Modification_0001_Question_and_Answer_Documents.docx
DOCX document 15 KB Posted
- Attached to
- NPS GNP Prefab Comm Shelter with Tower Federal contract opportunity
- Solicitation number
- P15PS00743
About this file
Amendment One Question and Answer Doc
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_P15PS00743_Amd_000004.pdf | ||
| Modification_0004_Question_and_Answer_Documents.docx | DOCX document | |
| Sol_P15PS00743_Amd_000003.pdf | ||
| Modification_0003_Question_and_Answer_Documents.docx | DOCX document | |
| Sol_P15PS00743_Amd_000002.pdf | ||
| Modification_0002_Question_and_Answer_Documents.docx | DOCX document | |
| Sol_P15PS00743_Amd_000001.pdf | ||
| Sol_P15PS00743.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
What is the max weight that can be carried by the helicopter?
Weight capacity of helicopter depends on the type of helicopter the contractor gets. The contractor is responsible for getting the helicopter. The Park is responsible for get the necessary permits to fly in the Park Will they be putting the shelter on the deck on site or can we have the entire product airlifted to the site?
We are NOT doing any of the installation, installation will be handled by the contractor. How the shelter and tower are installed will be left to the contractor. Flights are authorized however there is a limit on the number available. We will need to know the total of flight needed to complete the project.
What do they want in the shelter in the way of lighting, HVAC etc?
Lighting will be required. HVAC required unless the building is well insulated for a mountain top site at 5,500' and some kind of ventilation is included