plan_holder_list_41901ee8-6391-4301-b2c0-6a1029189078.pdf
PDF 59 KB Posted
- Attached to
- RFB - PRESIOCA STREET SIDEWALK PROJECT
- Solicitation number
- BPM013304
- Issued by
- California
About this file
This is a Plan Holders List document from the County of San Diego Department of Purchasing and Contracting for RFB 13304, the Presioca Street Sidewalk Project. The project involves sidewalk, curb and gutter, driveway, and curb ramp improvements along Presioca Street in unincorporated San Diego County, encompassing 416 feet of work in the Spring Valley vicinity. The scope includes 116 cubic yards of roadway excavation, 416 linear feet of curb and gutter, 16 cubic yards of sidewalk concrete, 62 tons of hot mix asphalt, demolition of approximately 4,073 square feet of existing asphalt pavement and 296 square feet of concrete, clearing and grubbing of 1,191 square feet, erosion control measures, and traffic control. Sealed bids were due September 3, 2026 at 2:00 p.m. local time. Six plan holders registered as of August 1, 2026, including general contractors Tri-Group Construction and Development, Inc., RGC General Engineering, Inc., Palm Engineering Construction Company, Inc., and Sael Construction Corporation, along with subcontractor Statewide Stripes, Inc., and AGC San Diego Planroom as an other participant.
The County's estimated project cost is $298,470.25. Prospective bidders must hold a valid California Class A General Engineering Contractor's license at time of bid submission and be pre-qualified contractors. Contractors must perform at least 50 percent of the original contract price with their own forces and comply with apprenticeship requirements and certified payroll record submissions. As a California public works project, the work is subject to prevailing wage requirements and the Working Families Ordinance, requiring skilled and trained workforce utilization and paid sick leave. Bid security of at least 10 percent of the total bid amount is required; the successful bidder must furnish Performance and Payment Bonds each for 100 percent of the contract amount. Utility relocations and coordination with Helix Water District, SDG&E, AT&T, and gas line providers are required, with contractors providing 48-hour advance notice to Helix Water District prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF SAN DIEGO
DEPARTMENT OF PURCHASING AND CONTRACTING
PLANHOLDERS LIST FOR
BPM013304
RFB - PRESIOCA STREET SIDEWALK PROJECT
DATE ADDED COMPANY/ CONTACT
PERSON/ EMAIL
GENERAL/ SUB ADDRESS
7/30/2026 Tri-Group Construction and
Development, Inc.
Hani Assi hani@trigroupinc.com
General 9580 Black Mountain Rd Suite L
San Diego, California 92126
UNITED STATES
7/30/2026 AGC San Diego Planroom
Scherrise Judge sjudge@agcsd.org
Other 10140 Riverford Rd
Lakeside, California 92040
UNITED STATES
7/30/2026 RGC General Engineering, Inc.
Ricardo Cota ricardo@rgcge.com
General 310 Davidson St
Chula Vista, California 91910
UNITED STATES
7/31/2026 Statewide Stripes, Inc.
Statewide Stripes, Inc.
sean@statewidestripes.com
Subcontractor 7320 Mission Gorge Rd
San Diego, California 92120
UNITED STATES
7/31/2026 Palm Engineering
Construction Company, Inc.
Estimating
Mo@palmengineeringco.com
General 7330 Opportunity Rd Suites A
San Diego, California 92111
UNITED STATES
8/1/2026 Sael Construction
Corporation General 2173 Camino Del Este
#6115
Ahmed Hussein eng.ahmed.sail@gmail.com
San Diego, California 92108
UNITED STATES
File details come from the government source that posted it. Updated .