Modification_0001_Question_and_Answer_Documents.docx

DOCX document 15 KB Posted

Attached to
NPS GNP Prefab Comm Shelter with Tower Federal contract opportunity
Solicitation number
P15PS00743
Issued by
Department of the Interior National Park Service

About this file

Amendment One Question and Answer Doc

View the file

Other files for this federal contract opportunity

Other files attached to NPS GNP Prefab Comm Shelter with Tower, newest first.
File Type Posted
Sol_P15PS00743_Amd_000004.pdf PDF
Modification_0004_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000003.pdf PDF
Modification_0003_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000002.pdf PDF
Modification_0002_Question_and_Answer_Documents.docx DOCX document
Sol_P15PS00743_Amd_000001.pdf PDF
Sol_P15PS00743.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

What is the max weight that can be carried by the helicopter?

Weight capacity of helicopter depends on the type of helicopter the contractor gets. The contractor is responsible for getting the helicopter. The Park is responsible for get the necessary permits to fly in the Park Will they be putting the shelter on the deck on site or can we have the entire product airlifted to the site?

We are NOT doing any of the installation, installation will be handled by the contractor. How the shelter and tower are installed will be left to the contractor. Flights are authorized however there is a limit on the number available. We will need to know the total of flight needed to complete the project.

What do they want in the shelter in the way of lighting, HVAC etc?

Lighting will be required. HVAC required unless the building is well insulated for a mountain top site at 5,500' and some kind of ventilation is included

File details come from the government source that posted it. Updated .