Amendment Three Questions and Answer Document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P15PS00743_Amd_000004.pdf | ||
| Modification_0004_Question_and_Answer_Documents.docx | DOCX document | |
| Sol_P15PS00743_Amd_000003.pdf | ||
| Sol_P15PS00743_Amd_000002.pdf | ||
| Modification_0002_Question_and_Answer_Documents.docx | DOCX document | |
| Modification_0001_Question_and_Answer_Documents.docx | DOCX document | |
| Sol_P15PS00743_Amd_000001.pdf | ||
| Sol_P15PS00743.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P15PS00743
Amendment Three QUESTION: Does the tower have to be lowered with the antennas installed?
ANSWER: Yes
QUESTIONL Can the tower be guyed to support the antenna loading?
ANSWER: No
QUESTION: The weight of the integrated building and tower far surpassed the lift capacity of the helicopters in the region. Can some assembly be done on the mountain?
ANSWER: Yes. How this all comes together will be left to the contractor , however they need to remember ther flight restriction of 10 flights.
QUESTION: No reference is made to entry ports on the building for the coaxes.
ANSWER: It was in the scope of work. We need a 9 port entry for 1/2 inch coax.
QUESTION: No reference is given for the electrical requirements for the building if any.
ANSWER: It was in the scope of work. Site has commercial power and we need the shelter able to take the commercial power.
QUESTION: Can the building be anchored via drilled anchors or ballasted mats?
ANSWER: Preference is ballast however we will differ to the contractor’s recommendations.
QUESTION: We have not had good success with Faraday grounding protection. Will any other types of grounds be required?
ANSWER: No.
QUESTION: Is overnight camping allowed at or near the site?
ANSWER: Yes but limited number of nights. No more than 3 nights will be approved.
QUESTION: Clarify the statement " electrical will be installed by park personnel under direction of the contractor".
ANSWER: This means the shelter needs to have the ability for the commercial power. Park electrician will connect the power to the shelter.
QUESTION: Are any electrical permits or inspections required?
ANSWER: No