PPQ.pdf

PDF 53 KB Posted

Attached to
NABR-PV BATTS REPLACEMENT Federal contract opportunity
Solicitation number
P15PS01127
Issued by
Department of the Interior National Park Service

About this file

Past Performance Questionairre

View the file

Other files for this federal contract opportunity

Other files attached to NABR-PV BATTS REPLACEMENT, newest first.
File Type Posted
Q_ _A_P15PS01127.pdf PDF
Q_ _A_P15PS01127.pdf PDF
Sol_P15PS01127_Amd_000001.pdf PDF
5_NABR-PV_BATTS_-_BCIS-14.pdf PDF
RFP_Package_B_M.rtf RTF text file
NABR_PV_BATTS_-_SOW-REV_1.doc DOC document
Sol_P15PS01127.pdf PDF
Drawings_and_Photos.pdf PDF
A_14_WD.docx DOCX document
Pricing_Schedule.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Performance Questionnaire Solicitation Title: Rehabilitate Bryce Point Trail, Bryce Canyon National Park

Name of Contractor:

Reference Contract / Project

a. Name of project:

b. Location of project:

c. Approximate completion date:

d. Approximate contract dollar amount:

e. Brief description of project and services provided:

Contact

a. Name of Contact & Organization represented:

b. Phone number (daytime):

c. Date contacted:

Reference Questions

Rating System

Rating * Rating Description

A The reference was extremely satisfied with the contractor’s performance. The contractor’s performance far exceeded the reference’s expectations.

B The reference was very satisfied with the contractor’s performance. The contractor’s performance exceeded the reference’s expectations

C The reference believes the contractor’s performance was satisfactory. The contractor’s performance only met the minimum contract requirements.

D The reference was very dissatisfied with the contractor’s performance. The contractor completed the work but their performance was just barely acceptable.

F The reference was extremely dissatisfied with the contractor’s performance.

* In addition the reference may note ratings at the top or bottom of each category with a + or – (i.e. A +, A-)

Please rate the contractor’s performance on the above listed project:

a. Quality of the contractor’s product or service:

b. Contractor’s ability to meet the contractual schedule:

c. Contractor’s staff or project team:

d. Contractor’s ability to manage the project documentation (the paperwork):

e. Contractor’s ability to quickly and adequately address issues that may have arisen after delivery or contract closeout:

f. Overall rating of the Contractor’s performance:

Additional reference comments:

Reference’s Printed Name: Title:

Reference’s Signature: Date:

File details come from the government source that posted it. Updated .