Paint_and_Caulk_Bodie_Island_Housing.pdf

PDF 246 KB Posted

Attached to
PAINT AND CAULK BI HOUSING
Solicitation number
140P5322Q0036
Issued by

View the file

Other files

File Type Posted
002_Form_1___Past_Performance_Quesionnaire.pdf PDF
003_Form_2_.pdf PDF
Price_Schedule_5_14__21.pdf PDF
Sol_140P5322Q0036.pdf PDF
Dare_wages_nc65.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPE HATTERAS NATIONAL SEASHORE

Bodie Island North Carolina

STATEMENT OF WORK:

Paint and Caulk BI Housing Units

NATIONAL PARK SERVICE

Southeast Region

2 | P a g e Paint and Caulk Bodie Island Housing

TABLE OF CONTENTS

TABLE OF CONTENTS

1.0 BACKGROUND/ EXISTING CONDITIONS..………………………………………………………………………………3

2.0 OBJECTIVES………………………………………………………………………………………………………………………………….3

3.0 PLACE OF PERFORMANCE

4.0 TASKS/SPECIFICATIONS ..…………………………………...………………………...……3,4,5

5.0 WARRANTIES……………………………………………………………………………………………….………………………….……5

6.0 DELIVERARY

7.0 GOVERNMENT FRINISHED EQUIPMENT

8.0 SECURITY

9.0 SPECIAL MATERIAL REQUIREMENTS

10.0 OTHER UNIQUE REQUIREMENTS…...…………………………………………...……………6

11.0 QUALITY ASSURANCE ……………………………………………………………………………………………………….……6

12.0 SUBMITTALS ....……………………………………………………………………………………7

13.0 BARRIERS & RESOURCE PROTECTION MEASURES……………………..………………………………..7

3 | P a g e

1.O BACKGROUND AND EXISTING CONDITIONS:

Bodie Island has four housing units: 117, 118, 119 and 120, that provide lodging for permanent and seasonal employees. The units were constructed circa 1965. The housing units are on pilings next to the Ocean. Salt and sand are constantly being blown against the exterior surfaces causing the paint to fail before it’s life expectancy. There are areas where the paint has chipped, and some areas have no paint at all. The exterior surfaces are covered with dirt and air pollutants and must be cleaned before painting.

2.0 OBJECTIVE:

2.1 Restore Exterior Finishes of Housing Units to protect critical component.

3.0 PLACE OF PERFORMANCE:

3.1 Bodie Island Housing Units 117, 118, 119 and 120 Park Service Rd Nags Head, NC 27959

4.0 TASKS/SPECIFICATIONS:

4.1 Clean Exterior Surfaces

4.1.1 Pressure-wash all exterior surfaces approximately 9472 sq ft with a cleaning solution to include windows, doors, trim and under house parking.

4.1.2 Pressure-wash the porch and railing approximately 360 sq ft after painting is completed to clean and remove current and previous paint droppings.

4.1.3 Allow surfaces to dry before painting.

4.1.4 Pick up all paint flakes that are knocked off during pressure washing.

4.2 Surface Preparation

4.2.1 The COR has the responsibility to determine that a surface is complete and that the “quality of appearance” is such that it is ready for finish priming and painting. If “quality of appearance” of a surface, prior to finishing, is judged marginal or unacceptable by COR, such alleged defective work must be corrected prior to priming and finishing so that all surfaces are made complete and ready for finishing. Provide advanced notice to the COR as to when you will have the surface ready for inspection so that there are no delays.

4.2.2 Ensure that all cracks, gaps, holes, nail pops, nicks, dents on both the walls and ceilings are patched and then sanded to a smooth finish.

4.2.3 An inspection of the prepped surface shall be conducted by the COR prior to paint being applied.

4.2.4 Be sure to wipe (with a damp cloth) away any debris or dust left behind by the sanding so that you have a smooth finish to work with.

4.2.5 Remove all vegetation and sand away from painted surfaces

4.2.6 Cover all adjacent surfaces with plastic, tarps, or painter’s tape to prevent other colors of paint coming in contact them.

Sand painted areas approximately 420 sq ft of under house parking where the paint has failing off or was knocked off by the pressure washer so that there is a smooth transition between painted areas and wood.

4 | P a g e

4.2.7 Sand all rough areas approximately 44 ln ft on windows and doors so that the result is a smooth finish.

4.2.8 Remove one sheet of plywood on housing unit 118 and replace with one sheet of

T111 3/4”.

4.2.9 Remove approximately 460 linear feet of 1 ¾” X ½” trim and replace in kind.

4.2.10 Remove one piece of siding (cement board) approximately 12’ 9” X 8 ¼” X ¼’ and replace in kind using stainless steel nails. Siding has a 6 1/8” reveal.

4.2.11 Remove four sheets of T111 ¾” and replace in kind.

4.2.12 Repair/Replace all defective surfaces that will be painted.

4.2.13 Remove any paint and loose rust from the heads of approximately 5,400 nails and countersink them, Apply rust destroyer to all nails and allow to dry, fill in holes with a high-quality exterior wood patch, one that dries hard, and dose not shrink.

Sand to a smooth finish.

4.3 Sanding existing painted exterior surfaces.

4.3.1 The existing painted surfaces show signs of lead paint that are above laboratory reporting limits.

4.3.2 The contractor will use the wet sanding method on any surfaces that need sanding. Sanding area is approximately 3220 square feet this will include windows, gutters, porches, railing, porch ceilings doors, soffit, and facia.

4.3.2.1 Tarp’s shell be laid down to prevent paint from covering surfaces below them while painting.

4.3.2.2 Lightly mist with spray bottles to keep the immediate area that the sanding is taking place wet.

4.3.2.3 Rags will be used to wipe off the paint and water from the sanded surface before it runs down the house.

4.3.2.4 Wet Sanded surfaces shell be limited to areas no larger than can be sanded and wipe so as not to allow the hazardous material to contaminate another surface or ground.

4.3.2.5 Wet sand all rough areas on clapboard to obtain a smooth surface and if unable to, replace area with a new board of the same species. Save boards so that sections of that board can be used at other locations on the building.

4.3.2.6 Wet sand any areas that do not have a smooth transition between coats of paint.

4.3.2.7 Used rags will be placed in a Hazardous container and deposed of at an authorized facility.

4.4 Caulk

4.4.1 Remove approximately 826 linear feet of existing caulking around doors and windows.

4.4.2 Apply approximately 826 linear feet of caulk to all exterior doors and windows.

4.4.3 Caulk should have enhanced UV resistance, paintable in one hour and the flexibility should be five times stretch and fifty percent joint movement.

5 | P a g e

4.5 Paint exterior surfaces.

4.5.1 The painting contractor will produce a “properly painted surface.” A “properly painted surface” is defined as uniform in appearance, color, texture, hiding and sheen. It is also free of foreign material, lumps, skins, runs, sags, holidays, misses, or insufficient coverage. It is also a surface free of drips, spatters, spills, or overspray caused by the painting contractor’s workforce. To determine whether a surface has been “properly painted” it shall be examined without magnification at thirty-nine (39) inches or one (1) meter, or more, under finished lighting conditions and from a normal viewing position. See PDCA P1. At

PDCA-Standards-May28-2019.pdf (pcapainted.org)

4.5.2 Contractor shall complete one area of painted surface so that the COR can inspected it and deem it a “properly painted surface” before continuing to paint.

Provide advanced notice to the COR as to when you will have the surface ready for inspection so that there are no delays.

4.5.3 All exposed surfaces will need one coat of primer. A combination paint and primer is acceptable.

4.5.4 Paint approximately 9472 sq ft to include windows, doors, siding and under house parking with two coats of high-quality exterior breathable latex paint, color shall match existing color.

4.5.5 Remove any paint splatter and/ or spills by cleaning while being careful not to damage adjacent finished surfaces as they occur if possible or at the end of each phase of painting.

5.0 WARRANTIES

5.1 A one-year warranty is required on all contractor and sub-contractor labor, which does not include the individual manufacturer’s part or product implied warranties.

5.2 A five year manufacturer’s warranty on all paint, and primer. All paint will be applied in accordance with manufacturer’s instructions to obtain manufacturer’s warranty

6.0 DELIVERY:

6.1 Deliver materials to the project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

6.2 Delivery of materials to the park will be brought in when needed. Items stored outside will be done at the Contractor’s own risk. Use and storage of a work trailer can be coordinated with the COR.

7.0 GOVERNMENT-FURNISHED EQUIPMENT:

7.1 No Government equipment will be provided. Water is available at each house via exterior hose bibs. Electricity is available at each house via exterior receptacles.

https://pcapainted.org/wp-content/uploads/2019/05/PDCA-Standards-May28-2019.pdf

6 | P a g e

8.0 SECURITY:

8.1 All access to the site will be during normal business hours (M-F 7:00 to 5:00 PM) unless temporarily approved by the COR. An escort will be provided during any necessary entry into non-public or secure areas. No work will be accomplished during federal holidays, during inclement weather, in advent of an emergency or during planned park events.

9.0 SPECIAL MATERIAL REQUIREMENTS:

9.1 The Contractor must submit for the government approval all products to be used on this project.

10.0 OTHER UNIQUE REQUIREMENTS:

10.1 This work is to be conducted with preservation of original materials in mind. Care must be used when demolishing, removing, repairing, and replacing building materials so as not to cause damage to adjacent building fabric.

10.2 This site is part of the Cape Hatteras National Seashore. Therefore, additional care must be taken while working around exhibits and visitor areas. No obscene language on clothing will be allowed. Appropriate clothing and shoe wear must be worn inside of the park’s areas. No smoking or tobacco products in or around the buildings (within 50 feet of buildings or entrances). The COR will show the crew members where the established smoking areas are located. No inside lunch areas are available. Clean-up will be accomplished 45 minutes prior to schedule closing time. No trash or debris will remain in the work site overnight. Dumpster locations if needed will be coordinated by the COR and is the sole responsibility of the contractor. Contractor’s vehicles will be parked be at the discretion and coordination of the COR to prevent impact on the visiting public.

10.3 During the demolition and construction phases of the project, work will be done to prevent the greatest impact on the visiting public and occupants. Areas that need to be closed will be coordinated with the COR.

10.4 The contractor will provide all technical support, materials, tools, equipment, and manpower required complete the project. The contractor is responsible for verifying existing conditions and dimensions in each housing unit. Refer to the Technical

Evaluation Statement.

11.0 QUALITY ASSURANCE:

11.1 Contractor shall maintain a qualified crew throughout the duration of the project and ensure quality control. Only qualified journeypersons shall be engaged in work.

Apprentices may be used provided they work under the direct supervision of a qualified journeyperson. A qualified crew will consist of the project manager, journeymen, and apprentices.

11.2 The services to be performed by the contractor shall be inspected by the Contracting

Officer Representative, the COR.

11.3 All work shall comply with the policies and standards of the governing bodies and applicable regulations, which include but are not limited to:

7 | P a g e

11.3.1 State and Local Codes (latest addition)

11.3.2 International Building Code (IBC, latest addition)

11.3.3 Occupational Safety and Health Act (OSHA, latest addition)

11.4 The contractor shall have a minimum of 5 years’ experience and expertise of successfully completed projects in:

11.4.1 Painting

11.4.2 clapboard siding repair

11.5 The Contractor must submit proof of experience by providing a list of references for projects completed of painting of historic structures or other related work like this

12.0 SUBMITTALS:

Submittals shall be submitted to the COR.

12.1 Work schedule delineating the various stages of work by phase (milestones).

12.2 Submit the manufacturer’s available colors for approval by the CO/COR for all products.

12.2 Contractor shall provide copies of product specifications, manufacturer’s literature and installation instructions of materials and products to be furnished and installed.

12.3 The Contractor must submit for the government approval all products to be used on this

12.5 The following submittals will-be required to-be submitted before final payment is made:

15.5.1 All Work Warranties and Product Guarantees.

15.5.2 Manufacturers recommended care and cleaning requirements.

13.0 BARRIERS & RESOURCE PROTECTION MEASURES:

13.1 Protect all exterior/interior surfaces of the building and adjacent landscaping, walks, drives, walls, signage, all adjacent buildings, and Government equipment from damage by project operations. Use drop cloths, shields, masking, templates, or other suitable protective means. Protect glass windowpanes, and metal hinges and other non-painted features from breakage or other damage during project work.

13.2 Erect temporary construction barriers to protect visitors, employees and restrict pedestrian access. The contractor shall work with the CO/COR to avoid or minimize interruptions to general visitor access. Minimum is OSHA standards.