Atch_2_-_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Repair Replace JEFF Louvers, St. Louis, MO Federal contract opportunity
- Solicitation number
- P15PS00924
About this file
Atch 2 - Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P15PS00924.pdf | ||
| Atch_4_-_PPQ.doc | DOC document | |
| Appdx_A_-_Additional_Information.pdf | ||
| Atch_3_-_Wage_Determination.pdf | ||
| Atch_1_-_Stamp.pdf | ||
| Atch_1_-_Specifications.pdf | ||
| Atch_5_-_Consent_Letter_Sample.docx | DOCX document | |
| A13_-_Draft_Specifications.pdf | ||
| A13_-_Draft_P15PS00924_-_JEFF_Louvers.pdf | ||
| A13_-_Draft_Drawings.pdf | ||
| A13_-_P15PS00924_-_Presol_Notice.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SUB-SHEET TITLE
1 G-0.0 COVER SHEET
2 A-1.1 NORTH TRAM CONTROL FLOOR PLAN AND PARTIAL ROOF PLAN
3 A-1.2 SOUTH TRAM CONTROL FLOOR PLAN
4 M-0.1 NORTH TRAM CONTROL FLOOR PLAN - MECHANICAL DEMOLITION
5 M-0.2 SOUTH TRAM CONTROL FLOOR PLAN - MECHANICAL DEMOLITION
6 M-1.1 NORTH TRAM CONTROL FLOOR PLAN - MECHANICAL NEW WORK
7 M-1.2 SOUTH TRAM CONTROL FLOOR PLAN - MECHANICAL NEW WORK
1. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE
MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE
FOR DAMAGE TO SAME RESULTING FROM WORK UNDER THIS
CONTRACT. THE CONTRACTOR SHALL RESTORE DAMAGED
EXISTING BUILDING AND SITE MATERIALS TO THEIR ORIGINAL
CONDITION.
2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
SHALL BE RESPONSIBLE FOR THE SAME. COORDINATE ALL WORK
AND SHOP DRAWINGS WITH OTHER TRADES.
3. REPORT DISCREPANCIES IN THE DESIGN TO THE CONTRACTING
OFFICER PRIOR TO ANY DEMOLITION. CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCING WORK.
4. THE CONTRACTOR SHALL COORDINATE ALL TESTING AND
INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE
A COMPLETE AND SATISFACTORY INSTALLATION.
5. THE CONTRACTOR SHALL COORDINATE ON-SITE STORAGE OF
BUILDING MATERIALS, EQUIPMENT, AND TRASH CONTAINERS WITH
THE PARK.
6. ALL WORK SHALL COMPLY WITH LOCAL CODES AND ALL OTHER
APPLICABLE CODES, REGULATIONS, AND ORDINANCES.
7. ALL MATERIALS AND EQUIPMENT OF THE SAME TYPE SHALL BE
SUPPLIED BY THE SAME MANUFACTURER, AND SHALL BE NEW, OF
THE BEST QUALITY AND DESIGN, AND FREE FROM DEFECTS.
8. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS
EXISTING.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE
INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE
RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL
COORDINATE INSTALLATION BETWEEN THE TRADES.
10. CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL
MECHANICAL AND ELECTRICAL ITEMS WITH THE GENERAL
CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER OF ANY DISCREPANCIES PRIOR TO INSTALLATION AND/OR
FABRICATION.
11. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A
MAIN LEVEL FINISH FLOOR DATUM OF 100'-0". WHERE ITEMS ARE
LABELED A.F.F. (ABOVE FINISHED FLOOR), CONTRACTOR SHALL SET
THE ITEM AS MEASURED FROM THE LOCAL FLOOR ELEVATION.
COORDINATE ANY DISCREPANCIES REGARDING THIS SITUATION TO
ASSURE THAT ALL BUILDING COMPONENTS ARE PROPERLY SET TO
FUNCTION AS INTENDED. CONTRACTOR SHALL ERECT ALL
PARTITIONS IN A VERTICAL PLANE, NOT NECESSARILY
PERPENDICULAR TO THE FLOOR.
12. IT IS THE INTENT OF THIS CONTRACT THAT ALL AREAS AFFECTED BY
CONSTRUCTION SHALL PROVIDE A FINISHED AND COMPLETE
PROJECT, UNLESS NOTED OTHERWISE. CONTRACTOR SHALL
PATCH, REPAIR, AND ADJUST AS REQUIRED TO ACHIEVE THIS
FINISHED PROJECT.
13. THE BUILDING, LANDSCAPE AND SURROUNDINGS IS ON THE
NATIONAL REGISTER OF HISTORIC PLACES. THE ENTIRE SITE IS A
HISTORIC PROPERTY AND ALL REASONABLE PRECAUTIONS SHALL
BE TAKEN TO PREVENT COLLATERAL DAMAGE TO HISTORIC
MATERIALS SURROUNDING THE WORK AREA. IF DAMAGE OCCURS,
REPAIRS SHALL BE MADE AT NO ADDITIONAL COST TO THE
GOVERNMENT TO THE SATISFACTION OF THE CONTRACTING
OFFICER. EVERY OPPORTUNITY SHOULD BE TAKEN TO PRESERVE,
REPAIR AND CONSERVE HISTORIC MATERIALS AND DESIGNS.
COORDINATE ALL NEW PENETRATIONS AND ANY ALTERATIONS TO
THE BUILDING WHICH MIGHT AFFECT THE HISTORIC INTEGRITY OF
THE BUILDING WITH THE CONTRACTING OFFICER PRIOR TO
BEGINNING WORK.
14. "REMOVE" MEANS TO DEMOLISH AND DISPOSE OF AN ITEM OFF OF
NPS PROPERTY.
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
MIDWEST REGIONAL OFFICE
INSTALL ACCESS PORTALS AND PERFORM COMPONENT
RENEWAL OF ARCH LOUVER SYSTEM
ST. LOUIS, MISSOURI
JEFFERSON NATIONAL EXPANSION MEMORIAL
KJH
NAS
DCF
03-26-15
FINAL CD SUBMITTAL
THERE ARE NO KNOW ASBESTOS-CONTAINING MATERIALS (ACM) IN THE PROJECT WORK AREAS. IF, DURING REMOVAL WORK, THE CONTRACTOR DISCOVERS ANY MATERIAL WHICH HE SUSPECTS MAY CONTAIN ASBESTOS, HE SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. THE CONTRACTING OFFICER WILL THEN ARRANGE FOR
TESTING AND REMOVAL OF ANY ACM.
THE GOVERNMENT HAS INDICATED THAT ALL PAINTED STEEL WITHIN THE ARCH LEGS IS PAINTED WITH LEAD BASED PAINT (LBP). IF, DURING REMOVAL AND/OR INSTALLATION WORK, THE CONTRACTOR DISTURBS ANY LBP IN A MANNER THAT WOULD CREATE DUST AND/OR TOXIC FUMES, HE MUST REMEDIATE ALL AFFECTED SURFACES IN ACCORDANCE WITH ALL GOVERNMENTAL REGULATIONS IN ORDER TO PERFORM HIS WORK FOR THIS CONTRACT. THE USE OF BOLTED CONNECTIONS IN LIEU OF WELDED CONNECTIONS IS ENCOURAGED IN ORDER TO MINIMIZE UNNECESSARY
DISTURBANCE OF LBP.
A1.1
A
A1.1
B
A1.1 C
A1.1
D
A1.1
E
A1.2
A
A1.2
B
A1.2
C
3-26-15
NPS JNEM ARCH
124323
186472
3/26/15
MRG
MRG
STA
NORTH TRAM CONTROL
FLOOR PLAN -
MECHANICAL DEMOLTION
124323
186472
3/26/15
MRG
MRG
STA
SOUTH TRAM CONTROL
MECHANICAL DEMOLITION
124323
186472
3/26/15
MRG
MRG
STA
NORTH TRAM CONTROL
MECHANICAL NEW WORK
124323
186472
3/26/15
MRG
MRG
STA
SOUTH TRAM CONTROL
FLOOR PLAN -
MECHANICAL NEW WORK
| 01_G-0.0 |
| 02_A-1.1 |
| 03_A-1.2 |
| 04_M-0.1 |
| 05_M-0.2 |
| 06_M-1.1 |
| 07_M-1.2 |