Deep_Creek_-_Site_Visit_Summary.doc
DOC document 112 KB Posted
- Solicitation number
- P15PS01426
About this file
Site Visit Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_P15PS01426_Amd_000001.pdf | ||
| Deep_Creek_Specs_(2015)_1.pdf | ||
| Clauses_-_UCF.docx | DOCX document | |
| Deep_Creek_Campground_Waterline_(half_size).pdf | ||
| Sol_P15PS01426.pdf | ||
| DB_WD_NC150061_dtd_1-2-15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Great Smoky Mountains National Park
Facility Management Division National Park Service
U.S. Department of the Interior
Pre-Solicitation Meeting – DEEP CREEK WATERMAIN
1. Introductions / Roles and Responsibilities
2. Contracting Officer’s overview
3. GRSM Special Issues
a. Safety – wildlife, worksite, visitor, motorist
b. Communications – cell phones have limited coverage in the park
c. Environmental Topics– it’s a park, respect it as such
· Prevention of exotic weeds; clean equipment before bringing it into Park
· Cultural Resources – It is a historic district – archaeologist will be onsite during work.
· Natural Resources - Wildlife (bear management issues))
· Erosion control, Mulch, use of straw bales/straw mulch is not permitted for use in the park
· Food storage (lunch) – pack it in, pack it out, secure all food in a cab of a vehicle or equipment; do not store coolers in the beds of trucks, do not discard food waste in construction dumpsters. Remove food waste, wraps daily from the construction site
· Construction debris shall be removed from the park
· Spill Kits and pollution prevention
d. Law Enforcement – Expectations are contractor complies with all motor vehicle regulations and laws. Trucks to enter through closest entrance. No special provisions because your working for the Park.
e. Firearms – No carrying firearms while working
f. Inclement Weather Access – Access will not be permitted until snow removal NPS snow removal operations are complete unless otherwise stated
g. Progress meetings identify a reoccurring day that works for all parties and time (determine meeting frequency, weekly or bi-weekly). – Only required if project falls behind Additional Comments at Site Visit
· Pipe embedment zone will need to be material brought onto site (No native soil)
· Price shall include all 72 feet of Hose Ramps even if you don’t plan to run temporary service to Ranger Station.
· Park will provide seed, Contractor responsible to spread
· Erosion Control is only required if soil will run from site – perimeter silt fencing not expected
· Bacti testing on service lines not required – Disinfection is required
· Road Closures must be communicated days in advance to let campers know
· PRV used on temp system may be re-used inside vault.
File details come from the government source that posted it. Updated .