BID: Submit bid for all items. In case of error in the extension of prices, unit price governs. In case of error in summation, the total of the corrected amounts governs. Quantities for unit price bid items are estimated, but payment will be made only for actual quantities of work completed.
| Item |
| Description |
| Unit |
| Unit Cost |
| Total |
| Item 1 |
| Botzum Trailhead: 2928 Riverview Road, Akron 44067 |
| 1a |
| In three areas totaling 1610 sq yards - Grind 6-inches asphalt and replace with 3.25-inches of #304 aggregate and 2.75-inches of ODOT 448 asphalt intermediate course Type II Medium |
| 8400 sq |
yards $ /sq yd
| 1b |
| In one area totaling 325 sq yards - Grind 24-inches asphalt and replace with geotextile fabric, 12-inches of No. 1&2 aggregate, 9.25-inches of #304 aggregate and 2.75-inches of ODOT 448 asphalt intermediate course Type II Medium |
| 325 sq yards |
| $ /sq |
| 1c |
| Replace Storm Drain under pavement - 10-inch diameter x 162-feet long |
| 162 lf |
| $ /lf |
| 1d |
| Grind 2-inches asphalt surface to match grade to existing pavement at road and trail |
| LS |
| 1e |
| Install 2400 sq yards of 2-inches of ODOT 448 asphalt surface course Type I Medium |
| 2400 sq |
yards $ /sq
| 1f |
| Reinstall Parking counter loop |
| LS |
| 1g |
| Install yellow parking striping for 121 spaces, 5 accessible spaces with aisles & 1 van accessible with aisle |
| LS |
| 1h |
| Install topsoil edging around entire parking area and islands 3200-feet x 1-foot x 2-inches deep, seed and mulch |
| 3200 sq |
feet $ /sq ft
1 SUB TOTAL
| OPTION 1 |
| Botzum Trailhead Repave Walkways - In 190 sq yard area of walkway, grind 2-inches asphalt and install 2-inches of ODOT 448 asphalt surface course Type I Medium to match grade to existing pavement at curb, kiosk and bollards. |
| 190 sq yard |
| $ /sq |
| OPTION 2 |
| Botzum Trailhead Storm sewer & catch basin replacement - Replace remainder of storm drains 10-inch diameter x 420-feet long and replace three catch basins with new 2-foot square concrete open bottom catch basin. |
| LS |
| Item 2 |
| Bike and Hike Trailhead: 315 Boston Mills Road, Boston Heights 44236 |
| 2a |
| Grind 2-inches asphalt surface to match grade to existing pavement at both road entrances |
| LS |
| 2b |
| Install 845 sq yards of 2-inches of ODOT 448 asphalt surface course Type I Medium |
| 845 sq yards |
| $ /sq |
| 2c |
| Reinstall parking counter loop |
| LS |
| 2d |
| Install yellow parking striping for 8 spaces, 1 accessible space with aisle to bulletin board |
| LS |
| 2e |
| Install topsoil edging around entire parking area and islands 560-feet x 1-foot x 2-inches deep, seed and mulch |
| 560 sq |
feet $ /sq
2 SUB TOTAL
| OPTION 3 |
| Bike and Hike Trailhead Replace 2 road side culverts – Two at 12-inch diameter x 30-feet long |
| LS |
| Item 3 |
| Happy Days Lodge, South Lot: 501 W Streetsboro Road, Peninsula, OH 44264 |
| 3a |
| Entrance Drive - Grind 10.75-inches of 800 sq yards asphalt surface in drive. Install geotextile fabric, 6- inches #304 aggregate and 2.75-inches of ODOT 448 asphalt intermediate course Type II Medium and 2- inches of ODOT 448 asphalt surface course Type I Medium |
| 800 sq yards |
| $ /sq |
| 3b |
| Entrance Drive - Reinstall Parking counter loop |
| LS |
| 3c |
| Parking Area – Remove existing asphalt 880 sq yards, catch basin and piping |
| LS |
| 3d |
| Parking Area - Install new drainage system: New 2-foot square concrete open bottom catch basin with 135-feet x 4-inch diameter ridged schedule 40 PVC w/ 2 sets of 5/8-inch perforation holes at 6” o.c. in 3-foot x 2-foot trench filled with No. 4 crushed washed river gravel. In wooded area for 35-feet, install 6-inches of No. 57 washed river gravel over trench with geotechnical fabric to separate topsoil from stone. |
| LS |
| 3e |
| Parking Area - Install 40-ft Sandstone B & C Rip Rap (30 tons) with No. 57 wash river gravel (10 tons) as bedding at outlet |
| LS |
| 3f |
| Parking Area – Fine grade to proposed grades, install geotextile fabric, 6-inches No. 304 aggregate and 2.75- inches of ODOT 448 asphalt intermediate course Type II Medium and 2-inches of ODOT 448 asphalt surface course Type I Medium |
| 880 sq yards |
| $ /sq |
| 3g |
| Install yellow parking striping for 11 spaces, 6 accessible spaces with aisles & crosswalks |
| LS |
| 3h |
| Install topsoil edging around entire parking area and islands 1050-feet x 1-foot x 2-inches deep, seed and mulch |
| 1050 sq |
feet $ /sq
3 SUB TOTAL
| OPTION 4 |
| Happy Days Lodge Walkway asphalt replacement - Grind 2-inches & install 2-inches asphalt on approaches and landings to steps either side of tunnel – 38 sq yards on south side and 50 |
| LS |
sq yards on north side
| OPTION 5 |
| Happy Days Lodge Tunnel asphalt replacement - Remove 2-inches asphalt in tunnel & install 2-inches asphalt – 45 sq yards. Allow drainage with 0.5% grade crowning in middle of tunnel. Paint both tunnel sides 24-inches up from asphalt by approx. 80-feet long with specialized white sealer and topcoat. |
| LS |
OPTION
| Happy Days Lodge Tunnel asphalt overlay- Install 2-inches asphalt – 45 sq yards. Allow drainage with 0.5% grade crowning in middle of tunnel. Paint both tunnel sides 24-inches up from asphalt by approx. 80-feet long with specialized white sealer and topcoat. |
| LS |
| Item 4 |
| Sealing, Crack filling, Striping parking lots |
9329 Riverview Road: 50,000 Sq. Ft.
15610 Vaughn Road: North 10,600 Sq. Ft.
15610 Vaughn Road: South 6,700 Sq. Ft.
Sq. Ft. is lot size 67300 sq ft
Items 1-4 SubTotal Total totaTotalTotal 1- 3
Overhead 15%
Profit 10%
Bonds 3%
TOTAL
Options 1-6 Sub Total
Overhead 15%
Profit 10%
Bonds 3%
Option TOTAL
TOTAL w/ OPTIONS