This is a Technical Specification Book for Contract PA2169, Remote Parking BAS-HVAC Rehabilitation, issued by Dallas-Fort Worth International Airport on June 3, 2026. The project involves rehabilitation of heating, ventilating, and air-conditioning (HVAC) systems and Building Automation Systems (BAS) at Control Plazas and remote parking facilities at DFW Airport. The specification document outlines comprehensive technical requirements across multiple divisions including general requirements, existing conditions, metals, thermal and moisture protection, openings, finishes, HVAC systems, electrical systems, and communications. The project includes selective demolition, asbestos abatement procedures, construction of new HVAC infrastructure with direct digital control systems, electrical system modifications, testing and balancing of HVAC systems, and final commissioning activities. The document references two separate Limited Asbestos Inspections dated February 2026 and February 17, 2026, for North and South Control Plazas respectively, indicating that asbestos management and abatement will be necessary components of the work.
The asbestos inspections identified one confirmed asbestos-containing material (ACM)—5% Chrysotile in concrete wall caulk at the North Control Plaza measuring 32 linear feet—and four presumed asbestos-containing materials (PACM) including ceramic wall and floor tile systems and mirror mastic. All identified ACM and PACM materials are rated as non-friable with a risk assessment level of R3, indicating no immediate action required but regular inspection and planned management. Licensed asbestos professionals must perform any abatement activities in accordance with Texas Department of State Health Services requirements and OSHA standards. The contractor is required to maintain an Asbestos Operations and Maintenance Plan, provide asbestos awareness training to all construction and maintenance staff, and contact the Environmental Affairs Department if additional suspect materials are encountered during construction. The technical specification book establishes detailed protocols for construction quality control, temporary facilities, protective measures on the airport operations area, waste management, and final system commissioning and documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO. _____
Title: – To be defined within each Contract –
DALLAS FORT WORTH INTERNATIONAL
AIRPORT
DALLAS-FORT WORTH
INTERNATIONAL AIRPORT
Control Plazas, Remote Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Permit No. B25-0662
PART III TECHNICAL SPECIFICATION BOOK
VERSION 4.3
Issued for Bid June 3, 2026
Remote Parking BAS-HVAC Rehabilitation
PART III – TECHNICAL SPECIFICATION BOOK V4.3
ISSUED DATE: JUNE 2025
UTL-212 Control Plazas, Remote 00 01 07 - 1 Issued for Bid
Parking BAS-HVAC Rehabilitation Seals Page Date: 06/03/2026
Contract No. PA2169 Permit No. B25-0662
SECTION 00 01 07
SEALS PAGE
Architecture
Name:
License #:
Firm Name:
Firm Registration #:
Date:
Ken Korab
TX RA #28776
Gannett Fleming Architects, Inc.
BR1977
06/03/2026
Structural
License #:
Firm Name:
Firm Registration #:
Date:
Geoffrey K Bliss
133934
Ponce-Fuess
F-12125
Plumbing & HVAC
License #:
Firm Name:
Firm Registration #:
Date:
Clinton A May
TX PE 143827
Campos Engineering Inc.
F-001731
UTL-212
UTL-212 Control Plazas, Remote 00 01 07 - 2 Issued for Bid
Parking BAS-HVAC Rehabilitation Seals Page Date: 06/03/2026
Contract No. PA2169 Permit No. B25-0662
Electrical
Name:
License #:
Firm Name:
Firm Registration #:
Date:
Anh Nguyen
TX PE #94936
Campos Engineering Inc.
F-001731
Technology
License #:
Firm Name:
Firm Registration #:
Date:
Daniel P. LeClair
TX PE 67100
TLC Engineering Solutions, Inc.
- END OF SECTION -
UTL-212 Control Plazas, Remote
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Parking BAS-HVAC Rehabilitation Contract No. PA2169
00 01 10 - 1 Table of Contents
Date: 06/03/2026
SECTION: 00 01 10
TABLE OF CONTENTS
Any Section marked with an “Issue Date” below is hereby incorporated into the Project Manual. Any Section revised after the IFB is released must include a “Revised Issue Date.” Any Section revised or a new Section to be added to supersede the latest published document are as indicated and dated below and are hereby included in the Project Manual. Any Section included in the published book that are not included in the table below are not included in the Project Manual.
Section Description Issue Date Revised
Issue Date
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
00 01 01 Title Page 06/03/2026
00 01 07 Seals Page 06/03/2026
00 01 10 Table of Contents 06/03/2026
00 31 26 Existing Hazardous Material Information 06/03/2026
DIVISION 01 GENERAL REQUIREMENTS
01 10 01 Abbreviations, Acronyms and Definitions 06/03/2026
01 10 02 Reference Standards 06/03/2026
01 11 00 Summary of Work 06/03/2026
01 18 16 Protection of Existing Underground Utilities and Cables 06/03/2026
01 18 16.13 Utility Location Sign-Off Sheet 06/03/2026
01 18 16.14 Underground Utilities Damage Report 06/03/2026
01 21 00 Standby Time Allowance 06/03/2026
01 21 00.01 Standby Time Work Report 06/03/2026
01 22 00 Measurement and Payment 06/03/2026
01 25 13 Product Substitution Procedures 06/03/2026
01 25 13.01 Product Substitution Form 06/03/2026
01 26 13 Request for Information 06/03/2026
01 29 00 Payment Procedures 06/03/2026
01 29 73 Schedule of Values 06/03/2026
01 29 85 Wage Rate Requirements 06/03/2026
01 30 00 Allowances 06/03/2026
01 31 01 Building Information Modeling (BIM) 06/03/2026
01 31 19 Project Meetings 06/03/2026
00 31 26 Existing Hazardous Material Information 06/03/2026
01 32 16 Schedules 06/03/2026
01 33 23 Shop Drawings, Product Data, and Samples 06/03/2026
01 33 29.06.01 Contaminated Media Management Plan 06/03/2026
01 35 13.13 Minimum Standards for Construction and Maintenance on the AOA
06/03/2026
01 35 13.13.01 Minimum Standards for Construction and Maintenance on the AOA Appendix
06/03/2026
01 35 23 Hot Work Operations and Control 06/03/2026
01 35 24 Asbestos Operations and Control 06/03/2026
UTL-212 Control Plazas, Remote
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Contract No. PA2169
00 01 10 - 2
Issue Date
01 41 26.10 Construction Air Permitting 06/03/2026
01 41 26.13 Concrete Batch Plant and Hot Mix Asphalt Plant Permitting
06/03/2026
01 41 26.21 Migratory Bird Protection 06/03/2026
01 45 16.13 Contractor Quality Control 06/03/2026
01 45 20 Non-Conformance Report 06/03/2026
01 45 29 Owners Testing Laboratory 06/03/2026
01 50 00 Temporary Facilities and Controls 06/03/2026
01 50 00.01 Temporary Facilities and Controls – Water Request Form
06/03/2026
01 50 13 Owner’s Field Office 06/03/2026
01 52 00.01 Construction Signage 06/03/2026
01 52 13 Dust Control 06/03/2026
01 52 16 Haul Road 06/03/2026
01 55 20 Contractor Badging, AOA Access and Revenue Area Access
06/03/2026
01 55 29 Staging Areas 06/03/2026
01 56 23 Temporary Barricades 06/03/2026
01 56 26 Temporary Fencing 06/03/2026
01 56 40 Tree Conservation Plan 06/03/2026
01 57 13 Temporary Erosion and Sediment Control 06/03/2026
01 57 19 Spill Prevention Control and Countermeasure 06/03/2026
01 57 19.13 Spill Response Plan 06/03/2026
01 57 19.13.01 Spill Response Plan Form 06/03/2026
01 66 00 Product Storage and Handling Requirements 06/03/2026
01 71 13 Mobilization 06/03/2026
01 71 14 Land Use Requirements 06/03/2026
01 71 14.01 Land Use Requirements – Application Procedures 06/03/2026
01 73 29 Cutting and Patching 06/03/2026
01 74 13 Progress Cleaning 06/03/2026
01 74 18 Concrete Waste 06/03/2026
01 74 19 Construction Waste 06/03/2026
01 74 23 Final Cleaning 06/03/2026
01 76 00 Protecting Installed Construction 06/03/2026
01 76 50 Punch List 06/03/2026
01 77 00 Closeout Procedures 06/03/2026
01 77 00.01 Closeout Procedures – System Acceptance 06/03/2026
01 78 23 Operation and Maintenance Data 06/03/2026
01 78 33.36 Bonds and Warranties 06/03/2026
01 78 39 Project Record Documents 06/03/2026
01 78 46 Extra Stock Materials 06/03/2026
01 79 00 Demonstration and Training 06/03/2026
01 81 13 Sustainable Design Requirements 06/03/2026
01 83 19 Contractor Roofing Area Access 06/03/2026
01 83 19.01 Contractor Roofing Area Access – Forms 06/03/2026
01 91 00 Commissioning 06/03/2026
UTL-212 Control Plazas, Remote
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Contract No. PA2169
00 01 10 - 3
Issue Date
DIVISION 02 EXISTING CONDITIONS
02 41 19 Selective Demolition 06/03/2026
02 80 00.11 Asbestos 06/03/2026
DIVISION 05 METALS
05 12 00 Structural Steel Framing 06/03/2026
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 01 50 Maintenance of Membrane Roofing 06/03/2026
07 59 00 Electronic Leak Detection – High Voltage ELD 06/03/2026
07 84 13 Penetration Firestopping 06/03/2026
07 92 00 Joint Sealants 06/03/2026
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 06/03/2026
08 31 13 Access Doors and Frames 06/03/2026
DIVISION 09 FINISHES
09 22 16 Non-Structural Metal Framing 06/03/2026
09 29 00 Gypsum Board 06/03/2026
09 51 13 Acoustical Panel Ceilings 06/03/2026
09 84 33 Sound-Absorbing Wall Units 06/03/2026
09 84 36 Sound-Absorbing Ceiling Units 06/03/2026
09 91 24 Interior Painting (MPI Standards) 06/03/2026
DIVISION 23
HEATING, VENTILATING, AND AIR CONDITIONING
(HVAC)
23 00 10 General Requirements for HVAC Systems 06/03/2026
23 01 30.51 HVAC Air-Distribution System Cleaning 06/03/2026
23 05 48 Vibration and Seismic Controls for HVAC 06/03/2026
23 05 93 Testing, Adjusting, and Balancing for HVAC 06/03/2026
23 07 13 Duct Insulation 06/03/2026
23 07 19 HVAC Piping Insulation 06/03/2026
23 09 01 Control System Integration 06/03/2026
23 09 23 Direct Digital Control (BAS) Systems for HVAC 06/03/2026
23 09 24 Graphical User Interface 06/03/2026
23 31 00 HVAC Ducts and Casings 06/03/2026
23 33 00 Air Duct Accessories 06/03/2026
23 74 16 Packaged Rooftop Air-Conditioning Units 06/03/2026
DIVISION 26 ELECTRICAL
26 00 10 General Requirements for Electrical Systems 06/03/2026
26 05 05 Selective Demolition for Electrical 06/03/2026
26 05 19 Low Voltage Electrical Power Conductors and Cables 06/03/2026
UTL-212 Control Plazas, Remote
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Contract No. PA2169
00 01 10 - 4
Issue Date
26 05 26 Grounding and Bonding for Electrical Systems 06/03/2026
26 05 29 Hangers and Supports for Electrical Systems 06/03/2026
26 05 33.13 Conduit for Electrical Systems 06/03/2026
26 05 33.16 Boxes for Electrical Systems 06/03/2026
26 05 33.23 Surface Raceways for Electrical Systems 06/03/2026
26 05 53 Identification for Electrical Systems 06/03/2026
26 05 83 Wiring Connections 06/03/2026
26 24 16 Panelboards 06/03/2026
26 28 13 Fuses 06/03/2026
26 28 16.16 Enclosed Switches 06/03/2026
DIVISION 27 COMMUNICATIONS
27 05 00 Common Work Results for Communications 06/03/2026
27 05 28 Pathways for Communications Systems 06/03/2026
27 05 53 Identification for Communications Systems 06/03/2026
27 15 00 Communications Horizontal Cabling 06/03/2026
DIVISION 32 EXTERIOR IMPROVEMENTS
32 92 19 Seeding and Sodding 06/03/2026
END OF SECTION
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
UTL-212 Control Plazas, Remote 00 31 26 - 1 Issued for Bid
Parking BAS-HVAC Rehabilitation Existing Hazardous Date: 06/03/2026
Contract No. PA2169 Material Information Permit No. B25-0662
DOCUMENT 00 31 26
EXISTING HAZARDOUS MATERIAL INFORMATION
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions.
This Document and its attachments are not part of the Contract Documents.
B. An existing Limited asbestos report for Project, prepared by DFW International Airport, Asbestos Management Planner Agency, for project HVAC and BAS Replacement at North Control Plaza (Facility ID # 53022), EAD Project ID # 208983, Permit # B25-0662, dated February 25, 2026, is available for viewing as appended to this Project Manual.
C. An existing Limited asbestos report for Project, prepared by DFW International Airport, Asbestos Management Planner Agency, for project HVAC and BAS Replacement at South Control Plaza (Facility ID # 13072), EAD Project ID # 208984, Permit # B25-0662, dated February 17, 2026, is available for viewing as appended to this Project Manual.
END OF DOCUMENT
UTL-212 Control Plazas, Remote
Parking BAS-HVAC Rehabilitation
Contract No. PA2169
Limited Asbestos Inspection North Control Plaza – HVAC and BAS Replacement
EAD Project ID No. 208983 Page 2 of 10
Contents
1.0 INTRODUCTION
2.0 SITE DESCRIPTION
3.0 REFERENCES
4.0 ASBESTOS INSPECTION METHODS AND ANALYTICAL PROCEDURES
5.0 OBSERVATIONS AND FINDINGS
6.0 SITE PHOTOGRAPHS
7.0 ASBESTOS-CONTAINING BUILDING MATERIALS
8.0 PRESUMED ASBESTOS-CONTAINING BUILDING MATERIALS
9.0 RECOMMENDATIONS
Appendices:
Appendix A: Inspection Area Location Map
Appendix B: Asbestos-Containing Material (ACM) Location Map
Appendix C: Presumed Asbestos-Containing Material (PACM) Location Map
Appendix D: Reference Report
EAD Project ID No. 208983 Page 3 of 10
1.0 INTRODUCTION
The following report represents a Limited Asbestos Inspection (LAI) of suspect asbestos-containing building materials (SACBM) located in North Control Plaza at DFW Airport, Texas.
The subject building was constructed in the 1970s and is located at 1491 N International Pkwy in
DFW Airport. The inspection area consists of the entire area that may be disturbed during planned renovation activities. The building allow limited public access. The scope of services for this inspection includes the identification, location, quantification, and sampling of SACBM within the study area of the subject property. Sampling was conducted by Mr. Edgar Roque (TDSHS License
No. 60-3615), and Mr. Gonzalo Correa (TDSHS License No. 60-3095) under the guidance of Mr.
Javier Araya of DFW Airport’s Environmental Affairs Department (EAD).
2.0 SITE DESCRIPTION
The North Control Plaza is used for administration offices for access control. The area of interest was as follows:
• North Control Plaza
3.0 REFERENCES
During the inspection, the following asbestos report was referenced and shall be used in conjunction with this report.
Report Date Laboratory Report No.
North Control Plaza (2023 Comprehensive Asbestos Inspection) 11/17/23 PLM-35154
During the onsite inspection, these previously sampled suspect materials were observed in the project work areas.
Bulk Sample
No.
HA #
Sample Date
Building Material Description Asbestos
Content by PLM Analysis
Approximate Quantity of
ACM
Friability
01-03 I01 06/24/22 Fireproofing, Brown ND N/A FR
04-06 I02 06/24/22 Fireproofing, Lt. Gray, Hard ND N/A FR
07-09 M01 06/24/22 Pipe Insulation Mastic, White ND N/A NF
10-12 I03 06/24/22 HVAC Ductwork Insulation ND N/A NF
13-15 M02 06/24/22 Wall Penetration Caulk, Red ND N/A NF
16-18 M03 06/24/22 Wall Caulking, White ND N/A NF
19-21 C01 06/24/22 2” x 2” Ceiling Tile, Rough ND N/A FR
22-24B
W01 T01
T02
06/24/22 Drywall, Texture, Smooth, Joint Compound ND N/A FR
25-27 M04 06/24/22 Door Caulk, Brown ND N/A NF
28-30 M05 06/24/22 Counter Edge Caulking, White ND N/A NF
31-33 I04 06/24/22 Sink Undercoating, Black ND N/A NF
34-36 M06 06/24/22 Men’s Restroom Fixture Calk, White ND N/A NF
37-39 M07 06/24/22 Carpet Mastic, Yellow ND N/A NF
EAD Project ID No. 208983 Page 4 of 10
Sample
No.
HA #
Sample Date
Building Material Description Asbestos
Content by PLM Analysis
Approximate Quantity of
ACM
Friability
40-42 M08 06/24/22 Cove Base Mastic, Yellow ND N/A NF
43-45
F01 M09
T03
06/24/22 12” x 12” Floor Tile, Cream, Mastic, Black, Floor Filler Gray
ND N/A NF
46-48 M10 06/24/22 Door Caulking ND N/A NF
49-51 M11 06/24/22 Wall Penetration Caulk, Red ND N/A NF
52-54 M12 06/24/22 Wall Expansion Caulk, White ND N/A NF
55-57 M13 06/24/22 Louver Caulking, White, Older ND N/A NF
58-60 W02 06/24/22 Concrete Wall ND N/A NF
61-63 T04 T05
06/24/22 Plaster and Lathe ND N/A NF
64-66 M14 06/24/22 Waterproofing Mastic, Black ND N/A NF
67-69 C02 06/24/22 Ceiling Tile, Pinhole and Fissures ND N/A FR
70-72 M15 06/24/22 Vacuum System Pipe Sealant, Black ND N/A NF
73-75 M16 06/24/22 Door Caulking ND N/A NF
76-78 M17 06/24/22 Expansion Sealant, Black ND N/A NF
79-81 F02 M18
06/24/22 Escalator Flooring, Beige, Mastic, Black ND N/A NF
82-84 F03 06/24/22 Concrete Flooring ND N/A NF
85 R01 06/24/22 Roofing Material ND N/A NF
85 R02 06/24/22 Roofing Material ND N/A NF
87 R03 06/24/22 Roofing Material ND N/A NF
88 R04 06/24/22 Roofing Material ND N/A NF
89 R05 06/24/22 Roofing Material ND N/A NF
90 R06 06/24/22 Roofing Material ND N/A NF
91 RF01 06/24/22 Roof Mastic ND N/A NF
92 RF02 06/24/22 Roof Mastic ND N/A NF
93 RF03 06/24/22 Roof Mastic ND N/A NF
94 RF04 06/24/22 Roof Mastic ND N/A NF
95 RF05 06/24/22 Roof Mastic ND N/A NF
96 RF06 06/24/22 Roof Mastic ND N/A NF
97-99 T06 06/24/22 Interior Concrete Wall Texture ND N/A NF
100-102 M19 06/24/22 Window Caulk Mastic, Black ND N/A NF
103-105 T07 06/24/22 CMU Filler ND N/A NF
106-108 T08 06/24/22 Concrete Texture ND N/A NF
98-100 M19 10/11/23 Door Frame Caulk, Beige ND N/A NF
101-103
W03 T06
T07
10/11/23 Drywall, Texture, Smooth, Joint Compound ND N/A FR
104-106 I03 10/11/23 Vbration Damper ND N/A NF
107-109 M20 10/11/23 Metal Seal Caulk, Black ND N/A NF
110-112 M21 10/11/23 Concrete Wall Caulk, Black 5% Chrysotile 32 LF NF
113-115 CR01 10/11/23 Slab Concrete ND N/A NF
N/A PR01 N/A 12” x 12” Ceramic Wall Tile System PACM N/A NF
N/A PR02 N/A 12” x 12” Ceramic Floor Tile System PACM N/A NF
N/A PR03 N/A 1” x 1” Ceramic Wall Tile System PACM N/A NF
EAD Project ID No. 208983 Page 5 of 10
Sample
No.
HA #
Sample Date
Building Material Description Asbestos
Content by PLM Analysis
Approximate Quantity of
ACM
Friability
N/A PR04 N/A Mirror Mastic PACM N/A NF
N/A: Not Applicable; ND: Non-Detect; LF: Linear Feet; SF: Square Feet; CF: Cubic Feet; ACM: Asbestos-Containing Material; PACM: Presumed Asbestos-Containing Material; NF: Non-Friable; FR: Friable
Laboratory analysis of the above-listed samples collected during the inspection indicated the presence of asbestos in the black concrete wall caulk (5% Chrysotile). All other sampled suspect materials indicated non-detect levels of asbestos.
4.0 ASBESTOS INSPECTION METHODS AND ANALYTICAL PROCEDURES
The inspection was performed in general accordance with the EPA Asbestos Hazard Emergency
Response Act (AHERA), National Emission Standard for Hazardous Air Pollutants (NESHAP), and Texas Asbestos Health Protection Rules (TAHPR); however, as with most scientific studies, an asbestos inspection is subject to various limitations, including access and observation limitations. Therefore, additional suspect asbestos-containing building materials (SACBM) may be present in inaccessible or concealed spaces. These spaces include but are not limited to pipe chases, spaces between walls, ceilings, doors, and floor cavities, the interior of mechanical components such as boiler cavities, interior ductwork, beneath foundation slabs, etc. If future renovation, demolition, or repair activities make these areas accessible, further sampling must be performed to confirm the presence or absence of asbestos. Any unsampled building materials must be presumed asbestos-containing building materials (PACBM) until additional sampling and laboratory analysis proves otherwise.
4.1 BULK SAMPLE COLLECTION METHODOLOGY
Prior to collecting any samples, materials considered as Homogenous Areas (HA’s) were identified and listed to develop a sampling strategy. A homogeneous area can be described as one or more areas that are similar in appearance and texture, and that have the same installation date and function. The actual number of samples collected from each homogeneous sampling varies based on the type of material and the professional judgment of the inspector. Determination of Homogenous Areas is determined based on the following criteria:
• Similar physical characteristics (same color and texture)
• Application (sprayed-on, troweled-on, assembly into a system)
• Material function (thermal system insulation, floor tile, wallboard system, etc.)
• Same date of installation
4.2 NON-SUSPECT ASBESTOS-CONTAINING MATERIALS
For building materials that a licensed asbestos inspector has determined as “non-suspect asbestos-containing materials,” bulk samples were not required to be collected. Examples of building materials that are considered non-suspect include plastic, PVC, fiberglass, foam, rubber, silicone, glass, wood, and metal.
The following non-suspect materials were observed during the on-site inspection:
EAD Project ID No. 208983 Page 6 of 10
• Ceiling System: Metal
• Wall System: Metal Wall Studs, Vinyl Cove Base
• Plumbing System: Metal Pipe, Fiberglass Insulation
• HVAC System: Metal Ductwork
• Electrical System: Metal Conduit
• Roofing System: Metal, Foam
4.3 ANALYTICAL PROCEDURES
The analytical method used to determine the asbestos content of bulk samples collected for
SACBM was polarized light microscopy (PLM) with dispersion staining, EPA Method 600. A material is considered by the USEPA to be asbestos-containing if at least one (1) sample collected from the homogenous area has asbestos present in concentrations equal to one percent (≥1.0%).
If bulk sample analysis was between 2% to 5% asbestos, the use of EPA Point Count Method
400/1000 was utilized to confirm if regulated amounts of asbestos were present. Samples were analyzed through EAD’s current contractual agreement with Cates Laboratories.
5.0 OBSERVATIONS AND FINDINGS
The LAI was performed on February 2, 2026. All sampling procedures were in accordance with federal and state protocols. During the inspection, no additional building materials were observed, and no additional building samples were collected. The Sample Location Map is in Appendix A.
6.0 SITE PHOTOGRAPHS
The following photos were collected at the time of the inspection:
Photo 1: View of North Control Plaza Location: North Control Plaza
EAD Project ID No. 208983 Page 7 of 10
7.0 ASBESTOS-CONTAINING BUILDING MATERIALS
During the on-site inspection, the following asbestos-containing building materials were observed in the planned construction area. Laboratory analysis of bulk samples collected during the survey indicated the presence of asbestos in:
Concrete Wall Caulk, HA ID #M21 Location: North Control Plaza
The material was observed in good condition at the time of the inspection.
If the above material is observed during construction activities, the contractor shall make every effort not to disturb them. The Asbestos-Containing Building Material Location Maps are included in Appendix B.
EAD Project ID No. 208983 Page 8 of 10
8.0 PRESUMED ASBESTOS-CONTAINING BUILDING MATERIALS
During the on-site inspection, in an effort not to perform destructive sampling or due to inaccessibility, the following suspect materials shall be presumed as asbestos-containing building materials (PACBM) until further sampling is performed.
12” x 12” Ceramic Wall Tile System, HA ID #PR01 Located at North Control Plaza
12” x 12” Ceramic Floor Tile System, HA ID #PR02
EAD Project ID No. 208983 Page 9 of 10
1” x 1” Ceramic Floor Tile System, HA ID #PR03
Mirror Mastic, HA ID #PR04
If these above materials are observed during construction activities, the contractor shall make every effort not to disturb them. The Presumed Asbestos-Containing Building Material Location
Maps are included in Appendix C.
EAD Project ID No. 208983 Page 10 of 10
9.0 RECOMMENDATIONS
Based on the laboratory analysis, asbestos-containing materials identified during the inspection included black concrete wall caulk (5% Chrysotile). Per requirement of State and Federal
Regulations, abatement of ACM will be required prior to any repair, demolition, renovation, or any other activities that have the potential to disturb the material. Trained Asbestos Professionals licensed by the Texas Department of State Health Services shall perform asbestos abatement and air monitoring.
Also, Based on laboratory analysis and field reconnaissance, suspect materials sampled within the inspection area were non-detect for asbestos. However, in an effort to limit destructive sampling or inaccessibility, ceramic floor and wall tile systems, and mirror mastic shall be presumed as asbestos-containing materials (PACMs). Further sample collection and laboratory analysis of these building materials will be required to determine the presence or absence of asbestos. Details regarding the type, location, and condition of PACM can be located in the
Presumed Asbestos-Containing Building Materials section of this report.
If presumed asbestos-containing materials or materials other than plastic, PVC, fiberglass, foam, rubber, silicone, glass, wood, and metal are to be disturbed that are not covered in this report, additional sampling will need to be performed to identify the absence or presence of asbestos.
Construction, maintenance, and custodial staff shall have asbestos awareness training compliant with OSHA 29 CFR 1926.1101 or 1910.1001. This report has been prepared by the Dallas/Fort
Worth International Airport, Environmental Affairs Department, for the exclusive use of the DFW
Airport Board. Any use of or reliance on this report by a third party shall be at such party’s sole risk.
EAD Project ID No. 208983
APPENDIX A
Inspection Area Location Map
APPENDIX B
Asbestos-Containing Material (ACM) Location Map
APPENDIX C
Presumed Asbestos-Containing Material (PACM) Location Map
APPENDIX D
Reference Report
Comprehensive Asbestos Inspection North Control Plaza Facility ID No. 53022
Report Issue Date: 11/17/2023
Contents
1.0 INTRODUCTION
2.0 SITE DESCRIPTION
3.0 ASBESTOS OPERATIONS AND MAINTENANCE (O&M) PLAN
4.0 ASBESTOS INSPECTION METHODS AND ANALYTICAL PROCEDURES
5.0 BULK SAMPLE COLLECTION METHODOLOGY
6.0 ANALYTICAL PROCEDURES
7.0 MATERIAL RISK ASSESSMENT
8.0 ASBESTOS INSPECTION AND BULK SAMPLE COLLECTION DATA
9.0 NON-SUSPECT ASBESTOS-CONTAINING MATERIALS
10.0 DETAILS OF REMOVED ASBESTOS-CONTAINING MATERIALS
11.0 ASBESTOS-CONTAINING BUILDING MATERIAL (ACBM) & PRESUMED ASBESTOS-
CONTAINING BUILDING MATERIAL (PACM) REGISTER
12.0 FINDINGS AND RECOMMENDATIONS
Appendices:
Appendix A: Bulk Sample Analytical Results Appendix B: Inspection Area & Asbestos Sample Location Maps Appendix C: Asbestos-Containing Material (PACM) Location Map Appendix D: Presumed Asbestos-Containing Material (PACM) Location Map Appendix E: Referenced Report
1.0 INTRODUCTION
This report provides detailed information and asbestos bulk sampling results following a comprehensive asbestos inspection of the North Control Plaza facility.
The scope of services for this inspection includes the identification, location, quantification, and sampling of SACBM within the study area of the subject property. Sampling was conducted by Mr. Gonzalo Correa (TDSHS License No. 60-3095) and Mr. Edgar Roque (TDSHS License No.
60-3615) under the guidance of Mr. Javier Araya of DFW Airport’s Environmental Affairs Department (EAD).
2.0 SITE DESCRIPTION
The North Control Plaza was constructed in the 1970s and is located at 1491 N. International Pkwy. in DFW Airport, Texas. The one-story building encompasses approximately 7,500 square feet and is used for administration offices for access control. The facility was occupied at the time of the inspection.
The building was constructed with tilt-up concrete walls, an interior open web joist system, on a poured-in-place concrete slab with a flat roof. The building’s exterior is finished with concrete, glass doors, and windows. The building’s interior is finished with suspended ceiling tiles, wallboard, concrete, carpet, wood, ceramic, and vinyl floor tiles.
3.0 ASBESTOS OPERATIONS AND MAINTENANCE (O&M) PLAN
DFW Airport’s Environmental Affairs Department maintains an Asbestos Operations and Maintenance (O&M) Plan for work performed in board-owned facilities that have been confirmed to contain or have been presumed to have asbestos-containing building materials. The O&M Plan provides guidelines for work activities that could potentially disturb asbestos-containing materials (ACM). For additional information or to obtain a copy of the O&M plan, please contact the Environmental Affairs Department.
4.0 ASBESTOS INSPECTION METHODS AND ANALYTICAL PROCEDURES
The inspection was performed in general accordance with EPA Asbestos Hazard Emergency Response Act (AHERA), National Emission Standard for Hazardous Air Pollutants (NESHAP), and Texas Asbestos Health Protection Rules (TAHPR); however, as with most scientific studies, an asbestos inspection is subject to various limitations, including access and observation limitations. Therefore, additional suspect asbestos-containing building materials (SACBM) may be present in inaccessible or concealed spaces. These spaces include but are not limited to pipe chases, spaces between walls, ceilings, doors, and floor cavities, the interior of mechanical components such as boiler cavities, interior ductwork, beneath foundation slabs, etc. If future renovation, demolition, or repair activities make these areas accessible, further sampling must be performed to confirm the presence or absence of asbestos. Any unsampled building materials must be presumed asbestos-containing building materials (PACBM) until additional sampling and laboratory analysis proves otherwise.
5.0 BULK SAMPLE COLLECTION METHODOLOGY
Prior to collecting any samples, materials considered as Homogenous Areas (HA’s) were identified and listed to develop a sampling strategy. A homogeneous area can be described as one or more areas that are similar in appearance and texture, and that have the same installation date and function. The actual number of samples collected from each homogeneous sampling varies based on the type of material and the professional judgment of the inspector. Determination of Homogenous Areas are determined based on the following criteria:
• Similar physical characteristics (same color and texture)
• Application (sprayed-on, troweled-on, assembly into a system)
• Material function (thermal system insulation, floor tile, wallboard system, etc.)
• Same date of installation
6.0 ANALYTICAL PROCEDURES
The analytical method used to determine the asbestos content of bulk samples collected for SACBM was polarized light microscopy (PLM) with dispersion staining, EPA Method 600. A material is considered by the USEPA to be asbestos-containing if at least one (1) sample collected from the homogenous area has asbestos present in concentrations equal to one percent (≥1.0%).
If bulk sample analysis was between 2% to 5% asbestos, the use of EPA Point Count Method 400/1000 was utilized to confirm if regulated amounts of asbestos were present. Samples were analyzed through EAD’s current contractual agreement with Cates Laboratories.
7.0 MATERIAL RISK ASSESSMENT
A condition assessment was performed for materials confirmed as asbestos-containing (≥1% asbestos content) or presumed as asbestos-containing building materials. The physical condition assessment includes evaluating the condition, assessing the potential for disturbance, and determining the friability of each building material. Friability is a term used to describe the ease with which a building material inherently lends itself to disturbance. By definition, "friable" materials are those that can be crumbled or reduced to powder by hand pressure when dry. Each material on the list was further classified into one of three categories, which have specific sampling requirements for each category. Suspect ACMs were then assessed by their condition as good (intact), fair (damaged), or poor (significantly damaged) per Title 40 Code of Federal Regulations Part 763. Observed material with localized significant damage was also assessed as poor.
The Asbestos Register Section contains all data collected during the re-inspection. Each element is fully detailed with a material assessment, photograph, and relevant comments and recommendations. The initial risk level assessments within this report are for those building materials that have been confirmed as asbestos-containing or presumed as asbestos-containing.
This assessment aims to clarify the potential for a material to release fibers into the air. The following tables represent the scoring strategy for the initial risk level assessment and indicate the scoring degree of those points that are considered.
7.1 BUILDING MATERIAL VARIABLES
Sample Variable Score Example of Scores
Product Type
Asbestos reinforced composites – Non-friable materials such as plastics, resins, mastics, felts, vinyl, cement products, and similar bound materials.
Materials of a medium asbestos content and low friability – Friable materials such as wallboard, textiles, and gaskets.
Materials of high asbestos content and high friability – Thermal System Insulation (TSI), spray-applied fireproofing, loose asbestos packing, filled padding, and debris.
Sample Variable Score Example of Scores
Material Condition
0 Undamaged (Good) - No visible signs of damage 1 Damaged (Minor) - Light material surface abrasion/abrasion to edges
Damaged (Fair) - Evidence of loose asbestos fiber protruding from the material / poor condition of material is notable
Significantly Damaged (Poor) - Significant damage to materials often resulting in the short-term production of asbestos-containing debris/delamination of sprays and thermal insulation/asbestos debris
Sample Variable Score Example of Scores
Material Accessibility
Normally inaccessible or occasionally accessed – The ACM will not be accessed or is unlikely to be disturbed
2 Periodically accessed – The ACM is likely to be disturbed occasionally 3 Frequently accessed – The ACM is routinely and easily disturbed
7.2 GENERAL INTERPRETATION OF RISK ASSESSMENT LEVELS
Risk Assessment Level Interpretation of Recommended Control Action
R1 (Score 7-9) Immediate Implementation
R2 (Score 4-6) As soon as practicable – in the interim period material should be regularly inspected and its management planned for
R3 (Score 1-3) No immediate action is required – material should be regularly inspected, and its management planned for
7.3 MANAGEMENT OF ASBESTOS-CONTAINING MATERIALS
In addition to the risk assessment level assigned to confirmed and presumed asbestos-containing building materials, a management control action recommendation is also made. It must be noted that the recommendations are made on the basis of prevailing material conditions and access at the time of the re-inspection and, as such, are intended solely as a guide to assist in the effective control of the materials concerned. Where doubt may be raised about the action that should be taken regarding an asbestos-containing material, measures should be implemented to a degree that reflects either those of higher risk or a more in-depth risk assessment should be carried out.
This risk assessment may account for greater knowledge of the material's location (i.e., greater than that of the surveyor at the time of re-inspection) or knowledge (current or future) of activities or works surrounding or concerning the material. The current recommendations conventionally made following inspections may include the following:
Recommendation Description Notes
Air Monitoring A sampling of air for asbestos fiber concentration. Necessary where a risk of fiber exposure is present.
Air sampling and analysis shall be performed by properly licensed third-party organizations.
Access Restriction Restriction of access to area/location only to personnel wearing appropriate PPE.
The suitability of PPE must be carefully assessed, and procedures invoked to ensure these control measures are adhered to.
Access Prohibition Prohibition of access to area/ location to all personnel.
The area should be marked clearly with asbestos warning stickers.
Environmental Clean
A clean-up of areas following disturbance of asbestos or discovery of loose asbestos dust/debris/material.
Cleanup such as vacuuming, wiping, and bagging debris. The work shall be performed by properly licensed third-party organizations.
Material Repair Repair of the material in such a manner as to minimize the release of asbestos fibers.
Recommended as an alternative to removal, where reasonably safe to do so. The work shall be performed by properly licensed and certified third-party organizations.
Material Encapsulation
Encapsulation of the material in a manner that ensures the complete enclosure of any remaining asbestos fibers.
A possible alternative to their removal, where reasonably safe to do so. The work shall be performed by properly licensed and certified third-party organizations.
Material Removal The material is currently considered a high-risk level, or removal may be necessary to permit work within the location.
Removal and air monitoring shall be performed by properly licensed third-party organizations.
8.0 ASBESTOS INSPECTION AND BULK SAMPLE COLLECTION DATA
The CAI was performed on June 24, 2022 and October 11, 2023. All sampling procedures were in accordance with federal and state protocols. During the inspection, one-hundred-eight (108) bulk samples were collected and submitted for analysis.
Each building material observed during the inspection was recorded and assigned unique identification numbers represented with an alpha-numeric number (i.e., C01). The following table summarizes the building materials sampled and submitted for PLM Analysis for asbestos content:
1491 N. International Pkwy., DFW Airport, TX
Facility ID No. 53022
Bulk Sample
No.
HA # Sample
Date Building Material Description Asbestos Content by
PLM Analysis
01-03 I01 6/24/22 Fireproofing, Brown None Detected 04-06 I02 6/24/22 Fireproofing, Lt. Gray, Hard None Detected 07-09 M01 6/24/22 Pipe Insulation Mastic, White None Detected 10-12 I03 6/24/22 HVAC Ductwork Insulation None Detected 13-15 M02 6/24/22 Wall Penetration Caulk, Red None Detected 16-18 M03 6/24/22 Wall Caulking, White None Detected 19-21 C01 6/24/22 2” x 2” Ceiling Tile, Rough None Detected
22-24B W01 T01 T02
6/24/22 Drywall, Texture, Smooth, Joint Compound None Detected
25-27 M04 6/24/22 Door Caulk, Brown None Detected 28-30 M05 6/24/22 Counter Edge Caulking, White None Detected 31-33 I04 6/24/22 Sink Undercoating, Black None Detected 34-36 M06 6/24/22 Men’s Restroom Fixture Calk, White None Detected 37-39 M07 6/24/22 Carpet Mastic, Yellow None Detected 40-42 M08 6/24/22 Cove Base Mastic, Yellow None Detected
43-45 F01 M09 T03
6/24/22 12” x 12” Floor Tile, Cream, Mastic, Black, Floor Filler Gray None Detected
46-48 M10 6/24/22 Door Caulking None Detected 49-51 M11 6/24/22 Wall Penetration Caulk, Red None Detected 52-54 M12 6/24/22 Wall Expansion Caulk, White None Detected 55-57 M13 6/24/22 Louver Caulking, White, Older None Detected 58-60 W02 6/24/22 Concrete Wall None Detected
61-63 T04 T05 6/24/22 Plaster and Lathe None Detected
64-66 M14 6/24/22 Waterproofing Mastic, Black None Detected 67-69 C02 6/24/22 Ceiling Tile, Pinhole and Fissures None Detected 70-72 M15 6/24/22 Vacuum System Pipe Sealant, Black None Detected 73-75 M16 6/24/22 Door Caulking None Detected 76-78 M17 6/24/22 Expansion Sealant, Black None Detected
North Control Plaza 1491 N. International Pkwy., DFW Airport, TX
Facility ID No. 53022
Bulk Sample
No.
HA #
Sample Date Building Material Description
Asbestos Content by PLM Analysis
79-81 F02 M18 6/24/22 Escalator Flooring, Beige, Mastic, Black None Detected
82-84 F03 6/24/22 Concrete Flooring None Detected 85 R01 6/24/22 Roofing Material None Detected 85 R02 6/24/22 Roofing Material None Detected 87 R03 6/24/22 Roofing Material None Detected 88 R04 6/24/22 Roofing Material None Detected 89 R05 6/24/22 Roofing Material None Detected 90 R06 6/24/22 Roofing Material None Detected 91 RF01 6/24/22 Roof Mastic None Detected 92 RF02 6/24/22 Roof Mastic None Detected 93 RF03 6/24/22 Roof Mastic None Detected 94 RF04 6/24/22 Roof Mastic None Detected 95 RF05 6/24/22 Roof Mastic None Detected 96 RF06 6/24/22 Roof Mastic None Detected
97-99 T06 6/24/22 Interior Concrete Wall Texture None Detected 100-102 M19 6/24/22 Window Caulk Mastic, Black None Detected 103-105 T07 6/24/22 CMU Filler None Detected 106-108 T08 6/24/22 Concrete Texture None Detected 98-100 M19 10/11/23 Door Frame Caulk, Beige None Detected
101-103 W03 T06 T07
10/11/23 Drywall, Texture, Smooth, Joint Compound None Detected
104-106 I03 10/11/23 Vbration Damper None Detected 107-109 M20 10/11/23 Metal Seal Caulk, Black None Detected 110-112 M21 10/11/23 Concrete Wall Caulk, Black 5% - Chrysotile 113-115 CR01 10/11/23 Slab Concrete None Detected
Laboratory analysis of the above-listed samples collected during the inspection indicated the presence of asbestos in the black concrete wall caulk (5% Chrysotile). All other sampled suspect materials indicated non-detect levels of asbestos.
9.0 NON-SUSPECT ASBESTOS-CONTAINING MATERIALS
For building materials that a licensed asbestos inspector has determined as “non-suspect asbestos-containing materials,” bulk samples were not required to be collected. Examples of building materials that are considered non-suspect include plastic, PVC, fiberglass, foam, rubber, silicone, glass, wood, and metal. The following non-suspect materials were observed during the on-site inspection:
• Ceiling System: Metal
• Wall System: Metal Wall Studs, Vinyl Cove Base
• Plumbing System: Metal Pipe, Fiberglass Insulation
• HVAC System: Metal Ductwork
• Electrical System: Metal Conduit
• Roofing System: Metal, Foam
10.0 DETAILS OF REMOVED ASBESTOS-CONTAINING MATERIALS
The following table details asbestos-containing materials, which were detailed within the original asbestos survey or additional inspection documents, which, when inspected, were no longer present within the specified location.
Building Material Location Additional Notes & Details:
Concrete Wall Caulk, Black
Tunnel N/A – All ACMs which were detailed within the original documentation and still present.
11.0 ASBESTOS-CONTAINING BUILDING MATERIAL (ACBM) & PRESUMED ASBESTOS-
CONTAINING BUILDING MATERIAL (PACM) REGISTER
Building Material Description:
Concrete Wall Caulk, Black / HA# M21
Date of Inspection:
10/11/2023
Asbestos Type/ Content: 5% Chrysotile
Material Classification & Score:
CAT II
Non-Friable (1)
Approximate Quantity: 32 LF Previous Condition
Assessment: Good
Current Condition Assessment:
Good/Undamaged (0)
Material Location(s): North Control Plaza Tunnel
Material Accessibility Occasionally Accessed (1)
Material Assessment Score R3 Recommendations: - No immediate action is required – The material should be regularly inspected, and its management planned for. Although labeling of asbestos-containing materials is not a legal requirement, it may reduce the risk of accidental disturbance and as such should be considered.
Building Material Description:
12” x 12” Ceramic Wall Tile System / HA# W03
Date of Inspection:
06/24/2022
Asbestos Type/ Content: PACM
CAT II
Non-Friable (1)
Approximate Quantity: 2,192 SF Previous Condition
Assessment: Good
Current Condition Assessment:
Good/Undamaged (0)
Material Location(s):
Men’s, Women’s, and Family Restrooms
Material Accessibility Occasionally Accessed (1)
Material Assessment Score R3
Recommendations: - No immediate action is required – The material should be regularly inspected, and its management planned for. Although labeling of asbestos-containing materials is not a legal requirement, it may reduce the risk of accidental disturbance and as such should be considered.
12” x 12” Ceramic Floor Tile System / HA# F04
Date of Inspection:
CAT II
Non-Friable (1)
Approximate Quantity: 808 SF Previous Condition
Assessment: Good
Current Condition Assessment:
Good/Undamaged (0)
Material Location(s):
Men’s, Women’s, and Family Restrooms
Material Accessibility Occasionally Accessed (1)
Material Assessment Score R3
Recommendations: - No immediate action is required – The material should be regularly inspected, and its management planned for. Although labeling of asbestos-containing materials is not a legal requirement, it may reduce the risk of accidental disturbance and as such should be considered.
Building Material Description:
1” x 1” Ceramic Floor Tile System / HA# F05
Date of Inspection:
CAT II
Non-Friable (1)
Approximate Quantity: 60 SF Previous Condition
Assessment: Good
Current Condition Assessment:
Good/Undamaged (0)
Material Location(s): Janitor’s Closet
Material Accessibility Occasionally Accessed (1)
Material Assessment Score R3
Recommendations: - No immediate action is required – The material should be regularly inspected, and its management planned for. Although labeling of asbestos-containing materials is not a legal requirement, it may
Mirror Mastic / HA# M20
Date of Inspection:
CAT II
Non-Friable (1)
Approximate Quantity: 42 SF Previous Condition
Assessment: N/A
Current Condition Assessment:
Good/Undamaged (0)
Material Location(s):
Men’s and Women’s
Restrooms
Material Accessibility Normally Inaccessible (1)
Material Assessment Score R3
Recommendations: - No immediate action is required – The material should be regularly inspected, and its management planned for. Although labeling of asbestos-containing materials is not a legal requirement, it may
12.0 FINDINGS AND RECOMMENDATIONS
Based on the laboratory analysis, asbestos-containing materials identified during the inspection included black concrete wall caulk (5% Chrysotile). Per requirement of State and Federal Regulations, abatement of ACM will be required prior to any repair, demolition, renovation, or any other activities that have the potential to disturb the material. Trained Asbestos Professionals licensed by the Texas Department of State Health Services shall perform asbestos abatement and air monitoring. However, in an effort to limit destructive sampling or inaccessibility, plumbing systems within wall cavities and ceramic floor and wall tile systems, and mirror mastic shall be presumed as asbestos-containing materials (PACMs). Further sample collection and laboratory analysis of these building materials will be required to determine the presence or absence of asbestos. Details regarding the type, location, and condition of ACM can be located in the Asbestos Containing Building Materials section of this report. Per the requirement of State and Federal Regulations, abatement is required prior to any renovation of the ACM. Third-party air monitoring will be required during the abatement. Trained Asbestos Professionals licensed by the Texas Department of State Health Services shall perform asbestos abatement and air monitoring. If PACM or materials other than steel, concrete, or rubber are encountered during construction that are not addressed in this inspection, the contractor should contact EAD for sampling prior to disturbance. Construction, maintenance, and custodial staff shall have asbestos awareness training compliant with OSHA 29 CFR 1926.1101 or 1910.1001. This report has been prepared by the Dallas/Fort Worth International Airport, Environmental Affairs Department for the exclusive use of the DFW Airport Board. Any use of or reliance on this report by a third party shall be at such party’s sole risk.
Bulk Sample Analytical Results
PLM REPORT SUMMARY
Cates Laboratories NVLAP Lab No. 200569-0
1339 Motor Circle TDSHS License No. 30-0287
Dallas, Texas 75207 (214) 920-5006
Client: Dallas/Fort Worth International Airport Lab Job No.: PLM-35154
Project (Line 1): North Control Plaza / Tunnel Set No.: 50316
Project (Line 2): Report Date: 10/17/2023
Project No: CAI2022 Sample Date: 10/11/2023
Identification: Asbestos, Bulk Sample Analysis
Test Method: Polarized Light Microscopy/Dispersion Staining (PLM/DS)
EPA Method 600/R-93/116 Page 1 of 2
On 10/12/2023, eighteen (18) bulk samples were submitted by Mr. Edgar Roque of Dallas/Fort Worth International Airport for asbestos analysis by PLM/DS.
Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below:
Lab
Sample No.
Client
Field I.D.
Sample Description/Location Asbestos Content
These samples were analyzed by layers. The overall percent asbestos for the sample is reported when relevant. The EPA considers a material to be asbestos containing only if it contains greater than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing
Materials (RACM) – materials that are friable or may become friable – be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. CatesLab utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced except in full.
CL1190505
M19 - Door Frame Caulk (beige) - Tunnel
None Detected - Beige Caulking
CL1190506
CL1190507
CL1190508
W03, T06, T07 - Drywall, Texture (smooth) Joint Compound - Tunnel
None Detected - Paint Texture
None Detected - Joint Compound
None Detected - Wallboard Material
CL1190509
CL1190510
CL1190511
I03 - Vibration Dampener - Tunnel
None Detected - Vibration Dampener
CL1190512
CL1190513
CL1190514
M20 - Metal Seal Caulk (black) (ceiling) - Tunnel
None Detected - Black Caulking
CL1190515
CL1190516
CL1190517
M21 - Concrete Wall Seal Caulk (black) - Tunnel
5% Chrysotile - Black Caulking
CL1190518
CL1190519
CL1190520
CR01 - Slab Concrete - Tunnel
None Detected - Concrete
CL1190521
CL1190522
Client: Dallas/Fort Worth International Airport Lab Job No.: PLM-35154
Project (Line 1): North Control Plaza / Tunnel Set No.: 50316
Project (Line 2): Report Date: 10/17/2023
Project No: CAI2022 Sample Date: 10/11/2023
Identification: Asbestos, Bulk Sample Analysis
Test Method: Polarized Light Microscopy/Dispersion Staining (PLM/DS)
EPA Method 600/R-93/116 Page 2 of 2
On 10/12/2023, eighteen (18) bulk samples were submitted by Mr. Edgar Roque of Dallas/Fort Worth International Airport for asbestos analysis by PLM/DS.
Copies of the lab data sheets are attached; additional information may be found therein.
STATEMENT OF LABORATORY ACCREDITATION
The samples were analyzed in general accordance with the procedures outlined in the U.S. EPA Interim Method for the Determination of Asbestos in Bulk Insulation Samples as found in 40 CFR, Part 763, Subpart E, Appendix E (formerly Subpart F, Appendix A), or the current U.S. EPA method (EPA Method 600/R-93/116) for the analysis of asbestos in building materials, by polarized light microscopy. The results of each bulk sample relate only to the material tested and the results shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.
Specific questions concerning bulk sample results shall be directed to the Laboratory Director.
Analyst:
Chris Munch
Laboratory Director: John R. Cates, P.G.
Approved Signatory:
TESTING
NVLAP LAB CODE 200569-0
APPENDIX B
Inspection Area & Asbestos Sample Location Map
APPENDIX C
Asbestos-Containing Material (ACM) Location Map
APPENDIX D
Presumed Asbestos-Containing Material (PACM)
Location Map
APPENDIX E
Referenced Report
Facility ID No. 53022
Report Issue Date: 7/12/2022
Contents
1.0 INTRODUCTION
2.0 SITE DESCRIPTION
3.0 ASBESTOS OPERATIONS AND MAINTENANCE (O&M) PLAN
4.0 ASBESTOS INSPECTION METHODS AND ANALYTICAL PROCEDURES
5.0 BULK SAMPLE COLLECTION METHODOLOGY
6.0 ANALYTICAL PROCEDURES
7.0 MATERIAL RISK ASSESSMENT
8.0 ASBESTOS INSPECTION AND BULK SAMPLE COLLECTION DATA
9.0 NON-SUSPECT ASBESTOS-CONTAINING MATERIALS
10.0 DETAILS OF REMOVED ASBESTOS-CONTAINING MATERIALS
11.0 ASBESTOS-CONTAINING BUILDING MATERIAL (ACBM) & PRESUMED ASBESTOS-
CONTAINING BUILDING MATERIAL (PACM) REGISTER
12.0 FINDINGS AND RECOMMENDATIONS
Appendices:
Appendix A: Bulk Sample Analytical Results Appendix B: Inspection Area & Asbestos Sample Location Maps Appendix C: Presumed Asbestos-Containing Material (PACM) Location Map
Facility ID No. 53022
Report Issue Date: 7/12/2022
1.0 INTRODUCTION
This report provides detailed information and asbestos bulk sampling results following a comprehensive asbestos inspection of the North Control Plaza facility.
The scope of services for this inspection includes the identification, location, quantification, and sampling of SACBM within the study area of the subject property. Sampling was conducted by Mr. Gonzalo Correa (TDSHS License No. 60-3095) and Mr. Edgar Roque (TDSHS License No.
60-3615) under the guidance of Mr. Javier Araya of DFW Airport’s Environmental Affairs Department (EAD).
2.0 SITE DESCRIPTION
The North Control Plaza was constructed in the 1970s and is located at 1491 N. International Pkwy. in DFW Airport, Texas. The one-story building encompasses approximately 7,500 square feet and is used for administration offices for access…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .