Amendment 0004 - NP-BLRI 2F27 2F28.pdf
PDF 951 KB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-B-000001
About this file
This document summarizes a federal solicitation and related amendment for slope stabilization repairs on the Blue Ridge Parkway. The solicitation is for certified Small Business Concerns to complete repairs at three milepost locations, including fill and cut slope stabilization, asphalt paving, markings, and miscellaneous work. The project value is estimated between $5-10 million. Bid documents were issued on October 1, 2021, with the bid due date and location specified in solicitation block 13a. The amendment revises plan sheets and bid schedule pages. Interested vendors must register at www.sam.gov for automatic email notifications of document updates. Annual representations and certifications must also be completed on the system. Questions should be directed to the specified contracting office email.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO - NP BLRI 2F27_ 2F28.pdf | ||
| Amendment 0003 - NP-BLRI 2F27 2F28.pdf | ||
| Amendment 0002 - NP-BLRI 2F27_2F28.pdf | ||
| Amendment 0001 - NP BLRI 2F27_2F28.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Plans - NP-BLRI 2F27.pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| IFB Solicitation - NP-BLRI 2F27_ 2F28.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7322B000001 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN:CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN:ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1411/04/20210004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/01/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP-BLRI 2F27, 2F28
The purpose of this Amendment is to:
1) Revise the plan sheets.
a) See revised plan Sheets C01_Amendment_0004 and C07_Amendment_0004.
2) Revise the Solicitation B pages as follows:
a) Delete the Solicitation Bid Schedule pages B-1 thru B-3 and substitute the amended Bid
Schedule pages B-1 thru B-3.
b) Updated quantity for pay item 40101-0100 Asphalt Concrete Pavement, Gyratory Mix, 3/8-Inch Nominal Maximum Size Aggregate, <0.3 Million ESAL (Type Iv Roughness, PG 64-22).
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 14
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7322B000001/0004
c) Updated quantity for pay item 41202-0000 Tack Coat.
d) Add pay item 41301-0400 Asphalt Pavement Milling, 1 ½-inch Depth.
e) Delete pay item 41801-3000 Asphalt Concrete Pavement Patch, Type 3.
f) See revised B Pages_Amendment_0004
3) Bid Opening date of November 9, 2021 at 2:00 p.m. EST remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 0004
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0004
Project NP-BLRI 2F27, 2F28
BLUE RIDGE PARKWAY
Solicitation: 693C73-22-B-000001
The purpose of this Amendment is to:
1) Revise the plan sheets.
a) See revised plan Sheets C01_Amendment_0004 and C07_Amendment_0004.
2) Revise the Solicitation B pages as follows:
a) Delete the Solicitation Bid Schedule pages B-1 thru B-3 and substitute the amended Bid Schedule pages B-1 thru B-3.
b) Updated quantity for pay item 40101-0100 Asphalt Concrete Pavement, Gyratory
Mix, 3/8-Inch Nominal Maximum Size Aggregate, <0.3 Million ESAL (Type Iv Roughness, PG 64-22).
c) Updated quantity for pay item 41202-0000 Tack Coat.
d) Add pay item 41301-0400 Asphalt Pavement Milling, 1 ½-inch Depth.
e) Delete pay item 41801-3000 Asphalt Concrete Pavement Patch, Type 3.
f) See revised B Pages_Amendment_0004
3) Bid Opening date of November 9, 2021 at 2:00 p.m. EST remains unchanged.
AMENDMENT NO. 4
4AMENDMENT NO. 4
& 41202-0000.
quantities for Pay Items 40101-0100 added Pay Item 41301-0400 & adjusted AMD #4 - Removed Pay Item 41801-3000, MWT11/4/214
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
TABULATION OF QUANTITY
:4
A
M
N o v e m b e r
S h e e t
C
T a b u la ti o n o f Q u a n ti ty
C
U s e r s \m ic h a e l.
to o m e r \D e s k to p
\C u r r e n t W o r k
\B L
R I
F
\C
A D
D \A m e n d m e n t
\C
C
B
L R
I
F
F q ty
A m e n d m e n t-
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C01
NPS Drwg No. 601/173627 NPS PMIS No. 242360
PAVEMENT SUMMARIES
AMENDMENT NO. 4 4
4 11/4/21 MWT
& 41202-0000.
quantities for Pay Items 40101-0100 added Pay Item 41301-0400 & adjusted AMD #4 - Removed Pay Item 41801-3000, NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SUMMARIES AND SCHEDULES
PAVEMENT SUMMARIES
:5
A
M
N o v e m b e r
S h e e t
C
P a v e m e n t
C
U s e r s \m ic h a e l.
to o m e r \D e s k to p \C u r r e n t
W o r k \B
L R
I
F \C
A D
D \A m e n d m e n t
\C
C
B
L R
I F
F q ty
A m e n d m e n t-
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP-BLRI 2F27, 2F28 C07
NPS Drwg No. 601/173627 NPS PMIS No. 242360
B - 1
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
0004 A0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0030 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
650 LNFT $____________ $____________
A0050 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
1 EACH $____________ $____________
A0060 20103-0000 CLEARING AND GRUBBING
820 SQYD $____________ $____________
A0070 20302-0400 REMOVAL OF CURB, ASPHALT
250 LNFT $____________ $____________
A0080 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
660 SQYD $____________ $____________
A0090 20401-0000 ROADWAY EXCAVATION
3,500 CUYD $____________ $____________
A0100 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B
880 SQYD $____________ $____________
A0110 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
670 SQYD $____________ $____________
A0120 20703-0000 GEOGRID (TYPE V)
7,850 SQYD $____________ $____________
A0130 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
4,500 SQFT $____________ $____________
A0140 26110-0000 SELECT GRANULAR BACKFILL (#57 STONE)
3,910 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 2
A0150 30101-4000 AGGREGATE BASE GRADING C OR D
300 TON $____________ $____________
A0160 31302-0450 AGGREGATE-TOPSOIL COURSE, 4 1/2-INCH DEPTH
110 SQYD $____________ $____________
0004 A0170 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (TYPE IV ROUGHNESS, PG
64-22)
80 TON $____________ $____________
A0180 40101-0500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (PG 64-22)
100 TON $____________ $____________
0004 A0190 41202-0000 TACK COAT
115 GAL $____________ $____________
0004 A0195 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
2,260 SQYD $____________ $____________
0004 A0200 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
2,260 SQYD $____________ $____________
A0210 60510-0700 6-INCH COLLECTOR PIPE (PREFORATED)
250 LNFT $____________ $____________
A0220 60510-0800 6-INCH OUTLET PIPE (NON-PREFORATED)
250 LNFT $____________ $____________
A0230 60802-0500 PAVED WATERWAY, TYPE 5
30 LNFT $____________ $____________
A0240 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
275 LNFT $____________ $____________
A0250 61901-2100 FENCE, CHAIN LINK, 96-INCH HEIGHT
120 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 3
A0260 61902-3300 GATE, CHAIN LINK, 12 FEET WIDTH
4 EACH $____________ $____________
A0270 62403-0000 FURNISHING AND PLACING TOPSOIL
350 CUYD $____________ $____________
A0280 62502-0000 TURF ESTABLISHMENT
1,140 SQYD $____________ $____________
A0290 62901-0900 ROLLED EROSION CONTROL PRODUCT, TYPE 3.A
1,900 SQYD $____________ $____________
A0300 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
A0310 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
550 LNFT $____________ $____________
A0320 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
A0330 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A0340 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
405 SQFT $____________ $____________
A0350 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 4
Contract Quantity Pay Items
20442-0000 SLOPE SCALING
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
B0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0030 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
300 LNFT $____________ $____________
B0050 15706-0200 SOIL EROSION CONTROL, CHECK DAM
12 EACH $____________ $____________
B0060 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
1 EACH $____________ $____________
B0070 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
1 EACH $____________ $____________
B0080 20103-0000 CLEARING AND GRUBBING
560 SQYD $____________ $____________
B0090 20302-1700 REMOVAL OF PAVED WATERWAY, ASPHALT
230 LNFT $____________ $____________
B0100 20442-0000 SLOPE SCALING
330 CUYD $____________ $____________
B0110 26001-0000 ROCK BOLT
6,000 LNFT $____________ $____________
B0120 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH
75 SQYD $____________ $____________
B0130 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (TYPE IV ROUGHNESS, PG
64-22)
Bid Schedule Schedule:B Schedule Type:Options
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
TON45 $____________ $____________
B - 5
B0140 41202-0000 TACK COAT
22 GAL $____________ $____________
B0150 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
540 SQYD $____________ $____________
B0160 60802-0500 PAVED WATERWAY, TYPE 5
230 LNFT $____________ $____________
B0170 61001-0000 HORIZONTAL DRAIN PIPE
800 LNFT $____________ $____________
B0180 62403-0000 FURNISHING AND PLACING TOPSOIL
15 CUYD $____________ $____________
B0190 62502-0000 TURF ESTABLISHMENT
330 SQYD $____________ $____________
B0200 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
460 LNFT $____________ $____________
B0210 65501-0000 ANCHORED WIRED MESH SYSTEM
2,200 SQYD $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 6
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
C0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0030 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
150 LNFT $____________ $____________
C0050 15706-0200 SOIL EROSION CONTROL, CHECK DAM
8 EACH $____________ $____________
C0060 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
1 EACH $____________ $____________
C0070 20103-0000 CLEARING AND GRUBBING
1,130 SQYD $____________ $____________
C0080 20302-1700 REMOVAL OF PAVED WATERWAY, ASPHALT
140 LNFT $____________ $____________
C0090 20305-1000 REMOVAL OF CONCRETE
40 CUYD $____________ $____________
C0100 20403-0000 UNCLASSIFIED BORROW
850 CUYD $____________ $____________
C0110 25602-0000 GROUND ANCHOR
4,800 LNFT $____________ $____________
C0120 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH
50 SQYD $____________ $____________
C0130 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (TYPE IV ROUGHNESS, PG
64-22)
30 TON $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 7
C0140 41202-0000 TACK COAT
13 GAL $____________ $____________
C0150 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
330 SQYD $____________ $____________
C0160 60802-0500 PAVED WATERWAY, TYPE 5
140 LNFT $____________ $____________
C0170 62403-0000 FURNISHING AND PLACING TOPSOIL
3 CUYD $____________ $____________
C0180 62502-0000 TURF ESTABLISHMENT
95 SQYD $____________ $____________
C0190 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B
1,540 SQYD $____________ $____________
C0200 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
290 LNFT $____________ $____________
C0210 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
C0220 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
22 EACH $____________ $____________
C0230 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
2 EACH $____________ $____________
C0240 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
515 LNFT $____________ $____________
C0250 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
70 LNFT $____________ $____________
C0260 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
2,250 LNFT $____________ $____________
C0270 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
150 SQFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 8
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
Project No:NP-BLRI 2F27, 2F28
Project Name:Slope repair and stabilization at MP 276.8, MP 277.1 and MP 323.25 on Blue Ridge Parkway
B - 9
BID SUMMARY
Project NP BLRI 2F27, 2F28
(1) Schedule A (Base Contract) Bid Total (from Page B-3) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-5) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-8) = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
Maximum Time Allowed for the Contract if all Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be as stated in Subsection 108.01 of the Special Contract Requirements (J Pages), all construction activities at the project site must be completed by no later than 09/30/2022.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 136 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 93 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 100 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0004 |
| Project NP-BLRI 2F27, 2F28 |
| Solicitation: 693C73-22-B-000001 |
File details come from the government source that posted it. Updated .