Statement of Work for Channel Islands National Park Sewage Pumping and Disposal

Channel Islands National Park has a requirement for sewage pumping and disposal, in an estimated three round trips (one round trip Santa Rosa Island, two round trips Santa Cruz Island).

The park will provide the transportation to and from the islands on the park owned landing craft and will depart from the Ventura Harbor Launch Ramp. The Landing Craft has a weight capacity of 100,000 pounds, and the well deck is 14 feet wide and 38 feet long.

- Landing Craft time from Ventura to Santa Rosa is 5 hours each way

- Landing Craft time from Ventura to Santa Cruz (Prisoners) is 3 hours

- Landing Craft time between Santa Cruz Prisoners and Scorpion is 1 hr

- Landing Craft time between Ventura and Santa Cruz (Scorpion) is 2.5 hours each way

- Time on each island estimated to be no more than 3 hrs each trip.

Park maintenance staff will accompany the truck on the islands at all times

Pumper truck volume must be not exceed 5,000 gallons and must be able to drive on rocky and sandy beaches.

Septic tank and vault toilet human waste to be pumped at multiple locations each island:

- Two separate septic tanks at Santa Rosa

- One vault toilet at Prisoners with two tanks of 500 to 1000 gallons each

- Four vault toilets at Scorpion with two tanks at each vault of 500 to 1000 gallons each

- One septic tank at Scorpion.

The Santa Cruz Island trips shall be scheduled in two different ways:

- One trip will begin by going to Prisoners first, then taking the landing craft to Scorpion to top off by pumping the septic tank, then vault toilets in that sequence

- The other trip will go only to Scorpion and pump the remaining vault toilets

Cost is to include truck, driver, and waste disposal. Documentation of proper waste disposal is required.