Modification_0004_Question_and_Answer_Documents.docx

DOCX document 17 KB Posted

Attached to
NPS GNP Prefab Comm Shelter with Tower Federal contract opportunity
Solicitation number
P15PS00743
Issued by
Department of the Interior National Park Service

About this file

Amendment Four Question and Answer

View the file

Other files for this federal contract opportunity

Other files attached to NPS GNP Prefab Comm Shelter with Tower, newest first.
File Type Posted
Sol_P15PS00743_Amd_000004.pdf PDF
Sol_P15PS00743_Amd_000003.pdf PDF
Modification_0003_Question_and_Answer_Documents.docx DOCX document
Modification_0002_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000002.pdf PDF
Modification_0001_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000001.pdf PDF
Sol_P15PS00743.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P15PS00743

Prefabricated Communications Shelter with Tower QUESTION: The wind loading on the towers cannot be calculated without knowing the model number (size) of the antennas or the height at which they will be located on the tower and size of coax needed.

ANSWER:

2 Each VFH is Telewave ANT 150F2 2 Each UHF is Telewave ANT 400F2 2 Each Microwave is Ubiquiti Air Fiber 5 2 Each Dipole is a Telewave ANT 450D6-9 With a 20 foot mast.

QUESTION: Does the foot print include the when the tower is laid down.

ANSWER: We are not considering the tower as part of the footprint only the shelter. Footprint is only for the shelter, they do not have to consider the tower when it’s lowered.