This is a Scope of Work document for the City of Phoenix, Arizona, prepared by the Public Works Streets Division in conjunction with the Water Services Department. The project involves inspecting and coordinating asphalt and concrete repairs for Water Services assets as part of the City's Pavement Management Program. The selected contractor will provide repair services on an as-needed basis, with work including all materials, labor, equipment, and incidentals necessary to complete repairs. A critical requirement is that the contractor maintain dedicated crews solely assigned to this project to ensure pavement restorations are completed within 21 calendar days from the date each street cut is made. Failure to maintain dedicated crews or meet the required restoration timeframe may result in non-compliance with contract requirements. The contractor must coordinate closely with City employees, other contractors, and customers while ensuring timely and efficient project completion.
The document does not specify pricing terms, contract duration, renewal options, or funding amounts in the sections provided. No incumbent contractor information, set-asides, or specific bidding timelines are detailed in this Scope of Work. The contract is structured as an as-needed agreement rather than a fixed-term engagement, allowing the City flexibility in scheduling repairs based on Water Services asset needs and operational demands.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Peoria, Arizona
Notice of Invitation for Bid
Rev(8/2023)CF Page 1 of 34
Invitation for Bid No.: P27-0002 Bid Due Date: September 24th, 2026
Capital Project No.: N/A Bid Due Time: 2:00 P.M. AZ Time
Materials and/or Services: Utility Cuts - Asphalt and Concrete Patches
Purchasing Agent: Mark Brown
Contact Phone: (623) 773-4603
Contact Email: Mark.Brown@peoriaaz.gov
In accordance with City of Peoria Procurement Code competitive sealed bids for the material or services specified will be received by the City of Peoria Materials Management until the date and time cited above. Bids received by the correct date and time shall be publicly opened and the bid price read. Bids shall be in the actual possession of the City of Peoria Materials Management on or prior to the exact date and time indicated above. Late bids will not be considered, except as provided in the City of Peoria Procurement Code. Bids shall be submitted electronically via the City’s Procurement Portal (Bonfire) or in a sealed envelope to 9875 N 85th Ave (2nd floor), Peoria AZ 85345 with the IFB number and the bidder’s name and address clearly indicated on the front of the envelope. Bidders are strongly encouraged to carefully read the entire Invitation for Bid Package.
OFFER
To the City of Peoria: The undersigned hereby offers and agrees to furnish materials and/or services in compliance with all terms, conditions, specifications and amendments in the Notice of Invitation for Bid except for any written exceptions in the offer. The signature below also certifies his or her understanding and compliance with paragraph one of The City of Peoria Standard Terms and Conditions (COP Form 202).
For clarification of this offer contact: Telephone: Fax:
Name: Email:
Company Name Authorized Signature for Offer
Address Printed Name
City State Zip Title
ACCEPTANCE OF OFFER AND CONTRACT AWARD (For City of Peoria Use Only)
Your offer is hereby accepted. The Contractor is now bound to sell the materials and/or services listed by the attached award notice based upon the solicitation, including all terms conditions, specifications, amendments, etc., and the Contractor’s offer as accepted by the City. The Contractor is hereby cautioned not to commence any billable work or provide any material, service or construction under this contract until Contractor receives an executed Purchase Order.
Attested by:
City of Peoria, Arizona Effective Date:
Approved as to form:
Agnes Goodwine, City Clerk
CC:
Emily Jurmu, City Attorney
Contract Awarded Date:
Contract Number
City Seal Copyright 2003 City of Peoria, Arizona
Official File
Christine Finney, Materials Manager
City of Peoria, Arizona
Instructions to Bidders
Rev(8/2023)CF Page 2 of 34
1. PREPARATION OF BID:
a. All bids shall be submitted on the forms provided in this Invitation to Bid package. It is permissible to copy these forms if required.
Telegraphic (facsimile), electronic or mailgram bids will not be considered.
b. The Offer and Contract Award document shall be submitted with an original ink or digital signature by a person authorized to sign the offer.
c. Erasures, interlineations, or other modifications in the bid shall be initialed in original ink by the authorized person signing the Offer.
d. If price is a consideration and in case of error in the extension of prices in the bid, the unit price shall govern. No bid shall be altered, amended, or withdrawn after the specified bid due date and time.
e. Periods of time, stated as a number of days, shall be calendar days.
f. Bid due date and time is stated as local Arizona time.
g. It is the responsibility of all Offerors to examine the entire Invitation For Bid package and seek clarification of any item or requirement that may not be clear and to check all responses for accuracy before submitting a bid. Negligence in preparing a Bid confers no right of withdrawal after bid due date and time.
2. INQUIRIES: Any question related to the Invitation For Bid shall be directed to the Buyer whose name appears as the contact on the IFB.
The Offeror shall not contact or ask questions of the department for which the requirement is being procured. Questions should be submitted in writing when time permits. The Buyer may require any and all questions be submitted in writing at the Buyer’s sole discretion. Any correspondence related to an Invitation For Bid should refer to the appropriate Invitation For Bid number, page, and paragraph number.
Offeror shall identify the envelope as containing questions since such an envelope may be identified as a sealed bid and may not be opened until after the official Invitation For Bid due date and time.
3. PROSPECTIVE OFFERORS CONFERENCE: A prospective offerors conference may be held. If scheduled, the date and time of this conference will be indicated on the cover page of this document. The purpose of this conference will be to clarify the contents of this Invitation For Bid in order to prevent any misunderstanding of the City’s position. Any doubt as to the requirements of this Invitation For Bid or any apparent omission or discrepancy should be presented to the City at this conference. The City will then determine if any action is necessary and may issue a written amendment to the Invitation For Bid. Oral statements or instructions will not constitute an amendment to this Invitation For Bid.
4. LATE BIDS: Late Bids will not be considered, except as provided by the City of Peoria Procurement Code. A vendor submitting a late bid shall be so notified.
5. WITHDRAWAL OF BID: At any time prior to the specified bid due date and time, a Vendor (or designated representative) may withdraw the bid.
6. AMENDMENT OF BID: Receipt of a Solicitation Amendment shall be acknowledged by signing and returning the document with the offer at the specified bid due date and time.
7. PAYMENT: The City will make every effort to process payment for the purchase of construction services within fourteen (14) calendar days after an approved pay request is received with a correct notice of amount due, unless a good faith dispute exists as to any obligation to pay all or a portion of the account.
8. VENDOR REGISTRATION: After the award of a contract, the successful Vendor shall complete a Vendor Registration Application and submit it to the City of Peoria Materials Management Division.
9. AWARD OF CONTRACT:
a. Unless the Offeror states otherwise, or unless provided within this Invitation For Bid, the City reserves the right to award by individual line item, by group of line items, or as a total, whichever is determined by the Materials Manager to be most advantageous to the City.
b. Notwithstanding any other provision of this Invitation For Bid, The City expressly reserves the right to:
i. Waive any immaterial defect or informality: or
ii. Reject any or all bids, or portions thereof, or
iii. Reissue a Invitation For Bid.
c. A response to a Invitation For Bid is an offer to contract with the City based upon the terms, conditions and specifications contained in the City’s Invitation For Bid and the written amendments thereto, if any. Bids do not become contracts unless and until they are accepted and executed by the City Council or Materials Manager. A contract is formed when written notice of award(s) is provided to the successful Offeror(s). The contract has its inception in the award document, eliminating a formal signing of a separate contract.
For that reason, all of the terms and conditions of the procurement contract are contained in the Invitation For Bid; unless modified by an Amendment.
STANDARD
TERMS AND CONDITIONS
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Phone: (623) 773-7115 Fax: (623) 773-7118
Rev(8/2023)CF Page 3 of 34
THE FOLLOWING TERMS AND CONDITIONS ARE AN EXPLICIT PART OF THE SOLICITATION AND ANY RESULTANT CONTRACT.
1. CERTIFICATION: By signature in the Offer section of the Offer and Contract Award page the Contractor certifies:
a. The submission of the offer did not involve collusion or other anti-competitive practices.
b. The Contractor shall not discriminate against any employee or applicant for employment.
c. The Contractor has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip favor, or service to a public servant in connection with the submitted offer. Failure to sign the offer, or signing it with a false statement, shall void the submitted offer or any resulting contracts, and the vendor may be debarred.
2. BRIBES AND KICK-BACKS: The General Contractor shall not by any means:
a. Induce any person or entity employed in the construction of the Project to give up any part of the compensation to which that person or entity is entitled;
b. Confer on any governmental, public or quasi-public official having any authority or influence over the Project, any payment, loan subscription, advance, deposit of money, services or anything of value, present or promised;
c. Offer nor accept any bribes or kick-backs in connection with the Project from or to any individual or entity, including any of its trade contractors, subcontractors, consultants, suppliers or manufacturers of Project goods and materials; or,
d. Without the express written permission of the Owner, call for or by exclusion require or recommend the use of any subcontractor, consultant, product, material, equipment, system, process or procedure in which the General Contractor has a direct or indirect proprietary or other pecuniary interest.
3. APPLICABLE LAW: In the performance of this agreement, contractors shall abide by and conform to any and all laws of the United States, State of Arizona and City of Peoria including but not limited to federal and state executive orders providing for equal employment and procurement opportunities, the Federal Occupational Safety and Health Act and any other federal or state laws applicable to this agreement.
Contractor specifically understands and acknowledges the applicability to it of the Americans with Disabilities Act, including Section 508, the Immigration Reform and Control Act of 1986, and the Drug Free Workplace Act of 1989. In addition, if this agreement pertains to construction, Contractor must also comply with A.R.S. § 34-301, as amended (Employment of Aliens on Public Works Prohibited) and A.R.S. § 34-302, as amended (Residence Requirements for Employees).
Under the provisions of A.R.S. § 41-4401, Contractor hereby warrants to the City that Contractor and each of its subcontractors (“Subcontractors”) will comply with, and are contractually obligated to comply with, all Federal immigration laws and regulations that relate to their employees and A.R.S. § 23-214(A) (hereinafter, “Contractor Immigration Warranty”).
A breach of the Contractor Immigration Warranty shall constitute a material breach of this agreement and shall subject Contractor to penalties up to and including termination of this agreement at the sole discretion of the City. The City may, at its sole discretion, conduct random verification of the employment records of Contractor and any Subcontractors to ensure compliance with the Contractor Immigration Warranty. Contractor agrees to assist the City in regard to any random verifications performed.
Neither Contractor nor any Subcontractor shall be deemed to have materially breached the Contractor Immigration Warranty if Contractor or the Subcontractor establishes that it has complied with the employment verification provisions prescribed by §§ 274A and 274B of the Federal Immigration and Nationality Act and the E-Verify requirements prescribed by A.R.S. §23- 214(A).
The provisions of this Paragraph must be included in any contract Contractor enters into with any Subcontractors who provide services under this agreement or any subcontract. “Services” is defined as furnishing labor, time or effort in the State of Arizona by a contractor or subcontractor. Services include construction or maintenance of any structure, building or transportation facility or improvement to real property.
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 4 of 34
Contractor warrants, for the term of this agreement and for six months thereafter, that it has fully complied with the requirements of the Immigration Reform and Control Act of 1986 and all related or similar legal authorities.
This contract shall be governed by the City and Contractor shall have all remedies afforded each by the Uniform Commercial Code, as adopted in the State of Arizona, except as otherwise provided in this contract or in statutes pertaining specifically to the City. This contract shall be governed by the laws of the State of Arizona and suit pertaining to this contract may be brought only in courts in the State of Arizona.
This contract is subject to the provisions of ARS §38-511; the City may cancel this contract without penalty or further obligations by the City or any of its departments or agencies if any person significantly involved in initiating, negotiating, securing, drafting or creating the contract on behalf of the City or any of its departments or agencies, is at any time while the contract or any extension of the contract is in effect, an employee of any other party to the contract in any capacity or a consultant to any other party of the contract with respect to the subject matter of the contract.
To the extent applicable, Contractor certifies to City that it is not currently engaged in and agrees for the duration of the contract not to engage in a boycott of Israel as defined in the provisions of ARS § 35-393.
Pursuant to the provisions of ARS §35-394, Contractor certifies that it will not use, during the term of the Agreement, i) the forced labor of ethnic Uyghurs in the People’s Republic of China, ii) any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China, or iii) any contractors, subcontractors, or suppliers that use forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China. To the extent that Contractor discovers an issue for its goods or services provided to the City which is in contravention of the certification above, it will notify the City as soon as practicable and take corrective actions in order to remain consistent with its certification.
4. LEGAL REMEDIES: All claims and controversies shall be subject to resolution according to the terms of the City of Peoria Procurement Code.
5. CONTRACT: The contract between the City and the Contractor shall consist of (1) the Solicitation, including instructions, all terms and conditions, specifications, scopes of work, attachments, price sheet(s) and any amendments thereto, and (2) the offer submitted by the Contractor in response to the solicitation. In the event of a conflict in language between the Solicitation and the Offer, the provisions and requirements in the Solicitation shall govern. However, the City reserves the right to clarify, in writing, any contractual terms with the concurrence of the Contractor, and such written contract shall govern in case of conflict with the applicable requirements stated in the Solicitation or the Vendor’s offer. The Solicitation shall govern in all other matters not affected by the written contract.
6. CONTRACT AMENDMENTS: This contract may be modified only by a written Contract Amendment signed by persons duly authorized to enter into contracts on behalf of the City and the Contractor.
7. CONTRACT APPLICABILITY: The Offeror shall substantially conform to the terms, conditions, specifications and other requirements found within the text of this Solicitation. All previous agreements, contracts, or other documents, which have been executed between the Offeror and the City are not applicable to this Solicitation or any resultant contract.
8. PROVISIONS REQUIRED BY LAW: Each and every provision of law and any clause required by law to be in the contract will be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party, the contract will forthwith be physically amended to make such insertion or correction.
9. SEVERABILITY: The provisions of this contract are severable to the extent that any provision or application held to be invalid shall not affect any other provision or application of the contract which may remain in effect without the invalid provision or application.
10. RELATIONSHIP TO PARTIES: It is clearly understood that each party will act in its individual capacity and not as an agent, employee, partner, joint venturer, or associate of the other. An employee or agent of one party shall not be deemed or construed to be the employee or agent of the other for any purpose whatsoever. The Contractor is advised that taxes or Social Security payments will not be withheld from any City payments issued hereunder and that the Contractor should make arrangements to directly pay such expenses, if any.
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 5 of 34
11. INTERPRETATION-PAROL EVIDENCE: This contract represents the entire agreement of the Parties with respect to its subject matter, and all previous agreements, whether oral or written, entered into prior to this contract are hereby revoked and superseded by this contract. No representations, warranties, inducements or oral agreements have been made by any of the Parties except as expressly set forth herein, or in any other contemporaneous written agreement executed for the purposes of carrying out the provisions of this contact. This contract may not be changed, modified or rescinded except as provided for herein, absent a written agreement signed by both Parties. Any attempt at oral modification of this contract shall be void and of no effect.
12. NO DELEGATION OR ASSIGNMENT: Contractor shall not delegate any duty under this Contract, and no right or interest in this Contract shall be assigned by Contractor to any successor entity or third party, including but not limited to an affiliated successor or purchaser of Contractor or its assets, without prior written permission of the City. The City, at its option, may cancel this Contract in the event Contractor undertakes a delegation or assignment without first obtaining the City’s written approval. Contractor agrees and acknowledges that it would not be unreasonable for the City to decline to approve a delegation or assignment that results in a material change to the services provided under this Contract or an increased cost to the City.
13. SUBCONTRACTOR / SUPPLIER CONTRACTS: The Contractor shall enter into written contracts with its subcontractor(s) and supplier(s), if any, and those written contracts shall be consistent with this Contract for Construction. It is the intent of the Owner and the Contractor that the obligations of the Contractor’s subcontractor(s) and supplier(s), if any, inure to the benefit of the Owner and the Contractor, and that the Owner be a third-party beneficiary of the Contractor’s agreements with its subcontractor(s) and supplier(s).
a. The Contractor shall make available to each subcontractor and supplier, if any, prior to the execution of written contracts with any of them, a copy of the pertinent portions of this Contract for Construction, including those portions of the Construction documents to which the subcontractor or supplier will be bound, and shall require that each subcontractor and supplier shall similarly make copies of applicable parts of such documents available to its respective subcontractor(s) and supplier(s).
b. The Contractor shall engage each of its subcontractor(s) and supplier(s) with written contracts which preserve and protect the rights of the Owner and include the acknowledgment and agreement of each subcontractor or supplier that the Owner is a third-party beneficiary of the contract. The Contractor’s agreements with its subcontractor(s) and supplier(s) shall require that in the event of default under, or termination of, this Contract for Construction, and upon request of the Owner, the Contractor’s subcontractor(s) and supplier(s) will perform services for the Owner.
c. The Contractor shall include in its agreements with its subcontractor(s) and supplier(s) a provision which contains the acknowledgment and agreement of the subcontractor or supplier that it has received and reviewed the applicable terms, conditions and requirements of this Contract for Construction that are included by reference in its written contract with the Contractor, and that it will abide by those terms, conditions and requirements.
14. RIGHTS AND REMEDIES: No provision in this document or in the vendor’s offer shall be construed, expressly or by implication, as waiver by the City of any existing or future right and/or remedy available by law in the event of any claim of default or breach of contract. The failure of the City to insist upon the strict performance of any term or condition of the contract or to exercise or delay the exercise of any right or remedy provided in the contract, or by law, or the City’s acceptance of and payment for materials or services, shall not release the Contractor from any responsibilities or obligations imposed by this contract or by law, and shall not be deemed a waiver of any right of the City to insist upon the strict performance of the Contract.
15. INDEMNIFICATION: To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City, and its officers and employees, from liabilities, damages, losses and costs, including reasonable attorney fees and court costs, but only to the extent caused by the negligence, recklessness or intentional wrongful conduct of the Contractor in the performance of the contract. The amount and type of insurance coverage requirements set forth herein will in no way be construed as limiting the scope of the indemnity in this paragraph.
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 6 of 34
16. OVERCHARGES BY ANTITRUST VIOLATIONS: The City maintains that, in practice, overcharges resulting from antitrust violations are borne by the purchaser. Therefore, to the extent permitted by law, the Contractor hereby assigns to the City any and all claims for such overcharges as to the goods and services used to fulfill the Contract.
17. FORCE MAJEURE: Except for payment for sums due, neither party shall be liable to the other nor deemed in default under this Contract if and to the extent that such party's performance of this Contract is prevented by reason of force Majeure. The term “force majeure” means an occurrence that is beyond the control of the party affected and occurs without its fault or negligence. Without limiting the foregoing, force majeure includes acts of God: acts of the public enemy; war; acts of terror, hate crimes affecting public order; riots; strikes; mobilization; labor disputes; civil disorders; fire; floods; lockouts, injunctions-intervention-acts, or failures or refusals to act by government authority; events or obstacles resulting from a governmental authority’s response to the foregoing; and other similar occurrences beyond the control of the party declaring force majeure which such party is unable to prevent by exercising reasonable diligence. The force majeure shall be deemed to commence when the party declaring force majeure notifies the other party of the existence of the force majeure and shall be deemed to continue as long as the results or effects of the force majeure prevent the party from resuming performance in accordance with this Contract.
Force majeure shall not include the following occurrences:
a. Late delivery of equipment or materials caused by congestion at a manufacturer’s plant or elsewhere, an oversold condition of the market, inefficiencies, or similar occurrences.
b. Late performance by a subcontractor unless the delay arises out of a force majeure occurrence in accordance with this Force Majeure term and Condition.
Any delay or failure in performance by either party hereto shall not constitute default hereunder or give rise to any claim for damages or loss of anticipated profits if, and to the extent that such delay or failure is caused by force majeure. If either party is delayed at any time in the progress of the work by force majeure, then the delayed party shall notify the other party in writing of such delay within forty-eight (48) hours commencement thereof and shall specify the causes of such delay in such notice. Such notice shall be hand delivered or mailed Certified-Return Receipt and shall make a specific reference to this article, thereby invoking its provisions. The delayed party shall cause such delay to cease as soon as practicable and shall notify the other party in writing. The time of completion shall be extended by contract modification for a period of time equal to the time that the results or effects of such delay prevent the delayed party from performing in accordance with this contract.
18. RIGHT TO ASSURANCE: Whenever one party to this contract in good faith has reason to question the other party’s intent to perform he may demand that the other party give a written assurance of this intent to perform. In the event that a demand is made and no written assurance is given within five (5) days, the demanding party may treat this failure as an anticipatory repudiation of the Contract.
19. RIGHT TO AUDIT RECORDS: The City may, at reasonable times and places, audit the books and records of any Contractor as related to any contract held with the City. This right to audit also empowers the City to inspect the papers of any Contractor or Subcontractor employee who works on this contract to ensure that the Contractor or Subcontractor is complying with the Contractor Immigration Warranty made pursuant to Paragraph 3 above..
20. WARRANTIES: Contractor warrants that all material, service or construction delivered under this contract shall conform to the specifications of this contract. Unless otherwise stated in Contractor’s response, the City is responsible for selecting items, their use, and the results obtained from any other items used with the items furnished under this contract. Mere receipt of shipment of the material/service specified and any inspection incidental thereto by the City shall not alter or affect the obligations of the Contractor or the rights of the City under the foregoing warranties. Additional warranty requirements may be set forth in the solicitation.
21. INSPECTION: All material and/or services are subject to inspection and acceptance by the City. Materials and/or services failing to conform to the specifications of this Contract will be held at Contractor’s risk and may be returned to the Contractor.
If so returned, all costs are the responsibility of the Contractor. The City may elect to do any or all of the following:
a. Waive the non-conformance.
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 7 of 34
b. Stop the work immediately.
c. Bring material into compliance.
This shall be accomplished by a written determination from the City.
22. TITLE AND RISK OF LOSS: The title and risk of loss of material and/or service shall not pass to the City until the City actually receives the material or service at the point of delivery, unless otherwise provided within this Contract.
23. NO REPLACEMENT OF DEFECTIVE TENDER: Every tender of materials shall fully comply with all provisions of the Contract. If a tender is made which does not fully conform, this shall constitute a breach of the Contract as a whole.
24. DEFAULT IN ONE INSTALLMENT TO CONSTITUTE TOTAL BREACH: Contractor shall deliver conforming materials in each installment of lot of this Contract and may not substitute nonconforming materials. Delivery of nonconforming materials or a default of any nature, at the option of the City, shall constitute a breach of the Contract as a whole.
25. SHIPMENT UNDER RESERVATION PROHIBITED: Contractor is not authorized to ship materials under reservation and no tender of a bill of lading will operate as a tender of the materials.
26. LIENS: All materials, service or construction shall be free of all liens, and if the City requests, a formal release of all liens shall be delivered to the City.
27. LICENSES: Contractor shall have at the time of bid submittal, and shall maintain in current status, all Federal, State and Local licenses and permits required for the operation of the business conducted by the Contractor as applicable to this Contract.
The conclusion of the issuing authority in each case is to be deemed conclusive for the purposes of complying with this provision. By submitting a bid for this public contract, you agree that, with respect to the contract, substantial compliance does not meet the minimum requirements of this or any provision hereof, or of any applicable law or other authority, and that strict compliance alone is adequate to meet those requirements, unless the City consents to such substantial compliance in writing at the time of bid submittal. The determination shall be made by the City.
28. PATENTS AND COPYRIGHTS: All services, information, computer program elements, reports and other deliverables, which may be patented or copyrighted and created under this contract are the property of the City and shall not be used or released by the Contractor or any other person except with the prior written permission of the City.
29. PREPARATION OF SPECIFICATIONS BY PERSONS OTHER THAN CITY PERSONNEL: All specifications shall seek to promote overall economy for the purposes intended and encourage competition and not be unduly restrictive in satisfying the City’s needs. No person preparing specifications shall receive any direct or indirect benefit from the utilization of specifications, other than fees paid for the preparation of specifications.
30. COST OF BID/PROPOSAL PREPARATION: The City shall not reimburse the cost of developing presenting or providing any response to this solicitation. Offers submitted for consideration should be prepared simply and economically, providing adequate information in a straightforward and concise manner.
31. PUBLIC RECORD: All offers submitted in response to this solicitation shall become the property of the City and shall become a matter of public record available for review, subsequent to the award notification, in accordance with the City’s Procurement Code. However, subsequent to the award of the contract, any information and documents obtained by the City during the course of an audit conducted in accordance with Paragraph 20 above for the purpose of determining compliance by Contractor or a Subcontractor with the Contractor Immigration Warranty mandated by Paragraph 3 above shall remain confidential and shall not be made available for public review or produced in response to a public records request, unless the City is ordered or otherwise directed to do so by a court of competent jurisdiction.
32. ADVERTISING: Contractor shall not advertise or publish information concerning this Contract, without prior written consent of the City.
33. DELIVERY ORDERS: The City shall issue a Purchase Order for the material and/or services covered by this contract. All such documents shall reference the contract number as indicated on the Offer and Contract Award
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 8 of 34
34. FUNDING: Any contract entered into by the City of Peoria is subject to funding availability. Fiscal years for the City of Peoria are July 1 to June 30. The City Council approves all budget requests. If a specific funding request is not approved, the contract shall be terminated.
35. PAYMENT: A separate invoice shall be issued for each shipment of material or service performed, and no payment will be issued prior to receipt of material and/or services and correct invoice.
36. PROHIBITED LOBBYING ACTIVITIES: The Offeror, his/her agent or representative shall not contact, orally or in any written form any City elected official or any City employee other than the Materials Management Division, the procuring department, City Manager, Deputy City Manager or City Attorney’s office (for legal issues only) regarding the contents of this solicitation or the solicitation process commencing from receipt of a copy of this request for proposals and ending upon submission of a staff report for placement on a City Council agenda. The Materials Manager shall disqualify an Offeror’s proposal for violation of this provision. This provision shall not prohibit an Offeror from petitioning an elected official after submission of a staff report for placement on a City Council agenda or engaging in any other protected first amendment activity after submission of a staff report for placement on a City Council agenda.
37. PROHIBITED POLITICAL CONTRIBUTIONS: Consultant during the term of this Agreement shall not make a contribution reportable under Title 16, Chapter 6, Article 1, Arizona Revised Statutes to a candidate or candidate committee for any city elective office during the term of this Agreement. The City reserves the right to terminate the Agreement without penalty for any violation of this provision.
GENERAL
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 9 of 34
1. DEFINITIONS: The terms, as used in or pertaining to the contract, are defined as follows:
CITY: The word “City” shall refer to the City of Peoria, Arizona.
CONTRACTOR: The word “Contractor” is defined as the person, firm or corporation with whom the contract is made by the City.
CONTRACT: The word “Contract” will include the Invitation to Bid Notice, Instructions to Bidders, Bid, Bid Bond, Performance Bond, Payment Bond, Notice of Award, Notice to Proceed, Change Order, Certificate of Insurance & Schedule A, Certificate of Completion, Contractor’s Affidavit Regarding Settlement of Claims, Contractor’s Affidavit Certifying Non- Collusion in Bidding, Standard Terms & Conditions, General Terms & Conditions, Special Terms & Conditions, Technical Provisions, Performance Provisions, Plans and Addenda thereto.
ENGINEER: The word “Engineer” is defined as the person, firm or corporation duly authorized by the City to act as agent in providing professional services including studies, planning, engineering design and construction administration services, inspecting materials and construction, and interpreting plans and specifications.
MATERIALS: The word “Materials” will include, in addition to materials incorporated in the project, equipment and other material used and/or consumed in the performance of the work.
SUBCONTRACTOR: The word “Subcontractor” is defined as those persons or groups of persons having a direct contract with the contractor and those who furnish material worked to a special design according to the plans and/or specifications for this work, and includes those who merely furnish materials not so worked.
WORK: The word “Work” shall include all labor necessary to accomplish the construction required by the Contract and all materials and equipment incorporated or to be incorporated in said construction.
2. REFERENCE STANDARDS:
2.1. The “Uniform Standard Specifications for Public Works Construction” and the “Uniform Standard Details for Public Works Construction” which are sponsored and distributed by the Maricopa Association of Governments (MAG), and which are hereinafter referred to as the “MAG Specifications,” are hereby adopted as part of these contract documents.
2.2. July 15, 1997 by Section 23-50a of Ordinance 97-38, the City of Peoria adopted the “Uniform Standard Details for Public Works Construction from the Maricopa County Association of Governments by reference with certain exceptions.
A copy of these documents is kept on file at the Office of the City Clerk at the City of Peoria.
2.3. If any contradiction exists between “MAG Specifications” and this solicitation document, the solicitation language shall prevail.
3. LAWS AND REGULATIONS: The Contractor shall keep himself fully informed of all existing and future City and County ordinances and regulations and state and federal laws and Occupational Safety and Health Standards (OSHA) in any manner affecting the work herein specified. He shall at all times observe and protect and indemnify the City of Peoria, Arizona, and its officers and agents against any claim or liability arising from or based on the violation of any such ordinances, regulations or laws. It is the responsibility of the Contractor to obtain any and all information regarding the laws and regulations which may be referenced in the Specifications.
4. RIGHTS OF WAY: The City will provide Rights-of-Way and easements for all work specified in this contract, and the Contractor shall not enter or occupy with men, tools, equipment or materials any private ground outside the property of the City of Peoria, Maricopa County, Arizona, without the consent of the owner.
The Contractor, at his own expense, is responsible for the acquisition of any additional easements or rights-of-way that he may desire to complete the work of this contract.
5. PROPOSAL QUANTITIES: It is expressly understood and agreed by the parties hereto that the quantities of the various
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 10 of 34 classes of work to be done and the material to be furnished under this Contract, which have been estimated as stated in the Bids, are only approximate and are to be used solely for the purpose of comparing, on a consistent basis, the bids offered for the work under this Contract. The Contractor further agrees that the City of Peoria will not be held responsible if any of the quantities shall be found incorrect; and the Contractor will not make any claim for damages or for loss of profits because of a difference between the quantities of the various classes of work as estimated and the work actually done. If any error, omission, or misstatement is found to occur in the estimated quantities, the same shall not invalidate this Contract or the whole or any part of the work in accordance with the Specifications and Plans herein mentioned, and for the prices herein agreed upon and fixed therefore, or excuse him from any of the obligations or liabilities hereunder, or entitle him to any damage or compensation except as may be provided in this contract.
6. FEDERAL FUNDING: It is the responsibility of the Contractor to determine on any project if federal wage rates apply. It is also the responsibility of the Contractor to incorporate any necessary amounts in the bid to accommodate for required federal record keeping and necessary pay structures. The Contractor should contact the City of Peoria regarding any applicable Davis Bacon wage rates.
7. PAYMENTS TO CONTRACTOR: Payments will be made on the basis of itemized monthly statements provided by the Contractor in accordance with these requirements. An itemized statement should be submitted to the Office of the City Engineering Department. After verification, payments will be processed by the City Finance Department.
The owner by mutual agreement may make progress payments on contracts of less than ninety days and shall make monthly progress payments on all other contracts as provided for in this paragraph. Payment to the contractor on the basis of a duly certified and approved estimate of the work performed during the preceding calendar month under such contract may include payment for material and equipment, but to ensure the proper performance of such contract, the owner shall retain ten percent of the amount of each estimate until final completion and acceptance of all material, equipment and work covered by the contract. An estimate of the work submitted shall be deemed approved and certified for payment after seven days from the date of submission unless before that time the owner or owner's agent prepares and issues a specific written finding setting forth those items in detail in the estimate of the work that are not approved for payment under the contract. The owner may withhold an amount from the progress payment sufficient to pay the expenses the owner reasonably expects to incur in correcting the deficiency set forth in the written finding. The progress payments shall be paid on or before fourteen days after the estimate of the work is certified and approved. The estimate of the work shall be deemed received by the owner on submission to any person designated by the owner for the submission, review or approval of the estimate of the work.
When the contract is fifty percent completed, one-half of the amount retained including any securities substituted under paragraph 5 of this subsection shall be paid to the contractor upon the contractor's request if the contractor is making satisfactory progress on the contract and there is no specific cause or claim requiring a greater amount to be retained. After the contract is fifty percent completed, no more than five percent of the amount of any subsequent progress payments made under the contract may be retained if the contractor is making satisfactory progress on the project, except that if at any time the owner determines satisfactory progress is not being made, ten percent retention shall be reinstated for all progress payments made under the contract subsequent to the determination.
Upon completion and acceptance of each separate building, public work or other division of the contract on which the price is stated separately in the contract, except as qualified in paragraph 5 of this subsection, payment may be made in full, including retained percentages thereon, less authorized deductions. In preparing estimates, the material and equipment delivered on the site to be incorporated in the job shall be taken into consideration in determining the estimated value by the architect or engineer.
Ten percent of all estimates shall be retained by the agent as a guarantee for complete performance of the contract, to be paid to the contractor within sixty days after completion or filing notice of completion of the contract. Retention of payments by a purchasing agency longer than sixty days after final completion and acceptance requires a specific written finding by the purchasing agency of the reasons justifying the delay in payment. No purchasing agency may retain any monies after sixty days that are in excess of the amount necessary to pay the expenses the purchasing agency reasonably expects to incur in order to pay or discharge the expenses determined by the purchasing agency in the finding justifying the retention of monies. In lieu of the retention provided in this section, the agent, at the option of the contractor, shall accept as a substitute an assignment of
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 11 of 34 time certificates of deposit of banks licensed by this state, securities of or guaranteed by the United States of America, securities of this state, securities of counties, municipalities and school districts within this state or shares of savings and loan associations authorized to transact business in this state, in an amount equal to ten percent of all estimates, which shall be retained by the agent as a guarantee for complete performance of the contract. In the event the agent accepts substitute security as described in this paragraph for the ten percent retention, the contractor shall be entitled to receive all interest or income earned by such security as it accrues and all such security in lieu of retention shall be returned to the contractor by the agent within sixty days after final completion and acceptance of all material, equipment and work covered by the contract if the contractor has furnished the agent satisfactory receipts for all labor and material billed and waivers of liens from any and all persons holding claims against the work. In no event shall the agent accept a time certificate of deposit of a bank or shares of a savings and loan association in lieu of the retention specified unless accompanied by a signed and acknowledged waiver of the bank or savings and loan association of any right or power to setoff against either the agent or the contractor in relationship to the certificates or shares assigned.
In any instance where the agent has accepted substitute security as provided in paragraph 5 of this subsection, any subcontractor undertaking to perform any part of such public work shall be entitled to provide substitute security to the contractor upon terms and conditions similar to those described in paragraph 5 of this subsection, and such security shall be in lieu of any retention under the subcontract.
8. LOSSES AND DAMAGES: All loss or damage arising out of the nature of the work to be done or from the action of the elements or from any unforeseen circumstances in the prosecution of the same, or from any unusual obstructions or difficulties which may be encountered in and/or during the prosecution of the work, or from any casualty whatsoever of every description, shall be sustained and borne by the Contractor at his own cost and expense.
9. CHARACTER AND STATUS OF WORKMEN: Only skilled foremen and workmen shall be employed on work requiring special qualifications.
When required by the City Engineer, the Contractor shall discharge any person who is, in the opinion of the Engineer, disorderly, dangerous, insubordinate, incompetent, or otherwise objectionable. The Contractor shall keep the City harmless from damages or claims for compensation that may occur in the enforcement of this section.
The Contractor shall be responsible for assuring the legal working status of its employees and it’s subContractor’s employees.
10. WORK METHODS: The methods, equipment and appliances used on the work shall be such as will produce a satisfactory quality of work, and shall be adequate to complete the contract within the time limit specified.
Except as is otherwise specified, the Contractor’s procedure and methods of construction may, in general, be of his own choosing, provided they follow best general practice and are calculated to secure results which will satisfy the requirements of the specifications and the supervision of the work.
The work covered by this Contract shall be carefully laid out in advance and performed in a manner to minimize interference with normal operation and utilization of the roads. The Contractor shall exercise caution during the course of this construction work to avoid damage to all known existing or possible unknown existing underground utilities. He shall conduct his construction operations in such a manner as to avoid injury to his personnel and to avoid damage to all utilities. Any damage done will be repaired without delay and at the expense of the Contractor.
11. PRE-CONSTRUCTION CONFERENCE: Within 30 days of the issuance of the Notice of Award, the Contractor is required to attend a Pre-construction Conference. The city will contact the Contractor to schedule a specific date, time and location for the Pre-construction conference. The purpose of the meeting is to outline specific construction items and procedures and to address items which require special attention on the part of the Contractor. The Contractor may also present proposed variations in procedures which the Contractor believes may improve constructability of the project, reduce cost, or will reduce inconvenience to the public. Any necessary coordination and procedures for Construction inspection and staking will be addressed during the Pre-construction Conference. The Contractor will be required to provide the following information at the Pre-construction Conference:
Materials Management Procurement
9875 N. 85th Ave., 2nd Fl.
Peoria, Arizona 85345-6560
Rev(8/2023)CF Page 12 of 34
11.1. Names and emergency telephone numbers of key personnel involved in the project.
11.2. Names and telephone numbers of all subcontractors proposed for use on the project.
11.3. A construction progress schedule showing the estimated time for start and completion of the major items of work.
11.4. A payment schedule showing the estimated dollar volume of work for each calendar month during the life of the project.
11.5. A written proposal outlining the intended plans for maintaining continuous access to residences and businesses along the construction site, and traffic control.
11.6. An itemized list of all required shop drawings, material and equipment submittals and a schedule indicating the dates each of these items will be transmitted to the City for review.
Each of the above items is subject to the review and approval by the City.
12. NOTICE TO PROCEED: Within 45 days of the issuance of the Notice of Award the City may issue a written Notice to Proceed. The Notice to Proceed shall stipulate the actual contract start date, the contract duration and the contract completion date. The time required for the Contractor to obtain permits, licenses and easements shall be included in the contract duration and shall not be justification for a delay claim by the Contractor. The time required for the Contractor to prepare, transmit and obtain approval of applicable submittals shall be included in the contract duration and shall not be justification for a delay claim by the Contractor.
No work shall be started until after all required permits, licenses, and easements have been obtained.
No work shall be started until all applicable submittals have been submitted and returned approved by the Owner’s Representative.
The Contractor shall notify the City of Peoria’s project…
This is the start of the file's text. The full file is on GovTribe.