PA2215 Technical Specifications.pdf
PDF 18 MB Posted
- Attached to
- Trigg Lake Dam Reclassification
- Solicitation number
- PA2215
- Issued by
- Dallas County, Texas
About this file
PA2215 Technical Specifications - Trigg Lake Dam Reclassification
This is a Technical Specification Book (Version 4.3) for the Trigg Lake Dam Reclassification project at Dallas Fort Worth International Airport, prepared by Dunaway Associates, LLC and affiliated professional engineers licensed in Texas. The project comprises four primary work components: raising the dam elevation by adding a 7-inch-high by 12-inch concrete wall on top of the dam, armoring the upstream face to prevent erosion, rehabilitating concrete extensions of downstream flumes to improve structural integrity, and rehabilitating the principal spillway to address water infiltration issues. Construction will occur outside the Airport's Air Operations Area. The contract establishes a total contract time of 360 consecutive calendar days from the Notice to Proceed, with 270 consecutive calendar days required for Substantial Completion and an additional 90 consecutive calendar days for Final Completion. Work may be performed 24 hours per day, 7 days per week, except during specified holiday blackout periods (Independence Day, Labor Day, Thanksgiving, Christmas/New Years, Spring Break, Memorial Day, and World Cup periods through 2027). The IFB submittal date was May 6, 2026, with Permit Number B25-0599.
The specifications establish comprehensive requirements for contractor responsibilities including utility location and protection, standby time allowance procedures for airfield operational impacts, measurement and payment protocols, and extensive administrative procedures. Contractors must obtain Airport Identification Badges and Vehicle Permits at their own expense and coordinate with the Owner's Authorized Representative regarding all work activities. Payment shall be made on a time and material basis for standby time compensation, with documented Standby Time Work Reports required for any work stoppages resulting from airfield operations. All unit prices are full compensation including materials, labor, supervision, equipment, tools, delivery, installation, insurance, applicable taxes, fees, overhead, and profit. The contract documents incorporate by reference numerous industry standards, codes, and regulations including FAA requirements, Texas Department of Transportation standards, and various technical specifications for construction activities within an active airport environment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART III - TECHNICAL SPECIFICATION BOOK
VERSION 4.3
PUBLISHED DATE: MAY 2026
DALLAS FORT WORTH
INTERNATIONAL AIRPORT
Trigg Lake Dam Reclassification
Contract Number: PA2215
Permit Number: B25-0599
PART III – TECHNICAL SPECIFICATION BOOK V4.3
PUBLISHED DATE: JUNE 2025
00 01 07 - 1 Seals Page
SECTION 00 01 07
SEALS PAGE
Discipline Stamp Signature
Division 00, Division 01, Civil Scope of Work Items Dakota B. Partain, PE License/Registration: TX 142763 Firm Name/Registration:
Dunaway Associates, LLC
F1114
Utilities Scope of Work Items Bryan E. Sherrieb, PE License/Registration: TX 92723 Firm Name/Registration:
Dunaway Associates, LLC F1114
Dam Improvements Clayton F. Terry, PE License/Registration: TX 116096 Firm Name/Registration:
Othon/ F1471
- END OF SECTION -
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
APRIL 2026
IFB Submittal April 29, 2026
Permit No. TBD
116096P R
O
F E
SSIONAL ENGI
N
E E
R
S T
A
TE
OF TEX
A
S
LICENSED
CLAYTON F. TERRY
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
Division 00, Division 01, Civil Scope of Work Items
License/Registration: TX Firm Name/Registration:
Dunaway Associates, LLC F1114
148114 David Jose Palacios, PE
DAVID JOSE PALACIOS
148114
S T
ATE
OF TEXA
S
LICENSED
P R
O F
E S
SIONAL E
NGI
N E E
R
142763
DAKOTA B. PARTAIN
S T
ATE
FO TEXA
S
P O
R F
E
SS
INO AL E
GN
I
E N
E R
LICENSED
IFB Submittal May 06, 2026
Permit No. B25-0599
MAY 2026
PUBLISHED DATE: APRIL 2026
00 01 10 - 1 Table of Contents
SECTION: 00 01 10
TABLE OF CONTENTS
Any Section marked with an “Issue Date” below is hereby incorporated into the Project Manual. Any Section revised after the IFB is released must include a “Revised Issue Date.” Any Section revised or a new Section to be added to supersede the latest published document are as indicated and dated below and are hereby included in the Project Manual. Any Section included in the published book that are not included in the table below are not included in the Project Manual.
Section Description Issue Date Revised Issue Date
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
00 01 01 Title Page 04/29/2026
00 01 07 Seals Page 04/29/2026
00 01 10 Table of Contents 04/29/2026
DIVISION 01 GENERAL REQUIREMENTS
01 10 01 Abbreviations, Acronyms and Definitions 04/29/2026
01 10 02 Reference Standards 04/29/2026
01 11 00 Summary of Work 04/29/2026
01 18 16 Protection of Existing Underground Utilities and Cables 04/29/2026
01 18 16.13 Utility Location Sign-Off Sheet 04/29/2026
01 18 16.14 Underground Utilities Damage Report 04/29/2026
01 21 00 Standby Time Allowance 04/29/2026
01 21 00.01 Standby Time Work Report 04/29/2026
01 22 00 Measurement and Payment 04/29/2026
01 25 13 Product Substitution Procedures 04/29/2026
01 25 13.01 Product Substitution Form 04/29/2026
01 26 13 Request for Information 04/29/2026
01 29 00 Payment Procedures 04/29/2026
01 29 73 Schedule of Values 04/29/2026
01 29 85 Wage Rate Requirements 04/29/2026
01 30 00 Allowances 04/29/2026
01 31 01 Building Information Modeling (BIM) 04/29/2026
01 31 19 Project Meetings 04/29/2026
01 32 16 Schedules 04/29/2026
01 33 23 Shop Drawings, Product Data, and Samples 04/29/2026
01 33 29.06.01 Contaminated Media Management Plan 04/29/2026
01 35 13.13 Minimum Standards for Construction and Maintenance on the AOA
01 35 13.13.01 Minimum Standards for Construction and Maintenance on the AOA Appendix
01 35 23 Hot Work Operations and Control 04/29/2026
01 35 24 Asbestos Operations and Control 04/29/2026
01 41 26.10 Construction Air Permitting 04/29/2026
01 41 26.13 Concrete Batch Plant and Hot Mix Asphalt Plant Permitting 04/29/2026
01 41 26.21 Migratory Bird Protection 04/29/2026
01 45 16.13 Contractor Quality Control 04/29/2026
01 45 20 Non-Conformance Report 04/29/2026
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
IFB Submittal May 06, 2026
Permit No. B25-0599
00 01 10 - 2
Section Description Issue Date Revised Issue Date
01 45 29 Owners Testing Laboratory 04/29/2026
01 50 00 Temporary Facilities and Controls 04/29/2026
01 50 00.01 Temporary Facilities and Controls – Water Request Form 04/29/2026
01 50 13 Owner’s Field Office 04/29/2026
01 52 00.01 Construction Signage 04/29/2026
01 52 13 Dust Control 04/29/2026
01 52 16 Haul Road 04/29/2026
01 55 20 Contractor Badging, AOA Access and Revenue Area Access
04/29/2026
01 55 29 Staging Areas 04/29/2026
01 56 23 Temporary Barricades 04/29/2026
01 56 26 Temporary Fencing 04/29/2026
01 56 40 Tree Conservation Plan 04/29/2026
01 57 13 Temporary Erosion and Sediment Control 04/29/2026
01 57 19 Spill Prevention Control and Countermeasure 04/29/2026
01 57 19.13 Spill Response Plan 04/29/2026
01 57 19.13.01 Spill Response Plan Form 04/29/2026
01 66 00 Product Storage and Handling Requirements 04/29/2026
01 71 13 Mobilization 04/29/2026
01 71 14 Land Use Requirements 04/29/2026
01 71 14.01 Land Use Requirements – Application Procedures 04/29/2026
01 73 29 Cutting and Patching 04/29/2026
01 74 13 Progress Cleaning 04/29/2026
01 74 18 Concrete Waste 04/29/2026
01 74 19 Construction Waste 04/29/2026
01 74 23 Final Cleaning 04/29/2026
01 76 00 Protecting Installed Construction 04/29/2026
01 76 50 Punch List 04/29/2026
01 77 00 Closeout Procedures 04/29/2026
01 77 00.01 Closeout Procedures – System Acceptance 04/29/2026
01 78 23 Operation and Maintenance Data 04/29/2026
01 78 33.36 Bonds and Warranties 04/29/2026
01 78 39 Project Record Documents 04/29/2026
01 78 46 Extra Stock Materials 04/29/2026
01 79 00 Demonstration and Training 04/29/2026
01 81 13 Sustainable Design Requirements 04/29/2026
01 83 19 Contractor Roofing Area Access 04/29/2026
01 83 19.01 Contractor Roofing Area Access – Forms 04/29/2026
01 91 00 Commissioning 04/29/2026
DIVISION 02 EXISTING CONDITIONS
02 80 00.11 Asbestos 04/29/2026
DIVISION 32 EXTERIOR IMPROVEMENTS
32 92 19 Seeding and Sodding 04/29/2026
NCTCOG
Item 201 Site Protection 04/29/2026
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
IFB Submittal May 06, 2026
Permit No. B25-0599
00 01 10 - 3
Item 801 Barriers, Warnings, and Detours Signs, and Fences 04/29/2026
Item 802 Steps and Retaining Walls 04/29/2026
TxDOT
Item 104 Removing Concrete 04/29/2026
Item 110 Excavation 04/29/2026
Item 132 Embankment 04/29/2026
Item 247 Flexible Base 04/29/2026
Item 276 Cement Treatment (Plant-Mixed) 04/29/2026
Item 360 Concrete Pavement 04/29/2026
Item 432 Riprap 04/29/2026
Item 502 Barricades, Signs, and Traffic Handling 04/29/2026
Item 644 Small Roadside Sign Assemblies 04/29/2026
Item 760 Cleaning and Reshaping Ditches 04/29/2026
Special Specifications
03 60 00 Cementitious Hand Grouting 04/29/2026
Item 5002 Floating Turbidity Barrier 04/29/2026
Appendix
Geotechnical Engineering Report
– END OF SECTION –
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 1 Abbreviations, Acronyms and
Definitions
PART 1 – GENERAL
1.01 SUMMARY
SECTION: 01 10 01
ABBREVIATIONS, ACRONYMS AND DEFINITIONS
A. This Section defines common terms, abbreviations, acronyms, and definitions used in the Contract Documents. The terms provided below are presented in alphabetical order and do not imply order of hierarchy or importance in the Project:
1. Access Control Office (ACO) – A section of the Department of Public Safety (DPS) responsible for administering Airport Access/Identification Badges and Air Operations Area (AOA) Access Permits.
2. Access Permit – A permit issued to a motor vehicle required to enter the AOA.
3. Administrator of the Code of Rules and Regulations (Administrator) – The Vice President of Public Safety for the Airport, or their authorized agent.
4. Air Operations Area (AOA) – Refer to General Provisions, Section 10.
5. Air Traffic Control Tower (ATCT).
6. Aircraft Movement Area (AMA) – An area surrounding all taxiways and runways within which aircraft and vehicles operate at the direction of the Federal Aviation Administration (FAA) Air Traffic Control Tower, and all other areas within the AOA but outside the Ramp/Apron areas.
7. Aircraft Rescue and Fire Fighting (ARFF) Road – A designated road on the Airport that is under the operational control of the DPS and Airport Operations and is used for emergency purposes.
8. Airfield Construction – All work performed within the AOA.
9. Airfield Operations – The section of the Airport Operations Department responsible for all day-to-day operations on and surround the airfield.
10. Airport – Refer to General Provisions, Section 10.
11. Airport Board (or Board) – Refer to General Provisions, Section 10.
12. Airport Board Policy (ABP).
13. Airport Design Criteria Manual – The latest edition of the design criteria document to be used for all projects on the Airport property that may be located at the following:
DFW Design Criteria Manual 2025
14. Airport Identification/Access Badge - A photo-identification badge issued by the Airport granting unescorted access to specific areas for the purpose of conducting business in accordance with the Rules and Regulations, Federal, State, and local laws and regulations, and Policies and Procedures of the Airport.
15. Airport Operations Department – Refer to “Operations Department.”
16. Allowance - As defined in Section 01 30 00.
17. Americans with Disabilities Act Accessibility Guidelines (ADAAG).
18. Approval Authority – The approval authority for ingress/egress issuance is the Airport’s Vice President of Airport Operations or Vice President of Design and Construction.
19. Apron (Ramp) – A paved surface usually around terminal buildings, cargo/air freight buildings, and aircraft hangars from which aircraft operate or are parked.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
MAY 2026
https://assets.ctfassets.net/m2p70vmwc019/6lFZQdp6e2USduutkkLwDk/1dc684b60c14cde16c20263f4347aeec/DFW_Design_Criteria_Manual_2025_FINAL.pdf
01 10 01 - 2
20. Architect/Engineer (A/E) – The individual, partnership, firm or corporation duly authorized by the Owner to be responsible for professional services associated with architecture, engineering, or management for the Project.
21. Award - Refer to General Provisions, Section 10.
22. Baseline Schedule - The detailed schedule of coordinated construction activities prepared by the Contractor and approved by the Owner’s Authorized Representative (OAR), to plan the Work of the Project. The Baseline Schedule shall not be modified after the approval of the OAR. Refer to Section 01 32 16 for additional information.
23. Basis of Design (BOD) – As defined in Section 01 91 00.
24. Best Management Practice (BMP)
25. Beneficial Occupancy- Stage of construction of a building or facility before final completion, at which its user can occupy for the purpose of construction.
26. Bidder - Refer to General Provisions, Section 10.
27. Building Information Model (BIM): BIM is a digital representation of the physical and functional characteristics of the Project and is referred as a Model(s), which term may be used to describe a Model Element, a single Model or technology used to create the Model.
28. Business Diversity and Development (BDD) - The Airport department responsible for business diversity and minority business opportunities and monitoring diversity participation in Airport projects.
29. Calendar Day - Refer to General Provisions, Section 10.
30. Certified Movement Area Escort (CMAE) – An Airport employee or otherwise authorized person responsible for guiding a non-Security Identification Display Area (SIDA) badged person and/or vehicle though the Transportation Security Administration (TSA) passenger screening checkpoint, manned AOA gate, or AOA un-manned access gate.
31. Central Terminal Area (CTA) – The ramp areas serving Terminals A, B, C, D, and E, and the 1E ramp.
32. Certificate of Occupancy (CO).
33. Change Order - Refer to General Provisions, Section 10.
34. Clean Air Act (CAA) – USC Title 42 §§ 7401 et seq.
35. Clean Water Act (CWA) - USC Title 33 §§ 1251, et seq.
36. Code of Federal Regulations (CFR).
37. Code of Rules and Regulations (Code) – The published Rules and Regulations of the Airport Board as ratified by local jurisdiction for the control of parking revenue boundary crossing by vehicles located at the following link: Code of Rules and Regulations Chapter 2.pdf
38. Commissioning – As defined in Section 01 91 00.
39. Commissioning Agent – As defined in Section 01 91 00.
40. Commissioning Coordinator – As defined in Section 01 91 00.
41. Commissioning Plan – As defined in Section 01 91 00.
42. Commissioning Team – As defined in Section 01 91 00.
43. Construction Site Notice (CSN).
44. Contaminated Media Management Plan (CMMP) – Refer to Section 01 33 29.06.01.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
MAY 2026
https://assets.ctfassets.net/m2p70vmwc019/6NQCPK4LS19XjMlUlpx9Zm/76786ef86cb5dece7bc09a5010e4ecd2/Code_of_Rules_and_Regulations__Chapter_2_.pdf https://assets.ctfassets.net/m2p70vmwc019/6NQCPK4LS19XjMlUlpx9Zm/76786ef86cb5dece7bc09a5010e4ecd2/Code_of_Rules_and_Regulations__Chapter_2_.pdf
01 10 01 - 3
45. Contract – Refer to General Provisions, Section 10.
46. Contract Administrator – The person assigned by the Owner to administer the Contract.
47. Contract Amount – The overall amount or cost included in the Contractor’s Bid and shown on Page 1 of the Executed Contract.
48. Contract Documents – All documents that together form that basis of the Contract including the Contract Agreement, including all General Provisions and Special Provisions, Project Schedule, Plans, and Specifications, and any executed modifications thereto.
49. Construction General Permit (CGP).
50. Contract Item (or Pay item) - Refer to General Provisions, Section 10.
51. Contract Time - Refer to General Provisions, Section 10.
52. Construction Manager (CM) - Refer to General Provisions, Section 10.
53. Construction Schedule – The schedule prepared by the Contractor updated throughout the course of the Project based on the approved Baseline Schedule.
54. Contractor - Refer to General Provisions, Section 10.
55. Contractor’s Authorized Representative (CAR) (Also Superintendent) - The Contractor’s official representative for the Project who is regularly present on the Project site, is authorized to receive and fulfill instructions from the Owner and is responsible to supervise and direct the Contractor’s personnel on the Project. The person shall be designated by the Contractor, in writing, as the primary point of contact for all Contract related matters. Refer to General Provisions, Section 10, Superintendent.
56. Control Plaza – The entrance and exit gates at the north and south ends of the Airport that provides a stop barrier on northbound and southbound International Parkway.
57. Corrective Action – The replacement, removal, repair, or modification proposed by the Contractor to address a deviation or non-conformance issue on the Project. The Corrective Action will be approved by the Owner prior to implementation.
58. Critical Path Method (CPM) - A detailed project management scheduling technique for planning and monitoring a project.
59. Cutting and Patching – Includes, but not limited to, the cutting and patching of existing work in order to accommodate the coordination of the Work, or the installation of new Work. Patching is also defined as the repair or filling of surfaces where existing items are removed depending on the context.
60. Department of Labor (DOL) – The United States Department of Labor which is responsible for the occupational safety, wage and hour standards, unemployment insurance benefits, and reemployment services.
61. Department of Public Safety (DPS) – The Airport department responsible for safety on the Airport property.
62. Design, Code, and Construction (DCC) – The Airport department responsible for, among other functions, the development of the Airport’s various components. The Contractor is required to coordinate with DCC and obtain permits from DCC through use of certain forms as described in the Contract Documents.
63. Digital Facilities and Infrastructure (DFI) Standards Manual – Establishes specific content criteria for all public infrastructure, terminal buildings and other public facilities owned, operated, or maintained by the Dallas Fort Worth International Airport Board (hereinafter
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 4 referred to as "Board"). It also serves as a guide for all other facilities designed and constructed within the boundaries of the DFW Airport.
64. Discharge Monitoring Report (DMR) – A regulatory term for a periodic water pollution report prepared for industry, municipalities, and other facilities discharging to the local surface waters.
65. Driver – An individual who drives or operates a commercial, governmental, institutional, and other type vehicle on the Airport.
66. Energy, Transportation and Asset Management (ETAM) – The Airport department including the Infrastructure Operations, Business Services and Energy & Utility Systems and responsible for operating and/or maintaining the Airport Infrastructure, Systems, and Equipment (Systems).
67. Engineer - Refer to General Provisions, Section 10. Refer to Architect/Engineer.
68. Environmental Affairs Department (EAD) – The Airport department responsible for environmental issues on the Airport.
69. Erosion Control Plans (ECP).
70. Estimated at Completion (EAC).
71. Estimate to Completion (ETC).
72. Extra Work - Refer to General Provisions, Section 10.
73. Final Stabilization: A construction site status where all soil disturbing activities at the site have been completed and a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover with a density of 70% of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as crushed stone, riprap, gabions, or geotextiles) have been employed.
74. Federal Aviation Administration (FAA) – Refer to General Provisions, Section 10.
75. Green Building Standards (GBS) – The latest edition of the Airport “Green Building Standards” document located at the following: DFW Green Building Standards
76. Haul Road – A specified roadway within the AOA serving authorized construction-related traffic.
77. Holder – A person, or his agent, who is granted operating authority to cross Parking Revenue Area (PRA) boundaries as specifically authorized in the Code.
78. Hot Work – Operations including cutting, welding, thermal welding, brazing, soldering, grinding, thermal straying, thawing pipe, or installation of roof systems requiring the use of a torch or any other open flame device or any other similar operation.
79. Hot Work Permit - A permit required of the Contractor from the Airport Fire Prevention and Planning Department necessary to perform any hot work operations on the Airport as part of the Project.
80. Infrastructure, Systems, and Equipment (Systems) - Consists of MEPS, Pavement, Signs & Markings, Grounds, Airfield Lighting and Utilities at the Airport. These systems are the responsibility of the Airport ETAM Department.
81. Ingress/Egress Device – A device that allows entry into the PRA by specified, unescorted vehicles.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
MAY 2026
https://assets.ctfassets.net/m2p70vmwc019/4M48oN1j6ojTuQjhxhlHIj/62bfb5ef53a0de36481262eccd6f6875/DFW_Green_Building_Standards_Jan_2021_update.pdf
01 10 01 - 5
82. Inspector – A person selected by the Owner assigned to make all necessary inspections and/or tests of the Work being performed or of the materials furnished or being furnished by the Contractor.
83. Instrument Landing System (ILS).
84. International Building Code (IBC).
85. International Fire Code (IFC).
86. Knox Box - The rapid access security box by the Knox Company which provides first responders with immediate access into secure buildings, campuses, residences and commercial properties.
87. Land Use Committee (LUC) - The committee responsible for review of the land use at the Airport consisting of representatives from all relevant Airport Departments.
88. Limited Notice to Proceed (LNTP)- Written notice instructing the contractor to proceed with parts of the work.
89. Materials - Refer to General Provisions, Section 10.
90. Safety Data Sheet (SDS) – A formal document required by the Occupational Safety and Health Administration (OSHA) that contains information about the characteristics and actual or potential hazards of a substance. It identifies the material manufacturer along with the chemical identity, hazardous ingredients, physical and chemical properties, fire and explosion data, reactivity data, health hazards data, exposure limits data, precautions for safe storage and handling, need for protective gear, and spill control, cleanup, and disposal procedures.
91. Milestones - A special event or specific date that is established in a schedule to monitor the progress of the Project or a portion of the Project to assist the determination of whether the Project is on schedule.
92. Mobilization – The actions of the Contractor to establish offices, lay-down areas, plants, and other facilities in preparation of performing the Work of the Contract.
93. Multi-Sector General Permit (MSGP).
94. Municipal Separate Storm Sewer System (MS4).
95. National Environmental Laboratory Accreditation Certification (NELAC).
96. Navigational Aid (NAVAID) – An apparatus, generally located within the AOA, which serves as a guide to landing aircraft.
97. NAVAID Critical Area (NCA) – A three-dimensional area surrounding a NAVAID that, if penetrated by equipment or a stockpile, could cause interference with navigational equipment.
98. Non-Conformance Report (NCR) – A report prepared by the OAR personnel to document a deviation, deficiency, or other non-conformance item on the Project.
99. Non-Movement Area – An apron or other portion of the AOA where control and direction by the FAA Tower is not required.
100. Notice of Intent (NOI).
101. Not in Contract (NIC).
102. Notice of Change (NOC).
103. Notice of Termination (NOT).
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 6
104. Notice to Proceed (NTP) - A written notice to the Contractor to begin the work under contract by a specified date. If applicable, the Notice to Proceed shall state the date on which the contract time begins.
105. Object Free Area (OFA) – As defined in Section 01 35 13.13.
106. Obstacle Free Zone (OFZ) – As defined in Section 01 35 13.13.
107. Operating Authority – Permission granted by the Administrator for a vehicle to enter the PRA in accordance with the Rules and Regulations.
108. Operations Department - The Airport department responsible for, among other functions, the Airfield Operations Section. Also, the Airport Operations Department.
109. Operator – The driver of a motor vehicle, the owner of a vehicle, or the Holder of a vehicle with Operating Authority.
110. Owner – Refer to General Provisions, Section 10. Refer to “Board.”
111. Owner’s Authorized Representative (OAR) – A person designated by the Owner, in writing, with specific limits of authority on the Project. The OAR may be an employee of the Owner or an employee of a firm under contract with the Owner to provide specific services.
112. Owner’s Project Requirements (OPR).
113. Parking Business Unit (PBU) - The Airport department is responsible for, among other functions, revenue control and operations of the PRA and issues and monitors use of parking privileges and Vehicle Access Tags (VATs).
114. Parking Revenue Area (PRA) – The area bounded by fences, gate control equipment and arms, from which the Owner produces revenue from parking spaces.
115. Pay Item – Refer to “Contract Item” and General Provisions, Section 10.
116. Payment Application – A formal request from the Contractor to the Owner for payment of the Work, or a portion of the Work, on the Project.
117. Person – An individual, a corporation, a government or governmental subdivision, or an agency, trust, partnership, or two or more persons having a joint or common economic interest.
118. Plans - Refer to General Provisions, Section 10.
119. Pre-conditioned Air Unit (PCA Unit) – Equipment that provides cooling to the jet bridge and the aircraft while the aircraft is parked at the gate.
120. Pre-Construction Conference – Refer to Section 01 31 19.
121. Progress Meeting – Refer to Section 01 31 19.
122. Progress Payment – A payment from the Owner to the Contractor in response to a Payment Application submitted by the Contractor on the Project.
123. Project – The Project is the total Work performed under the Contract Documents.
124. Project Manual – The package containing all the Specification Sections, General Provisions, Special Provisions, and all attachments included therein, (e.g., soils reports, environmental reports, safety documents, etc.).
125. Punch List - A list prepared by the Owner's personnel to document outstanding work items during the Project Closeout process.
126. Quality Assurance (QA) - Refer to General Provisions, Section 10.
127. Quality Control (QC) - Refer to General Provisions, Section 10.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 7
128. Quality Assurance Representative - The Airport employee or person designated by the
Owner responsible for quality assurance tasks on the Project.
129. Recovery Schedule – As defined in Section 01 32 16.
130. Request for Information (RFI) - A formal request from the Contractor for additional information or clarification of information regarding an apparent inconsistency, error, or omission in the Contract Documents. The request may be based on unanticipated existing conditions on the Project site.
131. Rules and Regulations – The vehicle Rules and Regulations established under the AOA Rules and Regulations for Construction and Maintenance.
132. Ramp – Refer to “Apron.”
133. Runway – Refer to General Provisions, Section 10.
134. Runway Incursion – An incorrect presence of an aircraft, vehicle, or person on the protected area of a Runway.
135. Runway Safety Area (RSA).
136. Safety Area – A specific area surrounding Runways and Taxiways, which requires special authorization to enter.
137. Schedule of Charges – The rates and fees charged by and as approved by the Owner.
138. Security Identification Display Area (SIDA) – All areas of the Airport identified in the security program as requiring each person to continuously display on their outermost garment above the waist and below the neck, an Airport approved identification medium unless under an escort by a CMAE. For purposes of construction and maintenance, it also includes the entire area of the AOA.
139. Schedule of Values (SOV) – A detailed schedule provided by the Contractor which breaks down the Contract Amount, including Supplemental Agreements and Change Orders to date, into the Project approved cost codes divisions and/or sections of the Work. Refer to Section 01 29 73.
140. Security Threat Assessment (STA).
141. Site Mobilization Conference – Refer to Section 01 31 19.
142. Unifier – Database software system used by the Owner for construction projects. All project submittals, meeting minutes, correspondence, etc. should be completed through this system unless otherwise noted in the Specification Sections or directed by the OAR.
143. Skylink Automated People Mover System – Guideway, stations, and vehicles to provide timely inter-terminal connections in the CTA.
144. Small/Disadvantaged/Minority/Women Business Enterprise (S/D/M/WBE).
145. Spill Prevention Control and Countermeasure (SPCC) – Refer to Section 01 57 19.
146. Spill Response Plan (SRP) – Refer to Section 01 57 19.13.
147. Specifications – Defines the qualitative requirements for material, and workmanship required for the Work. The Specifications for this Project consist of the Standard Specifications and any additional Specification Sections included in the Project Manual.
Any Specification Sections included in the Project Manual will supersede a Standard Specification where a conflict may occur. The Specifications are part of the Contract Documents. Refer to General Provisions, Section 10.
148. Standby Time – As defined in Section 01 21 00.
149. State – The State of Texas.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 8
150. Stockpiles – Quantities of materials, debris or spoils, which remain on the work site after work has finished for the day, etc.
151. Stormwater Pollution Prevention Plans (SWPPP).
152. Subcontractor – Any independent firm, corporation, or partnership that enters into a subcontract with the Contractor to perform a portion of the Work of the Contract.
153. Substantial Completion - The stage of the Project, or a portion of the Project, where the Owner determines the Project to be sufficiently complete. In accordance with the Contract Documents so the Owner may use or occupy the Project site, or a portion of the Project site, to be used for the intended purpose.
154. Substitution - As defined in Section 01 25 13.
155. Surface Movement Guidance & Control System (SMGCS).
156. Systems – Infrastructure, equipment, and systems which are identified in the Contract Documents to be commissioned on the Project.
157. Systems Performance Group (SPG) - A group within the Airport ETAM Department which consists of the following teams:
a. Facility Systems
b. Watershed Management
c. Computer Maintenance Management Systems
d. Commissioning
1) The SPG Manager is the designated Commissioning Authority (CxAuD)
e. Geospatial Analytics
158. Taxilane – A portion of an aircraft parking area used for access between Taxiways and aircraft parking positions.
159. Taxiway – Refer to General Provisions, Section 10.
160. Temporary Structure - A portable building, Conex container, or shade structure that will be on the Project site less than ninety-one (91) Calendar Days from the date of the letter of authorization.
161. Texas Administrative Code (TAC).
162. Texas Accessibility Standards (TAS).
163. Texas Pollutant Discharge Elimination System (TPDES).
164. Texas Risk Reduction Program (TRRP).
165. Texas Manual of Uniform Traffic Control Devices (TMUTCD).
166. Time Impact Analysis (TIA)- Refer to Schedules, Section 1.32.16.
167. United States Code (USC).
168. Utility - A private, publicly or cooperatively owned line, facility and/or system for producing, transmitting or distributing communications, power or electricity, cable television, light, heat, gas, gas, oil, crude products, water, wastewater, and other products that directly or indirectly serve the Airport or public.
169. Utility Coordinator - An employee of the Owner or other person designated by the Owner responsible to monitor and coordinate Utilities on the Project.
170. Utility Owner - A privately, publicly, or cooperatively owned company which owns, leases, and/or operates a Utility on the Airport.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 01 - 9
171. Vehicle - Private, commercial, governmental, institutional and any other type vehicles that operate in a way that requires crossing of the PRA boundary and have been licensed by proper authority.
172. Vehicle Access Tag (VAT).
173. Voluntary Cleanup Program (VCP).
174. Work - Refer to General Provisions, Section 10.
175. Work Breakdown Structure (WBS).
176. Working Day - Refer to General Provisions, Section 10.
B. Additional definitions and acronyms are included in the individual Specification Sections. Any such definitions and acronyms are meant to be cooperative with this Section.
C. Additional professional association and public agency names, abbreviations, and acronyms are included in Section 00 10 02.
D. The Contractor shall coordinate with the OAR to promptly resolve any conflicts in terminology or definitions between individual Specification Sections and this Section. Any unresolved disagreement between the Contractor and the OAR regarding interpretation shall be resolved by the Owner.
PART 2 – PRODUCTS
Not Used.
PART 3 – EXECUTION
Not Used.
- END OF SECTION -
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 1 Reference Standards
1.01 REQUIREMENTS INCLUDED
SECTION: 01 10 02
REFERENCE STANDARDS
A. This Section includes the language definitions and standard references. Agency/association acronyms are included in the Contract Documents. Additional term definitions are included in the individual Specification Sections.
1.02 QUALITY ASSURANCE
A. Application: When a standard is specified by reference, the Contractor shall comply with the requirements and recommendations stated in that standard. Except when requirements are modified by the Contract Documents or other applicable codes which establish more stringent standards.
B. Publication Date: The publication is in effect on the Bid Date, except when a specific version date or publication date is specified in the Contract Documents.
1.03 LANGUAGE DEFINITIONS
A. “Directed,” “Designated,” “Selected,” “Requested,” “Authorized,” “Permitted,” or words of similar import: Direction, designation, selection, or similar action of the Owner is intended.
B. “Require” and words of similar import: As required to complete Work and as required by the Owner.
C. “Shall” or “Must”: A mandatory requirement or activity of the Contractor or his associated Subcontractor.
D. “Perform”: Contractor shall perform operations necessary to complete Work. Including furnishing of necessary labor, tools, and equipment. Further including and installing of materials indicated, shall be specified or required to complete performance within the Contract Price.
E. “Provide”: Contractor shall furnish and install Work.
F. “Other acceptable manufacturer," "equal," "acceptable equal," "equivalent," or words of similar import: Refer to products or work proven to the satisfaction of the Owner, Architect/Engineer, or any specific department of the Airport to comply with the intent of the Contract Documents.
G. "Acceptance," "acceptable,” or words of similar import: Acceptance, acceptable or similar words shall be as approved by the Owner. "Accepted" or “Acceptance,” where used in conjunction with an action on the Contractor's submittals, and or requests, is limited to responsibilities and duties of the Owner’s Authorized Representative (OAR), Architect/Engineer, or any department of the Owner as stated in General and Supplementary Conditions. Approval does not release the Contractor from responsibility to fulfill the requirements of the Contract Documents, unless specifically stated otherwise in the Approval or Acceptance provided by the Owner.
H. "At no extra cost to Owner", "With no extra compensation to Contractor", "At Contractor's sole expense", or words of similar import: Terms shall be understood to mean that Contractor shall perform or provide specified operation of Work at no increase to Contract Amount stated in executed Contract.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 2
I. "NIC": Work identified on the Contract Documents, which is not being performed or provided as part of the Contract; the term shall mean "Not in This Contract" or "Not Part of Work to be performed or provided by Contractor." "NIC" work is indicated as an aid to Contractor in scheduling amount of time and materials necessary for completion of Contract.
J. "Indicated" refers to graphic representations, notes or schedules on the Plans, in other Specification Sections, or schedules, and similar requirements in the Contract Documents.
Where the term "shown", "noted", "scheduled", and "specified" are used, it is to help locate the reference.
K. "Regulation" includes laws, statutes, ordinances, and lawful orders issued by authorities having jurisdiction. As well as rules, conventions, and agreements within the construction industry that control performance of Work, whether they are lawfully imposed by authorities having jurisdiction or not.
L. "Furnish" means supply and delivery to Project site ready for unloading, unpacking, assembly, installation, and placing into operation in accordance with the Contract Documents.
M. “Incidental” means materials or efforts required for the completion of the Work or a work item but will not be itemized for payment individually and will be considered as part of the overall Work or construction or installation of another work item.
N. "Install" means unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations.
O. "Installer" is a person or firm engaged by Contractors either an employee or Subcontractor, regardless of tier, for performance of a particular construction activity. Including installation, erection, application, and similar operations. Installers are required to be experienced in the operations they are engaged in to perform. The term "experienced", when used with "installer", means having a minimum of five (5) years previous experience in projects of similar size and scope to this Project. Be familiar with precautions required and have complied with requirements of authority having jurisdiction.
P. "Project site" is space available to Contractor for performance of Work, either exclusively or in conjunction with others performing construction as part of Project. The limits of the Project site is shown on the Plans, or described in the Contract Documents, and may or may not be identical with description of land upon which Project is to be constructed.
Q. “Specification Section” (Section), “Project Specification,” “Technical Specification,” shall refer to the specifications identified or included in the Project Manual or refer to the requirements of a Reference Standard depending on context.
R. "Testing Laboratory" is an independent entity engaged by the Owner to perform specific inspections or tests, to report on, and if required, to interpret results of those inspections or tests, either at Project site or elsewhere.
1.04 SPECIFICATION SENTENCE STRUCTURE
A. Simple imperative mood of sentence structure may be used in the Specification Sections which place a verb as first word in sentence. Where "perform", "provide", "install", "erect", "furnish", "connect", "test", or words of similar import are used, it shall be understood that words include meanings of the phrase "The Contractor shall" is included before such words for interpretation.
B. Subsection titles and other identifications of subject matter in Specification Sections are intended as aid in locating and recognizing various requirements in Specification Sections.
Titles do not define, limit, or otherwise restrict the Specification Sections text. Capitalizing of words in text does not signify or mean that words convey special or unique meanings having
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 3 precedence over other parts of Contract Documents. Specification text shall govern over titling and shall be understood to be interpreted as a whole.
1.05 DOCUMENT ORGANIZATION
A. The organization of the Project Manual and Plans are not intended to control or to lessen responsibility of the Contractor, by dividing Work among its Subcontractors, or in establishing extent of the Work to be performed by any trade.
1.06 SYMBOLS
A. Graphic symbols used in the Contract Documents are those symbols recognized in the construction industry for indicated purposes. Where otherwise not noted symbols are those defined in "Architectural Graphics Standards", published by John Wiley & Sons, Inc., Current Edition.
B. Graphic symbols used on mechanical and electrical drawings are generally aligned with symbols recommended by American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE). Where appropriate, mechanical and electrical symbols are supplemented by more specific symbols recommended by the technical associations including American Society of Mechanical Engineers (ASME), American Society of Plumbing Engineers (ASPE), Institute of Electrical and Electronics Engineers (IEEE), and similar organizations. The Contractor shall request clarification from the OAR if the symbols are unfamiliar.
1.07 REFERENCE STANDARDS
A. Reference Standard-Abbreviations:
1. Reference standards are referred to in Specification Sections by basic designation only.
2. Where acronyms or abbreviations are used in the Contract Documents, they shall mean recognized name of trade association, standards generating organization, authority having jurisdiction, or other organization applicable to context of requirement.
3. Acronyms for governmental agencies and private associations are provided in this Section as aid to the Contractor and are not all inclusive.
4. Refer to "Encyclopedia of Associations", published by Gale Research Company, available in most public libraries, to reference unfamiliar organization acronyms or abbreviations.
B. Publications of organizations and societies listed in individual Specification Sections shall be considered an integral part of Contract Documents to the extent referenced. Work shall be executed on the Project in accordance with the requirements of the Reference Standards listed, to the extent such requirements do not supersede or conflict with the requirements within the Contract Documents.
C. Where a conflict may exist between requirements of two or more Reference Standards, and the Contract Documents do not clearly supersede the conflict, the Contractor shall request clarification from the OAR. Prior to proceeding with activities which are affected by such conflict. If work activities impacted by such conflict are on-going, the Contractor shall stop work and request clarification from the OAR.
D. If the Contractor does not request conflict clarification prior to proceeding or continuing, with activities impacted or controlled by such information. The Contractor will be proceeding at their own responsibility and will not be compensated for any re-work or removal of work, labor, material, or any other costs associated with the impacted work.
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 4
E. Publications may be referenced in text by basic designation only with organizations and societies referenced by abbreviations indicated.
F. When a Reference Standard is referred to in an individual Specification Section, but is not listed by title and date, it shall be considered to be the latest edition of such reference including the appropriate supplements, amendments, revisions, or errata at the date of the issuance of the Project Manual.
G. The Contractor shall provide at the Project site, copies of the Reference Standards per required, or as the OAR may request. Maintain those copies at the Project site throughout the construction period to ensure proper performance of the Work.
1.08 ABBREVIATIONS AND NAMES OF ORGANIZATIONS
A. Obtain copies of Reference Standards direct from publication source. All Airport codes and reference documents may be obtained online, as noted in various Sections, or from the Design, Code, and Construction Department (DCC).
AA Aluminum Association
AABC Associated Air Balance Council
AAMA American Architectural Manufacturers Association
AAES American Association of Engineering Societies
AAN American Association of Nurserymen
AASHTO American Association of State Highway Transportation Officials
ACEI Air Conditioning Engineers, Inc.
ACG AABC Commissioning Group
ACI American Concrete Institute
AGA American Gas Association
AGC Associated General Contractors of America
AHA American Hardboard Association
AI Asphalt Institute
AIA American Institute of Architects
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ALSC American Lumber Standards Committee
AMCA Air Movement and Control Association
ANSI American National Standards Institute
APA American Plywood Association
APFA American Pipe Fittings Association
ARI Air-Conditioning and Refrigeration Institute
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 5
ASA American Subcontractors Association
ASCA American Spray Coaters Association
ASCE American Society of Civil Engineers
ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers
ASLA American Society of Landscape Architects
ASME American Society of Mechanical Engineers
ASPE American Society of Plumbing Engineers
ASSE American Society of Sanitary Engineering
ASTM American Society for Testing and Materials
AWWA American Water Works Association
AWI Architectural Woodwork Institute
AWPA American Wood-Preservers' Association
AWS American Welding Society
BCA Building Commissioning Association
BIA Brick Institute of America
BHMA Builders Hardware Manufacturers Association
BOCA Building Officials and Code Administrators
CBM Certified Ballast Manufacturers
CDA Copper Development Association
CISCA Ceiling & Interior Systems Construction Association
CISPI Cast Iron Soil Pipe Institute
CLFMI Chain Link Fence Manufacturers Institute
CPSC Consumer Product Safety Commission
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standard
CSI Construction Specifications Institute
CTI Ceramic Tile Institute
DHI Door & Hardware Institute
EPA Environmental Protection Agency
FM Factory Mutual System
FAA Federal Aviation Administration
FARs Federal Aviation Regulations
FGMA Flat Glass Marketing Association
NOVEMBER 2025
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
70% Submittal November 14, 2025
Permit No. TBD
FEBRUARY 2026
100% Submittal February 6, 2026
Permit No. TBD
DFW Airport Trigg Lake Dam Reclassification Contract No.PA 1082
IFB Submittal April 29, 2026
Permit No. B25-0599
APRIL 2026
IFB Submittal May 06, 2026
Permit No. B25-0599
01 10 02 - 6
FS Federal Specification
FSCSI Food Service Consultants Society International
GA Gypsum Association
HPMA Hardwood Plywood Manufacturers Association
IAPMO International Institute of Plumbing and Mechanical Officials
ICBO International Conference of Building Officials
IEEE Institute of Electrical and Electronics Engineers
IES Illuminating Engineering Society
IETA International Electrical Testing Association, Inc.
IILP International Institute for Lath & Plaster
ILI Indiana Limestone Institute of America
IPCEA Industrial Power Cable Engineers Association
ISA Instrument Society of America
IWA International Waterproofing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .