This document is a professional services advertisement and procurement package from the Florida Department of Transportation (FDOT) for Construction Engineering and Inspection (CEI) services for the SR 75 (US 231) at CR 2315 Star Avenue/Titus Road Realignment project in Bay County, Florida. The contract (Advertisement No. 25337) was awarded to RS&H, Inc. as the top-ranked firm, with Metric Engineering Inc. and DRMP, Inc. ranked second and third, respectively. The procurement process involves District 3 of FDOT and follows state procurement regulations, including requirements for small business and disadvantaged business enterprise (DBE) participation.

The contract is valued at $2,500,000 with a project threshold greater than or equal to $500,000, requiring technically prequalified and unlimited audit status. The scope of work includes construction engineering and inspection services for realigning the intersection of SR 75 and Star Avenue, involving roadway construction, bridge construction, drainage improvements, and utility relocations. The project includes building an 87-foot bridge, installing large diameter pipes, milling and paving, traffic signalization, and constructing a roundabout. RS&H's team includes subconsultants Alday-Howell Engineering, ABC Group, MTN Resources, and Terracon Consultants, with an expected 12% DBE and 10% small business participation. The contract is anticipated to begin in early 2025 with a construction period spanning approximately 18 months.

View the file

Other files

File Type Posted
CN-550000-CAW20-00030000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROFESSIONAL SERVICES EXPANDED LETTER OF RESPONSE

375-030-23

PROCUREMENT

04/18

Advertisement No.: 25337 DOT FM Number: 21791096201

Submittal Date: 11/12/2024 Project Name: SR 75 (US 231) at CR 2315 Star Ave/Titus Rd Realign.

Consultant’s Name: RS&H, INC.

(Firm must use the name shown on the Consultant’s qualification letter.)

Street Address: 2123 Grassy Point Rd

City: Southport State: Florida Zip: 32409

Office Location: Southport, FL Contact person: Jack Elliott, PE

Phone: 850-265-4404 Contact email: Jack.Elliott@rsandh.com By submittal of this letter the Consultant certifies that all information provided in the letter is true and accurate. The Consultant further certifies that staff proposed are currently employed by the firm(s) identified, or the Consultant shall provide a statement indicating when staff will become employed by the identified firm(s).

Please refer to project advertisement for evaluation criteria. Other required submittals are specified in the advertisement.

Consultants: Please be aware that all font (including font in graphics, tables, and captions on photos) must be standard Arial Narrow, 11 point, single line spacing with no modification of font or spacing allowed. ½” clear margin on all sides must be maintained on all pages. It is the Consultant’s responsibility, due to font and format restrictions within this form, to work within the constraints of the form and its format. Character styling such as use of color, bold, and italics is allowed. Use of a table is recommended for text boxes. The page layout may be modified to add columns, tables, graphics, and photos. All graphics and photos must be created in a clean, blank word document and the “text wrapping square” option applied before cutting and pasting into this form. Consultants may add their logo at the top of the first page (directly underneath the header), however, the Consultant shall not extend the form beyond the pages allocated for the Letter to accommodate insertion of the logo. Consultants are not permitted to insert any other information in the header other than the logo. After pasting your letter into this form, highlight all text and ensure the font size of Arial Narrow, 11 point was retained. Once your content is inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the Letter of Response. Recreation of the form in another software application to modify the form format is not permitted. This form works best when saved with a .docx extension. *Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned restrictions. Note: You may begin typing on this page.

RS&H, Inc. (RS&H), has partnered with ABC Group, LLC (DBE/SB), MTN Resources, Inc. (DBE), Alday-Howell Engineering, Inc. (SB), and Terracon Consultants, Inc. to offer a unique opportunity for the Construction Engineering and Inspection (CEI) services for the SR 75 at Star Avenue/Titus Road intersection realignment project in Bay County. RS&H is distinctly qualified for this project based on our local project knowledge and having performed CEI services for the US 231 resurfacing project previously completed through this intersection. Our team’s collective expertise and track record position us uniquely to lead this endeavor to success. Our team ensures efficient project delivery with an established working relationship and seamless communication channels. Each member brings a wealth of experience to the table, having successfully completed projects of similar scope in the past. Their selection is based upon a demonstrated ability to consistently meet and often exceed the Department's objectives. At RS&H, we empower our team with innovative tools and technology, including GPS survey equipment, digital field books, GoPros, OnStation app access and commercial-grade air and underwater drones. This commitment to innovation ensures that we remain at the forefront of the industry, delivering exceptional results.

DBE & SBE: RS&H has enlisted ABC Group and MTN Resources to continue our commitment to supporting the Departments' DBE goals. Having a continued working partnership in District Three, we have a well-established relationship with both of them and know they reflect our commitment to quality. RS&H also supports FDOT’s Non- DBE Small Business Initiative and have teamed with Alday-Howell to support our CEI team. RS&H and Alday-Howell have teamed together and successfully completed several projects in the past for FDOT. Our team members are prequalified in 10.1 and 10.4.

In-Place Proximity and Resources: RS&H has a thirty-year history in District Three and has a proven history of delivering successful projects in Florida’s Panhandle. We will utilize our Southport office, which has been established for more than 14 years. This office is located under seven miles away providing a location for quick

375-030-23

PROCUREMENT

response for our office staff if issues arise during the life of the project. Each member of our team will have continual support from our company network of more than 30 local, seasoned professionals and 1,600 companywide.

Awareness and Understanding of Project Scope Understanding of Intent and Scope of Construction Project:

The intersection of SR 75 (US 231) Star Avenue/Titus Road serves as a key hub for commuters moving between the northern “sand Hills” area of Bay county and the populated regions of Lynn Haven and Panama City. Previously a quiet crossroads, the area is now bustling with numerous expanding subdivisions, schools, and retail and industrial operations. Moreover, Star Avenue links US 231 to SR 22, as well as Callaway, Parker, and Tyndall Air Force Base.

Realigning this intersection will enhance traffic safety and mobility across central and northern Bay County.

The scope of this project will include construction of a short section of new roadway shifting Star Avenue south approximately one tenth of mile down US 231 to align with Titus Road. To accomplish this, Titus Road will also be shifted slightly south to approach US 231 at a more perpendicular angle than the current roadway geometry. Improvements for Star Avenue/John Pitts Road will also be performed during this contract. The current traffic patterns near this intersection can be a bit confusing as John Pitts Road connects to Star Avenue very close to the intersection with US 231.

This contract will move this connection to Star Avenue to the south, further from US 231 and utilize a new roundabout to eliminate the existing three way, two stop sign, intersection. The roundabout will drastically reduce conflict points and increase traffic flow through the area.

To complete the work for the new intersections, the contract includes earthwork and surcharge embankment. This project will be a surplus earthwork project with over 100,000 cubic yards of excavation. Drainage improvements will also be performed including pipe runs with larger than normal pipe diameters, 54-, 60-and 72-inch round pipes as well as 48- and 60-inch elliptical pipes.

A new 87-foot bridge will be constructed on Titus Road. The bridge will be supported with 24inch square concrete piles for two end bents. The 87-foot span will be supported with 45-inch Florida I-beams. Other improvements under this contract will include milling and paving, new traffic signal, installation of curb and gutter, traffic separator, ditch pavement, grassing, highway signage, lighting, and thermoplastic striping.

Understanding of Project Issues: Our proposed Senior Project Engineer, Jack Elliott, PE, alongside Project Administrator, Jimmy Lark, has conducted comprehensive constructability reviews. Below, we discuss our findings of the potential challenges anticipated on this intersection realignment project, along with our strategy for resolution. We acknowledge the possibility of unforeseen issues in every project, and it is our standard procedure to promptly address all concerns and deliver effective solutions to the District Three Construction office.

Earthwork: To enhance roadway stability and more particularly bridge foundation stability, this project includes the construction of surcharge embankment. Our team members have worked on previous projects which included surcharge embankment, including our Senior Inspector, Alex Heilshorn. We are familiar with surcharge embankment construction requirements, measurements, and reporting. We have an established settlement monitoring program which we utilize to document and report the weekly measurements to the Geotechnical Engineer of Record (EOR), Kevin Sweeney.

Bridge Construction: The proposed bridge is approximately 87 feet in length over Dry Branch Creek. The new bridge includes an 8-inch deck sitting on 45-inch Florida I beams. The beams will be supported by two end bents sitting on 24-inch square concrete piles. The anticipated production lengths are approximately 90 feet long for the end bents. We have reviewed the Report of Core Borings for the bridge construction and there are no layers of underlying materials drawing concern at this time. We will monitor the reactions of the piles during the pile driving operations and notify our Geotechnical Engineer if there is any cause for concern. We are excited to have John Kimberly, PE of Terracon on the team to provide pile driving analysis services for the bridge construction. We will work closely with him to establish set-check criteria during the test pile program to minimize the need for instrumented re-strikes to verify pile capacity. The superstructure is an 8" thick deck with stay in place forms. Our team has extensive experience with this type of construction. Alex Heilshorn, our Senior Inspector, has ample experience on similar bridge construction projects. Alex is keenly aware of the placement, finishing, and curing procedures required to minimize cracking in deck slabs that can create long-term durability problems. The ends of the bridge are protected from high water events by rip rap at each end. Our team is aware of the importance to 1) verify the correct gradation for bedding stone, 2) that bank and shore material is delivered, and 3) the Contractor does not substitute cheaper "felt" filter fabric in place of the D-2 woven.

Public Information: The Star Avenue/Titus Road and US 231 intersection is heavily traveled by everyday commuters. These drivers will experience different traffic patterns on their daily commute as this construction contract includes multiple maintenance of traffic (MOT) phases with different traffic configurations including road closures and detours. Keeping the travel public informed of traffic pattern changes during the duration of the contracts helps offer the best public perception for the project.

We have enlisted ABC Group to our team to perform the public information and community outreach support for this contract. An integrated marketing and communications firm headquartered in Northwest Florida; ABC Group has supported the work of FDOT District Three for more than 20 years. This depth of experience allows ABC Group to develop and implement effective public information strategies that showcase the work of FDOT and enable stakeholders to make informed travel decisions.

Roadway Construction: Ultimately this project is an intersection realignment project, to accomplish this requires the construction of a new section of roadway. This new roadway construction is very similar in scope to a widening project. This RS&H Team has a long history of performing CEI services on widening projects throughout District Three. We have been working on roadway widening contracts, almost solely, for over two decades. Our team is very familiar with the construction process all the way from the initial bench loop survey through the materials certification and final estimate. A unique feature of this project is the construction of a single lane roundabout on the eastern end of the Star Avenue corridor. The geometry and elevations are the most crucial, ensuring that they are constructed to meet lines grades shown in the plans is vital. This will uphold the dynamics of a roundabout with the proper sight distance and drainage. RS&H inspection staff utilize GNSS survey equipment for quick and easy vertical and horizontal geometry checks to ensure that the roundabout construction meets what is shown in the plans. The new roadways of Star Avenue and Titus Road will utilize 12 inches of stabilized subgrade, supporting optional base group 06. The pavement design includes 2 inches of structural with 1 ¼ inches of FC 9.5 friction course asphalt. Once the subgrade construction is finished, the base will be installed, shaped, and compacted according to the specified lines and grades while also being input daily into the department’s electronic earthwork records system. Proper compaction and finishing of the base course are essential for achieving a durable and smooth roadway. Our inspectors prioritize the compaction process, thickness, and overall finishing of the base, as we take pride in ensuring excellent ride quality for every project we undertake. We conduct both longitudinal and transverse straightedge testing to verify a smooth final surface. It is crucial to maintain tight tolerances for cross slopes to ensure high ride quality and uniform asphalt thickness throughout the reconstruction areas.

Signalization: This project also includes the addition of a new signalized intersection. The work for the intersection includes new mast arms, signal heads, traffic detector loop installation, video detection, ITS, and controller upgrades. RS&H has been doing signal inspection in bay county for decades varying from small pedestrian pole jobs to high magnitude intersection jobs on roadway widening projects. We have developed a relationship with Bay County’s traffic department and are aware of the details they prefer during their final inspection. When reviewing the signalization plans, prior to the installation of mast-arm drill shafts, the southeast and northwest quadrants have utilities that will have to be located both underground and overhead respectively. Our team understands the importance of identifying utility conflicts and coordinating with local agency owners to relocate utilities without delaying the progress of the project. In addition, our staff verify the horizontal locations of the drill shafts and the vertical clearance to ensure there are no other conflicts. We are also aware of the challenges faced in the installation of conduit in pull boxes with respect to underground utilities. We will always work closely with the Contractor to verify Installation locations and conflicts.

This project includes a bore under the railroad for a connection of a detector loop. Because this bore will be installed under the railroad, it is required to be either five and half feet or ten feet below the bottom of the ties, depending on what installation method the contractor chooses. If they choose to utilize the directional bore method to install the conduit the required 10-foot depth could be difficult to achieve, given the tight working space in the area and the short horizontal distances. This challenge was overcome on a recent project in District 3, in which the loop detector on the other side of the railroad was eliminated and the detection will be conducted utilizing cameras instead. We will discuss this possible issue with the signal subcontractor early in the project to determine if the planned work can be completed or if changes will be needed.

Utilities: The realignment of the intersection impacts the existing locations of many utilities. The impacted gas line on the is to be relocated prior to construction start, however the rest of the utility relocations will be completed during the construction contract. The overhead utilities will be the most impacted of the utilities. On Star Avenue, the overhead utilities run along the corridor on the west side.

This is the side of the roadway that roundabout will be constructed.

These poles which support electric and communication services, were recently replaced, the old poles still remain in place and existing communication lines have not been transferred to the new poles yet.

The roundabout construction will take place during phase 2, step 2, which will take place early in the contract. The necessary preliminary work for this is placing temporary asphalt to shift traffic for the roundabout construction. On Titus Road, overhead utilities align on both sides of the roadway. Temporary asphalt along Titus Road will be placed outside of the overhead utility lines, however the bridge construction and new roadway alignment will conflict with the existing lines. On the south side of the roadway. Like Star Avenue, this work will be performed during phase 2, step 2, but the only required preliminary work is the placement of the temporary asphalt.

Considering the small number of activities needed to be performed before phase 2 step 2, this work will also occur early in the contract.

Few aspects of construction can stop the progress on a project faster than encountering a utility conflict. It is paramount that these relocations for Star Avenue and Titus Road. occur as soon as the Contractor can complete the required clearing and the new utility poles can be installed. Based on observations from similar projects in the area, utility owners are experiencing delays in completing their relocation efforts. To proactively address this potential issue, we recommend allowing the Contractor to begin clearing and grubbing as soon as the contract is executed. Following this, the timeline for material acquisition can be scheduled after the clearing is completed. This approach will enable utility owners to start their relocations promptly while the Contractor acquires the necessary materials. Our past local experience has provided us with good relationships, as well as open communications with the utility companies on this project. Coordination meetings will need to kick off very early. This will allow utility owners to become aware and knowledgeable of the Contractor’s work schedule, most particularly, when clearing is expected to begin and be complete. These meetings will also include reviewing the time for work prior and during construction in the utility work schedule agreements for each company, and discussing what work, including work by other utility owners, needs to be complete prior to each company beginning their work. We have extensive experience with utility coordination including multiple phase utility relocation and understand the importance of meshing the relocation work with the construction phasing.

Environmental: The new roadway section of Star Avenue will be constructed on property previously owned by Triangle Construction Road Building. This property housed their asphalt plant and shop. There is some potential of soil and groundwater contamination on the property. This RS&H team has dealt with unforeseen contamination areas during our work on the SR 390 widening projects in Panama City. During excavation of contract work, our team will be observant to the scent of any potential fuel (contamination) present. If we suspect there might be contamination present, we know to contact Shannon Foor, the District Contamination Supervisor, to begin the investigation process and guide construction personnel through the steps to safely continue working in the area.

Drainage: This contract will include a large amount of drainage improvements for a project with confined limits. There are 38 structures to be installed along with over 4,500 linear feet of pipe.

Most of the drainage installation will take place away from traffic in open areas, but there are a couple of pipe run installations that present some challenges. The first of these challenges for the Contractor is the 30-inch diameter pipe run between S239 and S240 under US 231. The plans intend for the pipe to be installed via open trench across the roadway. The contract only allows lane closures to be utilized between 8pm and 6am. The excavation depth for this work will be over nine feet deep. Taking into consideration the excavation depths and the allowable work periods, it will be very difficult for the Contractor to complete the installation, compaction, placement of asphalt, and open the travel lane, even when constructing one lane at a time. A possible solution for this work is to jack and bore the portion under US 231 with steel pipe, and optional pipe material for the remainder of the run utilizing concrete collars for the differing pipe material connections. The existing roadway through this area is very stable and functions as a homogenous system. When a roadway gets cut for a drainage crossing, there is a greater chance for future material settlement which results in a bump in the roadway. An added benefit to jack and boring would be the ride quality along US

231. Another challenge presented with planned drainage installation can be found with the pipe run between structures S240 and S241. The plans call for a 42” jack and bore steel casing with a 36” carrier pipe inside. This jack and bore is required because the pipe runs crosses underneath the Bayline railroad tracks. The issue with this plan is that due to the wall thickness and bells the 36” carrier pipe will not fit inside of the 42” casing. We ran across this same issue on our SR 390 widening project. There are two potential solutions to this issue, the first is to increase the size of the jack and bore, allowing the 36” pipe to fit inside and grout the void between the two pipes with additional grout. The second solution, which is what we used on our SR 390 project, is to utilize reinforced polyethylene pipe as the carrier pipe. This pipe has a smaller outside diameter than standard pipe and will fit inside of the 42” pipe, however the cavity between the two pipes is unable to be grouted. This will need to be discussed with both the Engineer of Record and Bayline Railroad to determine if it would be an acceptable solution.

Railroad Coordination: This project involves a large amount of work adjacent to the Bayline Railroad. Partnering with the railroad during the construction contract can present certain challenges.

Communication is key to maintaining a good working relationship with Bayline Railroad. We have prior experience working with Bayline Railroad, and Ray Corbitt, the District Three Rail Administrator, on various projects. We are familiar with the necessary requirements to ensure compliance with the general notes included in the contract plans and will ensure that all contract personnel follow these mandatory guidelines.

Maintenance of Traffic (MOT) MOT is one of the most important functions during the life of a construction project. Providing a clear and safe path through the work zone not only keeps motorists and workers safe, but it minimizes the frustrations of the traveling public, which is the most effective way of representing the Department in a positive perception. To complete the work an minimize the impact to the traveling public this contract includes a complex MOT plan with three multistep phases. The complexity of the MOT is driven primarily by two factors. The first is to provide a safe travel way through the project allowing the Contractor the necessary space to complete the work for the new roadways and bridge. The second factor is providing access to residential homes while Titus Road. is shut down. A detour will be in place for Titus Road, and access for residents living adjacent to the work will be provided utilizing temporary pavement / driveways. While reviewing the Temporary Traffic Control Plan (TTCP), we identified that there is no plan for temporary drainage between the work zone and temporary asphalt on Star Avenue and Titus Road. The existing ground and temporary asphalt elevations and grades reveal a concern to retain water during heavy rainfall. During layout of the temporary asphalt, we will review the grade and drainage conditions in these areas to ensure positive drainage can be maintained. If an issue is identified, we utilize the options for swales, ditch construction and temporary pipe / structures as solutions and work with the Contractor and EOR to eliminate any problems. The area of most concern for this issue can be found at 3100+51of Old Star Avenue. The ditch between the work zone and temporary asphalt flows down to an existing 30” pipe. If this existing pipe is removed prior to the installation of the new pipe and structures to pond D-1, there will be no conveyance for the water in this area. Sequencing of the Contractor’s drainage, and earthwork schedule will be crucial and discussed prior to construction beginning As mentioned previously, the area of Star Avenue and US 231 is continually getting busier and busier. The three-way, two-way stop intersection with John Pitts Road can already cause confusion with no construction present. When traffic is moved to the temporary asphalt in this area, we anticipate additional potential backups. A critical component to a successful MOT is the communication between our team and the PIO. We will get ahead of this potential problem by altering the public. Public Information is used as a supplement to the deployed MOT devices, and its importance cannot be overstated. RS&H has partnered with ABC

Group as our public information officers. Educating the traveling public of the upcoming work zone as well as what to expect greatly improves the quality and performance of the deployed MOT devices. Our team is extremely proactive in the Department’s lane-closure notification, One.Network. Prior to any lane closures, our team will review the Contractor’s plan, assist and adjust daily, and ensure that the lane closures are entered into One.Network.

Quality Control: RS&H has a proven record of making sound decisions and resolving issues at the project level, acting in the Department’s best interest. Over the past two decades, RS&H’s goal has been to serve as a trusted partner to administer, monitor, and inspect the construction contract per CPAM guidelines. We identify and communicate deficiencies to our construction project managers while also bringing solutions to the table for efficient resolutions. Our team is diversified with associates who have worked as CEI inspectors, and as employees of the Department, giving each individual unmatched experience. Our associates are experts at constructability reviews, interpreting contract documents, and performing schedule reviews, all of which are tools we use to enhance the project schedule.

Partnering: RS&H uses an approach to partner with the Contractor to resolve issues at the lowest level. Our core team members have worked together for over ten years. Our philosophy is to collaborate with the Contractor by being available as a resource and providing guidance with the goal of the Contractor completing a successful project while maintaining the high standard for quality work the FDOT expects. We will also coordinate early and often with the maintaining agencies to ensure any concerns are addressed. We utilize an approach of constant communication with all parties with a focus on setting expectations prior to the beginning of construction. While our daily discussions with the Contractor help the team monitor the project’s schedule for deviations from their original plan, we also take pride in building a working relationship with our counterparts to ensure the project is an overall success. Each of our associates will be prepared to work as a team adjusting as it best benefits all parties. Our constant coordination, discussion, and involvement with daily activities will ensure our team remains in tune with all potential issues, but most importantly, discuss each item and recommended solutions with our Construction Project Manager, Linda Melvin. We believe in early involvement, encouraging our team to hit the ground running.

Our team has completed a constructability review of the drawings, performed site visits, and reached out to our partners at the Department as it pertains to the project’s scope of work. Through this level of investigation, we were able to develop a full understanding of the project scope, which also allowed our team to identify potential problems and suggested solutions.

When selected, our team aspires to achieve the highest level of quality. While it may be difficult to determine exactly how this goal is measured, it is noticeable when a team exceeds expectations.

For a firm to perform at this level, it must follow a plan that each member of its team has adopted without reluctance. Each member of our RS&H Team has bought into our main principles established to develop a reputation unprecedented to others.

Our approach to successful delivery is RS&H’s commitment to provide constant, consistent communication and coordination while overseeing the QA/QC process. Our QA oversight will be led by Lori Kietzer. Lori will submit an initial QA plan within 30 days of NTP (as required by the scope) and will perform site visits every 180 days, submitting the report of all findings and corrections. These semi-annual reviews are performed to ensure the contract management organization and process is in compliance with the requirements cited in the scope. He evaluates the processes, documentation, procedures, training, guidance, and staffing, and submits to the project manager within 30 days of the review.

Staffing/Technical Plan Proposed Staff Quality: Our team is well established in District Three, where key members have worked together for over a decade.

We have established proven procedures for consistently providing superior quality CEI services and are prepared to apply our years of similar project experience to successfully oversee work on the US 231 & Star Avenue/Titus Road intersection realignment project.

Each team member proposed for this project has developed their career as an RS&H associate, obtaining the necessary certifications and required licenses. Registration and certification details are indicated within each resume attached to this letter. Our team members are fully prepared for the start of these projects with work anticipated to begin in April of 2025.

Jack Elliott, PE (RS&H) | Senior Project Engineer Jack has more than 20 years of transportation construction experience. Since 2003, he has continued to serve FDOT District Three in increasing roles and responsibilities, including Inspector, Senior Inspector, Project Engineer, and Senior Project Engineer.

Jack has served on many similar projects in District Three. This experience includes the SR 77 (Bay County), I-10 (Leon County), SR 79 (Washington County), and SR 390 (Bay County) widening projects. Jack is currently a Senior Project Engineer on the SR 390 widening project and SR 95 (US 29) resurfacing/reconstruction project in Escambia County, where he oversees all CEI activities on challenging and complex contracts.

Jimmy Lark (RS&H) | Project Administrator Jimmy has more than 37 years of progressive CEI experience and specializes in all phases of roadway and bridge inspection. He has been working exclusively on projects with similar scope to this SR 79 reconstruction for over a decade. Projects he has worked on during this time include, US 331 Design Build Widening from SR 20 to I-10 in Walton County, SR 77 Design Build Widening project in Washington County, and SR 77 from SR 20 to CR 279 in Washington County. His areas of expertise include earthwork and asphalt paving construction, quality assurance, contract administration, and overseeing the entire construction project. As Project Administrator, Jimmy is responsible for overseeing the day-to-day CEI operations, including RFIs, shop drawings, DWRs, utility conflicts, review and approve lane closures, stormwater, and MOT reports, responding to public concerns, monthly estimates, WOs, structural issues, plan revisions, NOIs, and any new issues.

04/18

Dana Kelly (MTN) | Contract Support Specialist Dana Kelly holds 14 years’ experience working on transportation construction projects, performing as a CSS for the past five (05) years. She has been a trusted partner of District Three, having successfully delivered 15 projects to date. Dana has developed a detailed tracking system to track all items related to the contract per CPAM and Final Estimate requirements. This system has proven successful and continues to deliver excellent results on PAR reviews.

Alex Heilshorn (RS&H) | Senior Inspector Alex brings 22 years of experience, skilled in planning work detail and making technical decisions on project field activities. His expertise spans various construction phases where he conducts field tests to ensure compliance with plans, specs and contract documents as well as records pay quantity measurements. His previous similar project experience includes Group 24-H and all Hybrid CSC contracts for District Three.

Proposed Staff Availability:

Name Role Date Available

Available

Jack Elliott, PE SPE 2/1/2025 60% Jimmy Lark PA 2/1/2025 100% Dana Kelly CSS 2/1/2025 25%

Alex Heilshorn Senior Inspector 2/1/2025 100%

Sy Seley Inspector 2/1/2025 100% Steven Gilmore Inspector 2/1/2025 100%

Sean Pettit Asphalt Plant Inspector 2/1/2025 25%

Richard Smithwick Inspectors Aide 2/1/2025 100%

Sharon Hynes Secretary/Clerk 2/1/2025 100%

Experience on Similar Projects:

Senior Project Engineer, Jack Elliott, PE, Project Administrator Jimmy Lark, and the members of this team have worked together for several years, providing District Three quality service and continuity while delivering highly successful projects. In addition to milling and resurfacing, their collective experience includes drainage improvements and cross slope correction, guardrail improvements and installations, erosion control, inspection and coordination for ITS work, and oversight of maintenance of traffic on high-speed roads. Examples of their shared similar project experience are provided below.

SR 20 (Group 21A) | FDOT D3 RS&H provided CEI services for the SR 20 project from SR 77 to SR 75 (US 231). Existing travel lanes, auxiliary lanes, and paved shoulders are being resurfaced. The section consists of 12-foot travel lanes and 10-foot shoulders (5-foot paved). Two (2) signalized intersections exist within the project limits. The project also included widening a new turn lane at Blue Springs Road. A new park and ride lot was constructed at the Econfina River bridge. This park and ride required the construction of a new stormwater pond, gravity wall, and handrail construction.

SR390 Widening (Group 17C) │ FDOT D3 RS&H is providing inspection, materials sampling and testing, and administrative activities for these two widening projects in Bay County. These major urban roadway projects are comprised of widening from a two-lane rural, to a six-lane urban typical section.

Additional work includes constructing sidewalks on both sides of the roadway, as well as the addition of stormwater ponds, new mast arms at signalized intersections, several large box culverts, utility relocations, and installation of fiber optic cable for the County’s Advanced Traffic Management System. The Jenks Avenue to SR 77 project also includes a new pedestrian overpass at Mowat Middle School.

SR 79 Reconstruction (from Strickland Road to north of Mill Branch Bridge) in Washington County, FL | FDOT D3 RS&H provided CEI services on this project. The project extended the four-lane construction completed up to Strickland Road in Washington County. The work included in this project is utility relocation, the addition of lanes and reconstruction of SR 79, earthwork, drainage improvements, asphalt, and the construction of two new 500-foot bridges over Mill Branch Creek. The total cost for construction was over $20 million.

US 231 (SR 75) Milling and Resurfacing from Harrison Ave. to

CR 2301 | FDOT D3

RS&H provided CEI Services for the SR-75 (US 231) project in Bay County. Work consisted of milling and resurfacing on four-lane divided and un-divided sections, the addition of turn lanes, signalization, signage, guardrail, drainage improvements, and railroad crossing removal work on ten miles of US 231. Due to lane closure restrictions, this project required close traffic coordination and a significant amount of night work.

RS&H’s relationship with FDOT District Three staff promotes excellent communication, which decreases potential delays and improves project quality. The team we have selected is available and well-suited to providing high-quality CEI services by working well with the local agencies, public outreach, and the Contractor who is selected. We constantly work to resolve all project issues quickly and at the lowest possible level. In reviewing our team’s qualifications, issue resolution, track record, and team approach to contract administration and inspection, we are confident the Department will find the RS&H Team has the experience, talent, and resources to provide the best overall services. We are excited and grateful for the opportunity to continue serving District Three.

Respectfully submitted, RS&H, Inc.

Jack Elliott, PE

Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work:

Consultant Name Project Advertised Major & Minor Work Types

10.1 10.4 DBE SB UU

Prime RS&H, INC.

Su bc on su lta nt s

Alday-Howell Engineering, Inc.

ABC Group, LLC MTN Resources, LLC Terracon Consultants, Inc.

SB = Small Business UU = Under-utilized work type; subconsultant is a professional services firm and is prequalified in the Under-Utilized Work Group. Refer to the advertisement for applicability.

My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.

https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance

Quality Assurance Lori Kietzer (RS&H)

Project Administrator Jimmy Lark (RS&H)

ORGANIZATIONAL

C H A R TC H A R T

Contract Support Specialist Dana Kelly (MTN)

FDOT PROJECT MANAGER

Linda Melvin

Senior Project Engineer Jack Elliott, PE (RS&H)

Senior Roadway Inspector Alex Heilshorn (RS&H)

LEGEND OF FIRMS

(RS&H)RS&H, Inc.
(MTN)MTN Resources
(AHE)Alday-Howell Engineering, Inc.
(ABC)ABC Group, LLC
(TC)Terracon Consultants, Inc.

Inspector Steven Gilmore (AHE)

Asphalt Plant Inspector Sean Pettit (RS&H)

Inspector Sy Seley (RS&H)

Inspector Aide Richard Smithwick (RS&H) Subconsultants

Community Outreach Specialist Mike Sasser (ABC)

Geotechnical Terracon

Community Outreach Specialist Emily Larrabee (ABC)

Secretary/Clerk Typist Sharon Hynes (RS&H)

Name Firm Name TIN #

A C

I C on cr et e Fi el d

Le ve l 1

A C

I C

TC

I ( Le ve l 2

FD

O

T C rit ic al S tr uc tu re s

FD

O

T M

SE

W al l I ns pe ct or

A

TS

SA

W

ZT

C

/M O

T

FD

O

T/ C

TQ

P

A sp ha lt

Pa vi ng L ev el

FD

O

T/ C

TQ

P

A sp ha lt

Pa vi ng L ev el

FD

O

T/ C

TQ

P

C on cr et e Fi el d

Le ve l 1

FD

O

T/ C

TQ

P

C on cr et e Fi el d

Le ve l 2

FD

O

T/ C

TQ

P

C on cr et e Fi el d

Sp ec ifi ca tio n

FD

O

T/ C

TQ

P

D ril le d

Sh af t

FD

O

T/ C

TQ

P

Ea rt hw or k Le ve l 1

FD

O

T/ C

TQ

P

Ea rt hw or k Le ve l 2

FD

O

T/ C

TQ

P

Fi na l E st im at es L ev el

FD

O

T/ C

TQ

P

Fi na l E st im at es L ev el

FD

O

T/ C

TQ

P

Pi le

D riv in g

FD

O

T/ C

TQ

P

Q C

M an ag er

FD

EP

S to rm w at er

M an ag em en t I ns pe ct or

H A

ZM

A

T

N R

C N uc le ar G au ge

S af et y

O

SH

A C on st ru ct io n

Sa fe ty

H ea lth

Jack Elliott, PE RS&H, Inc. E43043479 X A X X X X X X X

Lori Kietzer RS&H, Inc. K32652161 X X X X X

Jimmy Lark RS&H, Inc. L62044966 X A X X X X X X X

Dana Kelly MTN K40017479 X X

ASPHALT PLANT INSPECTOR

Sean Pettit RS&H, Inc. P33029770 X X A X X X X X X X X X X X

SENIOR INSPECTOR

Alex Heilshorn RS&H, Inc. H42601074 X X A X X X X X X X X X X X X X X X X

INSPECTORS

Sy Seley RS&H, Inc. S40078296 X A X X X X X X X X X X Steven Gilmore Alday-Howell G45678170 X A X X P X X X

INSPECTORS AIDE

Richard Smithwick RS&H, Inc. S53275990 S A X S X X X X X

Sharon Hynes RS&H, Inc. N/A

LEGEND

A = Advanced I = Intermediate P = Pending S = Scheduled

SECRETARY/CLERK TYPIST

CONTRACT SUPPORT SPECIALIST

SENIOR PROJECT ENGINEER

FDOT D3 SR 75 (US 231) at CR 2315 Star Ave/Titus Rd Realignment (25337) CTQP Matrix

PROJECT ADMINISTRATOR

QUALITY ASSURANCE

FDOT District Three Panama CIty Operations Center

Total Man

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Months

SR 75 (US 231) & Star Ave. / Titus Rd. Intersection Realignment Jack Elliott, P.E. Sr. Project Engineer (RS&H) 0.30 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.30 10.8 Jimmy Lark - Project Administrator (RS&H) 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 18.0 Dana Kelly - Contract Support Specialist (MTN) 0.20 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 7.4 Alex Heilshorn - Sr. Inspector (RS&H) 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0.50 17.5 Sy Seley - Inspector (RS&H) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 16.5 Steven Gilmore - Inspector (Alday Howell) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 15.5 Richard Smithwick - Inspector's Aide (RS&H) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 13.0 Mike Sasser - Community Outreach Specialist (ABC Group) 0.10 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.10 3.4 Emily Larabee - Community Outreach Specialist (ABC Group) 0.10 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.10 3.4 Sharon Hynes - Secretary/Clerk Typist (RS&H) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.9 John Kimberly - Chief Engineer 2 (Terracon) 0.25 0.3 Mingu Kim - Geotechnical Engineer (Terracon) 1.00 1.0 Liming Xue, EI - Geotechnical Tech (Terracon) 1.00 1.0

Total Man Months 0.0 0.0 0.0 1.8 4.5 5.5 6.5 6.5 8.8 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 0.0 109.7

Letting 18,092.3 Construction Man-Hours

Project (Construction Time - Days)

PROFESSIONAL SERVICES COMMITMENT FORM

375-030-83

PROCUREMENT

11/21

Submit this form as required in the Request for Proposal or alternatively, at the time of Expanded Letter of Response is due:

Contract/Advertisement No.: 25337 Prime Consultant: RS&H, Inc.

Project Description: SR 75 (US 231) at CR 2315 Star Ave/Titus Rd Realignment

Expected percentage of contract fees to be utilized by DBE(s): 12 %. (Combine DBE Prime and DBE subconsultants, if applicable).

Expected percentage of contract fees to be utilized by Non-DBE Small Businesses 10 %. (Combine Non-DBE Small Business Prime and Non-DBE Small Business subconsultants, if applicable).

The proposed Prime and subconsultants/subvendors’ work is as follows:

Prime Type of Work

(List each type of work separately, only one type of work per line) of overall contract amount

DBE Small Business

Non

DBE/

Non

Small Business

RS&H, Inc. 10.1 67

10.4 9

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Subconsultant/Subvendor Type of Work

(List each type of work separately, only one type of work per line) of overall contract amount

DBE Small Business

Non

DBE/

Non

Small Business

ALDAY-HOWELL ENGINEERING, INC 10.1 10

MTN RESOURCES, LLC Non-Professional Service Firm 7 ABC GROUP, LLC Non-Professional Service Firm 5

TERRACON CONSULTANTS, INC. 9.2 2

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Ffdotwww.blob.core.windows.net%2Fsitefinity%2Fdocs%2Fdefault-source%2Fprocurement%2Fpdf%2Frule-14-75-990746854.pdf%3Fsfvrsn%3D41be1c2c_2&data=04%7C01%7CStephanie.Kutchinski%40dot.state.fl.us%7C337fb188ea8d4b7b0e0608d999552a3a%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C637709413321806279%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=lqWvb8kdEy10kPWwYss8j8aDVzAawCGzRJt68%2B798%2FI%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Ffdotwww.blob.core.windows.net%2Fsitefinity%2Fdocs%2Fdefault-source%2Fprocurement%2Fpdf%2Frule-14-75-990746854.pdf%3Fsfvrsn%3D41be1c2c_2&data=04%7C01%7CStephanie.Kutchinski%40dot.state.fl.us%7C337fb188ea8d4b7b0e0608d999552a3a%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C637709413321806279%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=lqWvb8kdEy10kPWwYss8j8aDVzAawCGzRJt68%2B798%2FI%3D&reserved=0

PROFESSIONAL SERVICES COMMITMENT FORM

375-030-83

PROCUREMENT

11/21

Subconsultant/Subvendor Type of Work

(List each type of work separately, only one type of work per line) of overall contract amount

DBE Small Business

Non

DBE/

Non

Small Business

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Choose an item.

Total percent for Prime and Subs committed:

(Note to Consultants: should be 100% when submitted to FDOT) 100

Total percent for Prime and Subs remaining to be committed:

(Note to Consultants: should be 0% when submitted to FDOT) 0

The percentage column must total 100% for Prime and all subs.

Please note, the number one ranked firm is required to enter DBE Participation in the Equal Opportunity Compliance (EOC) System subsequent to contract award and any future contract amendments or task work orders (if applicable).

DBE status for all firms can be verified by using the DBE Directory:

https://fdotxwp02.dot.state.fl.us/EqualOpportunityOfficeBusinessDirectory/CustomSearch.aspx

Small Business status for Non-Professional Services firms can be found here:

https://ssrs.fdot.gov/Reports/report/PDA%20Reports/Public%20Reports/EOOSmallBusinessCertificationReport

Small Business status for Professional Services firms is located here:

https://www.fdot.gov/procurement/InternetReports.shtm#qual

By: William Downey, PE, LEED AP Title: Vice President Date: 11/12/2024 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Ffdotwww.blob.core.windows.net%2Fsitefinity%2Fdocs%2Fdefault-source%2Fprocurement%2Fpdf%2Frule-14-75-990746854.pdf%3Fsfvrsn%3D41be1c2c_2&data=04%7C01%7CStephanie.Kutchinski%40dot.state.fl.us%7C337fb188ea8d4b7b0e0608d999552a3a%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C637709413321806279%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=lqWvb8kdEy10kPWwYss8j8aDVzAawCGzRJt68%2B798%2FI%3D&reserved=0 https://fdotxwp02.dot.state.fl.us/EqualOpportunityOfficeBusinessDirectory/CustomSearch.aspx https://ssrs.fdot.gov/Reports/report/PDA%20Reports/Public%20Reports/EOOSmallBusinessCertificationReport https://www.fdot.gov/procurement/InternetReports.shtm#qual

TRUTH IN NEGOTIATION CERTIFICATION

375-030-30

PROCUREMENT

05/14

Pursuant to Section 287.055(5)(a), Florida Statutes, for any lump-sum or cost-plus-a-fixed fee professional services contract over the threshold amount provided in Section 287.017, Florida Statutes for CATEGORY FOUR, the Department of Transportation (Department) requires the Consultant to execute this certificate and include it with the submittal of the Technical Proposal, or as prescribed in the contract advertisement.

The Consultant hereby certifies, covenants, and warrants that wage rates and other factual unit costs supporting the compensation for this project’s agreement are accurate, complete, and current at the time of contracting.

The Consultant further agrees that the original agreement price and any additions thereto shall be adjusted to exclude any significant sums by which the Department determines the agreement price was increased due to inaccurate, incomplete, or noncurrent wage rates and other factual unit costs. All such agreement adjustments shall be made within (1) year following the end of the contract. For purposes of this certificate, the end of the agreement shall be deemed to be the date of final billing or acceptance of the work by the Department, whichever is later.

Name of Consultant

By:

Date

RS&H, Inc.

November 12, 2024William Downey, PE, LEED AP- Vice President

CERTIFICATION REGARDING DEBARMENT, SUSPENSION,

INELIGIBILITY AND VOLUNTARY EXCLUSION-

LOWER TIER COVERED TRANSACTIONS FOR FEDERAL AID CONTRACTS

(Compliance with 2 CFR Parts 180 and 1200)

375-030-32

PROCUREMENT

11/15

It is certified that neither the below identified firm nor its principals are presently suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency.

Name of Consultant/Contractor:

By:

Date:

Title:

Instructions for Certification

Instructions for Certification - Lower Tier Participants:

(Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200)

a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below.

b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .