+40
Profile Grade Line
Top of RSS (typ.)
Bottom of RSS (typ.)
Geogrid reinforcement (typ.)
100+50 101+00 101+50 102+00
BEGIN ROADWAY RECONSTRUCTION
Sta. 100+75
El. 3230.5 Existing ground
Begin Paved Waterway, Type 5 (Asphalt)
Sta. 100+49
El. 3227.8
BEGIN SCHEDULE A
El. 3230.6
Sta. 100+75
Type 5 (Asphalt)
End Paved Waterway, Slope = 10.57%
Centerline Profile
Type 5 (Asphalt)
Paved Waterway, 102+50 103+00
3,218 3,218
3,220 3,220
3,222 3,222
3,224 3,224
3,226 3,226
3,228 3,228
3,230 3,230
3,232 3,232
3,234 3,234
3,236 3,236
3,238 3,238
3,240 3,240
3,242 3,242
3,244 3,244
3,246 3,246
3,248 3,248
El. 3241
Sta. 102+90
El. 3245.5
Sta. 102+90
El. 3244
Sta. 102+70
El. 3242.5
Sta. 102+50
El. 3223
Sta. 102+50
El. 3229
Sta. 102+60
El. 3232
Sta. 102+70
El. 3236.5
Sta. 102+80
Bottom of RSS (typ.)
Top of RSS (typ.)
Profile Grade Line
Geogrid reinforcement (typ.)
Sta. 103+25
El. 3249.2
END SCHEDULE A
Existing ground
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONSTRUCTION PROFILE
SCHEDULE A - MP 276.8
103+00102+50102+00101+50101+00100+50
LEFT LANE
RIGHT LANE
-0.6%
2.1%
-2.0%
2.0%
101+30
101+30
-7.8%
102+35
7.8%
102+35
-7.8%
102+75
7.8%
102+75
-8.3%
103+25
7.2%
103+25
100+75
100+75
Transition
Transition
Transition
Transition
Transition
Transition
SCALE IN FEET
0 10 20
:4
J u ly
S h e e t
M
P
.8
P r o f il e
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.8
S c h e d u le
A \D
-D
-B
L R
I2 F
-2
F P
L N
-P R
O -2
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 D02
10H
A L F S I L T
E D
E L E
V .0
TBAR
E L E
V .9
TBAR
TBAR
90 3390
95 3395
S03°02'38" E
.7
N
NOTES:
Protect existing guardrail during construction. 4.
Furnish 10-foot rock bolt for anchored wired mesh system. See Typical Section.3.
See Detail E260-A for rock bolts.2.
See Sheet C06 for rock bolt locations and lengths. Confirm final location with the CO.1.
Rock bolts bearing plate (typ.)
Rock bolts (typ.)
Limits of anchored wired mesh system
BEGIN SCHEDULE B
END SCHEDULE B
E 1261475
N 909368
STA. 203+90
E 11261486
N 909159
STA. 206+00
Sta. 205+15
Existing Inlet to remain.
See Detail E608-05
Sta. 203+90 to Sta. 206+00
Paved Waterway, Type 5 (Asphalt)
Remove and replace
See Typical Section
Sta. 203+90 to Sta. 206+00
Mill & Overlay
See Typical Section.
Install 1548 SQYD anchored wired mesh system
See Notes 1, 2 & 3.
Install rock bolt (typ.)
See Notes 1 & 2.
Install rock bolt (typ.)
L = 350.25'
T = 176.38'
R = 1,200.00'
Δ = 16°43'24" (LT)
PI 201+99.89
See Note 4.
Sta. 204+31 to Sta. 206+00 Existing guardrail to remain.
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONSTRUCTION PLAN
SCHEDULE B - MP 277.1
SCALE IN FEET
0 20 40
:2
A u g u s t
S h e e t
D
M P
.1
S c h B
P
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M P
.1
S c h e d u le
B \D
-B L
R I2
F
-2
F
P L
N -2
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 D03
14"Ø
MAPLE
12" Ø M
APLE
2-TRUNK
12"Ø MAPLE
6"Ø MAPLE
3265 3265
N73° 08'4
0"W N44°58'12"W
.2
.3
N
L = 236.04'
T = 120.45'
R = 480.00'
Δ = 28°10'29" (RT)
PI 301+51.73
Confirm final anchor location with CO prior to installation.
NOTE:
Ground Anchors Row 1-3: 25' length
Ground Anchors Row 4-6: 40' length
Ground Anchors Row 7-9: 55' length
BEGIN SCHEDULE C
END SCHEDULE C
STA. 302+50
N 798256 E 1119921
STA. 301+20
N 798182 E 1120027
See Detail E608-05 Sta. 301+20 to Sta. 302+50
Paved Waterway, Type 5 (Asphalt) Remove and replace and Detail E256-A See Note, Typical Section
Install ground anchor (typ.)
See Typical Section and Detail E629-01 Sta. 301+25 to Sta. 302+45
Control Product, Type 2.B Install 1400 SQYD Rolled Erosion
Place 775 CUYD unclassified borrow (concrete anchor blocks)
Remove 35 CUYD of concrete
See Typical Section Sta. 301+20 to Sta. 302+50
Mill & Overlay
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONSTRUCTION PLAN
SCHEDULE C - MP 323.3
SCALE IN FEET
0 10 20
:0
J u ly
S h e e t
D
M
P
.3
S c h
C
P
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M P
.2
S c h e d u le
C \D
-B L
R I2
F
-2
F
P L
N -3
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 D04
(Describe the pavement surface, provide runoff coefficient prior to and after construction)
- Provide project specific best management practices, examples include;
Stabilize all areas that are disturbed due to the removal of sediment control devices-
Remove fiber roll after all upslope areas are stabilized and vegetation is well established.-
Remove all devices used for dewatering-
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized riprap slopes-vegetation has not established
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where-permanently stabilize disturbed areas:
After the completion of roadway reconstruction and slope stabilization, do the following as directed by the CO to or 1-202-267-2675.
Report spills large enough to discharge to surface water to the National Response Center (NRC) at 1-800-424-8802-waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous conduct these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance-
Collect and store all waste in dumpsters, or in metal or plastic drums as appropriate.
Solid waste resulting from the construction will consist of construction debris, garbage, and empty containers.-
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.-
Cover stockpiled soil with plastic or surround it with fiber roll.
Stockpile topsoil stripped from the construction area in an area that will not interfere with construction phases.-
In general, preserve existing vegetation, trees, and shrubs.-of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain regularly all mechanized equipment used in or near surface waters to prevent contamination-
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.-measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control-
Do not allow construction vehicles to track sediment outside the project limits.-
Do not drive construction equipment across flowing waterways.-type, size, or location of any control or practice without prior approval from the CO.
Install all erosion and sediment control measures as directed by the Contracting Officer (CO). Do not modify the-
Employ temporary stabilization practices in incremental stages as construction proceeds.-control.
control measures with roadway activities to assure economical, effective, and continuous erosion and sediment erosion, particularly at the toe of fills. Coordinate the installation, use, and removal of erosion and sediment
Install fiber roll per Detail E157-04 in all areas of ground disturbance where sheet flow may cause-in conjunction with the construction of this project. These include:
Temporary Best Management Practices (BMP) to reduce erosion as a result of project work will be implemented of the erosion and sediment controls.
Requirements. The attached Erosion and Sediment Control Plan, M05-M07, provides details regarding the installation
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 and in the Special Contract
Erosion Control and Turf Establishment measures listed in this narrative are defined and outlined in the Standard
EROSION AND SEDIMENT CONTROLS
site condition after construction for Schedule B (MP 277.1) and Schedule C (323.25) will be unchanged at 0.35.
B (MP 277.1) is 0.35. The existing site condition runoff coefficient for Schedule C (MP 323.25) is 0.35. The proposed existing coefficient after construction for Schedule A (MP 276.8) is 0.44. The existing site condition runoff coefficient for Schedule
The existing site condition runoff coefficient for Schedule A (MP 276.8) is 0.54. The proposed existing site condition runoff
SQFT or 0.23 acre. The total disturbed area for the entire project is 36,141 SQFT or 0.83 acres.
area for Schedule B (MP 277.1) is 8,106 SQFT or 0.19 acre. The total disturbed area for Schedule C (MP 323.25) is 10,245 anchor installation. The total disturbed area for the Schedule A (MP 276.8) is 17,790 SQFT or 0.41 acre. The total disturbed
Soil disturbing activities will include construction of RSS wall, roadway reconstruction, rock bolt installation and ground
SUMMARY
and Stony Fork. The receiving water for Schedule C (MP 323.25) is Honeycutt Creek.
The receiving waters for Schedule A (MP 276.8) and Schedule B (MP 277.1) are Flowers Branch, Left Prong Stony Fork, a fill slope at MP 276.8 (RSS Wall), a cut slope at MP 277.1 (Rock Bolts), and a cut slope at MP 323.25 (Ground Anchors).
This project consists of repairs and long-term stabilization of the following three failed slopes along the Blue Ridge Parkway:
PROJECT DESCRIPTION
(Provide project specific seed mix and application rates)
(provide project specific mulch type and application rate) clogged. Clean clogged inlet protection or replace clogged or damaged inlet protection as necessary.
Inlet protection: Inspect to ensure that inlet protection remains firmly in place and is not damaged or -equipment. Check staples and stakes to make sure they are securely in the ground.
for damage and erosion beneath the matting. Replacement of matting may be necessary if damaged by
Rolled erosion control product: Inspect matting after every significant rainfall (0.5 inch or greater) event -it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll: Inspect weekly and after each runoff event. Removal sediment deposits from the fiber roll when -stone or replace it completely. Immediately sweep any sediment on roadway.
If vehicles passing through stabilized exit continue to track sediment onto adjacent roadways, replenish
Stabilized construction exit: Inspect every 7 calendar days and after a storm event of 0.5 inch or greater. -
MAINTENANCE AND INSPECTION PROCEDURES
Remove all other perimeter controls when directed by the CO.-
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.-where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas-
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.-
After completion of roadway construction do the following as directed by the CO:
PHASE III- Final Construction / Stabilization remaining in place longer than 14 days, or when directed by the CO.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles
Do not allow ponded water to encroach into the travel lanes.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm runoff.
according to Section 624 and 625.
As soon as practical, but not to exceed 7 calendar days, apply permanent turf establishment to the finished slopes or as directed by the CO.
Apply temporary turf establishment in completed disturbed areas that will remain exposed for over 7 calendar days, problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing erosion
Sediment Control Plans, sheets M05-M07. Install check dams (fiber roll) in ditches along the roadway.
Apply intermediate controls during rough grading operations. Install fiber roll in areas called out on the Erosion and
PHASE II- Intermediate Controls limits.
not leave the project site. Perimeter controls include fiber roll and other approved measures outside the construction Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment does
PHASE I Establish Perimeter Controls
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
according to the NC Dept. on Environmental and Natural Resources, Guidelines for Riparian Buffer Restoration) (Provide riparian seed mix for riparian areas. Obtain mix from local seed supplier, the Partner or develop a mix
284 Total Seed 2 2Red Top
87Fescue, Kentucky 31 110Fescue, Chewings 65Summer Annual Rye
March 1 - September 30 (Turf Shoulders)
Total Seed 136 44Winter Rye Grain 27Fescue, Kentucky 31 65Fescue, Chewings
October 1 - February 28 (Turf Shoulders)
Rates (pounds per acre) Name of Seed Seeding Seasons and
In accordance with the Special Contract Requirements, apply seed at the rates for each season as stated below:
Stabilize 0.32 acres as a result of this project. The area will be prepared for turf establishment with topsoil and mulch.
VEGETATIVE STABILIZATION
Sheet 1 of 4
1500Wood Fiber Mulch Rate (pounds per acre)Mulch
In accordance with the Special Contract Requirements, apply mulch at the following rates:
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
CONTROL NARRATIVE
EROSION AND SEDIMENT
J u ly
S h e e t
M
E a n d S
N a rr a ti v
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L R
I F
\C
A D
D \M
-M
-B
L R
I2 F
-2
F E
S
-n a r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M01
clogged. Clean clogged inlet protection or replace clogged or damaged inlet protection as necessary.
Inlet protection: Inspect to ensure that inlet protection remains firmly in place and is not damaged or -equipment. Check staples and stakes to make sure they are securely in the ground.
for damage and erosion beneath the matting. Replacement of matting may be necessary if damaged by
Rolled erosion control product: Inspect matting after every significant rainfall (0.5 inch or greater) event -it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll: Inspect weekly and after each runoff event. Removal sediment deposits from the fiber roll when -stone or replace it completely. Immediately sweep any sediment on roadway.
If vehicles passing through stabilized exit continue to track sediment onto adjacent roadways, replenish
Stabilized construction exit: Inspect every 7 calendar days and after a storm event of 0.5 inch or greater. -
MAINTENANCE AND INSPECTION PROCEDURES
Remove all other perimeter controls when directed by the CO.-
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.-where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas-
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.-
After completion of roadway construction do the following as directed by the CO:
PHASE III- Final Construction / Stabilization remaining in place longer than 14 days, or when directed by the CO.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles
Do not allow ponded water to encroach into the travel lanes.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm runoff.
according to Section 624 and 625.
As soon as practical, but not to exceed 7 calendar days, apply permanent turf establishment to the finished slopes or as directed by the CO.
Apply temporary turf establishment in completed disturbed areas that will remain exposed for over 7 calendar days, problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing erosion
Sediment Control Plans, sheets M05-M07. Install check dams (fiber roll) in ditches along the roadway.
Apply intermediate controls during rough grading operations. Install fiber roll in areas called out on the Erosion and
PHASE II- Intermediate Controls limits.
not leave the project site. Perimeter controls include fiber roll and other approved measures outside the construction Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment does
PHASE I Establish Perimeter Controls
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
Sheet 2 of 4 stabilized by September 30, and remain stable through March 31.
with associated erosion and sediment control measures) until the following April. All disturbed soils must be If bridge construction cannot be completed within this window, leave temporary traffic control in place (along occur from April 16 to October 14, to avoid impacts to trout reproduction and downstream aquatic resources.
area. Construction in the stream channel, and within a 25-foot buffer zone along each bank of the river, must sand, or other materials be dredged from the wetted stream channel, except in the immediate permitted work Caney Fork Creek is a North Carolina Designated Mountain Trout Water. Under no circumstances should rock, LOCATION OF SPECIAL RESOURCES OR PROBLEM AREAS
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
N o v e m b e r
S h e e t
M
E a n d S
N a rr a ti v
U s e rs \m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M
-B
L R
I2 F
-2 F
E
S
-n a r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M02
Sheet 3 of 4
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
N o v e m b e r
S h e e t
M
E a n d S
N a r r a ti v
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
-B
L R
I2 F
-2
F E
S
-n a r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M03
Sheet 4 of 4
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
:3
N o v e m b e r
S h e e t
M
E a n d S
N a r r a ti v
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\B L
R I
F
\C A
D D
\M
-M
-B L
R I2
F
-2
F
E
S -n a r.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M04
I N
V
.0 x .9
' C
M P
I N
V
.2
BH#2
TBAR
BH#3
BH#1
TBAR
PARKWAY
SPEED LIMIT
N
BEGIN SCHEDULE A END SCHEDULE A
E 1262043
N 910433
STA. 103+25
E 1262233
N 910550
STA. 100+49
Toe of fill (typ.)
Construction Centerline
Proposed Edge of Travelway Proposed Edge of Shoulder
Existing Edge of Roadway
Limits of Disturbance (typ.)
See Detail E157-04
Install Fiber Roll (typ.)
Turf Establishment (typ.)
on facing of wall. See Typical Section for details.
Install Rolled Erosion Control Product, Type 3.A allowed only within the limits of disturbance.
Equipment access at each site will be
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
PLAN
EROSION & SEDIMENT CONTROL
SCHEDULE A - MP 276.8SCALE IN FEET
0 10 20
:0
J u ly
S h e e t
M
M
P
.8
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.8
S c h e d u le
A \M
-B
L R
I2 F
-2
F E
S
-P L
N -2
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M05
10H
A L F S I L T
E D
E L E
V .0
TBAR
E L E
V .9
TBAR
TBAR
90 3390
95 3395
N
BEGIN SCHEDULE B
END SCHEDULE B
E 1261475
N 909368
STA. 203+90
E 11261486
N 909159
STA. 206+00
Limits of Disturbance (typ.)
See Detail E157-04
Install Fiber Roll (typ.)
See Detail E157-04
Install Check Dam (fiber roll) (typ.)
See Detail E157-04
Install Inlet Protection (fiber roll) has exposed rock on the surface.
Project area not included in Limits of Disturbance allowed only within the limits of disturbance.
Equipment access at each site will be
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SCHEDULE B - MP 277.1SCALE IN FEET
0 20 40
Turf Establishment (typ.)
:0
J u ly
S h e e t
M
M P
.1
S c h B
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.1
S c h e d u le
B \M
-B
L R
I2 F
-2
F E
S
-P L
N -2
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M06
14"Ø
MAPLE
12" Ø M
APLE
2-TRUNK
12"Ø MAPLE
6"Ø MAPLE
3265 3265
N
BEGIN SCHEDULE C
END SCHEDULE C
STA. 302+50
N 798256
E 1119921
STA. 301+20
N 798182
E 1120027
Limits of Disturbance (typ.)
See Detail E157-04
Install Check Dam (fiber roll) (typ.)
Turf Establishment (typ.)
See Detail E157-04
Install Fiber Roll (typ.)
See Detail E256-A, Detail E629-01, and Typical Section.
distrubed areas above turf establishment limits on slope.
Install Rolled Erosion Control Product, Type 2.B on
Equipment access at each site will be allowed only within the limits of disturbance.
NOTE:
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SCHEDULE C - MP 323.3SCALE IN FEET
0 10 20
:1
J u ly
S h e e t
M
M P
.3
S c h
C
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \M
P
.2
S c h e d u le
C \M
-B
L R
I2 F
-2
F E
S
-P L
N -3
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 M07
Sign for Old US 421
See Detail A (Sheet N02)
See Detail B (Sheet N02)
NOTES:
Sta. 206+00 to Sta. 203+90
NP-BLRI 2F27, 2F28 Schedule B (MP 277.1)
P C
M S
PCMS
Install 60' of chain link fence, 96-inch height and 2 gates (12-foot width each) at each closure point as directed by the CO.8.
Install traffic control devices in accordance with the "Manual of Uniform Traffic Control Devices (MUTCD)," latest edition.7.
For sign special dimensions, see Temporary Traffic Control, Special Sign Details Sheet (N04).6.
14 days prior to roadway closure. Configure PCMS location and message as directed by the CO.
Place two PCMS at the north and south end of the Blue Ridge Parkway before the proposed closed section 5.
See Temporary Traffic Control, Sign Key (N03) for sign information.4.
Maintain all signs along the detour route for the duration of construction for Schedule A & Schedule B3.
Adjust signs and barricades to meet field conditions as approved by the CO.2.
from the US Route 421 Junction to the Old US Route 421 Junction.
Close the Blue Ridge Parkway to traffic during construction of Schedule A & Schedule B 1.
NOTES:
LEGEND:
Proposed Sign Location
Barricade Type 3
Closed Road
Detour Route
Message Sign
Portable Changeable
Chain Link Fence/Gate
PCMS
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TEMPORARY TRAFFIC CONTROL
SCHEDULE A & B DETOUR MAP
:3
A u g u s t
S h e e t
N
D e to u r M a p
S c h
A B
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \N
-N
-B
L R
I2 F
-2
F tc p .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 N01
DETAIL A DETAIL B
OLD U
S 4
BLUE RIDGE PARKWAY
PARKW
AY
U S H
W Y
O X C
O A
T R
D
B E
N M
I L
L E
R R
D
Install 60' of chain link fence, 96-inch height and 2 gates (12-foot width each) at each closure point as directed by the CO.8.
Install traffic control devices in accordance with the "Manual of Uniform Traffic Control Devices (MUTCD)," latest edition.7.
For sign special dimensions, see Temporary Traffic Control, Special Sign Details Sheet (N04).6.
14 days prior to roadway closure. Configure PCMS location and message as directed by the CO.
Place two PCMS at the north and south end of the Blue Ridge Parkway before the proposed closed section 5.
See Temporary Traffic Control, Sign Key (N03) for sign information.4.
Maintain all signs along the detour route for the duration of construction for Schedule A & Schedule B3.
Adjust signs and barricades to meet field conditions as approved by the CO.2.
from the US Route 421 Junction to the Old US Route 421 Junction.
Close the Blue Ridge Parkway to traffic during construction of Schedule A & Schedule B 1.
NOTES:
Sta. 100+75 to Sta. 103+25
Schedule A (MP 276.8)
NP-BLRI 2F27, 2F28
B L U
E
R
ID
G E
See Note 7
See Note 7
LEGEND:
Proposed Sign Location
Barricade Type 3
Closed Road
Detour Route
Message Sign
Portable Changeable
Chain Link Fence/Gate
PCMS
N N
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TEMPORARY TRAFFIC CONTROL
SCHEDULE A & B DETOUR MAP
:3 u g u s t
S h e e t
N
Z o o m
D e to u r M p
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \N
-N
-B
L R
I2 F
-2
F tc p .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 N02
PARKWAY
RIDGE
BLUE
30" x 30"
Special Sign 1
FOLLOW DETOUR
CLOSED
PARKWAY SOUTH
BLUE RIDGE
60" x 36"
Special Sign 3
FOLLOW DETOUR
CLOSED
PARKWAY NORTH
BLUE RIDGE
60" x 36"
Special Sign 2
12 13 14
2 3
DETOUR DETOUR
DETOUR
30" x 24"
M4-9 (L)
30" x 24"
M4-9 (S)
30" x 24"
M4-9 (R)
36" x 36"
W20-3
36" x 36"
W20-2
CLOSED
ROAD
1000 FT AHEAD
DETOUR
1 5 8
CLOSED
ROAD
MILE2
CLOSED
ROAD
1 MILE
36" x 36"
W20-3
36" x 36"
W20-3
END
DETOUR
24" x 18"
M4-8a
ORTHN OUTHS
24" x 12"
M3-1
24" x 12"
M3-3
10 11
ROAD
CLOSED
Mount on Barricade
48" x 30"
R11-2
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TEMPORARY TRAFFIC CONTROL
SIGN KEY
:3
A u g u s t
S h e e t
N
S ig n K y
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \N
-N
-B
L R
I2 F
-2
F tc p .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 N03
SPECIAL SIGN 2
panelStyle:construction_guide.ssilevels:GSCOLORFILL|GSBWFILL|GSOUTLINE
6.47" 47.05" 6.47"
60"
.3
.8
.8
.8
.3
Panel Style: construction_guide.ssi
M.U.T.C.D.: 2009 Edition
BORDER
R=1.5"
TH=0.63"
IN=0.47"
6.47" 47.05" 6.47"
60"
.3
.8
.8
.8
.3
Panel Style: construction_guide.ssi
M.U.T.C.D.: 2009 Edition
BORDER
R=1.5"
TH=0.63"
IN=0.47"
SPECIAL SIGN 3
All special signs are Black on Orange.
NOTE:
5" 20" 5"
30"
Panel Style: construction_guide.ssi
M.U.T.C.D.: 2009 Edition
BORDER
R=1.5"
TH=0.63"
IN=0.47"
SPECIAL SIGN 1
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TEMPORARY TRAFFIC CONTROL
SPECIAL SIGN DETAILS
:5 u g u s t
S h e e t
N
S p e c ia l S ig s
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\B L
R I
F
\C
A D
D \N
-N
-B
L R
I2 F
-2
F tc p .d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 N04
Work area boundary
2.
1.
18' (m in.)
50' (m in.)
entire area prior to placing the aggregate.
Place Geotextile, Class 2, Type C, over the crosses existing drainage ditches.
where the stabilized construction exit
Install temporary 18-inch pipe culverts stabilized construction exit when required.
Construct drainage ditches along the
(6" minimum depth)
Size Number 3
Aggregate, AASHTO M 43, pipe culvert (if required)
Temporary 18" shoulder
Existing
Exis ting Ro adway
E157-01
NO SCALE
EXIT
STABILIZED CONSTRUCTION
Flo w
Flo w
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MARCH 2015
:3
J u ly
S h e
U s e r s \m ic h a e l.
to o m e r \D e s k to p \C u r r e n t
W o r k \B
L R
I
F \C
A D
D \S td D e t\
S s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 S01
EFLHD DETAIL
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
E157-04
NO SCALE
height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection detail.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
Furnish wood stakes meeting the requirements of ground and 3 inches protruding above the roll.
length to attain a minimum of 12 inches into the section of 2-inch x 2-inch and of sufficient
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place the fiber roll.
1-inch that may interfere with proper function of including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber…
This is the start of the file's text. The full file is on GovTribe.