PD-73147-6K FORKLIFT_v2 final.pdf

PDF 100 KB Posted

Attached to
DREXEL R60I5 4 WHEEL HEAVY CAPACITY LP GAS SIDE LOADER VNA
Solicitation number
FA8571-23-Q-3147
Issued by

View the file

Other files

File Type Posted
DREXEL R0165 4 WHEEL RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

6K SWING MAST FORKLIFT

DATE: 25 JAN 2023

1.0 DESCRIPTION. The Contractor shall provide to the 402d Maintenance Support Group

(MXSG) one (1) new 6K side loader forklift. The forklift is used by MXSG for maneuvering material through narrow doors and aisles within B607 and B321 warehouse and yard at

Robins AFB, Georgia.

1.1 The forklift must possess the following characteristics:

1.1.1 6,000 lb. (2722kg) Capacity at 24" (600mm) Load Center

1.1.2 Four-Wheel Design, Dual Independently Driven Front Wheels

1.1.3 Solid, Pneumatic-Style Drive and Steer Tires

1.1.4 LPG Engine, GM 4.3L Tier III and LPG Fuel System

1.1.5 Hydrostatic Drive

1.1.6 Hydrostatic Power Steering with adjustable steering wheel

1.1.7 Dual Joystick Hydraulic Control Levers

1.1.8 23" (584mm) of Shift Includes 2" (51mm) of Reach

1.1.9 40" (1016mm) Forks with Standard Bottom Taper and Class III Carriage and Long

Load Handling Package

1.1.10 Additional set of 48" forks

1.1.11 Dash Display Contains: Engine Coolant Temperature Gauge, Hour Meter, Clock, Warning Icons, and Display Function Buttons

1.1.12 91" (2311mm) High Overhead Guard

1.1.13 42" (1067mm) High Load Backrest

1.1.14 48" (1219mm) Wide Fork Carriage

1.1.15 Mast Height Max of 240 IN

1.1.16 Neutral Start, Anti Restart, Operator Presence Seat Switch

1.1.17 Adjustable Steering Column, Key Switch, Rear View Mirror, Horn and Seat Belt

1.1.18 Comfortable Seated Operation with Vinyl Suspension Seat

1.1.19 Mast Tilt of 3° Forward and 4° Backward

1.1.20 Integral Fork Positioner

1.1.21 UL 583 LPS Safety Rating

1.1.22 LED Headlights, Flashing Light and Rear Safety Lights

2.0 Service Support. n/a

2.1 Delivery.

2.1.1 Government Representatives.

2.2 Shipping/Delivery/Period of Performance. Delivery is FOB Destination. Contractor shall contact the Government POC 10 days before shipping the forklift.

2.3 Ship To Address.

DODAAC: FD2060

402 MXSG/MXDPM

ATTN: Christopher Gilliland*

235 Robins Pkwy, B321 Warehouse, Station 15

Robins AFB Ga. 31098-1621

*Govt POC should be contacted prior to shipping.

Ph: 478-926-0464

Email: christopher.gilliland.2@us.af.mil

2.4 Incidental Services. N/A

2.5 Warranty. The Contractor shall provide the standard commercial warranty.

3.0 Government Furnished Equipment and Services or Government Furnished Property

(PFP) and services. N/A

4.0 General Information.

4.1 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list

[https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or

United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.3.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and

Primary Government Representative Alternate Government Representative

Name: Christopher Gilliland Name: Anthony Seupaul

Unit: 402 MXSG/MXDPM Unit: 402 MXSG/MXDPM

Phone: 864-313-6857 Phone: 253-579-4855

Email: christopher.gilliland.@us.af.mil Email: anthony.seupaul.1@us.af.mil http://www.biopreferred.gov/ mailto:christopher.gilliland.@us.af.mil mailto:anthony.seupaul.1@us.af.mil certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative

Procurement Program (formerly Green Procurement Program (GPP)) Plan, the

Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request

(PR) package.

5.0 Appendices – N/A

File details come from the government source that posted it. Updated .