act_Bid_Schedule_for_Impacted_Soil_Remediation_.pdf

PDF 76 KB Posted

Attached to
Devil's Postpile Impacted Soil Remediation Federal contract opportunity
Solicitation number
P15PS00694
Issued by
Department of the Interior National Park Service

About this file

Contract Price Schedule and Instruction Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Devil's Postpile Impacted Soil Remediation, newest first.
File Type Posted
Pre_Bid_Meeting_Minutes_20150604.pdf PDF
Sol_P15PS00694_Amd_000005.pdf PDF
Pre-proposal_Sign_In.pdf PDF
CPS_P15PS00694_Impacted_Soil_Remediation_Revised_June_24_2015.pdf PDF
SOW_P15PS00694_Impacted_Soil_Remediation_Revised_06242015.pdf PDF
FINAL_SOW_Impacted_Soil_Remediation_20150612.pdf PDF
Sol_P15PS00694_Amd_000004.pdf PDF
P15PS00694_Amendment_000004_Q A.pdf PDF
Sol_P15PS00694_Amd_000003.pdf PDF
Sol_P15PS00694_Amd_000002.pdf PDF
SOW_Impacted_Soil_Mitigation_R2.pdf PDF
Sol_P15PS00694_Amd_000001.pdf PDF
Key_Personnel_Qualifications.docx DOCX document
DB_WG_CA150029_5-8-2015.pdf PDF
Final_EE-CA_Report.pdf PDF
General_References.docx DOCX document
SOW_Impacted_Soil_Remediation_R1.pdf PDF
Past_Performance_Questinnaire.docx DOCX document
Sol_P15PS00694.pdf PDF
P15PS00694_DEPO_Soil_Remediation.pdf PDF
Subcontractor_Reference.docx DOCX document
Pre-Solicitation_DEPO_Soil_Mitigation_Project.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PRICE SCHEDULE

SOLICITATION NO. P15PS00694

PROJECT AREA: Devils Postpile National Monument

PROJECT TITLE: IMPACTED SOIL REMEDIATION

NOTICE: Offers’ are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Additive line items. Failure to do so may render this proposal unacceptable. On lump‐sum (LS) line items, provide the total price only. For all unit‐price (UP) line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM TITLE

QTY

UNIT

PRICE

UNIT OF

MEASURE

TOTAL

PRICE

Prepare Schedule and Conduct Conference Call

1 $ Lump

Prepare Plans – Project Plans/Action Plan, Site Specific Health and Safety Plan, and Sampling and Analysis Plan HASP, Sampling and Analysis Plan

1 $ Lump

3.1 Removal Actions – Clear and Stockpile, Confirmation Sample Collection and Analysis, Load Trucks

1 $ Lump

3.2.1 Transportation – Non-Hazardous Waste Transport to Landfill

1 $ Trip

3.2.2 Transportation – Hazardous Regulated Waste 2Transport to RCRA Landfill

1 $ Trip

3.2.3

Disposal – Disposal Fees for Non- Hazardous Waste

1 $ Ton

3.2.4 Disposal – Disposal Fees for Hazardous Regulated Waste

1 $ Ton

4 Composite Sampling 1 $ Lump $ 5 Site Survey 1 N/A 6 Meetings/Conference Calls 1 $ Lump $ 7 Prepare Reports 1 $ Lump $

TOTAL PROPOSED PRICE

(Contract Line Item Numbers 1 through 9)