Deep_Creek_-_Site_Visit_Summary.doc

DOC document 112 KB Posted

Attached to
Install new water distribution mains and services at Deep Creek Campground
Solicitation number
P15PS01426
Issued by

About this file

Site Visit Summary

View the file

Other files

File Type Posted
Sol_P15PS01426_Amd_000001.pdf PDF
Deep_Creek_Specs_(2015)_1.pdf PDF
Clauses_-_UCF.docx DOCX document
Deep_Creek_Campground_Waterline_(half_size).pdf PDF
Sol_P15PS01426.pdf PDF
DB_WD_NC150061_dtd_1-2-15.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Great Smoky Mountains National Park

Facility Management Division National Park Service

U.S. Department of the Interior

Pre-Solicitation Meeting – DEEP CREEK WATERMAIN

1. Introductions / Roles and Responsibilities

2. Contracting Officer’s overview

3. GRSM Special Issues

a. Safety – wildlife, worksite, visitor, motorist

b. Communications – cell phones have limited coverage in the park

c. Environmental Topics– it’s a park, respect it as such

· Prevention of exotic weeds; clean equipment before bringing it into Park

· Cultural Resources – It is a historic district – archaeologist will be onsite during work.

· Natural Resources - Wildlife (bear management issues))

· Erosion control, Mulch, use of straw bales/straw mulch is not permitted for use in the park

· Food storage (lunch) – pack it in, pack it out, secure all food in a cab of a vehicle or equipment; do not store coolers in the beds of trucks, do not discard food waste in construction dumpsters. Remove food waste, wraps daily from the construction site

· Construction debris shall be removed from the park

· Spill Kits and pollution prevention

d. Law Enforcement – Expectations are contractor complies with all motor vehicle regulations and laws. Trucks to enter through closest entrance. No special provisions because your working for the Park.

e. Firearms – No carrying firearms while working

f. Inclement Weather Access – Access will not be permitted until snow removal NPS snow removal operations are complete unless otherwise stated

g. Progress meetings identify a reoccurring day that works for all parties and time (determine meeting frequency, weekly or bi-weekly). – Only required if project falls behind Additional Comments at Site Visit

· Pipe embedment zone will need to be material brought onto site (No native soil)

· Price shall include all 72 feet of Hose Ramps even if you don’t plan to run temporary service to Ranger Station.

· Park will provide seed, Contractor responsible to spread

· Erosion Control is only required if soil will run from site – perimeter silt fencing not expected

· Bacti testing on service lines not required – Disinfection is required

· Road Closures must be communicated days in advance to let campers know

· PRV used on temp system may be re-used inside vault.