About this file

This performance work statement outlines the requirements for upgrading video teleconferencing and digital display systems in multiple conference rooms at Joint Base Elmendorf-Richardson for the Department of the Air Force Pacific Air Forces. The contractor shall remove existing equipment in four conference rooms and install new audio-visual components including video switches, videoconference codecs, displays, microphones, and control systems to provide upgraded video teleconferencing and presentation capabilities. The contractor must complete installations within 120 days and is responsible for maintenance and support over optional one to five-year service periods after the initial upgrade. The government will furnish some existing equipment including codecs, racks, cameras and microphones to be integrated with the new systems.

View the file

Other files for this federal contract opportunity

Other files attached to ALCOM J6 Conference Room Upgrades, newest first.
File Type Posted
Solicitation Amendment - FA500020Q01110001.pdf PDF
Questions and Answers.pdf PDF
Solicitation Amendment FA500020Q01110001 SF 30.pdf PDF
WD 2015-5682 R11_20200727.pdf PDF
Solicitation - FA500020Q0111.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 July 2020

PERFORMANCE WORK STATEMENT (PWS)

Alaskan Command Video Teleconference & Digital Presentation Display Suite Upgrades

Part 1

General Information

1. GENERAL: This is a non-personal services contract to provide Installation of a new Video Teleconference (VTC) Suite with Audio, Visual and Presentation Display capabilities. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the VTC Suite upgrade as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The current VTC/Digital display systems in the ALCOM conference rooms require a complete refresh.

1.3 Objectives: Remove and upgrade current VTC and presentation/display suites in the Conference Rooms. This includes all audio, display, & display controller, and VTC equipment. The government will furnish 1 of 2 required CODECs, a 20-40 RU equipment rack, and the camera for each system. All installed equipment must be compatible with the government furnished items. Maintain system to full operational capability for life of service agreement and option years.

1.4 Scope: Uninstall old equipment/systems being removed and turn over to government rep to be disposed of through proper DRMO channels. Upgrade system per below scope items utilizing only DISA Approved and JITC certified equipment and install according to current Defense information Systems Agency Secure Technical Implementation Guidelines (STIGs). Patch and maintain system to most current/secure settings and updates, and maintain full operational capability. Provide remote assistance and when on site assistance is needed be available to troubleshoot on site within 24 hours. Optional Service contract year Costs should be listed for each conference room. The A2C2 should list four optional years (five years total) and all others should list two option years (three years total). All equipment will be government owned once installed.

1.5 Period of Performance: 120 days for upgrade. Plus length of follow on service contract for troubleshooting system during any occurrence of loss of functionality, instance of latency over acceptable levels mentioned in this PWS, and maintenance of system firmware/software/operating system updates.

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program (QCP) is the means by which he assures himself that his work complies with the requirement of the contract. Provide QCP within two working days of award, three copies of a comprehensive written QCP shall be submitted to the contracting officer or representative at this time and within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the quality control system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: Contractor must be able to provide remote troubleshooting assistance any day of the year to include holidays mentioned below and in person assistance if needed any day of the year except the following holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700 through 1700 Monday through Friday, and on call for emergencies any other hours to include weekends. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Response time for remote troubleshooting is within one hour on the same day. For onsite troubleshooting must be scheduled within two days.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at JBER, Bldg 9480 and 10471.

1.6.6 Type of Contract: The government will award a Services contract

1.6.7 Security Requirements: It is preferred that contractor personnel performing work under this contract have a background check and be able to access the base at time of the proposal submission, and should maintain the level of security required for the life of the contract. Government will provide an escort for contractor personnel who lack a Secret security clearance. Notwithstanding, the contractor must meet all performance requirements including installation timeliness requirements with or without an escort. The contractor is highly encouraged to provide installation and support personnel to perform all aspects of work.

1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.8 Special Qualifications:

1.6.8.1 U.S. Citizenship is required. The Contractor shall provide sufficient trained personnel fully capable of providing the deliverables requested in this PWS and have the knowledge, skills and expertise to meet the requirements specified.

1.6.8.2 The contractor shall ensure all work performed on this PWS shall be in accordance with Federal, State of Alaska, and local laws, regulations and procedures. All systems installed must be already approved for use on Air Force networks, meet current DISA STIG requirements, be fully up to date on patches, and maintain network separation for differing classification levels.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The contracting officer, Contracting Officers Representative, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the Contractor concerning technical aspects of the contract:

issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: Installation on site supervisor, remote troubleshooting point of contact and on site troubleshooting POC. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0700 to 1700 Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: Personnel must be current on network and security plus 8570 certifications.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be required to obtain and wear badges, or be escorted by government personnel, in the performance of this service in accordance with Bldg 9480 security manager requirements.

1.6.13 Contractor Travel: Contractor will fund any/all travel needs.

1.6.14 Other Direct Costs: N/A

1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.17 PHASE IN /PHASE OUT PERIOD : N/A

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DISA Defense Information Systems Agency DOD Department of Defense FAR Federal Acquisition Regulation GVS Global Video Systems HIPAA Health Insurance Portability and Accountability Act of 1996 OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program STIG Secure Technical Implementation Guideline TE Technical Exhibit VTC Video Teleconferencing Equipment

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide: Acceptance Testing of the equipment

3.2 Facilities: The Government will provide access to the conference room and the back room where equipment rack is stored behind display equipment.

3.3 Utilities: N/A

3.4 Equipment: The Government will provide five of the ten required Cisco CODECs, existing equipment racks (estimated 20- 40 RUs), five Touch 10 displays, and the five Cameras for the VTC solution. Five Cisco Microphones will be available for room B100.

3.5 Materials: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: The government prefers the contractor possess and maintain a SECRET facility clearance from the Defense Security Service. The Contractor’s employees, performing work in support of this contract may be granted a SECRET security clearance from the Defense Industrial Security Clearance Office. The DD 254 will be provided if vendor has or will pursue unescorted access.

Government will make every effort to provide an escort for contractor personnel who lack a Secret security clearance. However, Government escort availability may limit contractor access to the facility.

Notwithstanding, the contractor must meet all performance requirements including installation timeliness requirements with or without an escort. The contractor is highly encouraged to provide installation and support personnel to perform all aspects of work.

4.3. Materials. The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.4. Equipment. The Contractor shall provide / furnish all equipment requirements under this PWS, outside of three items mentioned in Part 3.4.

4.5. Continued Support on Service Contract / Response times: The contractor shall provide phone support within 2 hours during normal work day (7am to 5pm) Alaska Time. Service contract will include quarterly functions check and no less than annual maintenance/ updates. In the event of system failure, onsite support shall be available within 24 hours.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Commanders Conference room for the period of the service agreement.

4.6. Training. The Contractor shall complete the OPSEC training mandated by the Secretary of Defense.

The government will provide the location of the training for each of the Contractors employees to complete.

PART 5

A2C2 SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide services for the removal of old VTC suite and digital display solution; design/engineering/installation of new VTC solution/digital display suite, provide performance metrics/data rates, & participate in acceptance testing with government technical reps.

5.2. Task Heading.

5.2.1. DISPLAY: Mount two, contractor provided, 86 inch 4k flat panel displays and eight 40 inch 4k flat panel side displays. Displays shall be commercially rated for 24 hours a day operation. All mounting hardware and labor responsibility of Contractor

5.2.1. CONNECTIVITY: The Contractor shall provide input connectivity from the following AV sources

a. Table Location

i. Two HDMI male – NIPR PC

ii. Two HDMI male – SIPR PC

b. Rack Location

i. Two HDMI Male – NIPR Cisco Webex Pro

ii. Two HDMI Male – SIPR Cisco Webex Pro

iii. One HDMI Male – IPTV

c. Lectern

i. One HDMI Male – Blu Ray Player

5.2.2 Window Processing: The Contractor shall provide and rack mount one video/video wall Display Processor. The processor will be capable of displaying various window layouts across both High Definition and Ultra High Definition. The two 86” 4K displays shall be capable of displaying four sources simultaneously in varying windows configurations. The Contractors shall work with operators of the system to define up to six predefined windowing layouts – room presets. The presets shall be selectable via the Crestron room control system. The display processor shall be capable of 12 4K inputs and 12 4K outputs. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

5.2.3 Audio System: The existing distributed audio system consists of a pair of wall-mounted speakers, existing ceiling-mounted speakers, and a rack-mounted audio amplifier. The configuration and function of this system shall remain unchanged with the exception the Contractor shall replace the existing audio amplifier with a new two-channel audio amplifier.

5.2.4 Conference System: The Contractor shall two ceiling mount 360 degree pendant microphones to provide voice pickup for video conferencing. The Contractor shall install one digital signal processor, configured to provide proper gain structure and echo cancellation. The Contractor shall install two Cisco Webex Pro codecs and ensure the capability of delivering 1080p at 30 fps (IP only). Each codec shall be dedicated to its own network (NIPR/SIPR). The Contractor shall wall mount the Cisco IP60 Camera to provide pan/tilt/zoom (PTZ) camera movement. The Camera shall be wall mounted in a location specified by Government to provide a traditional conference room view. The Contractor shall provide input connectivity from computer inputs to the Cisco Webex Pro codecs so the government shall be able to take advantage of the Webex Pro content sharing capabilities. The Contractor shall ensure that the SIPR Codec can only display SIPR PC content and that the NIPR Codec can only display NIPR PC content during Videoconferences. All videoconference functions shall be controlled using the Crestron control system. A Cisco 1-year support agreement and Cisco Software Multisite License should been included in the price of proposal.

5.2.5 Control System: The contractor shall provide a control processor and 15 inch touch panel. It shall control display input selection, source selection, audio level and mute, secure/non-secure codec, Haivision set-top-box channel up/down and guide, and video conferencing controls.

5.2.6 Components: The government shall provide one Cisco Webex Pro NR with IP60 camera and Touch10. There will also be one government furnished rack for equipment mounting (around 40 RUs). The contractor shall provide all other hardware/software/firmware.

5.2.7 Acceptance testing:

5.2.7.1 The government will conduct acceptance testing to ensure VTC system can be connected to NIPR/SIPR, registered with GVS, make VTC connections on both networks, can select send sources and the distant end can see those sources, that the audio and video are sent and received with proper clarity and quality. Solution must maintain separation of networks. No visible latency for audio or visual should occur in a point to point call with another VTC site within the building.

5.2.7.2 The government will conduct acceptance testing in the presentation mode to ensure inputs and outputs function and are labeled correctly. Audio and video must provide proper clarity and quality. Solution must maintain separation of networks. A maximum of 1 second latency should exist when pushing different input sources to the displays.

5.2.8 Continued support on Service Contract / Response Times:

In the event of the selection of a warranty/service, the contractor shall provide phone support within 1 hour during normal work day 0700 to 1700) Alaska Time. Vendor will provide a method/costing premium for afterhours support/holiday hours support. In the event of system failure, onsite support shall be available within two working day.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Conference room for the period of the service agreement.

5.2.9 Section 2: Current Major Hardware for Vendor Situational Awareness Crestron Pro2 Biamp Nexia vc SecureSwitch ABC Fiber Switch Cisco C40 Crestron QM-TX Electrosonic VNMatrix QTY:10 Extron DVS 304 QTY: 5 KVM Drawer with KVM Switch Extron Crosspoint Ultra 16x16 Workstation Electrosonic VNQuantum Crown CTS 4200 SurgeX

**The Electrosonic VNMatrix gets AV from another location on same floor of same building (Joint Operations center/A2C2)

PART 6

ROOM 122 SPECIFIC TASKS

6. Specific Tasks:

6.1. Basic Services. The contractor shall provide services for the removal of old VTC suite and digital display solution; design/engineering/installation of new VTC solution/digital display suite, provide

6.2. Task Heading.

6.2.1. DISPLAY: Mount one, contractor provided, 75 inch 4k flat panel displays. Display shall be commercially rated for 24 hours a day operation. All mounting hardware and labor responsibility of Contractor.

6.2.1. CONNECTIVITY: The Contractor shall provide input connectivity from the following AV

a. Table Location

i. Two HDMI male – NIPR PC

ii. Two HDMI male – SIPR PC

b. Rack Location

i. Two HDMI Male – NIPR Cisco Webex Pro

ii. Two HDMI Male – SIPR Cisco Webex Pro

iii. One HDMI Male – IPTV

6.2.2 Video Switch: The Contractor shall provide and rack mount one video switch capable of 12 4K inputs and 8 4K outputs. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

6.2.3 Audio System: The existing distributed audio system consists of a pair of wall-mounted speakers, existing ceiling-mounted speakers, and a rack-mounted audio amplifier. The configuration and function of this system shall remain unchanged with the exception the Contractor shall replace the existing audio amplifier with a new two-channel audio amplifier.

6.2.4 Conference System: The Contractor shall two ceiling mount 360 degree pendant microphones to provide voice pickup for video conferencing. The Contractor shall install one digital signal processor, configured to provide proper gain structure and echo cancellation. The Contractor shall install two Cisco Webex Pro codecs and ensure the capability of delivering 1080p at 30 fps (IP only). Each codec shall be dedicated to its own network (NIPR/SIPR). The Contractor shall wall mount the Cisco IP60 Camera to provide pan/tilt/zoom (PTZ) camera movement. The Camera shall be wall mounted in a location specified by Government to provide a traditional conference room view. The Contractor shall provide input connectivity from computer inputs to the Cisco Webex Pro codecs so the government shall be able to take advantage of the Webex Pro content sharing capabilities. The Contractor shall ensure that the NIPR Codec can only display NIPR PC content during Videoconferences. All videoconference functions shall be controlled using the Crestron control system. A Cisco 1-year support agreement and Cisco Software Multisite License should been included in the price of proposal.

6.2.5 Control System: The contractor shall provide a control processor and 15 inch touch panel. It shall control display input selection, source selection, audio level and mute, secure/non-secure codec, Haivision set-top-box channel up/down and guide, and video conferencing controls.

6.2.6 Components: The government shall provide one Cisco Webex Pro NR with IP60 camera and Touch10. There will also be one government furnished rack for equipment mounting (around 20 RUs). The contractor shall provide all other hardware/software/firmware.

6.2.7 Acceptance testing:

6.2.7.1 The government will conduct acceptance testing to ensure VTC system can be connected to NIPR/SIPR, registered with GVS, make VTC connections on both networks, can select send sources and the distant end can see those sources, that the audio and video are sent and received with proper clarity and quality. Solution must maintain separation of networks. No visible latency for audio or visual should occur in a point to point call with another VTC site within the building.

6.2.7.2 The government will conduct acceptance testing in the presentation mode to ensure inputs and outputs function and are labeled correctly. Audio and video must provide proper clarity and quality. Solution must maintain separation of networks. A maximum of 1 second latency should

6.2.8 Continued support on Service Contract / Response Times:

method/costing premium for afterhours support/holiday hours support. In the event of system failure, onsite support shall be available within two working day.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Commanders Conference room for the period of the service agreement.

6.2.9 Section Current Major Hardware for Vendor Situational Awareness Crestron AV2 Crestron C2N VEQ4 Tanberg Codec Extron DVS 304 QTY: 2 Extron Crosspoint Ultra 12x8 Biamp MXA 75 SurgeX

PART 7

ROOM 201 SPECIFIC TASKS

7. Specific Tasks:

7.1. Basic Services. The contractor shall provide services for the removal of old VTC suite and digital display solution; design/engineering/installation of new VTC solution/digital display suite, provide

7.2. Task Heading.

7.2.1. DISPLAY: Two new 75 inch 4k flat panel displays are currently mounted.

7.2.1. CONNECTIVITY: The Contractor shall provide input connectivity from the following AV

c. Table Location

iii. Two HDMI male – NIPR PC

iv. Two HDMI male – SIPR PC

d. Rack Location

iv. Two HDMI Male – NIPR Cisco Webex Pro

v. Two HDMI Male – SIPR Cisco Webex Pro

vi. One HDMI Male – IPTV

7.2.2 Video Switch: The Contractor shall provide and rack mount one video switch capable of 12 4K inputs and 8 4K outputs. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

7.2.3 Audio System: The existing distributed audio system consists of a pair of wall-mounted speakers, existing ceiling-mounted speakers, and a rack-mounted audio amplifier. The configuration and function of this system shall remain unchanged with the exception the Contractor shall replace the existing audio amplifier with a new two-channel audio amplifier.

7.2.4 Conference System: The Contractor shall two ceiling mount 360 degree pendant microphones to provide voice pickup for video conferencing. The Contractor shall install one digital signal processor, configured to provide proper gain structure and echo cancellation. The Contractor shall install two Cisco Webex Pro codecs and ensure the capability of delivering 1080p at 30 fps (IP only). Each codec shall be dedicated to its own network (NIPR/SIPR). The Contractor shall wall mount the Cisco IP60 Camera to provide pan/tilt/zoom (PTZ) camera movement. The Camera shall be wall mounted in a location specified by Government to provide a traditional conference room view. The Contractor shall provide input connectivity from computer inputs to the Cisco Webex Pro codecs so the government shall be able to take advantage of the Webex Pro content sharing capabilities. The Contractor shall ensure that the NIPR Codec can only display NIPR PC content during Videoconferences. All videoconference functions shall be controlled using the Crestron control system. A Cisco 1-year support agreement and Cisco Software Multisite License should been included in the price of proposal.

7.2.5 Control System: The contractor shall provide a control processor and 15 inch touch panel. It shall control display input selection, source selection, audio level and mute, secure/non-secure codec, Haivision set-top-box channel up/down and guide, and video conferencing controls.

7.2.6 Components: The government shall provide one Cisco Webex Pro NR with IP60 camera

40 RUs). The contractor shall provide all other hardware/software/firmware.

7.2.7 Acceptance testing:

7.2.7.1 The government will conduct acceptance testing to ensure VTC system can be connected to NIPR/SIPR, registered with GVS, make VTC connections on both networks, can select send sources and the distant end can see those sources, that the audio and video are sent and received with proper clarity and quality. Solution must maintain separation of networks. No visible latency for audio or visual should occur in a point to point call with another VTC site within the building.

7.2.7.2 The government will conduct acceptance testing in the presentation mode to ensure inputs and outputs function and are labeled correctly. Audio and video must provide proper clarity and quality. Solution must maintain separation of networks. A maximum of 1 second latency should

7.2.8 Continued support on Service Contract / Response Times:

method/costing premium for afterhours support/holiday hours support. In the event of system failure, onsite support shall be available within two working day.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Conference room for the period of the service agreement.

7.2.9 Section 2: Current Major Hardware for Vendor Situational Awareness Crestron Pro2 Biamp Nexia vc SecureSwitch ABC Fiber Switch Cisco C40 Crestron QM-TX Extron DVS 304 QTY: 2 Extron Crosspoint Ultra 12x8 Workstation Crown CTS 4200

PART 8

ROOM 301 SPECIFIC TASKS

8. Specific Tasks:

8.1. Basic Services. The contractor shall provide services for the removal of old VTC suite and digital display solution; design/engineering/installation of new VTC solution/digital display suite, provide performance metrics/data rates, & participate in acceptance testing with government technical reps. Room 302 should have the same hardware and programing, except for the display shut off codes

8.2. Task Heading.

8.2.1. DISPLAY: One new 86 inch 4k flat panel display is currently mounted.

8.2.1. CONNECTIVITY: The Contractor shall provide input connectivity from the following AV

e. Table Location

v. Two HDMI male – NIPR PC

vi. Two HDMI male – SIPR PC

f. Rack Location

vii. Two HDMI Male – NIPR Cisco Webex Pro

viii. Two HDMI Male – SIPR Cisco Webex Pro

ix. One HDMI Male – IPTV

8.2.2 Video Switch: The Contractor shall provide and rack mount one video switch capable of 12 4K inputs and 8 4K outputs. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

8.2.3 Audio System: The existing distributed audio system consists of a pair of wall-mounted speakers, existing ceiling-mounted speakers, and a rack-mounted audio amplifier. The configuration and function of this system shall remain unchanged with the exception the Contractor shall replace the existing audio amplifier with a new two-channel audio amplifier.

8.2.4 Conference System: The Contractor shall two ceiling mount 360 degree pendant microphones to provide voice pickup for video conferencing. The Contractor shall install one digital signal processor, configured to provide proper gain structure and echo cancellation. The Contractor shall install two Cisco Webex Pro codecs and ensure the capability of delivering 1080p at 30 fps (IP only). Each codec shall be dedicated to its own network (NIPR/SIPR). The Contractor shall wall mount the Cisco IP60 Camera to provide pan/tilt/zoom (PTZ) camera movement. The Camera shall be wall mounted in a location specified by Government to provide a traditional conference room view. The Contractor shall provide input connectivity from computer inputs to the Cisco Webex Pro codecs so the government shall be able to take advantage of the Webex Pro content sharing capabilities. The Contractor shall ensure that the NIPR Codec can only display NIPR PC content during Videoconferences. All videoconference functions shall be controlled using the Crestron control system. A Cisco 1-year support agreement and Cisco Software Multisite License should been included in the price of proposal.

8.2.5 Control System: The contractor shall provide a control processor and 15 inch touch panel. It shall control display input selection, source selection, audio level and mute, secure/non-secure codec, Haivision set-top-box channel up/down and guide, and video conferencing controls.

8.2.6 Components: The government shall provide one Cisco Webex Pro NR with IP60 camera

20 RUs). The contractor shall provide all other hardware/software/firmware.

8.2.7 Acceptance testing:

8.2.7.1 The government will conduct acceptance testing to ensure VTC system can be connected to NIPR/SIPR, registered with GVS, make VTC connections on both networks, can select send sources and the distant end can see those sources, that the audio and video are sent and received with proper clarity and quality. Solution must maintain separation of networks. No visible latency for audio or visual should occur in a point to point call with another VTC site within the building.

8.2.7.2 The government will conduct acceptance testing in the presentation mode to ensure inputs and outputs function and are labeled correctly. Audio and video must provide proper clarity and quality. Solution must maintain separation of networks. A maximum of 1 second latency should

8.2.8 Continued support on Service Contract / Response Times:

method/costing premium for afterhours support/holiday hours support. In the event of system failure, onsite support shall be available within two working day.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Conference room for the period of the service agreement.

8.2.9 Section 2: Current Major Hardware for Vendor Situational Awareness Crestron AV2 Crestron C2N VEQ4 Tanberg Codec Extron DVS 304 QTY: 2 Extron Crosspoint Ultra 12x8 Biamp MXA 75

PART 9

Building 10471 Room B100 SPECIFIC TASKS

9. Specific Tasks:

9.1. Basic Services. The contractor shall provide services for the removal of old VTC amplifier;

design/engineering/installation of new VTC solution, provide performance metrics/data rates, & participate in acceptance testing with government technical reps.

9.2. Task Heading.

9.2.1. DISPLAY: Two new 75 inch 4k flat panel displays are currently mounted.

9.2.1. CONNECTIVITY: The Contractor shall provide input connectivity from the following AV

g. Table Location

vii. One HDMI male – NIPR PC

viii. One HDMI male – SIPR PC

h. Rack Location

x. Two HDMI Male – NIPR Cisco Webex Pro

xi. Two HDMI Male – SIPR Cisco Webex Pro

xii. One HDMI Male – IPTV

9.2.2 Video Switch: The Contractor shall provide any required programing of the Extron video switch. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

9.2.3 Audio System: The existing distributed audio system consists of a pair of wall-mounted speakers, existing ceiling-mounted speakers, and a rack-mounted audio amplifier. The configuration and function of this system shall remain unchanged with the exception the Contractor shall replace the existing audio amplifier with a two new single audio amplifiers.

9.2.4 Conference System: The Contractor shall use provided Cisco microphones for voice pickup during video conferencing. The Contractor shall install two Cisco Webex Pro codecs and ensure the capability of delivering 1080p at 30 fps (IP only). Each codec shall be dedicated to its own network (NIPR/SIPR). The Camera is wall mounted in a location specified by Government to provide a traditional conference room view. The Contractor shall provide input connectivity from computer inputs to the Cisco Webex Pro codecs so the government shall be able to take advantage of the Webex Pro content sharing capabilities. The Contractor shall ensure that the NIPR Codec can only display NIPR PC content during Videoconferences. All videoconference functions shall be controlled using the Crestron control system.

9.2.5 Control System: The contractor shall provide a control processor and 10 inch or larger touch panel. It shall control display input selection, source selection, audio level and mute, secure/non-secure codec.

9.2.6 Components: The government shall provide one Cisco Webex Pro NR with IP60 camera, Touch10 and up to five Cisco microphones with extension cables. There will also be one government furnished rack for equipment mounting (around 20 RUs available). The contractor shall provide all other hardware/software/firmware.

9.2.7 Acceptance testing:

9.2.7.1 The government will conduct acceptance testing to ensure VTC system can be connected to NIPR/SIPR, registered with GVS, make VTC connections on both networks, can select send sources and the distant end can see those sources, that the audio and video are sent and received with proper clarity and quality. Solution must maintain separation of networks. No visible latency for audio or visual should occur in a point to point call with another VTC site within the building.

9.2.7.2 The government will conduct acceptance testing in the presentation mode to ensure inputs and outputs function and are labeled correctly. Audio and video must provide proper clarity and quality. Solution must maintain separation of networks. A maximum of 1 second latency should

9.2.8 Continued support on Service Contract / Response Times:

method/costing premium for afterhours support/holiday hours support. In the event of system failure, onsite support shall be available within two working day.

The vendor must support fixing or replacing any component of the VTC & Digital Display/Control suite in the Conference room for the period of the service agreement.

9.2.9 Section 2: Current Major Hardware for Vendor Situational Awareness Cisco Webex Pro Codec Touch 10 Extron XTP II Crosspoint HDMI 16x16 Amplifier

PART 10

APPLICABLE PUBLICATIONS

10. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

10.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

JBER Telecommunications Standard dated 29 Jul 16

DODIN Approved Products List: https://aplits.disa.mil/processAPList.action

DISA STIG: https://public.cyber.mil/stigs/compilations/

PART 11

ATTACHMENT/TECHNICAL EXHIBIT LISTING

11. Attachment/Technical Exhibit List:

11.1 Technical Exhibit 1 – Performance Requirements Summary

‐ Remove old systems ‐ Install new VTC, audio and Digital display/control components ‐ Provide IT Inventory Data to government ‐ Complete system patching and DISA STIGs ‐ Complete acceptance testing

11.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule

D-Day Contractor receipt of purchase order from Government D+2 Provide Vendor Solution & Equipment List & QC Plan D+5 Placement of orders for required materials D+10 to D+14 Arrival of materials in shop and on site D+14 to D+ 18 Shop assembly of AV system components D+18 to D+32 On-site installation D+34 Provide Patch & STIG report to Government rep D+35 Final inspection and acceptance signoff

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement (Parts 5-9). These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

The contractor shall provide a NIPR & SIPR VTC Solution

Less than 300 milliseconds latency No more than 4 observable latency defects a month

Customer Complaint

PRS # 2

A digital control and display solution

Less than 1 second latency to push different display feeds within conference room

No more than 4 observable latency defects a month

Customer Complaint

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Project Schedule 1 1 Digital CO & COR New VTC Suite Design Plans and Component Lists

Digital

Brett Thompson

Equipment lists with make, model, Serial Numbers

Digital

System Patch & DISA STIG Reports

1X per quarter 1 Digital Ranny Gaines