This solicitation document is seeking sealed bids from certified Small Business Concerns for a bridge replacement project at Pictured Rocks National Lakeshore located in Alger County, Michigan. The work includes removing and reconstructing the Miners River Bridge, replacing guardrails, reconstructing pavement, improving drainage, and other miscellaneous tasks. The total cost of the project is expected to be between $700,000 to $2,000,000. Bid documents will be issued on or around January 18, 2024. Interested parties should monitor www.sam.gov for solicitation details and documentation. Bids are due by the date specified in block 13a of the SF1442 form included with the solicitation. In addition to completing bids, annual representations and certifications must be filed through the System for Award Management at www.sam.gov and VETS-4212 form at dol.gov. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MI NP PIRO 11(2).pdf | ||
| Amendment 0001 - MI NP PIRO 11(2).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| VETS-4212 - Form - 2021.pdf | ||
| MI_NP_PIRO_11(2)_PVT_Memo.pdf | ||
| MI_NP_PIRO_11(2)_Bridge_Insp_Rpt.pdf | ||
| IFB Solicitation - MI NP PIRO 11(2).pdf | ||
| FP14_Eng.pdf | ||
| MI_NP_PIRO_11(2)_GEO_Memo.pdf | ||
| MI_NP_PIRO_11(2)_HYD_Memo.pdf | ||
| Categorical Exclusion Form (NEPA).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
MI NP PIRO 11(2)
MICHIGAN
ALGER COUNTY
Project Manager
Jatinder Bains
Lead Designer
Shoukat Nawaz
Highway Design Manager
Francisco Santaliz
INDEX TO SHEETS
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DECEMBER, 2023
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
DESCRIPTION OF PROJECT
SPECIFICATIONS:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
Know what'sbelow.
before you dig.Call
R
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Summaries and Schedules
Plans And Profile
Erosion and Sediment Control Plan
Standards And Details
Cross Sections
DESCRIPTION
SHEET
NO
A01
A02-A03
A04
B01-B03
C02-C04
D01-D04
M02
S01-S17
T01-T12
M01 Erosion and Sediment Control Narrative
C01 Tabulation of Quantities
MI NP PIRO 11(2)
N
L A
K E M
I C
H I G
A N
Detroit
Sault Ste Marie
Ironwood
Escanaba
Lansing
Hiawatha NF
KEY MAP
INTERSTATE
INTERSTATE
INTERSTATE
STATE OF MICHIGAN
NATIONAL
PARK
SERVICE
MI NP PIRO 11(2)
N
SCALE IN MILES
0 3 6
Last Date of Inspection: 9/22/2021
Miners River Bridge, Structure No. 6320-001P
Miners Beach Road miscellaneous work.
reconstruction, drainage improvements, and other
Miners River Bridge, guardrail replacement, pavement
The work consists of the removal and reconstruction of e(max) 8%
C/A None
IMPROVEMENT:
PROJECT LENGTH: 0.07 Miles
ADT (2023)
ADT (2043)
DHV
%Truck
D
V (MPH)
50/50
1%
DESIGN DESIGNATION:
LANE MILES:
BRIDGE:
ROAD: WIDTH
24'
SURFACE BASE SUBGRADE
4" ACP 8" Aggr N/A
0.15 Miles
Survey Information
A06 Horizontal Alignment
Temporary Traffic Control PlansN01-N02
Bridge Plans
NO SCALE
H-58
Marquette
Munising
Grand Marais
A Miners Beach Road 103+06 - 106+82 376 6
Schedule Description Station Range (feet)
Length RIP Cycle #
Drainage ProfilesK01-K03
P01 Permanent Signing and Markings Plan
A05
R01-R20 with Pull-Off
Miners Beach Road 4" ACP 8" Aggr N/A max.
24' + 11' www.missdig811.org
811 or 1-800-482-7171
PICTURED ROCKS NATIONAL LAKESHORE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
RIVER BRIDGE
REPLACEMENT OF MINERS
:4
A
M
D e c e m b e r
T it le
S h e e t
N P
S
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \A
M
I_ N
P -P
IR
O
(2 tt l.
d g n
PROJECT
NUMBER
SHEET
A01
NPS No. 625/180567 PMIS No. 242097
0.00EL.
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION PICTURED ROCKS NATIONAL LAKESHORE
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AMD
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point bench mark back approach amendment ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:1
J u n e
S
H E
E T
P
R O
J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\A
-A
M
I_ N
P -P
IR
O
(2 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
N
AREA PATTERN
Vertical curveVC
Stopping sight distanceSSD
Pictured Rocks National LakeshorePIRO
Michigan Department of TransportationMDOT
K-valueK
Headlight sight distanceHLSD
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION PICTURED ROCKS NATIONAL LAKESHORE
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:2
N o v e m b e r
S H
E E
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \A
-A
M
I_ N
P -P
IR
O
(2 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
MI NP-PIRO 11(2)
BEGIN PROJECT
NO SCALE
Miners Beach Road
M in e rs C a s tle R o a d
N
Miners Beach ParkingMiners Castle Parking
A lg e r C o u n ty
R o a d H
-1
M in e r s C a s tle
R o a d
Alger County Road H-58
M in e rs R iv e r
Munising, MI
10 miles to
Marquette, MI
36 miles to
Grand Marais, MI
27 miles to
R o a d H -5
A lg e r
C o u n ty
Munising
Structure 6320-001P
MI NP-PIRO 11(2)
END PROJECT
103+06
106+82
See Note 2.
as a staging area as approved by the CO.
Use a portion of the closed roadway
See Note 1.
by the CO.
area as approved area as a staging
Castle parking of the Miners
Use a portion
NOTES:
only while Miners Beach Road is fully closed.
roadway. Use roadway as a staging area
Maintain the staging area within the existing 2.
or under single lane closures.
area while Miners Beach Road is fully open parking area. Use parking area as a staging
Maintain the staging area within the RV 1.
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
:0
N o v e m b e r
L o c a ti o n
M a p
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \A
M
I_ N
P -P
IR
O
(2 lo c .d g n
LOCATION MAP
PROJECT
A04
SCALE IN FEET
0 25 50
NOTE:
Azimuth angles shown is based on north axis at clockwise rotation.
NOT TO SCALE
NOT TO SCALENOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NAIL
USGS SRV MRK
MON
RBAR
RBAR
USGS SRV MRK
MON
RBAR
USGS
stream gaging station
RBAR
8" Maple
8" Maple
24" Maple
6" Maple
T r ip le M a p le
7" Pine 7" Pine
7" Pine
8" Maple
24" Maple
24" Maple16" Maple
18" Maple
24" Maple
W ithered Pine
12" Pine
6" Pine
12" Pine
16 & 14" Pines
18" Pine
8" Pine
10" Maple
10" Maple
18" Maple 8" Maple
REBAR
Az. 298°
12.6'
REBAR
A
z. 309°
16.7'
REBAR
20M P H
WATER GAUGES
Sea Lamprey Barrier
INFO
A z . 3
Az. 271°
3.5'
49.7'
A z
Az. 276°
Az. 90°
REBAR
REBAR
.2
19.6'
USGS SRV MRK
MON
A z
PROJECT CONTROL POINTS REFERENCES
A z
To REBAR 2
.4 ' 249.9'Az. 292°
RBAR
PROJECT COORDINATE SYSTEM
Coordinate System : US State Plane 1983
Zone : Michigan North 2111
Hor. Datum : NAD 1983 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Units : International Foot
Geoid Model : GEIOD09 (Conus)
Project Site : PIRO 11(2)
PROJECT CONTROL POINTS
NAME NORTHING EASTING ELEV. TYPE
1 622023.425 26362280.438 626.806 RBAR
2 622198.931 26362133.426 633.285 RBAR
3 622292.170 26361901.753 641.832 RBAR
4 622029.878 26362460.409 627.594 RBAR
51 622060.436 26362375.443 623.918 NAIL
:5
M a y
U n ti tl e d
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \A
M
I_ N
P -P
IR
O
(2 s u r.
d g n
SURVEY INFORMATION
PROJECT
A05
NOTE:
Follow stationing along the Roadway centerline.
MINERS BEACH ROAD
:0
S e p te m b e r
H o r iz o n ta l
A li g n m e t
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\A
M I_
N P
-P
IR
O
(2 h o r_ a li
.d g n
HORIZONTAL ALIGNMENT
PROJECT
A06
Follow stationing along the Roadway centerline.4.
See Plan and Profile sheets for "e" values.3.
accordance with Section 629.
disturbed slope areas where riprap is not present in
Install rolled erosion control product, type 2.D, on all2.
accordance with Sections 624 and 625.
areas where asphalt or riprap are not required in
Apply topsoil and turf establishment to all disturbed 1.
NOTES:
NO SCALE
Travel lane Travel lane
103+06 TO 103+45
MINERS BEACH ROAD
ROADWAY RECONSTRUCTION
ground
Existing
C
Roadway
L profile grade
Proposed
Limits of construction or flatter
1V:4H
Existing aggregate base
Existing asphalt concrete pavement
Tack coat
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch borrow (typ.)
Select or flatter
1V:4H
0' to 3'12'12'2.5'0' to 10'
Roadway excavation, 8-inch depth and varies
Removal of pavement, asphalt, 4-inch depth
Separation/stabilization geotextile, class 2, type E
Aggregate base, grading C or D, 8-inch depth
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch ee
Varies Varies
See Detail E609-A concrete, 16-inch depth
Construct curb and gutter, Remove existing curb and gutter.
Select borrow
:1
N o v e m b e r
T y p ic a l
S e c ti o
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \B
-B
M
I_ N
P -P
IR
O
(2 ty p .d g n
TYPICAL SECTIONS
PROJECT
B01
NO SCALE
Travel lane
103+45 TO 104+51
MINERS BEACH ROAD
ROADWAY RECONSTRUCTION
ground
Existing
L e
Existing aggregate base
Existing asphalt concrete pavement
2.5'0' to 3' or flatter
1V:4H
Limits of construction
Travel lane Pull-off Area Shoulder
Paved Shoulder
Paved
Follow stationing along the Roadway centerline.4.
width transitions.
See Plan and Profile sheets for "e" values and shoulder3.
accordance with Section 629.
disturbed slope areas where riprap is not present in
Install rolled erosion control product, type 2.D, on all2.
accordance with Sections 624 and 625.
areas where asphalt or riprap are not required in
Apply topsoil and turf establishment to all disturbed 1.
NOTES:
2%
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
Aggregate base, grading C or D, 8-inch depth
Separation/stabilization geotextile, class 2, type E
Select borrow, depth varies
Tack coat
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
L profile grade
Proposed
0' to 1.7'
0' to 2'2.5'0' to 12'0' to 4.4'12'12'0' to 1' or fla tter
1V:4H
Varies Varies
See Detail E609-A concrete, 16-inch depth, 103+45 to 104+36.
Construct curb and gutter, Remove existing curb and gutter.
approved by the CO to 4 feet from edge of curb or as
Remove and reset existing boulders
See Standards 617-20 and 617-32.
104+22 to 104+71.
system MGS (typ.), Install guardrail, 104+31 to 105+83
Remove existing SBT guardrail, See Detail E609-A concrete, 16-inch depth
Construct curb and gutter, Remove existing curb and gutter.
e
Roadway excavation, 8-inch depth and varies
Removal of pavement, asphalt, 4-inch depth
Select borrow
C
Roadway C
Construction
:1
N o v e m b e r
T y p ic a l
S e c ti o
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \B
-B
M
I_ N
P -P
IR
O
(2 ty p .d g n
TYPICAL SECTIONS
PROJECT
B02
Follow stationing along the Roadway centerline.4.
width transitions.
See Plan and Profile sheets for "e" values and shoulder3.
accordance with Section 629.
disturbed slope areas where riprap is not present in
Install rolled erosion control product, type 2.D, on all2.
accordance with Sections 624 and 625.
areas where asphalt or riprap are not required in
Apply topsoil and turf establishment to all disturbed 1.
NOTES:
104+51 TO 104+71.16
MINERS BEACH ROAD
ROADWAY RECONSTRUCTION
ground
Existing ee
Existing aggregate base
Existing asphalt concrete pavement or flatter
1V:3H
Shoulder Paved Travel lane Travel lane
Shoulder Paved
Limits of construction
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
Aggregate base, grading C or D, 8-inch depth
Separation/stabilization geotextile, class 2, type E
Tack coat
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
See Subsection 617.10A.
104+51 to 104+71.
and replace with impact attenuator, Remove existing SBT guardrail, 104+62 to 105+74, borrow (typ.)
Select
Select borrow, depth varies
L grade profile
Proposed
1.7'
0' to 5'4.4'12'12'1'2.5'
Varies
L ee
Roadway excavation, 8-inch depth and varies
Removal of pavement, asphalt, 4-inch depth
C
Roadway C
Construction or flatter
1V:4H
See Standards 617-20 and 617-32.
Install guardrail, system MGS (typ.), 104+22 to 104+71.
Remove existing SBT guardrail, 104+31 to 105+83
See Detail E609-A concrete, 16-inch depth
Construct curb and gutter, Remove existing curb and gutter.
Select borrow ty p
See Detail E609-B concrete, 13-inch depth, 104+64 to 104+71.
Construct curb and gutter, Remove existing curb and gutter.
0' to 6'
Varies
:1
N o v e m b e r
T y p ic a l
S e c ti o
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \B
-B
M
I_ N
P -P
IR
O
(2 ty p .d g n
TYPICAL SECTIONS
PROJECT
B03
ShoulderTravel LaneTravel Lane
1%1%
4.4'12'12'1'
104+71.16 TO 105+33.16
MINERS RIVER BRIDGE
1.7'
Follow stationing along the Roadway centerline.2.
See Bridge plans for details and additional dimensions.1.
NOTES:
profile grade
Proposed
LLC
Roadway C
ConstructionBridge railing (typ.)
:1
N o v e m b e r
T y p ic a l
S e c ti o
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \B
-B
M
I_ N
P -P
IR
O
(2 ty p .d g n
TYPICAL SECTIONS
PROJECT
B04
Match top of crown at 106+82 to existing.5.
Follow stationing along the Roadway centerline.4.
width transitions.
See Plan and Profile sheets for "e" values and shoulder3.
accordance with Section 629.
disturbed slope areas where riprap is not present in
Install rolled erosion control product, type 2.D, on all2.
accordance with Sections 624 and 625.
areas where asphalt or riprap are not required in
Apply topsoil and turf establishment to all disturbed 1.
NOTES:
105+33.16 TO 106+82
MINERS BEACH ROAD
ROADWAY RECONSTRUCTION
ground
Existing ee
Existing aggregate base
Existing asphalt concrete pavement or flatter
1V:3H or f latt er 1V:2
H
Shoulder Paved Travel lane Travel lane
Shoulder Paved
Limits of construction
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
Aggregate base, grading C or D, 8-inch depth
Separation/stabilization geotextile, class 2, type E
Tack coat
NMSA), 2-inch depth
Hot asphalt concrete pavement, Type 1 (1/2-inch
See Standards 617-20 and 617-32
105+33 to 106+00.
Install guardrail, system MGS (typ.), Remove existing SBT guardrail, 104+62 to 105+74 borrow (typ.)
Select
Select borrow, depth varies L grade profile
Proposed
1.7' to 0.6'
0' to 7'4.4' to 0'12'12'1' to 0'0' to 18'
Varies Varies
L ee
See Standards 617-20 and 617-32
105+33 to 106+00.
Install guardrail, system MGS (typ.), Remove existing SBT guardrail, 104+31 to 105+83
Roadway excavation, 8-inch depth and varies
Removal of pavement, asphalt, 4-inch depth C
Roadway C
Construction
See Note 5
:5
N o v e m b e r
T y p ic a l
S e c ti o
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \B
-B
M
I_ N
P -P
IR
O
(2 ty p .d g n
TYPICAL SECTIONS
PROJECT
B05
SUMMARY OF QUANTITIES - Schedule A
:3 e c e m b e r
T a b u la ti o n o f Q u a n ti ti s
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\C
M I_
N P
-P
IR
O
(2 q n t.
d g n
TABULATION OF QUANTITIES
PROJECT
C01
Sheet 1 of 3
:3 e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\C
M I_
N P
-P
IR
O
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C02
Sheet 2 of 3
:3 e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\C
M I_
N P
-P
IR
O
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C03
Sheet 3 of 3
:3 e c e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\C
M I_
N P
-P
IR
O
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
NAIL
USGS SRV MRK
MON
RBAR 4
RBAR
USGS SRV MRK
MON
RBAR
USGS
stream gaging station
N
BEGIN WORK
103+06.00
N 622127.2353
E 26362249.9252
END WORK
106+82.00
N 622063.0687
E 26362600.5274
CURVE DATA:
1 PI 102+12.60
Δ = 23°46'04" (RT)
R = 425.00' T = 89.44' L = 176.30'
PI 104+14.99
Δ = 43°59'48" (LT)
R = 150.00' T = 60.60' L = 115.18'
PI 107+81.39
Δ = 44°58'54" (LT)
R = 500.00' T = 207.01' L = 392.54'
1. Adjust the limits and locations of all proposed work to fit field conditions as directed by the CO.
2. Follow stationing along the Roadway centerline.
3. Follow top of crown along the Construction centerline.
4. See Drainage Plan for drainage work.
5. See Guardrail Plan for guardrail work, shoulder widths, and roadway dimensions.
NOTES:
M in e rs R iv e r
Mi ne rs
Be ac h Ro ad
T ra il
Offset 26.5' 104+36
Offset 25' 104+00
Offset 12.5' area, 103+56 Begin pull-off
See Typical Section Plans 103+06 to 104+71.16
Roadway reconstruction, Proposed EOP (typ.)
Slope stake limit (typ.)
Existing EOP (typ.)
slab, 105+22.16 begin approach End bridge, Do not disturb existing lamprey barrier
See Bridge Plans Replace bridge.
See Typical Section Plans Roadway reconstruction, 105+33.16 to 106+82
Pull-off Area
105+33.16 End approach slab, to be removed and reset by others Existing USGS stream gage instruments closest to the bridge as shown Relocate the last 3 boulders
See Typical Section sheets.
Remove and reset 14 boulders (typ.).
Toe of fill (typ.)
slab, 104+82.16 end approach Begin bridge, slab, 104+71.16 Begin approach
Roadway C. See Note 2.
Construction C. See Note 3.
L
L
103+54. Offset 0'.
Begin Structure C,L
Match roadway crown to existing.
End Structure C, 106+82. Offset 0.6'.L
Offset 15' End pull-off area, 104+51, to be removed and reset by others Existing USGS stream gaging station
Proposed shoulder (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
ROADWAY PLAN
MINERS BEACH ROAD
PICTURED ROCKS NATIONAL LAKESHORE
SCALE IN FEET
0 25 50
S46°00'12"E
N90°00'00"E
N °0
1' "E
3+
.3
PC
.5
9+
.9
PT
2+
.4
PT
0+
.6
PO
E
S46°00'12"E
N90°00'00"E
:5
N o v e m b e r
M in e rs
B e a c h R d -1
P la n
S h e t]
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\D
M I_
N P
-P
IR
O
(2 p ln
.d g n
PLAN
PROJECT
D01
LT
RT
104+70
105+75
105+75
Transition
Transition
104+70
-1.00%
-1.00%Transition
Transition
BEGIN WORK
103+06
Existing profile
See Notes 1 and 2
Proposed profile
104+71.16
Begin approach slab
End road work
See Bridge Plans
104+82.16
End approach slab
Begin bridge
See Bridge Plans
105+22.16
Begin approach slab
End bridge
105+33.16
End approach slab
Begin road work
END WORK
106+82
103+06
103+06
106+82
106+82 existing Match existing Match existing Match existing Match
NOTES:
1. Follow stationing along the Roadway centerline.
2. Follow elevations, top of crown, and superelevations along the
Construction centerline.
3. Match top of crown at 106+82 to existing.
Roadway C Construction CL L
103+54.39
Horizontal
Offset (ft)
Elevations
Station
104+71.16
104+82.16
105+22.16
105+33.16
105+60.00
106+82.00
629.94 629.94
624.95 624.97
625.02 625.04
625.29 625.31
625.36 625.38
625.97 625.99
633.89 633.90
1.72
1.72
1.72
1.72
1.72
0.61
See Note 3
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
PROFILE
SCALE IN FEET
0 25 50
102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00
590 590
600 600
610 610
620 620
630 630
640 640
650 650
660 660
670 670
-3.05%
-6.53% +8.3
4%
+4.05
+0.68% .9
.9
.4
.5
.7
.3
.5
.1
.1
L
' VC70
20K =
'346SSD = ' VC65
15K =
'284SSD =
' VC61
8K =
'77HLSD =
' VC60
8K =
'73HLSD =
.6
.9
:3
S e p te m b e r
B
L
P r o f il e
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\D
M I_
N P
-P
IR
O
(2 p ln
.d g n
PROJECT
D02
USGS SRV MRK
MON
RBAR 4
RBAR
USGS SRV MRK
MON
RBAR
USGS
stream gaging station
N
T ra il
104+64 to 104.71.16. See Detail E609-B.
Install curb and gutter, 11 lnft
103+91. See Detail E608-A.
Install drainage chute, 5 lnft
11 tons. See Drainage Profile Sheets
Place riprap, Method A, Class 3, 103+45 to 104+36. See Detail E609-A
Install curb and gutter, 105 lnft
Slope stake limit (typ.)
Proposed EOP (typ.)
BEGIN WORK
103+06.00
N 622127.2353
E 26362249.9252
M in e r s R iv e r
104+65. See Detail E608-A.
Install drainage chute, 1.5 lnft, END WORK
106+82.00
N 622063.0687
E 26362600.5274
M in er s
Be ac h Ro ad
See Drainage Profile sheets
Class 3, 26 tons
Place riprap, Method A, Existing EOP (typ.)
28 tons. See Drainage Profile sheets
Place riprap, Method A, Class 3, Pull-off Area
103+06 to 104+71.16. See Detail E609-A
Construct curb and gutter, concrete, 155 lnft
Remove existing curb and gutter, 155 lnft
51 tons. See Drainage Profile Sheets
Place riprap, Method A, Class 3, See Drainage Profile sheets
Class 3, 49 tons
Place riprap, Method A,
1. Adjust the limits and locations of all proposed work to fit field conditions as directed by the CO.
2. Follow stationing along the Roadway centerline.
3. Follow top of crown along the Construction centerline.
4. See Roadway Plan for pavement and miscellaneous work.
5. See Guardrail Plan for guardrail work, shoulder widths, and roadway dimensions.
NOTES:
Roadway C. See Note 2.L
LConstruction C. See Note 3.
U.S. DEPARTMENT OF TRANSPORTATION
DRAINAGE PLAN
MINERS BEACH ROAD
PICTURED ROCKS NATIONAL LAKESHORE
SCALE IN FEET
0 25 50
S °0
'1 "E
N90°00'00"E
N °0
'0 "E
.6
P O E
:5
O c to b e r
M in e r s B e a c h
R d
P la n
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\D
M I_
N P
-P
IR
O
(2 p ln
.d g n
PLAN
PROJECT
D03
USGS SRV MRK
MON
RBAR 4
RBAR
USGS SRV MRK
MON
RBAR
USGS
stream gaging station
N
See Note 2.
impact attenuator.
QuadGuard II - QG27024
Install Valtir
105+53 to 105+78. See Standard 617-20
Place terminal, type MGS tangent, See Bridge Plans and Detail E617-A railing, 105+32 to 105+53.
and replace with structure transition
Remove existing SBT guardrail
See Bridge Plans and Detail E617-A railing, 105+32 to 105+53.
and replace with structure transition
Remove existing SBT guardrail
38 lnft. See Standard 617-32.
class A steel posts, 105+53 to 105+91, Install guardrail system MGS, type 2, See Standard 617-20
105+91 to 106+17.
Place terminal, type MGS tangent, BEGIN WORK
106+82.00
N 622063.0687
E 26362600.5274
END WORK
103+06.00
N 622127.2353
E 26362249.9252
Existing EOP (typ.)
Proposed EOP (typ.)
Pull-off Area
M in er s
Be ac h Ro ad
T ra il
See Bridge Plans and Detail E617-A
104+49 to 104+72.
Place structure transition railing, 104+22 to 104+49. See Standard 617-20
Place terminal, type MGS tangent,
1. Adjust the limits and locations of all proposed work to fit field conditions as directed by the CO.
2. Install impact attenuator according to Subsection 617.10A.
3. Follow stationing along the Roadway centerline.
4. Follow top of crown along the Construction centerline.
5. See Roadway Plan for pavement and miscellaneous work.
6. See Drainage Plan for drainage work.
NOTES:
104+62 to 104+72.
Place structure transition railing, Roadway C. See Note 3.L
LConstruction C. See Note 4.
Proposed edge of shoulder (typ.)
103+56
Width = 0'
Begin shoulder transition
Begin RT shoulder
106+82
Width = 0'
End shoulder transition
End RT shoulder
104+71
Width = 1'
Begin LT shoulder
106+26
Width = 0'
End shoulder transition.
End LT shoulder.
105+74
Width = 1'
Begin shoulder transition
104+71
Width = 4.4'
End shoulder transition
105+74
Width = 4.4'
Begin shoulder transition
.4
M a tc h e x is ti n g
M a tc h e x is tin g
U.S. DEPARTMENT OF TRANSPORTATION
GUARDRAIL PLAN
MINERS BEACH ROAD
PICTURED ROCKS NATIONAL LAKESHORE
SCALE IN FEET
0 25 50
S °0
'1 "E
N90°00'00"E
N °0
'0 "E
.6
P
:3 e c e m b e r
M in e r s B e a c h
R d
P la n
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\D
M I_
N P
-P
IR
O
(2 p ln
.d g n
PLAN
PROJECT
D04
10'8.5'
103+91
See Detail E608-A
Install drainage chute (MDOT Detail 1)
Length = 8'
Method A, Class 3
Place riprap, Existing ground
LCLC
Roadway Construction
Geotextile, Class 1, Type C
U.S. DEPARTMENT OF TRANSPORTATION
MINERS BEACH ROAD
DRAINAGE PROFILE
103+95.93
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
620 620
630 630
640 640
650 650
+2.7% -0.8%
627.67 Des Grade =
Skew = 14.8° Rt
:3
N o v e m b e r
M in e r s B e a c h R d
.9
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\K
M I_
N P
-P
IR
O
(2 d x s .d
N o v e m b e r
:3
N o v e m b e r
K01
NPS No. 625/180567 PMIS No. 242097
NUMBER
PROJECT
LC
Existing ground
Place riprap, Method A, Class 3
Low point, 104+65
4' 6'
See Detail E608-A
Install drainage chute (MDOT Detail 3)
NOTE:
Do not install guardrail posts within drainage chute.
Install structure transition railing. See Note.
Install impact attenuator. See Note.
LC
Roadway Construction
Geotextile, Class 1, Type C
U.S. DEPARTMENT OF TRANSPORTATION
MINERS BEACH ROAD
104+63.93
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
620 620
630 630
-0.5%
624.96 Des Grade =
Skew = 3.8° Rt
:5
N o v e m b e r
M in e r s B e a c h R d
.0
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\K
M I_
N P
-P
IR
O
(2 d x s .d
:5
N o v e m b e r
:5
N o v e m b e r
K02
NPS No. 625/180567 PMIS No. 242097
NUMBER
Varies 10' to 15'
Bridge
1V:3 H 1V:3H
Do not disturb existing wingwall
15'
Existing ground
See Bridge plans
Bridge railing (typ.)
104+71 to 104+96. See Note.
Place riprap, Method A, Class 3
104+71 to 104+92. See Note.
Place riprap, Method A, Class 3
LCLC
Downstream OHWM = 614.46'
Upstream OHWM = 618.50'
ConstructionRoadway
Lamprey barrier
Geotextile, Class 1, Type C
Geotextile, Class 1, Type C
-1.0%
104+90.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
610 610
620 620
630 630
-1.0%
625.09 Des Grade =
No Skew
Varies 0' to 18'
Select borrow (typ.)
Bridge approach
Existing ground
Varies 0' to 15'
See Bridge plans
Bridge railing (typ.)
105+12 to 105+33. See Note.
Place riprap, Method A, Class 3 105+13 to 105+33. See Note.
Place riprap, Method A, Class 3LCLC
Upstream OHWM = 618.50'
Downstream OHWM = 614.46'
ConstructionRoadway
Lamprey barrier
Geotextile, Class 1, Type C Geotextile, Class 1, Type C
U.S. DEPARTMENT OF TRANSPORTATION
MINERS BEACH ROAD
NOTE:
Do not place riprap below the OHWM.
1V:
2H
1V:3H
-1.0%
105+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
600 600
610 610
620 620
630 630
-1.0%
625.33 Des Grade =
No Skew
N o v e m b e r
M in e r s B e a c h R d
.0
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\K
M I_
N P
-P
IR
O
(2 d x s .d
N o v e m b e r
:3
N o v e m b e r
K03
NPS No. 625/180567 PMIS No. 242097
NUMBER
outside the construction limits.
does not leave the project site. Perimeter controls include silt fence, fiber roll, and other specified measures
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
The Runoff Coefficient prior to construction is 0.58. The Runoff Coefficient after construction will be 0.55.
Approximately 0.01 acres of new impervious surface will be created by the reconstructed roadway.
River and Lake Superior.
The total disturbed area for the project is approximately 0.43 acres. The receiving waters are the Miners
Soil disturbing activities include clearing and grubbing, bridge replacement, and roadway reconstruction.
pavement reconstruction, drainage improvements, and other miscellaneous work.
The work consists of the removal and reconstruction of Miners River Bridge, guardrail replacement, Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
becomes 0.5 feet deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when it
Silt fence - inspect for buildup of excess sediment, under cutting, sags, and other failures. If the fabric equipment. Check staples and stakes to make sure they are securely in the ground.
for damage and erosion beneath the matting. Replacement of matting may be necessary if damaged by
Rolled erosion control product - inspect matting after every significant rainfall (0.5 inch or greater) event it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll - inspect weekly and after each runoff event. Remove sediment deposits from the fiber roll when end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
established.
Remove silt fence and fiber rolls only after all upslope areas are stabilized and vegetation is well
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.
riprap as called out in the Erosion and Sediment Control plans. Install fiber roll in ditches along the Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the
Phase II Intermediate Controls
:5
N o v e m b e r
U n ti tl e d
M P
R O
J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I N
P P
IR
O
\d g n \M
M
I_ N
P -P
IR
O
(2 e s c n a r.
d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
PROJECT
M01
18" Triple Maple
18" Triple Maple
16" Tw in M aple
4" Pine 6" Pine6" Pine 6" Pine 6" Pine
8" Pine
24" Pine 28" Pine 10" Cedar
6" Pine4" Pine
W ithered Pine
10" M aple
Tw in 10" M aple
12" & 14" Pines
7 to 8" Pines
6" Birch
12" Pine
6" Pine
12" Pine
16 & 14" Pines
18" Pine
10" Pine
8" Pine
24" Pine
18" Maple
10" Maple
14" Pine
18" Pine
24" Maple
10" Maple
10" Maple
7" Pine
7" Pine
7" Pine
8" Maple
24" Maple
24" Maple 16" Maple
18" Maple
18" Maple 8" Maple
10" Maple
10" Maple 24" Maple
12" Maple
6" Maple 24" Maple
10" Maple 8" Maple
12" Maple
6" Maples
8" Maple
24" Maple
8" Maple
6" Maple
8" Maple
18" Maple
18" Maple
8" Maple
12" Maple
8" Maple
24" Maple 10" Maple
12" Maple
10" Maple 10" Maple
18" Maple
6" Maple
8" Maples
M a p le
NAIL
USGS SRV MRK
MON
RBAR 4
RBAR
USGS SRV MRK
MON
RBAR
USGS
stream gaging station
N
BEGIN WORK
103+06.00
N 622127.2353
E 26362249.9252
END WORK
106+82.00
N 622063.0687
E 26362600.5274
M in e r s R iv e r
M in er s
Be ac h Ro ad
T ra il
Proposed EOP (typ.)
Slope stake limit (typ.)
Roadway C. See Note 3.
Existing EOP (typ.)
L
Pull-off Area
See Detail E157-04 and Note 1.
Place fiber roll, 155 lnft
Limits of disturbance (typ.)
See Detail E157-04 and Note 1.
Place fiber roll, 85 lnft.
OHWM elev. = 618.50'
LIMIT OF DISTURBANCE AREA:
Total (including travel way) = 18,892 sqft = 0.43 acres
Existing travel way (including pull-off area) = 9,122 sqft = 0.21 acres
Outside travel way = 9,770 sqft = 0.22 acres
See Detail E157-02 and Note 1.
Place silt fence (typ.), 166 lnft.
OHWM elev. = 614.46'
See Detail E157-04 and Note 1.
Place fiber roll, 125 lnft
1. Fiber roll and silt fence locations shown are approximate.
Place fiber roll and silt fence to fit field conditions as approved by the CO.
2. Trees to be removed by others.
3. Follow stationing along the Roadway centerline.
4. Follow top of crown along the Construction centerline.
NOTES:
See Note 2
See Note 2
Construction C. See Note 4.L
SCALE IN FEET
0 25 50
S °0
'1 "E
N90°00'00"E
N °0
'0 "E
.6
P
S °0
'1 "E
N90°00'00"E
:5
N o v e m b e r
M in e r s B e a c h R d
P la n
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\M
M I_
N P
-P
IR
O
(2 e s c .d g n
CONTROL PLAN
EROSION AND SEDIMENT
PROJECT
M02
CLOSED
ROAD
AHEAD
ROAD
CLOSED
36" x 36"
W20-3
48" x 30"
R11-2
(Mounted on barricade) staging area only while Miners Beach Road is fully closed.
Maintain the staging area within the existing roadway. Use roadway as a 2.
closures.
staging area while Miners Beach Road is fully open or under single lane
Maintain the staging area within the RV parking area. Use parking area as a 1.
Control Devices" (MUTCD), latest edition.
Install traffic control devices in accordance with the "Manual on Uniform Traffic 8.
Cover or remove all conflicting signs as approved by the CO.7.
Install construction signs according to Detail E635-01.6.
Obtain the CO's approval for the final locations of all traffic control devices.5.
installation.
Place steel plates, 320 square feet, over excavations performed for micropile4.
according to Detail 635-6A.
the Tuesday after Labor Day. Perform single lane closures during this period
Do not perform full road closures from the Thursday before Memorial Day to 3.
NOTES:
NO SCALE
N
MINERS BEACH RD
See Detail E635-A
54" x 12"
Special Sign 1
See Note 1.
staging area as approved by the CO.
Castle parking area as a
Use a portion of the Miners
See Note 2.
as a staging area as approved by the CO.
Use a portion of the closed roadway
Miners River Bridge
Structure 6320-001P
Project site:
72" x 48"
Special Sign 2
See Detail E635-15
AMERICA
INVESTING IN
BIPARTISAN INFRASTRUCTURE LAW
PROJECT FUNDED BY THE
ROAD CLOSURE BEFORE AND AFTER REMOVAL OF BRIDGE
each barricade.
Place identified sign on
Place 2 barricades (typ.).
:5 e c e m b e r
T
T
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \N
M
I_ N
P -P
IR
O
(2 tt c .d g n
CONTROL PLANS
TEMPORARY TRAFFIC
PROJECT
N01
CLOSED
ROAD
AHEAD
ROAD
CLOSED
36" x 36"
W20-3
48" x 30"
R11-2
(Mounted on barricade) staging area only while Miners Beach Road is fully closed.
Maintain the staging area within the existing roadway. Use roadway as a 2.
closures.
staging area while Miners Beach Road is fully open or under single lane
Maintain the staging area within the RV parking area. Use parking area as a 1.
Control Devices" (MUTCD), latest edition.
Install traffic control devices in accordance with the "Manual on Uniform Traffic 8.
Cover or remove all conflicting signs as approved by the CO.7.
Install construction signs according to Detail E635-01.6.
Obtain the CO's approval for the final locations of all traffic control devices.5.
installation.
Place steel plates, 320 square feet, over excavations performed for micropile4.
according to Detail 635-6A.
the Tuesday after Labor Day. Perform single lane closures during this period
Do not perform full road closures from the Thursday before Memorial Day to 3.
NOTES:
N
MINERS BEACH RD
See Detail E635-A
54" x 12"
Special Sign 1
See Note 1.
staging area as approved by the CO.
Castle parking area as a
Use a portion of the Miners
See Note 2.
as a staging area as approved by the CO.
Use a portion of the closed roadway
Miners River Bridge
Structure 6320-001P
Project site:
72" x 48"
Special Sign 2
See Detail E635-15
AMERICA
INVESTING IN
BIPARTISAN INFRASTRUCTURE LAW
PROJECT FUNDED BY THE
BRIDGE
OUT
48" x 30"
R11-2 (Mod)
(Mounted on barricade)
NO SCALE
ROAD CLOSURE DURING REMOVAL OF BRIDGE
each barricade.
Place identified sign on
Place 2 barricades (typ.).
:5 e c e m b e r
T
T
P R
O J E
C T
S \p ir o \1
(2
H
W Y
D
E S
\C A
D D
\M I
N P
P
IR
O
\d g n \N
M
I_ N
P -P
IR
O
(2 tt c .d g n
CONTROL PLANS
TEMPORARY TRAFFIC
PROJECT
N02
SPEED
LIMIT
MPH
20M
PH
Sea Lamprey Barrier
INFO
DANGER
UNDERTOW
NO BOATING
NO SWIMMING
NO WADING
M .
.5 .
N
BEGIN WORK
103+06.00
N 622127.2353
E 26362249.9252
END WORK
106+82.00
N 622063.0687
E 26362600.5274
M in er s
Be ac h Ro ad
Proposed EOP (typ.)
Proposed Roadway CL
Pull-off Area yellow pavement markings, 752 lnft
4-inch double solid
134 lnftwhite pavement markings, 4-inch single solid
104+85 RT
Remove and reset sign
104+65 RT
information plaque
Remove and reset
104+51
105+83
.4
NOTES:
1. Follow stationing along the Roadway centerline.
2. Place double yellow markings along the Roadway centerline.
3. Match ends of double yellow markings to existing.
105+83
104+21
.5
158 lnftwhite pavement markings, 4-inch single solid
104+36
104+00
38 lnftwhite pavement markings, 4-inch single solid
SCALE IN FEET
0 25 50
S °0
'1 "E
N90°00'00"E
:2 e c e m b e r
M in e r s B e a c h R d
P la n
S h e
P R
O J E
C T
S \p ir o
\1
(2
H W
Y
D E
S \C
A D
D \M
I N
P P
IR
O
\d g n
\P
M I_
N P
-P
IR
O
(2 s s p
.d g n
MARKINGS PLAN
PERMANENT SIGNING AND
PROJECT
P01
R01
/1
/2
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
GENERAL NOTES AND INDEX
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
GENERAL NOTES:
th
DESIGN LOADS:
HL-93, Maximum Dynamic Load Allowance, IM=33%
Live Load:
Average Railing Weight: 173 plf
Concrete: 150 pcf
Dead Load:
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020 with 2021 Revision.
Design:
SPECIFICATIONS:
R P
IR
O
(2
G
E N
N
O T
E S
.D G
N A
C T
U A
L F
IL
E
HS No scale
GEOTECHNICAL REPORT:
For boring logs and other geotechnical information, see Preliminary Geotechnical Memorandum.
INDEX OF BRIDGE PLAN SHEETS
Reinforcement Steel Bar List
Boring Log
Miscellaneous Details
Guardrail Detail
Rail Details - 3
Rail Details - 2
Rail Details - 1
Deck and Approach Slab Reinforcement
Keyway and UHPC Joint Details
Girder Details - 2
Girder Details - 1
Framing Plan
Typical Section and Roadway Elevation
Abutment Reinforcement (Abutment 1 and 2)
Typical Abutment Layout (Abutment 1 and 2)
Abutment and Wingwall Demolition
Foundation Layout
Plan and Elevation
Site Plan
General Notes and Index
SHEET NO. SHEET TITLE
Furnish neat cement grout with a minimum compressive strength of f'c = 6.0 ksi at 28 days.
Grout:
Furnish steel micropile end caps that meet ASTM A572 Grade 50 ksi.
submitted in lieu of mill certification.
Furnish N80 casing with a minimum yeild strength of 80 ksi for all piles. Coupon test results may be
Steel Micropile:
Bridge Specifications, with 60 durometer hardness. Follow AASHTO LRFD design Method A.
Provide elastomeric bearing pads conforming to the requirements of Section 18.2 of the AASHTO LRFD
Bearing:
28,500 psi.
The final estimated effective prestress force per strand is 37,800 lb based on estimated lossess of
Pre-tension each strand to a total load of 43,950 lbs, at which load f'si =0.75 f'u = 202,500 psi.
203, Grade 270.
Furnish 0.6-inch diameter, seven wire, low-relaxation, prestressing strand conforming to AASHTO M
Prestressing Steel:
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish epoxy coated reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcement Steel:
-inch, transverse roughened finish.4 1Rake top surface of each beam with an amplitude of
-inch unless otherwise noted.4 3Chamfer exposed edges of all concrete keys with f'c = 13.0 ksi at 4 days and f'c = 18.0 ksi at 28 days.
Furnish Class Ultra High Performance Concrete (UHPC) for MDOT 21" x 48" adjacent box beam shear release and f'c = 7.0 ksi at 28 days.
Furnish Class P(Prestressed) concrete for MDOT 21" x 48" adjacent box beam with f'ci = 5.5 ksi at
Furnish Class D(AE) concrete deck and approach slabs with f'c = 5.0 ksi at 28 days.
Furnish Class A(AE) concrete for abutments and backwalls with f'c = 4.5 ksi at 28 days.
Concrete:
MATERIALS:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
180567
242097 MI MI NP PIRO 11(2)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS CV
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133620
Structure Number 6320-001P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
REPLACEMENT OF MINERS RIVER BRIDGE
December 2023
R02
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/1
/2
R P
IR
O
(2
S
IT
E
P
L A
N .D
G N
A C
T U
A L
F
IL
E
SITE PLAN
104+80 105+00 105+20 105+40
Elev. 625.04
Sta. 104+82.16
Begin Bridge Elev. 625.31
Sta. 105+22.16
End Bridge
Bridge Length = 40'-0"
104+60
104+40
M in e r s R iv e r
Existing wingwall
No scaleHS pavement
Edge of existing pavement
Edge of existing
Existing bridge
C RoadwayL
C StructureL wall to remain
Sea lamprey barrier
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
180567
242097 MI MI NP PIRO 11(2)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS CV
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133620
Structure Number 6320-001P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
REPLACEMENT OF MINERS RIVER BRIDGE
December 2023
P C
.5
R04
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/1
/2
Notes:
R P
IR
O
(2
F
O U
N D
A T
IO
N
L
A Y
O U
T .D
G N
A C
T U
A L
F
IL
E
PLAN
SECTION A-A SECTION B-B
FOUNDATION LAYOUT
Begin Bridge
Elev. 625.04
Sta. 104+82.16 Elev. 625.31
Sta. 105+22.16
End Bridge
GEOTECHNICAL DATA
Location
Elev. (ft) of micropile
Approx. bottom resistance (kips)
Factored Geotechnical length (per pile) (ft)
Est. Avg. Micropile
Abutment 1
Abutment 2
Elev. 619.85 South face
Elev. 619.85 North face
AA BB
CL Abutment 1
CL
CL Abutment 2
CL
HS
576.10
576.36
(T y p
45.0
45.0
(Typ.)
" Dia. micropile8
Existing abutment
Top of bond length
B o n d l e n g th
T y p
" = 1'-0"4
See Note 1
Micropile
Micropile
" = 1'-0"4 1Scale: " = 1'-0"4
1Scale:
" = 1'-0"4 1Scale:
(Typ.)
(Typ.)
C Structure L
Elev. 619.59 South face
Elev. 619.59 North face
LC Roadway and typical section details.
See "MISCELLANEOUS DETAILS" sheet for micropile connection 3.
according to Subsection 567.06(b)(2).
utilizing static load testing during installation process
Indicates proof testing one micropile at each abutment, 2.
to remain during the removal process.
and according to Section 203. Protect all elements designated
Remove sections of existing abutments/wingwalls as required 1.
T y p
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
180567
242097 MI MI NP PIRO 11(2)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS CV
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133620
Structure Number 6320-001P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
REPLACEMENT OF MINERS RIVER BRIDGE
December 2023
5'-10"
3'-8"
5'-10"
3'-8"
1'-1"1'-1" 3'-8" 3'-8"1'-1" 1'-1"
T y p
S p a
R05
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
DEMOLITION
ABUTMENT AND WINGWALL
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/1
/2
Notes:
As shown
Units
CUYD
CUYD
0.6
4.6
Quantity
Approx.
Wingwalls
Backwalls
QUANTITIES
ESTIMATED CONCRETE REMOVAL
Location
Area of concrete removal
Legend:
EXISTING ABUTMENT 1
remain in place
Existing abutment to
Remove existing backwall
" = 1'-0"2
Scale:
are shown in parenthesis
Elevations for existing abutment 2
OF ABUTMENT 1
EXISTING WINGWALLS
" = 1'-0"4
Scale:
are shown in parenthesis
Elevations for existing wingwalls of abutment 2
Elev. 624.07 (624.15)
Elev. 621.57 (621.65) in place wingwall to remain
Existing section of wingwall
Remove section of existing
R
P
IR
O
(2
A B
U T
W
IN
G
W A
L L
D
E M
O .D
G N
A C
T U
A L
F
IL
E
JD/HS
(Typ.)
T y p
T y p
Elev. 621.60 (621.68)
Elev. 624.07 (624.15) the work.
dimensions in the field before commencement of
2. All dimensions are approximate. Verify all removal process.
all elements designated to remain during the as required and according to Section 203. Protect
1. Remove sections of existing abutments/wingwalls
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
180567
242097 MI MI NP PIRO 11(2)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS CV
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133620
Structure Number 6320-001P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
REPLACEMENT OF MINERS RIVER BRIDGE
December 2023
30'-0"
3'-0"
R06
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/1
/2
Notes:
R
P
IR
O
(2
T Y
P
IC
A L
A
B U
T
L A
Y O
U T
A b u t a n d
D
G N
A C
T U
A L
F
IL
E
PLAN
" = 1'-0"2 1Scale:
" = 1'-0"2 1Scale:
ELEVATION ALONG FACE OF ABUTMENT
SECTION A-A
As shown
Scale: 1" = 1'-0"
ABUTMENT ELEVATION
Elevation Abutment 1 Abutment 2
A
B
C
624.87
622.59
619.59
625.14
622.85
619.85
Elev. A
Elev. B
Elev. C
C StructureL
Begin/End Bridge
C BearingL (See Note 7)
2" Dia. sleeve
(See Note 6) threaded steel dowel bar, Grade 304 Stainless
1" Dia. ASTM A276
(See Note 5) joint filler
Flexible cellular
Backfill (Typ.)
approach slab as shown cast in place backwall and
Extend hooked bars into the
See Note 1
Elev. A
Elev. B
Elev C.
Bearing pad (Typ.) Begin/End Bridge CL filler (See Note 5)
Flexible cellular joint
(Typ.)
C BeamL
T y p
HS
beam
Prestressed box
(ABUTMENT 1 AND 2)
TYPICAL ABUTMENT LAYOUT
Bearing pad not shown for clarity
A A block (EPS) polystyrene
Expanded
Edge of deck
Bearings
Abutment & additional information.
9. See "DECK AND APPROACH SLAB REINFORCEMENT'' sheet for conforming to ASTM D6690, Type II.
-inch anchor hole with hot pour bituminous joint filer 2 fill 2 nonshrink grout conforming to ASTM C1107. At expansion end, -inch anchor hole with high-strength, 2
8. At fixed end, fill 2
ASTM D3034 anchor sleeve.
7. Furnish a non-corrosive pipe conforming to AASHTO M 232 or into the concrete.
6. Place dowels cast in the concrete abutment. Do not drill holes
712.01(a)(5).
5. Furnish flexible cellular joint filler conforming to Subsection
4. See "FOUNDATION LAYOUT'' sheet for additional information.
additional information.
See "ABUTMENT AND WINGWALL DEMOLITION" sheet for 3.
micropile information.
See "MISCELLANEOUS DETAILS" sheet for bearing and 2.
sheet for abutment drainage details.
See Detail B and Detail C on ''MISCELLANEOUS DETAILS" 1.
C or D course base grading
6" Aggregate
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
180567
242097 MI MI NP PIRO 11(2)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS CV
DRAWN BY
Anna Kang of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-133620
Structure Number 6320-001P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PICTURED ROCKS NATIONAL LAKESHORE
REPLACEMENT OF MINERS RIVER BRIDGE
December 2023
"4
32'-1
1'-0"
5'-10"
"8
16'- "8
16'-
"4
28'-1" = 4
7 Spa. @ 4'-
"4
32'-1
(See Note 4)
Micropile foundation
"8
2'-"8
2'-
10"
10"
1'-0"
"4
4'-
"4
5'-7"4
5'-7"4
5'-7"4
5'-7"4
5'-7
4'-0"
R07
M
P R
O J E
C T
S \p ir o \1
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0
P
R O
J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
/1
/2
R
P
IR
O
(2
A B
U T
R
E
IN
F O
R C
E M
E N
T
A b u t a n d
D G
N A
C T
U A
L F
IL
E
BOTTOM REINFORCEMENT TOP…