Technical_(Go_No-go_evaluation_factor).pdf

PDF 64 KB Posted

Attached to
REPLACE ROOFS ON TWO HISTORIC STRUCTURES Federal contract opportunity
Solicitation number
P15PS00148
Issued by
Department of the Interior National Park Service

About this file

Evaluation factor

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE ROOFS ON TWO HISTORIC STRUCTURES, newest first.
File Type Posted
Sol_P15PS00148_Amd_000001.pdf PDF
Sol_P15PS00148.pdf PDF
SOW_JICA_Wood_Shake_Roofing.pdf PDF
Wage_Determination.pdf PDF
Technical_(Go_No-go_evaluation_factor).docx DOCX document
SOW_JICA_Wood_Shake_Roofing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical (Go No-go evaluation factor) and Price Proposals

This RFP will require submission of Technical (Go No-go evaluation factor) and Price Proposals.

In accordance with FAR Subpart 15.101-2 and 15.305(a)(2)(i), award will be based on the lowest evaluated price of the proposal meeting or exceeding the acceptability standard of the Go no-go evaluation factor set forth herein. In other words, relevant past performance will be evaluated to determine whether it meets or exceeds the acceptability standards set forth in the stated technical factors.

However, FAR 15.3055(a)(2)(ii) is not applicable to this solicitation.

Contractors that fail to response to the Go no-go factor will not be given further consideration. Pursuant to FAR 15.305(b), the government reserves the right to reject all proposals received in response to this solicitation if doing so is in the best interest of the government.

Technical Requirement

• Demonstrates capability to install pine shake roofing on buildings of comparable scope and complexity o Provide descriptions and references for two similar projects completed within the last three (3) calendar years complete with references, the Government may at its discretion contact selected references to verify relevant information provided or seek additional clarification including information that the contractor was capable, efficient and effective and that the contractor’s performance conformed to the terms and conditions of its contract.

Price proposal

The price proposal shall include a lump sum price for all of the work required herein along with a cost break down showing the hourly rates for the prime and consultants, in addition cost for overhead, material, profit, insurance and bonding.