Pricing_Schedule.docx
DOCX document 15 KB Posted
- Attached to
- NABR-PV BATTS REPLACEMENT Federal contract opportunity
- Solicitation number
- P15PS01127
About this file
Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_ _A_P15PS01127.pdf | ||
| Q_ _A_P15PS01127.pdf | ||
| 5_NABR-PV_BATTS_-_BCIS-14.pdf | ||
| Sol_P15PS01127_Amd_000001.pdf | ||
| A_14_WD.docx | DOCX document | |
| PPQ.pdf | ||
| NABR_PV_BATTS_-_SOW-REV_1.doc | DOC document | |
| Sol_P15PS01127.pdf | ||
| Drawings_and_Photos.pdf | ||
| RFP_Package_B_M.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply Batteries for Photovoltaic System Natural Bridges National Monument, Utah
CONTRACT PRICE SCHEDULE
All Items or None
ITEM UNIT QTY PRICE TOTAL
| 1. Removal of old batteries | LS | 1 | $______ | $______ | |
| (disassembly, freight) |
| 2. Delivery | LS | 1 | $_______ | $______ | |
| (delivery of new batteries) |
| 3. 2V Flooded Lead Acid Batteries | EA | 216 | $_______ | $_______ | |
| (cost of new batteries less rebate | |||||
| from recycling old batteries) |
| 4. Installation of New Batteries | * | LS | 1 | $_______ | $________ |
| (labor, connection materials) |
OPTION LINE – to be performed no sooner than six months after battery installation and no later than nine months
5. Acceptance testing* LS 1 $_______ $________ (labor, equipment, report)
GRAND TOTAL $______
Notice: Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 270 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
*The Department of Labor Wage Determination applies to the installation services, line 4, and acceptance testing services, line 5.