About this file

Amendment Three Questions and Answer Document

View the file

Other files for this federal contract opportunity

Other files attached to NPS GNP Prefab Comm Shelter with Tower, newest first.
File Type Posted
Sol_P15PS00743_Amd_000004.pdf PDF
Modification_0004_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000003.pdf PDF
Sol_P15PS00743_Amd_000002.pdf PDF
Modification_0002_Question_and_Answer_Documents.docx DOCX document
Modification_0001_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000001.pdf PDF
Sol_P15PS00743.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P15PS00743

Amendment Three QUESTION: Does the tower have to be lowered with the antennas installed?

ANSWER: Yes

QUESTIONL Can the tower be guyed to support the antenna loading?

ANSWER: No

QUESTION: The weight of the integrated building and tower far surpassed the lift capacity of the helicopters in the region. Can some assembly be done on the mountain?

ANSWER: Yes. How this all comes together will be left to the contractor , however they need to remember ther flight restriction of 10 flights.

QUESTION: No reference is made to entry ports on the building for the coaxes.

ANSWER: It was in the scope of work. We need a 9 port entry for 1/2 inch coax.

QUESTION: No reference is given for the electrical requirements for the building if any.

ANSWER: It was in the scope of work. Site has commercial power and we need the shelter able to take the commercial power.

QUESTION: Can the building be anchored via drilled anchors or ballasted mats?

ANSWER: Preference is ballast however we will differ to the contractor’s recommendations.

QUESTION: We have not had good success with Faraday grounding protection. Will any other types of grounds be required?

ANSWER: No.

QUESTION: Is overnight camping allowed at or near the site?

ANSWER: Yes but limited number of nights. No more than 3 nights will be approved.

QUESTION: Clarify the statement " electrical will be installed by park personnel under direction of the contractor".

ANSWER: This means the shelter needs to have the ability for the commercial power. Park electrician will connect the power to the shelter.

QUESTION: Are any electrical permits or inspections required?

ANSWER: No