Plans - NC NP BLRI BR 5140-091P.pdf
PDF 13 MB Posted
- Attached to
- Blue Ridge Parkway
- Solicitation number
- 693C73-26-B-000005
About this file
This is a detailed design and construction project document for the rehabilitation of the U.S. Route 421 Bridge on the Blue Ridge Parkway in Watauga County, North Carolina. The project, identified as NC NP BLRI BR 5140-091P, involves repairing and rehabilitating approximately 0.11 miles of roadway, with specific focus on bridge infrastructure improvements. Key scope of work includes micro milling existing concrete overlay, repairing concrete and cracks on the deck, installing spray-applied waterproofing membrane, placing a 3-inch asphalt overlay, repointing stone masonry, removing and replacing expansion joints, and resetting loose stones at wingwalls.
The project documentation includes comprehensive technical details such as construction plans, typical sections, alignment data, erosion control measures, traffic control plans, and specific repair methodologies for the bridge's structural components. The work will be conducted on a bridge with a total length of 269'6" and involves careful restoration of existing stone masonry, concrete surfaces, and pavement. The project is being managed by the U.S. Department of Transportation's Federal Highway Administration, Office of Federal Lands Highway, with an anticipated construction timeline in September 2025. The estimated project area involves minimal soil disturbance, approximately 0.02 acres, with the receiving water being the South Fork New River.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ROUTE 421 BRIDGE
SCHEDULE A
existing
Match
Parkway
Blue Ridge
LB
existing
Match
MILL AND OVERLAY
1657+61.88 to 1658+61.80
Travel lane
11' 11'
Travel lane existing
Match
Parkway
Blue Ridge
LB
existing
Match
MILL AND OVERLAY
1662+25.64 to 1663+25.64
Travel lane
11' 11'
Travel lane
3'
Shoulder
3'
Shoulder
Existing stone masonry guardwall
Existing stone masonry guardwall
Existing stone masonry guardwall
Existing stone masonry guardwall
Aggregate-topsoil, 4-inch depth
4-inch depth
Aggregate-topsoil, on all disturbed areas excluding paved areas.
4. Provide and place 4-inch aggregate-topsoil and turf establishment
3. Apply tack coat between successive lifts of pavement.
2. Construct pavement transitions according to Detail E401-01.
when it meets design and drainage requirements.
as approved by the CO. Match existing roadway superelevation only achieve positive drainage and acceptable pavement surface roughness,
1. Correct deficient cross slope and make necessary adjustment to Existing paved waterway Existing paved waterway
Asphalt pavement milling, 2-inch to 3-inch depth
Asphalt pavement milling, 2-inch to 3-inch depth
Tack coat
See Note 3
3-inch depth (2 equal lifts)
Asphalt concrete pavement Type 1 (3/8-inch NMSA), Tack coat
See Note 3
3-inch depth (2 equal lifts)
Asphalt concrete pavement Type 1 (3/8-inch NMSA), NO SCALE
Existing ground (typ.)
Existing ground (typ.)
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. ROUTE 421 BRIDGE
SCHEDULE A
BLUE RIDGE PARKWAY
NOTES:
:2
P
M
O c to b e r
U n ti tl e d
S h e e t
P R
O J E
C T
S \b lr i\
-0
P
\H W
Y
D E
S \C
A D
D \B
N
C N
P B
L R
I
-0
P ty p
.d g n
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
B01
NPS Drwg No. 601/194867 NPS PMIS No. 336000
NC NP BLRI BR 5140-091P
U.S. DEPARTMENT OF TRANSPORTATION
U.S. ROUTE 421 BRIDGE
SCHEDULE A
BLUE RIDGE PARKWAY
:1
A c to b e r
D e s ig n I n tl
F fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b lr i\
-0
P
\H W
Y D
E S
\C A
D D
\C .d g n
TABULATION OF QUANTITIES
PROJECT
C01
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
U.S. ROUTE 421 BRIDGE
SCHEDULE A
BLUE RIDGE PARKWAY
:0 c to b e r
C o n s tr u c ti o n S ig n s fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b lr i\
-0
P
\H W
Y
D E
S \C
A D
D \C
-C
-C
N
C N
P B
L R
I
-0
P q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C02
Sheet 2 of 3
U.S. DEPARTMENT OF TRANSPORTATION
U.S. ROUTE 421 BRIDGE
SCHEDULE A
BLUE RIDGE PARKWAY
:1
J u ly
C o n s tr u c ti o n S ig
P R
O J E
C T
S \b lr i\
-0
P
\H W
Y D
E S
\C A
D D
\C -C
-C
N
C N
P B
L R
I -0
P q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C03
Sheet 3 of 3
U.S. DEPARTMENT OF TRANSPORTATION
US ROUTE 421 BRIDGE
SCHEDULE A
BLUE RIDGE PARKWAY
:0 c to b e r
C o n s tr u c ti o n S ig fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b lr i\
-0
P
\H W
Y
D E
S \C
A D
D \C
-C
-C
N
C N
P B
L R
I
-0
P q ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
Erosion and Sediment Controls or 1-202-267-2675.
Report spills large enough to discharge to surface water to the National Response Center (NRC) at 1-800-424-8802-waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous conduct these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance-
Collect and store all waste in dumpsters, or in metal or plastic drums as appropriate.
Solid waste resulting from the construction will consist of construction debris, garbage, and empty containers.-
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.-
Cover stockpiled soil with plastic or surround it with silt fence.
Stockpile topsoil stripped from the construction area in an area that will not interfere with construction phases.-
In general, preserve existing vegetation, trees, and shrubs.-of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain regularly all mechanized equipment used in or near surface waters to prevent contamination-
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.-measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control-
Do not allow construction vehicles to track sediment outside the project limits.-
Do not drive construction equipment across flowing waterways.-type, size, or location of any control or practice without prior approval from the CO.
Install all erosion and sediment control measures as directed by the Contracting Officer (CO). Do not modify the-
Employ temporary stabilization practices in incremental stages as construction proceeds.-control.
control measures with roadway activities to assure economical, effective, and continuous erosion and sediment erosion, particularly at the toe of fills. Coordinate the installation, use, and removal of erosion and sediment
Install fiber roll according to Detail E157-04 in all areas of ground disturbance where sheet flow may cause-
Requirements.
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24 and in the Special Contract
Erosion Control and Turf Establishment measures listed in this narrative are defined and outlined in the Standard
Stabilize all areas that are disturbed due to the removal of sediment control devices.-
Remove silt fence after all upslope areas are stabilized and vegetation is well established.-
Remove all devices used for dewatering.-
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized riprap slopes.-vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where-permanently stabilize disturbed areas:
After the completion of roadway construction and culvert replacement, do the following as directed by the CO to
5000 (1 to 2 inch mat)Straw
Rate (pounds per acre)Mulch
In accordance with the Special Contract Requirements, apply mulch at the following rates:
68 Total Seed
25German or Browntop Millet
4Switchgrass
6Indiangrass
8Big Bluestem
25Kentucky Bluegrass
May 1 August 30
Total Seed 78
35 Rye Grain
4Switchgrass
6Indiangrass
8Big Bluestem
25Kentucky Bluegrass
September 1 April 30
Rates (pounds per acre)Name of Seed
Seeding Seasons and
In accordance with the Special Contract Requirements, apply seed at the rates for each season as stated below:
acres as a result of this project. The area will be prepared for turf establishment with topsoil and mulch.X.XStabilize
VEGETATIVE STABILIZATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
The Runoff Coefficient of 0.90 will remain the same prior to and after construction.
No new impervious surface will be created by this project.
approximately 0.02 acres.
Soil disturbing activities will mainly include roadway grading. The total disturbed area for the project is
The receiving water is South Fork New River.
concrete pavement, and other miscellaneous work.
removal of concrete pavement (micro milling), asphalt pavement milling, waterproofing membrane, asphalt
This project consists of repair concrete, concrete crack repair, clean and reseal joints, repoint stone masonry, Project Description
Remove all other perimeter controls.-
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.-where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas-
Finish grading and apply permanent turf establishment to any remaining disturbed areas.-
After completion of roadway construction do the following as directed by the CO:
Phase III FINAL CONSTRUCTION / STABILZIATION the CO.
Apply temporary turf establishment to stockpiles remaining in place longer than 14 days, or when directed by
Do not allow ponded water to encroach into the travel lanes.
runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm according to Section 625.
As soon as practical, but not to exceed 7 days, apply permanent turf establishment to the finished slopes or as directed by the CO.
Apply temporary turf establishment in completed disturbed areas that will remain exposed for over 7 days, Phase II Intermediate Controls erosion problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing construction limits.
does not leave the project site. Perimeter controls include fiber rolls and other approved measures outside the Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll: Inspect weekly and after each runoff event. Remove sediment deposits from the fiber roll when it during wet weather. Repair or replace any damaged measures by the end of the day.
erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and daily Section 157, the details shown in the plans, and the individual permitting requirements. Check and maintain Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according to
MAINTENANCE AND INSPECTION PROCEDURES
:5
J u ly
D
P
R O
J E
C T
S \b lr i\
-0
P \H
W Y
D
E S
\C A
D D
\M
N C
N P
B L
R I
-0
P e s c n a rr a ti v e
.d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
D
P
R O
J E
C T
S \b lr i\
-0
P \H
W Y
D
E S
\C A
D D
\M
N C
N P
B L
R I
-0
P e s c n a rr a ti v e
.d g n
PROJECT
M01
ONE
W
AY
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
P K
.4
.5
.9
R E
B A
R
.8
.8
.5
R E
B A
R
.9
.0
.1
R E
B A
R
.9
.2
.7
R E
B A
R
.5
.5
.1
N A I L
.2
.4
.4
N A I L
.7
.4
.0
C o d e
E le v a ti o
E a s ti g
N o r th in g
N a m
R O J E
C T C
O N
T R
O L P
O I N
T S L I S
T
P r o je c t B
L R I f1
G e o id M o d e l G
E I O
D
C o n u s
V e r t.
D a tu m N
A V
D
H o r
D a tu m N
A D
C o n u s
Z o n e N o r th C a r o li n a
C o o r d in a te S y s te m U
S S ta te P la n e
P R
O J E
C T C
O O
R D I N
A T
E S
Y S
T E
M
L a t.
.1
N
L o n g .7
W
D I D I
D I
D I
N C
D O
T
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
D I
NST T
RAIL
CRES
TOFT
HEBLR
I
LE
D31
42DEEP
GAP
1 -
1.8'H X 1.5'W
OPENING
STONE HEADW
ALL
N
Begin 4" SSW, Type B, 1658+47
W16-4P signs
Install W11-2 and
W16-4P signs
Install W11-2 and
1662+34, 1662+18
End 4" SSW, Type B, 4" DSY, Type B
Begin 4" SSW, Type B, 1658+77
NEXT
1000 FT
NEXT
1000 FT
Existing sign to remain to remain
Existing sign
Existing sign to remain
Existing sign to remain
Existing sign to remain
U.S. DEPARTMENT OF TRANSPORTATION
U.S. ROUTE 421 BRIDGE
BLUE RIDGE PARKWAY
SCALE IN FEET
0 50 100
BEGIN WORK
1657+61.88
N= 0.0000
E= 0.0000
END WORK
1663+25.64
N= 911,562.8094
E= 1,262,882.1041
Blue Ridge Parkway
U .S
H w y
ONEWAY STOP
B e n M ille r R d
Blue Ridge P kwy Access
O x
Ca rt R d
Deep Gap
ELEV. 3142 ft
CREST OF THE
BLUE RIDGE
BOONE
WILKESBORO
MST TRAIL
:1
S e p te m b e r
P
M Y
P la n
S h e t]
P R
O J E
C T
S \b lr i\
-0
P
\H W
Y
D E
S \C
A D
D \P
N
C N
P B
L R
I
-0
P p tc
.d g n
AND SIGNING PLAN
PAVEMENT MARKING
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P P01
Existing Manhole 15
Existing Top Slab Reinforcement 2 14
Existing Top Slab Reinforcement 1 13
Existing Abutment 2 Reinforcement 12
Existing Abutment 1 Reinforcement 11
Concrete Repair Details 10
Joint Details 9
Typical Section at South Approach 8
Typical Section 7
Pier 6
Abutment 2 5
Abutment 1 4
Reflective Superstructure Underside 3
Plan and Elevation 2
General Notes and Index 1
SHEET TITLESHEET NO.
INDEX OF BRIDGE PLAN SHEETS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
RG / BRP NO.DATEBRIDGE PLAN SHEETSCALEPROJECT TEAM LEADCHECKED BYDRAWN BYDESIGNED BY
September 2025 Christopher NegleyMBDLDL
REVISIONSBYDATENO.
BRP-1357
STRUCTURE NO.
STRUCTURE NAME
FEATURES INTERSECTED LOCATION
BLUE RIDGE PARKWAY5140-091P U.S. ROUTE 421 BRIDGE BLUE RIDGE PARKWAY OVER U.S. ROUTE 421
1 of 15Not to scale
GENERAL NOTES AND INDEX
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
R01
GENERAL NOTES:
Field verify all dimensions.
CONSTRUCTION:
Provide reinforcing steel conforming to AASHTO M 31 (ASTM A615), Grade 60 deformed.
Reinforcing Steel:
days.
= 5000 psi at 28 c
Provide Class HES concrete for concrete repairs on deck and all other locations , f'
= 2200 psi at 28 days.c
Provide elastomeric concrete for joint repairs, f' days.
= 4500 psi at 56 c
Provide Service Life Design Concrete for concrete repairs at abutments and pier, f'
Structural Concrete:
MATERIALS:
Structural Backfill: 125 pcf
Stone Masonry: 170 pcf
Bituminous Wearing Surfaces: 140 pcf
Concrete: 150 pcf
Dead Load:
Traffic: AASHTO MS18 HS20-44
Live Load:
DESIGN LOADS:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.
Construction:
Joint replacement and concrete repairs: AASHTO LRFD Bridge Design Specifications, 9th Edition, 2020.
Existing structure: Standard Specifications for Highway Bridges AASHTO 1996.
Design:
SPECIFICATIONS:
SCOPE OF WORK:
Remove existing manhole and install new manhole.-
Clean and repoint stone masonry.-
Reset loose stones at southwest wingwall.-parapets.
Remove and replace expansion joints on deck and stone masonry -asphalt overlay in 1.5-inch lifts.
install spray-applied waterproofing membrane, and place 3-inch cracks on deck, use hydrodemolition according to Section 559, Micro mill the existing 2-inch concrete overlay, repair concrete and -
Repair cracks at pier.-
Repair deteriorated concrete at abutments and pier.-
SCHEDULE A:
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
G N
.D G
2 of 151" = 20'
PLAN AND ELEVATION
(Looking East)
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R02
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
Abut. 1
Begin Bridge
L Pier
End Bridge
Abut. 2
Face of backwall
C
N
PLAN
ELEVATION
"4 112'-1
"8 157'-7
"2 1101'-4
"4
168'-1
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
P
E .D
G N
Face of backwall
"4 -Bridge Length: 269' 6 proposed pavement grade.
Set manhole cover at the and install new manhole.
Remove existing manhole
C Structure
(do not disturb)
Scupper
CL
(See Note 1) expansion joint (Typ.)
Remove and replace deck from stone masonry
Clean efflorescence and stalactites overlay in 1.5-inch lifts.
waterproofing membrane, and place 3-inch asphalt according to Section 559, install spray-applied concrete and cracks on deck, use hydrodemolition
Micro mill the existing 2-inch concrete overlay, repair
Perform the following on deck and approach slabs:
expansion joint (Typ.)
stone masonry
Remove and replace
Reset 2 loose stones
(approx. 335 LNFT)
Repoint outer stone masonry
"8
16'-4
Measu red a long
C Blu e Rid ge P arkway
CL Approach slab
Approach slab
Clean water staining from stone masonry
Legend:
- Stone Masonry approach slabs (Typ.)
joints at the end of
Install asphalt expansion
Notes:
installation of the expansion joint seals.
Clean abutment bearing seats of construction debris after the 2.
repairs are complete.
Do not install expansion joint seals until abutment concrete 1.
3 of 151" = 20'
UNDERSIDE
REFLECTIVE SUPERSTRUCTURE OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R03
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
Notes:
PLAN
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
D e c k U n d e rs id e .D
G N
Face of backwall
Abut. 1
Begin Bridge
C Pier
Abut. 2
Face of backwall
N
CL125' (Ty p.)
90' (Typ.)
Notes:
Subsection 572.06(d) and as directed by the CO.
Epoxy coat all exposed reinforcement according to 4.
concrete repairs.
inch in width as 4 width. Treat cracks more than inch in 16
Do not repair cracks equal or less than 3.
surface area.
Do not repair spalls less than 0.25 square feet in 2.
DETAILS"
Repair concrete as shown on "CONCRETE REPAIR 1.
"4
168'-1 "2
1101'-4
Legend:
- Crack
4 of 15" = 1'-0"8
ABUTMENT 1
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R04
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
ABUTMENT 1 PLAN
ABUTMENT 1 SOUTHWEST ELEVATION
N Notes:
DETAILS"
Repair concrete as shown on "CONCRETE REPAIR 3.
until the concrete has achieved 80% f'c.
the bearing impacted by the concrete repair stage
Do not allow traffic or construction equipment over 2.
existing mortar color, dimension, and finishing.
directed by the CO. Provide mortar matching
Repoint masonry according to Section 620 and as 1.
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
A b u t1
.D G
N
(approx. 30 LNFT)
Repoint stone masonry
Notes 2 and 3).
the sequence indicated (See
4 seperate stages following abutment. Repair concrete in
8" throughout entire face of
Repair concrete to a depth of
Construction joint (Typ.)
2 4 31
Legend:
- Concrete Repair
- Stone Masonry width of the abutment step (Typ.)
Match repair stage width to the
5 of 15" = 1'-0"8
ABUTMENT 2
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R05
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
ABUTMENT 2 PLAN
ABUTMENT 2 NORTHEAST ELEVATION ABUTMENT 2 SOUTHWEST ELEVATION
N
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
A b u t2
.D G
N
(approx. 100 LNFT)
Repoint stone masonry (approx. 80 LNFT)
Repoint stone masonry
Notes 2 and 3).
the sequence indicated (See
4 separate stages following abutment. Repair concrete in
8" throughout entire face of
Repair concrete to a depth of
Construction joint (Typ.)
Notes:
DETAILS"
Repair concrete as shown on "CONCRETE REPAIR 3.
until the concrete has achieved 80% f'c.
the bearing impacted by the concrete repair stage
Do not allow traffic or construction equipment over 2.
existing mortar color, dimension, and finishing.
directed by the CO. Provide mortar matching
Repoint masonry according to Section 620 and as 1.
3 1 24
Legend:
- Concrete Repair
- Stone Masonry width of the abutment step (Typ.)
Match repair stage width to the
6 of 15" = 1'-0"8
PIER
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R06
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
PIER PLAN
PIER SOUTHWEST ELEVATION PIER NORTHEAST ELEVATION
N Notes:
Subsection 572.06(d) and as directed by the CO.
Epoxy coat all exposed reinforcement according to 5.
repairs.
inch in width as concrete 4
Treat cracks more than inch in width. 16
Do not repair cracks equal or less than 4.
area.
Do not repair spalls less than 0.25 square feet in surface 3.
DETAILS"
Repair concrete as shown on "CONCRETE REPAIR 2.
dimension, and finishing.
by the CO. Provide mortar matching existing mortar color, Repoint masonry according to Section 620 and as directed 1.
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
P ie r.
D
G N
Legend:
- Concrete Repair
9'-0"
2'-0"
1'-6"
9'-0"
9'-0"
F u ll h e ig h t
2'-0"
(approx. 40 LNFT)
Repoint stone masonry
(approx. 225 LNFT)
Crack injection Crack injection (approx. 300 LNFT)
- Stone Masonry
(North elevation)
7 of 15" = 1'-0"2
TYPICAL SECTION
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R07
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
TYPICAL SECTION
Notes:
prior to asphalt placement.
after spray-applied waterproofing membrane, Install tack coat according to Section 412 7.
the CO.
to Subsection 572.06(d) and as directed by
Epoxy coat all exposed reinforcing according 6.
in width as concrete repairs.
inch 4 inch in width. Treat cracks more than
Do not repair cracks equal or less than 5.
feet in surface area.
Do not repair spalls less than 0.25 square 4.
REPAIR DETAILS" sheet.
Repair concrete as shown on "CONCRETE 3.
to Subsection 203.05A.
Remove concrete by micro milling according 2.
membrane according to Section 559.
Install spray-applied waterproofing 1.
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
T y p S e c t.
D G
N
11'-7"±"±2
5'-6"±2
5'-611'-7"±
L StructureC L Girder (Typ.)C
NEAR PIER & ABUTMENTSNEAR MIDSPAN
(Typ.)
Concrete core 7.00%
2'-0"
35'-7"
2'-0"31'-7"2'-0" masonry (Typ.)
stalactites from stone
Remove efflorescence and
3-inch asphalt overlay in 1.5-inch lifts.
spray-applied waterproofing membrane, and place hydrodemolition according to Section 559, install repair concrete and cracks on deck, use
Micro mill the existing 2-inch concrete overlay, Notes 1 and 7) membrane and tack coat (See
Spray-applied waterproofing
Legend:
- Stone Masonry
(See Notes 1 and 7) (Typ.)
up the side wall at the gutter line membrane and tack coat 3-inches
Extend spray-applied waterproofing
(approx. 150 LNFT)
Repoint inner stone masonry
(approx. 150 LNFT)
Repoint inner stone masonry
(North elevation near stub abutment shown, near abutment similar)
8 of 15" = 1'-0"2
APPROACH
TYPICAL SECTION AT SOUTH OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R08
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
TYPICAL SECTION (AT SOUTH APPROACH)
Notes:
Dimension measured perpendicular to beam.* asphalt placement.
spray-applied waterproofing membrane, prior to
Install tack coat according to Section 412 after 7.
and as directed by the CO.572.06(d)Subsection
Epoxy coat all exposed reinforcing according to 6.
concrete repairs.
inch in width as 4 width. Treat cracks more than inch in 16
Do not repair cracks equal or less than 5.
surface area.
Do not repair spalls less than 0.25 square feet in 4.
DETAILS" sheet.
Repair concrete as shown on "CONCRETE REPAIR 3.
Subsection 203.05A.
Remove concrete by micro milling according to 2.
according to Section 559.
Install spray-applied waterproofing membrane 1.
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
T y p S e c tS o u th A p p r.
D
G N
L StructureC L Girder (Typ.)C
(Typ.)
Stone masonry girder (Typ.)
Prestressed
(Typ.)
Concrete core
4'-0"*"*4
6'-2"*8
6'-10"*8
6'-10"*8
6'-10"*8
3'-4
East wall
West wall in 1.5-inch lifts.
membrane, and place 3-inch asphalt overlay
559, install spray-applied waterproofing use hydrodemolition according to Section overlay, repair concrete and cracks on deck, Micro mill the existing 2-inch concrete
Notes 1 and 7) membrane and tack coat (See
Spray-applied waterproofing
7.00% masonry (Typ.)
stalactites from stone
Remove efflorescence and
Legend:
- Stone Masonry
(See Notes 1 and 7) (Typ.)
up the side wall at the gutter line membrane and tack coat 3-inches
Extend spray-applied waterproofing
"16
1"16
12""16
2"16
2Abut. 2
"16
1"8
12""8
2"16
2Abut. 1
8070605040
Temperature at Installation (°F)
Joint "D"
Location of
JOINT SETTING TABLE
9 of 15As shown
JOINT DETAILS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R09
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
J o in t D e ta il s .D
G N
Notes:
"2
Anchorage @ 12" O.C.
" Dia. x 6" Concrete 2
(Do not damage existing rebar)
Limits of concrete removal
T y p
Top of asphalt overlay
JOINT PLAN VIEW
= 1'-0""4
Scale:
Scale: 3" = 1'-0"
SECTION A-A
Scale: 3" = 1'-0"
B
B
A A
A A
C Expansion joint
VIEW B-B
= 1'-0"3"Scale:
CL
C Expansion jointCL
Inside parapet face
Outside parapet face
Stone masonry
Steel edge beam
Top of overlay
Scale: 3" = 1'-0"
VIEW C-C
Stone masonry as approved by the CO)
(color to match mortar joints supported silicone joint seal
Pre-compressed foam-
49.10° (Abutment 2) 50.52° (Abutment 1)
51.80° (Abutment 2) 48.55° (Abutment 1)
C C concrete as approved by the CO) joint seal (color to match adjacent
Pre-compressed foam-supported silicone
Field splice location silicone joint seal
Pre-compressed foam-supported
STEEL JOINT ARMOR
Scale: 3" = 1'-0"
Replace concrete joints before installing asphalt overlay.7.
concrete color.
with integrally colored elastomeric concrete matching existing
Replace all concrete removed for expansion joint installation 6.
recommendations.
Install joint as shown and according to the manufacturer's f.
debris, and remove laitance with oil-free compressed air.
Remove existing joint material, clean joint opening of e.
determine seal size for parapets.
Coordinate with the manufacturer's representative to d.
approval.
Submit the measurement and calculations to the CO for c.
uncompressed size of seal.
expected bridge movement to determine the needed
Field measure deck joint opening width and calculate the b.
oversee the installation.
Provide an authorized manufacturer's representative to a.
5. Pre-compressed foam-supported joint sequence of work:
recommendations.
Subsection 712.01(h) and install according to manufacturer's compressed foam-supported joint seal conforming to
Provide pre-conforming to ASTM A108 and ASTM A153.
A709, Grade 50, and ASTM A153. Provide galvanized studs
Provide galvanized steel locking rails conforming to ASTM 4.
Install a continuous expansion joint seal. 3.
Verify dimensions before fabrication of expansion joint seal.2.
expansion joint system shown.
Remove existing expansion joint assemblies and replace with 1.
Legend:
- Stone Masonry
Scale: 3" = 1'-0"
ASPHALT EXPANSION JOINT
Approach slab
"2 pavement
Saw cut asphalt
Asphalt pavement
Joint filler material
- Asphalt
C JointCL beads and silicone band
Field-applied silicone corner
Factory-applied silicone coating
Epoxy adhesive (Typ.)
(Typ.)
Existing concrete
Impregnated foam
1'-0""D"1'-0"
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
M
P R
O J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
C o n c re te R e p a ir
D e ta il s .D
G N
/1
/2
Not to Scale surface
Existing concrete
CONCRETE CRACK REPAIR
(Typ.)
Injection port crack
Existing concrete
Face of existing material
Concrete repair
Existing concrete
Galvanic anode
Existing reinforcing steel
GALVANIC ANODE INSTALLATION DETAIL
(when applicable) mortar pocket
Low-resistivity
Notes:
2'' x 2'', W2 x W2
Steel welded wire reinforcement
OVERHEAD CONCRETE REPAIR VERTICAL CONCRETE REPAIR
x x
Class HES concrete Shotcrete or
Class HES concrete
Shotcrete or
2'' x 2'', W2 x W2
Steel welded wire reinforcement
HORIZONTAL CONCRETE REPAIR
Class HES concrete
Shotcrete or
Anode Depth of concrete repair
'' Min.2 clr.
2'' Min.
concrete
Face of existing
'' Saw cut4 concrete
Face of existing
'' Saw cut4
2'' x 2'', W2 x W2
Steel welded wire reinforcement
Min.
''2
2'' Min. clr.
Anode
Depth of concrete repair
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0'' in each
(length varies) with sleeve anchor
'' Dia. stainless steel machine bolt
1" Min. clr. below reinforcing steel top cut
'' Under cut all sides except2 x x x x concrete
Face of existing
'' Saw cut4
" Min.2
Anode
Existing reinforcing steel
Existing reinforcing steel steel
Existing reinforcing reinforcing steel
1" Min. clr. above reinforcing steel
1" Min. clr. to
'' Under cut all sides2
Depth of concrete repair
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0" in each
(length varies) with sleeve anchor
'' Dia. stainless steel machine bolt4
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0" in each
(length varies) with sleeve anchor
'' Dia. stainless steel machine bolt4
2'' Min. clr.
adhesive
Epoxy resin
CONCRETE REPAIR DETAILS
(See Note 4)
Do not permit debris to enter travel lanes.7.
Repair concrete cracks according to Section 561.6.
secure to concrete with machine bolts as needed.
Fasten welded wire fabric to existing reinforcement, and 5.
to a depth of 8" from the face of existing concrete.
For vertical concrete repairs on abutments, remove concrete 4.
For shallow repairs, see Subsection 572.06(b).3.
Repair concrete according to Section 572.2.
sounding throughout the concrete surface.
concrete (cracked, hollow-sounding, and spalled). Perform
For the pier and deck, locate and repair all deteriorated 1.
R10
11 of 15Not to scale
REINFORCEMENT
EXISTING ABUTMENT 1 OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R11
FOR INFORMATION ONLY
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
E x is ti n g A b u tm e n t
.D
12 of 15Not to scale
REINFORCEMENT
EXISTING ABUTMENT 2 OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R12
FOR INFORMATION ONLY
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
E x is ti n g A b u tm e n t
.D
13 of 15Not to scale
REINFORCEMENT 1
EXISTING TOP SLAB OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R13
FOR INFORMATION ONLY
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
E x is ti n g T o p S la b R e in fo rc e m e n t
.D
14 of 15Not to scale
REINFORCEMENT 2
EXISTING TOP SLAB OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R14
FOR INFORMATION ONLY
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I
-0
P
E x is ti n g
T o p S la b
R e in fo rc e m e n t
.D
15 of 15Not to scale
EXISTING MANHOLE
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
R15
FOR INFORMATION ONLY
PROJECT
NUMBER
SHEET
NC NP BLRI BR 5140-091P
NPS Drwg No. 601/194867PMIS No. 336000
/1
/2
M
P
R O
J E
C T
S \b lr i\
-0
P
\B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \R
N
C N
P B
L R
I -0
P
E x is ti n g M a n h o le
.D
(See Table)
Device Spacing
VARIABLE
(WORK SPACE)
TYPICAL APPLICATION: ONE WAY, TWO LANE ROADWAY, CLOSING ONE LANE
36'' x 36''
W20-1 36'' x 18''
G20-2
2600'
36'' x 36''
W20-1
36'' x 18''
G20-2
(ADVANCE WARNING AREA)
TAPER LENGTH 100' 500'
arrow panel
Advance warning
1600' 1000'
Traffic flow
Traffic flow
Approach speed based on the regulatory posted speed, not the advisory speed.*
SPACE
BUFFER
See Note 2
Channelizing Devices
(See Table)
(MPH)
SPEED
APPROACH
WORK AREA
TAPER AREA
LANE WIDTH (LNFT)
MINIMUM TAPER LENGTH (LNFT)
SPACING (LNFT)
CHANNELIZING DEVICE
(min.)
100'
24'' x 24''
W13-1P
36'' x 36''
W20-5
36'' x 36''
W4-2
36'' x 36''
W20-5
24'' x 24''
W13-1P 36'' x 36''
W4-2
LENGTH AND SPACING TABLE
See Note 4
Temporary 4" solid edge stripe
See Note 4 marking as required
Remove conflicting pavement m in
S e e N o te
NOTES:
specified in Section 156.
Use minimum width shown unless otherwise place edge stripe as shown.
days) remove conflicting pavement markings and lane is continuously closed for more than three
For long-term operations (operations where the closure signs.
closure, substitute W20-5 and W4-2 left lane
Right lane closure is shown. For left lane cones, type A in the work area as approved.
for a day or less, drums may be substituted with
For operations that require a lane closure conditions as approved.
control devices may be changed to fit field
Final location and spacing of temporary traffic
5.
4.
3.
2.
1.
WORK
ROAD
1 MILE
CLOSED
MILE2
RIGHT LANE
XX
MPH
WORK
ROAD
1 MILE
CLOSED
MILE2
RIGHT LANE
XX
MPH
ROAD WORK
END
ROAD WORK
END
NO SCALE
APPROVED FOR USE
FP-24, FP-14
EFLHD DETAIL
:4
S e p te m b e r
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b lr i\
-0
P \H
W Y
D
E S
\C A
D D
\S td
-D e t\ S
E
-0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
E635-05
06/2024
PROJECT
S05
NO SCALE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
Traffic flow
Traffic flow
ROAD WORK
END
STOP
HERE ON
RED
xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
STOP
HERE ON
RED
ROAD WORK
END
(optional) light warning
Type B
See Note 5
STOP LINE
See Note 5
STOP LINE
See Note 2
Temporary traffic signal
See Note 2
Temporary traffic signal
Channelizing devices it has two signal faces that are at least 8 feet apart and meets the other
50' - 100'50' - 100'
40' - 180'
See Note 7
10' min.
40' - 180'
NOTE:LENGTH AND SPACING TABLE
SIGN SPACING TABLE
8.
7.
6.
5.
4.
3.
2.
1.
A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to those the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Section 156.
For project specific minimum width, refer to Special Contract Requirements, AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD WORK be used for stop lines and no-passing pavement markings.
stop line that comply with the MUTCD. Removable pavement markings may the work space and the stop line. Add no-passing lines in advance of the
Remove existing conflicting pavement markings and raised markers between
For paved roadway surfaces, install stop lines complying with the MUTCD.
qualified engineer.
approved. If signals are moved, determine revised signal timing using a
Final location and spacing of devices may be changed to fit field conditions as or automatically, ensure red signal indications are flashed to both approaches.
engineer. When the signal is changed to the flashing mode either manually requirements of the MUTCD. Establish signal timing using a qualified
Install and operate temporary traffic control signals in accordance with the requirements of the MUTCD.
See Note 6
G20-2
W3-3
R10-6
See Note 6
W20-1 W20-4
(optional)
W13-1P
(optional)
W1-4R
R10-6
See Note 6
G20-2
(See Length and Spacing Table) VARIABLE TERMINATION AREA
ABUFFER SPACE TAPER AREA
(optional)
WORK SPACE
(optional)
BUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 5 Device spacing
Spacing Table)
(See Length and
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
ROAD TYPE
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
SIGNS IN FEET
MPH
FEET
SPACING IN FEET
(WITH SIGNALS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-9
FP-24, FP-14
2/2024
FLH STANDARD
:4
S e p te m b e r
S td f h f l1 f il e s e r v e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \b lr i\
P \H
W Y
D
E S
\C A
D D
\S td
D e t\
S
S td
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
S06
| A01 |
| A02 |
| A03 |
| A04 |
| A05 |
| B01 |
| C01 |
| C02 |
| C03 |
| C04 |
| D01 |
| M01 |
| N01 |
| N02 |
| N03 |
| P01 |
| R_Bridge_NC NP BLRI 5140-091P - PLANS 100% |
| R Bridge |
| R01 |
| R02 |
| R03 |
| R04 |
| R05 |
| R06 |
| R07 |
| R08 |
| R09 |
| R10 |
| R11 |
| R12 |
| R13 |
| R14 |
| R15 |
| S01 |
| S02 |
| S03_E633-01-Sheet-000 |
| S04_E633-03-Sheet-000 |
| S05_Std635-9-Std 635-9-000 |
| S06_E635-05-Sheet-000 |
| S07_E635-A-S06 [Sheet]-000 |
| S08_E635-B-Sheet 1-000 |
| S09 |
File details come from the government source that posted it. Updated .