PBXP262019 - Statement of Work- Condenser.docxPBXP262019 - Statement of Work- Condenser.docx

DOCX document 31 KB Posted

Attached to
Replace Outdoor Condenser at Refueling Building
Solicitation number
SRC0000041810
Issued by
Ohio

About this file

This Statement of Work outlines a construction project for the Ohio Air National Guard at Mansfield Lahm ANG Base in Mansfield, Ohio. The project (PBXP262019) involves the replacement of an outdoor condenser at Building 600. The contractor shall disconnect and remove the existing outdoor condenser, furnish and install one new like-in-kind outdoor condenser compatible with the existing system and electrical service, and install all necessary materials, fittings, and accessories required for connection. Additional work includes completing all refrigerant, electrical, and control connections, performing startup procedures, verifying proper operation, and correcting any deficiencies identified during startup. The contractor shall also provide applicable warranty documentation for the installed equipment. Bids for this project are valid for 90 days. Points of contact are Captain Clayton McCarthy at (419) 520-6158 and Mr. Joe Logan at (419) 520-6051.

The contractor shall furnish all labor, material, and appurtenances and must use only U.S.-manufactured equipment. The contractor is responsible for field verification of all existing dimensions and underground utilities before commencing work and shall maintain a clean and safe job site. The contractor shall provide a one-year warranty for all work performed and shall pass along extended guarantees for equipment and products. All trash, waste, and construction debris generated from the project become the contractor's property and shall be removed from the base in compliance with applicable Federal and State laws, including hazardous material disposal and recycling requirements. The contractor must comply with the Occupational Safety and Health Act of 1972 and protect all government property from damage. No government-furnished property or special project considerations are provided for this project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project PBXP262019

BLDG 600 CONDENSOR

MANSFIELD LAHM ANG BASE

MANSFIELD, OHIO

Table of Contents 1

General Requirements 2-3

Project Description 3-4

1. GENERAL REQUIREMENTS

1.1 The contractor shall furnish all labor, material and appurtenances to perform work in accordance with the drawings and specifications for various roof repairs. This work shall include all accessories, parts and equipment necessary to make a complete and usable system. Only U.S. manufactured equipment shall be installed for this project.

1.2 The location of the proposed work is within the Mansfield Lahm ANG Base, Mansfield, Ohio.

1.3 The contractor shall not exceed the scope of work without prior approval from the Contracting Officer.

1.4 The contractor shall protect all government property from damage. Any damages incurred in pursuance of this project shall be replaced and/or restored to original condition.

1.5 The contractor shall maintain a clean and safe job site at all times to prevent damage to aircraft on concrete parking apron, other existing utilities, and surrounding facilities that may be affected; this is also intended to protect building occupants from potential health hazard associated with the proposed work. This shall include dust, debris, and waste created in performance of this project; along with tools, equipment, and vehicles located at the job site. The contractor shall comply with the provisions of the Occupational Safety and Health Act of 1972 and all provisions thereto.

1.6 The Contractor is responsible for properly laying out the work, and for lines and measurements for the work executed under the Contract Documents.

A. The Contractor, NOT the Government, is responsible to field verify all existing underground utilities within the excavation limits and/or as shown on the Drawings, before laying out the work. The Contractor is to report errors or inaccuracies in writing to the Contracting Officer's Representative before commencing work.

B. The Contracting Officer or his Representative will in no case assume the responsibility for any layout of the work or damages to existing underground utilities while performance of work is underway.

1.7 THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. The dimensions provided by the government are only approximations and they are not responsible for their precision or accuracy. This includes but is not limited to blueprints, drawings, schedules, and statements of work.

1.8 The contractor shall provide a one-year warranty for the work contained herein. They shall pass along extended guarantees for equipment and products.

1.9 All trash, waste, and construction debris generated from this project shall become property of the contractor and shall be removed from the base. The disposal of these materials shall follow the appropriate Federal and State laws. This includes the disposal or recycling of hazardous materials.

1.10 Bids for this project shall be valid for 90 days.

1.11 Point of Contact for this project is Captain Clayton McCarthy (419) 520-6158 or Mr. Joe Logan (419) 520-6051

2. PROJECT DESCRIPTION

2.1 Scope: The contractor shall provide all labor and materials to install the following, as outlined below. Offerors are responsible for verifying field conditions that may affect means, methods, and pricing.

2.1.1 The contractor shall provide all labor and materials to install the following:

A. Disconnect, remove, and dispose offsite the existing outdoor condenser.

B. Furnish and install one new like-in-kind outdoor condenser compatible with the existing system and existing electrical service.

C. Furnish and install all necessary materials, fittings, and accessories required to connect the new condenser to the existing system.

D. Complete all required refrigerant, electrical, and control connections for a complete and operational installation.

E. Start up the new condenser, verify proper operation, and correct any deficiencies identified during startup.

F. Provide applicable warranty documentation for the installed equipment.

2.2 Special Considerations: There are NO special project considerations other than requirements on the drawings and as required in specification sections of the project documents.

2.3 Government Furnished Property: There is NO Government furnished property provided for this project.

End Statement of Work