Phillips HS HVAC Renovations.pdf
PDF 120 KB Posted
- Solicitation number
- RFQ-26-F-LC
- Issued by
- Wake County, Teachey Town, North Carolina
About this file
This is a Request for Qualifications (RFQ) issued by Wake County Public School System (WCPSS) Facilities Design and Construction Department for designer selection on the Phillips High School HVAC Renovation project (RFQ-26-F-LC). The project scope encompasses replacement of air handlers, chillers, pumps, boilers, and controls, with design work to include additional items of concern identified during the initial site visit. The selected firm will provide turnkey design services including HVAC, lighting, control system replacement, and other systems as determined during the scope walk-through. Professional services will encompass bidding, construction administration including scheduling, pre-bid meetings, preconstruction meetings, regular site construction meetings during project execution, and project closeout. Statements of Qualifications must be submitted electronically to sthompson@wcpss.net by 11:00 a.m. on Thursday, September 24th, 2026. Design fee negotiations are anticipated to occur immediately following designer selection, with a projected design notice to proceed on November 4th, 2026.
The selected design firm must maintain a minimum of $1,000,000 in professional liability insurance. The RFQ does not specify pricing terms, set-asides, or funding sources within the provided document. Qualifications will be the primary evaluation criterion for ranking and selection of the design firm.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.wcpss.net
Facilities Design and Construction Facility Assessments and Lifecycle Department 111 Corning Rd, Suite 190 Cary, NC 27518
REQUEST FOR QUALIFICATIONS
Designer Selection
RFQ-26-F-LC - Phillips HS HVAC Renovation
Firms wishing to submit for consideration should follow the guidelines established herein. A Statement of Qualifications along with supporting documentation should be submitted to:
Facility Assessment & Lifecycle Department, Attention: Scott Thompson WCPSS, by 11:00 a.m., Thursday September 24th, 2026. Responses should be submitted electronically to sthompson@wcpss.net . Statements of Qualifications received after that time will not be considered.
1. Project Scope of Work – Replacement of Air Handlers, chillers/pumps, boilers, and controls. Design work will also include additional items of concern during initial site visit.
2. Professional Services Required – Firm will provide turnkey design services including but not limited to HVAC, lighting, control system replacement and other systems as determined in the scope walk-through, bidding, construction administration including scheduling, pre bid, preconstruction meetings, regular site construction meetings during the project, and project closeout.
3. Schedule – Qualifications submitted September 24th, 2026, with design fee negotiations immediately following the selection with an anticipated design notice to proceed on November 4th, 2026.
4. Selection Criteria & Format of Proposal – The qualifications presented will be used for ranking and selection.
5. Insurance – The selected design firm must carry a minimum of $1,000,000 of professional liability insurance.
File details come from the government source that posted it. Updated .